ATTACHMENT J-17 Fire Extinguisher Log.docx
DOCX document 233 KB Posted
- Attached to
- Operation and Maintenance of Philadelphia Inactive Vessels and CG/LSD Modernization Detachment Norfolk
- Solicitation number
- N00024-21-R-4203
About this file
This document contains two fire extinguisher inspection log templates and guidelines for inspecting CO2 fire extinguishers on board ships. The templates include sections for recording inspection dates, discrepancies found, and corrections made. Inspection items cover verifying the presence and condition of CO2 cylinders, hoses, fittings, valves, pins, and seals. The related federal contract opportunity is solicitation number N00024-21-R-4203 for operation and maintenance services of inactive Philadelphia vessels and the CG/LSD Modernization Detachment in Norfolk. Proposals must be received by November 1, 2021. The soliciting agency is the Department of the Navy Naval Sea Systems Command.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Periodicity:
Spec Code:
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
CO1
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item CO2 cylinders are in place on board?
Check latest hydrostatic test data stamped on cylinder dome. Inspection card in place and up to date.
Hose and horn are free of deterioration and fittings are tight?
CO2 band and clamp assembly in satisfactory condition?
The extinguisher valve, handle, locking pin and D-ring are free of damage and corrosion?
Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 Bottles (visual) FWD Draft:
AFT Draft:
List:
Comments:
Inspector Inspector Inspection Manager
Attachment 17 NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:
Line Item # Location Discrepancy Discovery Dt Correction Dt
Periodicity:
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
CO2
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item CO2 cylinders are in place on board?
Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 cylinders are of proper weight?
CO2 Bottles (Weigh) FWD Draft:
AFT Draft:
List:
Comments:
Inspector Inspector Inspection Manager
NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing
Line Item # Location Discrepancy Discovery Dt Correction Dt
File details come from the government source that posted it. Updated .