ATTACHMENT J-15 Arrival Inspection.docx

DOCX document 232 KB Posted

Attached to
Operation and Maintenance of Philadelphia Inactive Vessels and CG/LSD Modernization Detachment Norfolk
Solicitation number
N00024-21-R-4203
Issued by

About this file

This document contains an arrival inspection checklist for inactive vessels in Philadelphia and Norfolk. The checklist outlines 34 inspection items to assess the condition of mooring lines, flood markers, watertight integrity, hazardous materials, safety equipment, electrical systems, draft readings and other vessel details. Records and equipment are to be properly secured. The related federal contract opportunity is solicitation number N00024-21-R-4203 for operation and maintenance of the inactive vessels and detachment in Norfolk. Proposals are due by November 1, 2021 for this Department of the Navy, Naval Sea Systems Command contract.

View the file

Other files

File Type Posted
QA Master List 2 Nov 2021.xlsx XLSX spreadsheet
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001_Rev1.xlsx XLSX spreadsheet
N00024-21-R-4203 Conformed through Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0006.pdf PDF
N00024-21-R-4203 Amendment 0005.pdf PDF
QA Master List 12 Oct 2021.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0004.pdf PDF
N00024-21-R-4203 Amendment 0003.pdf PDF
N00024-21-R-4203 Amendment 0002.pdf PDF
QA Master List 06 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-22 INACTSHIPMAINTO Philadelphia Organizational Chart .pdf PDF
N00024-21-R-4203 Amendment 0001_rev1.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Amendment 0001.xlsx XLSX spreadsheet
N00024-21-R-4203 Amendment 0001.pdf PDF
QA Master List 05 Oct 2021.xlsx XLSX spreadsheet
ATTACHMENT J-12 Dehumidification.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J-7 Janitorial Task and Frequency Chart.xlsx XLSX spreadsheet
Attachment J-20 Quality Assurance Surveillance Plan.doc DOC document
ATTACHMENT J-17 Fire Extinguisher Log.docx DOCX document
ATTACHMENT J-3 VESSELS.xls XLS spreadsheet
ATTACHMENT J-19 PCB Inventory.doc DOC document
ATTACHMENT J-10 Tools and Material.xls XLS spreadsheet
CDRL33_36.pdf PDF
CDRL41_44.pdf PDF
ATTACHMENT J-6 History Folder Index.docx DOCX document
CDRL17-20.pdf PDF
ATTACHMENT J-8 GFE from NAVY ERP.xls XLS spreadsheet
ATTACHMENT J-9 Vehicles.xlsx XLSX spreadsheet
CDRL13-16.pdf PDF
CDRL45-48.pdf PDF
CDRL29-32.pdf PDF
CDRL53-54.pdf PDF
N00024-21-R-4203 RFP.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
Exhbt B - Past Performance Data.docx DOCX document
CDRL05_08.pdf PDF
Attachment J-21 DD 254 for N00024-21-R-4203.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
CDRL49-52.pdf PDF
CDRL37_40.pdf PDF
ATTACHMENT J-16 Security Report.doc DOC document
CDRL21-24.pdf PDF
ATTACHMENT J-5 RRWO.docx DOCX document
CDRL09_12.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
ATTACHMENT J-13 Fire and Flood.docx DOCX document
ATTACHMENT J-14 Integrity Inspection.docx DOCX document
ATTACHMENT J-18 Mooring.xlsx XLSX spreadsheet
CDRL01_04.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Mooring lines, chains, wire ropes, and camels are adequate and properly secured? Check for signs of wear, damage and preservation.

Flood markers are at the waterline on the bow and stern and visible from a distance to detect a change in draft.

Brow is properly placed, secure and safe.

Topside Watertight doors, hatches and scuttles are secured from the inside or padlocked from the outside? (All doors and hatches shall be secured to allow opening from the inside in case of emergency) Emergency exit(s) to vessels weather decks other than Main Access can only be opened from the inside of the ship and the route and hatch are plainly marked.

Classified material storage is secure?

Storerooms are locked and secured Pilferable gear locker is locked or welded shut?

Ships records are properly secured?

Bilges, voids and open tanks are free of oil, water and trash?

Internal above waterline spaces are weather-tight and dry.

Fire hazards are removed. (Flammable materials, trash, etc.)

Mechanical safety devices: lifelines, safety chains at ladders, hatches and scuttles are installed and in good working order.

Is vessel electrically safe? Wiring safe and adequate, rubber matting properly placed in front of all energized equipment.

Items on PCB inventory (transformers and capacitors) inspected for leaks. No leakage observed?

Hazardous Material/Waste has been removed.

Ships exterior preservation is in good condition. Update COF as required.

Main Access has fire bulletin posted, fire bottles are in place and a Sign-In Log available and being utilized?

Is Lighting in compartments at a minimum of 50%?

Have all safety hazards been reported? If not list compartment / location and nature of hazard.

Verify condition of mooring lines and chaffing gear. Water is free of obstructions which may jeopardize the hull?

Air condition and refrigeration units are pumped down and isolated. Where refrigerant has been evacuated from equipment and charged with nitrogen is pressure holding? (3-5 psig) All insulating material has been sealed to prevent possible spread of asbestos?

All sea valves are blank flanged with valves shut tight and seizing wire is adequate to prevent opening at valve.

ARRIVAL INSPECTION

Attachment 14 All Emergency Beacons have been removed from the ship?

Manhole screens and deck plates in place and secured properly.

All weather deck openings; stacks, ventilation intakes and exhaust, hatches, port holes, stuffing tubes; sealed?

COF items checked and updates made to the MR?

Record FWD, AFT Draft and ships List. Changes identified since last inspection?

Ships Records are properly secured in History Folders in Building 545?

TAG-OUT log updated? List / Identify any unterminated cables.

Shaft and Rudder Locks are in place and properly mounted? Locks are undamaged?

Stern tube(s) packing glands are watertight and dry (adequate packing gland available for additional adjustments)?

Have all other discrepancies been reported? If not report them here.

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt