Attachment E - Price Proposal Form.docx
DOCX document 36 KB Posted
- Solicitation number
- N40085-20-R-0033
About this file
This document contains a price proposal form and description for a federal contract solicitation to repair Building 106 at Naval Submarine Base New London in Connecticut. The solicitation seeks firm fixed prices for base line work including renovations and repairs to the building, site work, and asbestos and hazardous material abatement. Optional line items include replacing two rooftop HVAC units, adding a roof stair, replacing two concrete pads, providing metal instead of HDPE lockers, and using prefabricated acrylic instead of solid surface showers. Award will be made based on the total of the base line items, and the Navy reserves the right to add any of the optional line items within 90 days of award. Responses are due by the date specified in solicitation number N40085-20-R-0033 issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair NAVY Information Operations Detachment Building 106 1600391
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work for renovations and repairs to Building 106 complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH and CLINS 0002, 0003, 0004, 0005, 0006. Options and CLINs to be confirmed prior to Final Design Submittal, paragraph to be finalized based on CLINs.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| Renovations and repairs to Building 106 |
CLIN 0001AB. Price for the entire project Site Work, outside the facility's 5-foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR 0001AB |
| 0001AB |
| Site work outside the facility 5-foot line |
CLIN 0001AC. Price for removal and disposal of asbestos containing floor tiles and mastic complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH AND CLINs 0002, 0003, 0004 0005 and 0006
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AC (UNIT PRICE X NO. UNITS) |
| 0001AC |
| Asbestos floor tile and mastic |
| Square Feet |
22,400
CLIN 0001AD. Price for removal and disposal of asbestos containing pipe insulation of less than 6” in diameter complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 000A1H AND CLINs 0002, 0003, 0004 0005 and 0006.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AD (UNIT PRICE X NO. UNITS) |
| 0001AD |
| Asbestos pipe insulation <6” diameter |
| Lineal Feet |
1,780
CLIN 0001AE. Price for removal and disposal of asbestos containing pipe insulation of greater than 6” in diameter complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH AND CLINs 0002, 0003, 0004 0005 and 0006.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AE (UNIT PRICE X NO. UNITS) |
| 0001AE |
| Asbestos pipe insulation >6” diameter |
| Lineal Feet |
CLIN 0001AF. Price for removal and disposal of asbestos containing gaskets on steam line complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, AND CLINs 0002, 0003, 0004, 0005 and 0006.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AF (UNIT PRICE X NO. UNITS) |
| 0001AF |
| Asbestos containing gaskets |
| Lineal Feet |
CLIN 0001AG. Price for removal and disposal of asbestos containing window caulking complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, AND CLINs 0002, 0003, 0004, 0005, 0006.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AG (UNIT PRICE X NO. UNITS) |
| 0001AG |
| Asbestos window caulk |
| Lineal Feet |
CLIN 0001AH. Price for removal and disposal of subsurface transite pipe insulation complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH AND CLINs 0002, 0003, 0004, 0005, 0006.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AH (UNIT PRICE X NO. UNITS) |
| 0001AH |
| Subsurface transite pipe insulation |
| Lineal Feet |
1,000
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001 |
| 0001 |
| TOTAL COSTS FOR ALL BASE BID WORK NOTED FOR CLIN 0001. INCLUDES 0001A THROUGH 0001H |
CLIN 0002 Option Item No. 1 - Price includes the following:
Price for demolition and removal of two existing Roof top units and provision and installation of two new HVAC Rooftop units complete and as indicated on the drawings and in the specifications.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0002 |
| 0002 |
| New Rooftop units |
CLIN 0003 Option Item No. 2 - Price includes the following:
Price for provision and installation of roof stairs.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0003 |
| 0003 |
| Roof Stairs |
CLIN 0004 Option Item No. 3 - Price includes the following:
Price for removal of two concrete exterior pads and replacement with bituminous concrete surface.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0004 |
| 0004 |
| Remove two concrete pads |
CLIN 0005 Option Item No. 4 - Price includes the following:
Deduct price for provision of metal lockers in lieu of HDPE lockers shown.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0005 |
| 0005 |
| Metal lockers in lieu of HDPE lockers |
CLIN 0006 Option Item No. 5 - Price includes the following:
Deduct price for ALL one-piece prefab acrylic showers in lieu of solid surface showers shown.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0006 |
| 0006 |
| Prefab acrylic showers in lieu of solid surface showers |
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG and 0001AH. For CLINs 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005 and CLIN 0006 to the Contractor at the proposed price within 90 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, and CLIN 0003 CLIN 0004, CLIN 0005 and CLIN 0006. No provision is made for economic price adjustment.
c. Evaluation of Options. Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document -- DOCUMENT 00 22 13.00 20 Page 1