This document package includes construction plans and specifications for a federal contract opportunity. The project involves repairs and renovations to Building 106 at Naval Submarine Base New London in Groton, Connecticut. Work includes selective demolition, replacement of a fire escape tower, HVAC replacement, roof replacement, fire protection system repairs, basement structural repairs and waterproofing, plumbing repairs and replacements, bathroom renovations, loading dock and ramp repairs, structural repairs throughout the building and basement, hazardous material abatement, interior finish replacements, exterior masonry and concrete repairs, lightning protection, and electrical equipment replacements, redistribution and related work. The solicitation number is N40085-20-R-0033 and was issued by the Department of the Navy Naval Facilities Engineering Command for repairs to the Navy Information Operations Detachment facility. The construction plans show details of proposed fire protection system modifications and secure area boundary requirements.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION DEMOLITION NOTES:
1. TAKE CARE DURING DEMOLITION WORK TO AVOID
DAMAGE TO SPRINKLERS AND PIPING. LEAVE
ACOUSTICAL CEILING PANELS IN PLACE IN LOCATIONS
WITH HEADS TO PROVIDE A TEMPORARY HEAT
COLLECTOR DURING CONSTRUCTION.
2. VERIFY THE INTEGRITY, CONDITION AND
LOCATION OF EXISTING PIPING WHICH IS TO BE
REUSED. IF PIPING CANNOT BE REUSED, THE
CONTRACTOR SHALL NOTIFY THE ARCHITECT OR
ENGINEER TO DETERMINE EXTENT OF
REPLACEMENT.
3. SYSTEM SHALL REMAIN IN FULL OPERATION EACH
NIGHT. SYSTEM SHALL BE TESTED AND FILLED AT
END OF EACH DAY TO PROVIDE FULL SPRINKLER
PROTECTION OVERNIGHT DURING CONSTRUCTION.
4. IF DEMOLITION OF THE SPRINKLER SYSTEM REQIRES
AN EXTENDED INTERUPTION IN SERVICE, AS
DETERMINED BY THE AHJ, THE CONTRACTOR SHALL
BE RESPONSIBLE FOR PROVIDING FIREWATCH.
CARRY PRICE FOR WORST CASE OPTION FOR BASE
BID. PROVIDE IMPAIRMENT PLAN FOR LOCAL AHJ AT
NO ADDITIONAL COST TO OWNER.
5. DEMOLITION WORK SHALL BE PERFORMED BY THE
FIRE PROTECTION CONTRACTOR, UNLESS NOTED
OTHERWISE. THE FIRE PROTECTION CONTRACTOR
SHALL COORDINATE ALL WORK CONCERNING
EXISTING EQUIPMENT AND SYSTEMS REMAINING IN
THE BUILDING.
FIRE PROTECTION GENERAL NOTES:
1. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO COMPLY WITH THE DEPARTMENT OF DEFENSE (DOD) UNIFIED FACILITIES CRITERIA (UFC), UNITED FACILITIES GUIDE SPECIFICATION (UFGS) AND NFPA 13 REQUIREMENTS: FINAL DESIGN SHALL BE
BASED ON THIS CRITERIA.
2. EXAMINE ALL CONTRACT DOCUMENTS FOR ALL TRADES. THE FIRE PROTECTION CONTRACTOR SHALL COORDINATE ALL
ELECTRICAL, PLUMBING & HVAC REQUIREMENTS WITH RESPECTIVE CONTRACTOR.
3. DRAWINGS ARE DIAGRAMMATIC ONLY, FINAL ROUTING OF PIPING AND EQUIPMENT LOCATIONS SHALL BE DETERMINED IN THE FIELD. ADDITIONAL OFFSETS, ELBOWS, ETC., SHALL BE PROVIDED AND INSTALLED WITHOUT ADDITIONAL COST TO THE OWNER.
4. VERIFY THE INTEGRITY, CONDITION AND LOCATION OF EXISTING PIPING WHICH IS TO BE REUSED. IF PIPING CANNOT BE REUSED, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER TO DETERMINE EXTENT OF REPLACEMENT.
5. VERIFY IN FIELD EXACT LOCATIONS, PIPE ELEVATIONS AND PIPE SIZES OF EXISTING SPRINKLER PIPING (BRANCH AND MAIN) AND
SPRINKLER HEADS PRIOR TO ANY WORK.
6. TAKE CARE AND PROTECT EXISTING SPRINKLER HEAD (S) AND PIPING TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
7. COORDINATE ALL ELECTRICAL, PLUMBING & HVAC REQUIREMENTS WITH THE ELECTRICAL, PLUMBING AND HVAC CONTRACTORS.
8. FURNISH AND INSTALL ALL INCIDENTAL ACCESSORIES/SUPPLEMENTAL STEEL NECESSARY TO MAKE THE FIRE PROTECTION
WORK COMPLETE AND READY FOR OPERATION.
9. INFORM AND COORDINATE WITH THE OWNER, MIDLANT FPE, AND FIRE DEPARTMENT ALL NECESSARY INTERRUPTIONS TO EXISTING BUILDING SYSTEMS AND SERVICE THAT MAY AFFECT THE NORMAL OPERATION OF OCCUPIED PORTIONS OF THE BUILDING. THE OWNER, MIDLANT FPE, AND FIRE DEPARTMENT SHALL BE INFORMED OF ANY INTERRUPTIONS AT LEAST 72 HOURS IN ADVANCE, AND GRANT PERMISSION OF EACH SHUT-DOWN. PROVIDE COSTS FOR ANY FIRE WATCH OR TEMPORARY SERVICE REQUIRED BY THE AHJ TO REDUCE OR ELIMINATE UNPROTECTED AREAS AT ANY TIME DURING DEMOLISHED CONSTRUCTION. PROVIDE AN IMPAIRMENT PLAN TO THE OWNER, MIDLANT FPE, AND FIRE DEPARTMENT PRIOR TO INSTALLATION.
10. INFORM THE OWNER 14 DAYS IN ADVANCE OF ANY WORK TO BE UNDERTAKEN IN OCCUPIED AREAS OF THE BUILDING ASSOCIATED WITH THIS PROJECT. THE FIRE PROTECTION CONTRACTOR SHALL CONFORM TO THE OWNER'S CRITERIA FOR WORK HOURS, ENVIRONMENTAL ISOLATION, AND NOISE LIMITS FOR PORTIONS OF THE BUILDING THAT ARE OCCUPIED DURING
CONSTRUCTION.
11. PERFORM HYDRANT FLOW TEST AND PROVIDE HYDRAULIC CALCULATIONS FOR THE INSTALLED SYSTEMS.
12. OBTAIN APPROPRIATE WASTEWATER PERMITS AND COORDINATE SPRINKLER SYSTEM DISCHARGE WITH THE WASTEWATER
PROGRAM MANAGER.
13. PROVIDE COORDINATED, HYDRAULICALLY SIZED, AND FULLY DESIGNED SPRINKLER FABRICATION DRAWINGS TO THE ARCHITECT, MIDLANT FPE, AND AHJ FOR REVIEW PRIOR TO ANY WORK, FABRICATION, OR ORDERING OF MATERIALS.
INCLUDED IN THIS SUBMISSION SHALL BE STAMPED AND SIGNED DRAWINGS AND HYDRAULIC CALCULATIONS OF THE ENTIRE FACILITY, AS WELL AS SEISMIC RESTRAINT LOCATIONS AND DESIGN. THIS SHALL ALL BE PROVIDED AFTER COORDINATION
DRAWINGS ARE SUBMITTED AND APPROVED.
14. PROVIDE COORDINATION DRAWINGS FOR REVIEW BY THE ARCHITECT AND ENGINEER PRIOR TO FABRICATION OR INSTALLATION.
COORDINATE THE WORK OF THE FIRE PROTECTION CONTRACT WITH THE WORK OF THE MECHANICAL, PLUMBING, ELECTRICAL, AND TELE/DATA CONTRACTS. RESOLVE LOCATION AND DIMENSION CONFLICTS PRIOR TO FABRICATION OR INSTALLATION.
15. REFER TO SPRINKLER SYSTEM DESIGN CRITERIA SCHEDULE FOR THE SYSTEM HYDRAULIC DESIGN REQUIREMENTS. PROVIDE A PLACARD CONTAINING THE SYSTEM HYDRAULIC REQUIREMENTS. MOUNT PLACARD AT THE SYSTEM RISER.
16. ALL SYSTEM PIPING, FITTINGS, DEVICES, VALVES, AND SPRINKLERS SHALL BE UL LISTED AND FM APPROVED FOR THE SERVICE
AND USE INTENDED.
17. FLOW AND TAMPER SWITCHES WILL BE PROVIDED BY FIRE PROTECTION CONTRACTOR, HOWEVER, ALL ELECTRICAL WIRING IS BY OTHERS. FIRE PROTECTION CONTRACTOR WILL BE RESPONSIBLE TO COORDINATE WITH THE APPROPRIATE
SUBCONTRACTOR.
18. ALL SPRINKLER PIPING SHALL BE AT LEAST 1" SIZE, AND AS REQUIRED BY HYDRAULIC CALCULATIONS.
19. NEW SPRINKLERS SHALL MATCH THE THERMAL SENSITIVITY, RESPONSE TIME, PROTECTION AREA, AND SPACING OF THE
EXISTING SPRINKLERS THAT ARE TO REMAIN WITHIN THE SAME COMPARTMENT.
20. THREADED PIPE SHALL BE BLACK STEEL, SCHEDULE-40 OR EQUAL.
21. GROOVED PIPE SHALL BE BLACK STEEL, SCHEDULE-10 OR EQUAL.
22. PIPING 2 INCHES IN DIAMETER AND SMALLER SHALL BE A MINIMUM OF SCHEDULE-40. PIPING 2.5 INCHES IN DIAMETER AND
LARGER SHALL BE A MINIMUM OF SCHEDULE-40.
23. FITTINGS SHALL BE CLASS 125 THREADED CAST IRON ANSI B16.4.
24. ALL PIPING SHALL BE EARTHQUAKE BRACED AS OUTLINED IN NFPA 13 / FM DATA SHEET 2-8.
25. ALL HANGER COMPONENTS AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 13 / FM DATA SHEETS.
26. ALL NEW PIPING SHALL BE HYDROSTATICALLY TESTED AT SYSTEM WORKING PRESSURE.
SYMBOLS:
DOUBLE CHECK VALVE ASSEMBLY WITH TAMPER SWITCHES
HYDRAULIC REFERENCE POINT
ELECTRIC BELL
SHUT-OFF VALVE (TYPE PER SPECS)
CHECK VALVE
VALVE IN VERTICAL
SHUT-OFF VALVE WITH TAMPER SWITCH
PRESSURE GAUGE
PIPE BREAK
PIPE UP THROUGH FLOOR ABOVE
PIPE DROP OR RISE
PIPE DOWN THROUGH FLOOR
PIPE CAP
WET ALARM CHECK VALVE
DRAIN VALVE
FLOW SWITCH
VALVE IN VERTICAL WITH TAMPER SWITCH
FIRE DEPARTMENT CONNECTION
PENDENT/RECESSED SPRINKLER
EXISTING SPRINKLER PIPING
NEW SPRINKLER PIPING
CONNECT TO EXISTING
POST INDICATOR VALVE
UPRIGHT SPRINKLER
DRY SIDEWALL SPRINKLER
HIGH TEMERATURE (212 ) SPRINKLER (SEE TYPE)
NEW SPRINKLER (SEE TYPE)
DS
EXISTING SPRINKLER TO REMAIN (SEE TYPE)
RELOCATE SPRINKLER (SEE TYPE)
N
E
R
DELETE SPRINKLER (SEE TYPE)D
FIRE PROTECTION SCOPE OF WORK:
1. THE WORK INCLUDES MODIFICATION OF THE EXISTING WET-PIPE SPRINKLER
SYSTEM FOR BUILDING 106 AS INDICATED ON THE DRAWINGS.
2. THE WORK INCLUDES DEMOLITION OF THE EXISTNG ALARM VALVE ASSEMBLY,
CONTROL VALVES, PRESSURE SWITCH, WATER MOTOR GONG, DRAIN PIPING,
CHECK VALVE AND FIRE DEPARTMENT CONNECTION.
3. THE WORK INCLUDES PROVIDEING A NEW RISER CHECK VALVE ASSEMBLY,
CONTROL VALVES, VANE TYPE WATERFLOW SWITCH, ELETRICAL BELL, DRAIN
PIPING, CHECK VALVE, AND STORZ TYPE FIRE DEPARTMENT CONNECTION.
4. THE WORK INCLUDES PROVIDING NEW CONTROL VALVES FOR THE EXISTING
DOUBLE CHECK VALVE BACKFLOW PREVENTER.
5. THE WORK INCLUDES PROVIDING NEW PIPING AND SUPPORTS FOR THE EXISTING
DOUBLE CHECK VALVE BACKFLOW PREVENTER.
6. THE WORK INCLUDES PROVIDING NEW DRY SIDEWALL SPRINKLERS UNDER THE
COMBUSTIBLE CANOPIES ON THE LOADING DOCK.
7. THE WORK INCLUDES PROVIDING NEW SPRINKLERS IN THE EXISTING STAIRWELLS.
8. THE WORK INCLUDES PROVIDING NEW SPRINKLERS ON THE BASEMENT MAIN.
9. THE WORK INCLUDES MODIFYING THE EXISTING SPRINKLER LAYOUT TO
ACCOMODATE NEW CEILINGS AND ROOM CONFIGURATIONS. ADDITIONAL
SPRINKLERS SHALL BE INSTALLED AS NEEDED.
10. THE WORK INCLUDES PROVIDING AUXILIARY DRAINS ON EACH FLOOR OF THE
BUILDING FOR TRAPPED SECTIONS OF THE EXISTING SPRINKLER SYSTEM.
11. THE WORK INCLUDES PROVIDING A TEMPORARY ISOLATION VALVE AND
AUXILARY DRAIN ON THE SECOND FLOOR TO ISOLATE THE WORK AREA.
12. THE WORK INCLUDES PROVIDING HIGH TEMPERATURE SPRINKLERS IN THE
EXISTING SERVER ROOM.
13. THE WORK INCLUDES PROVIDING NEW SPRINKLERS IN THE CLOSETS.
14. THE WORK INCLUDES GROUNDING ALL NEW FIRE PROTECTION WORK THAT
PENETRATES THE BOUNDRIES OF THE SECURED AREAS.
FIRE PROTECTION PHASING NOTES:
1. THE EXISTING FIRE PROTECTION SPRINKLER SYSTEM
WILL BE MODIFIED AS PART OF THIS PROJECT. THE
WORK WILL BE COMPLETED IN ACCORDANCE WITH
THE PROJECT PHASING PLAN. PHASE 1 WILL INVOLVE
THE MODIFICATION OF THE EXISTING SPRINKLER
SYSTEM ON THE 1ST FLOOR AND THE BASEMENT.
PHASE 2 WILL INVOLVE THE MODIFICATION OF
THE NEW SPRINKLER SYSTEM ON THE 2ND FLOOR.
2. THE FIRE PROTECTION SPRINKLER SYSTEM WILL
NEED TO BE DE-ENERGIZED DAILY TO ALLOW FOR
THE WORK TO BE PERFORMED. THE SYSTEM WILL BE
MADE OPERATIONAL AT THE END OF EACH WORKDAY.
THE FIRE PROTECTION CONTRACTOR WILL BE
RESPONSIBLE FOR PROVIDING FIREWATCH FOR
ANY INTERRUPTION IS SERVICE THAT EXCEEDS 8
HOURS. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATION OF WORK TO MINIMIZE
DISRUPTION TO THE BUILDING’S OCCUPANTS.
SECURE AREA BOUNDRY PENETRATION NOTES:
1. NEW WET SPRINKLER SYSTEM PIPING WILL BE EQUIPPED WITH DIELECTRIC
BREAKS/COUPLINGS PRIOR TO EXITING THE SECURE AREA.
2. NEW DRY SIDEWALL SPRINKLERS WILL BE ELECTRICALLY BONDED TO
STRUCTURE GROUND AT THE CLOSEST POINT BEFORE EXITING THE SECURE
AREA. THE GROUND WIRE/STRAP WILL NOT EXCEED TWO METERS IN LENGTH.
3. NEW PENETRATIONS WILL REQUIRE CORE DRILLING OF THE EXISTING
EXTERIOR WALLS.
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
NTS
:5 :5
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP001
FI
R E P R O
TE
C
TI
O N
N O
TE
S
AN
D
S
YM
B O
LS
P
LA
N
F P
12811681
PSM PSM CMA
DSN
D E S
IG
N
2 0
0%
P R E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
3 7
9 9
10 10
FIRST FLOOR
SECOND FLOOR
ROOF LEVEL
BUILDING 106
BASEMENT LEVEL
EXTERIOR GRADE
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE
FIRE DEPARTMENT CONNECTION
OS&Y SUPERVISED GATE VALVE
RISER CHECK VALVE
TEST AND DRAIN VALVE
CHECK VALVE
POST INDICATING VALVE
DOUBLE CHECK VALVE ASSEMBLY
PIPE CONTINUATION
AUXILIARY DRAIN
INDICATING BUTTERFLY VALVE
WATERFLOW SWITCH
DRAIN ELBOW
PRESSURE GAUGE
2 1/2 HOSE VALVE CONNECTION
ELECTRIC BELL
CONNECT TO EXISTING
SYMBOLS LEGEND
PROVIDE NEW RISER CHECK VALVE ASSEMBLY
PROVIDE NEW DRAIN PIPING TO BUILDING EXTERIOR
PROVIDE NEW CONTROL VALVE ASSEMBLY
PROVIDE NEW ELECTRIC BELL ASSEMBLY
PROVIDE NEW CHECK VALVE ASSEMBLY
PROVIDE NEW VANE TYPE WATERFLOW SWITCH
PROVIDE NEW AUXILIARY DRAIN ASSEMBLY
PROVIDE NEW STORTZ CONNECTION FOR FDC
PROVIDE NEW SUPPORTS FOR BACKFLOW PREVENTER
PROVIDE ADDITIONAL SIX INCH PIPING FOR SUPPORT
OF THE EXISTING BACKFLOW PREVENTER.
PROVIDE TEMPORARY ISOLATION VALVE FOR WORK AREA
EXITING BACKFLOW PREVENTER TO REMAIN
EXISTING HOSE VALVE CONNECTIONS TO REMAIN
DEMOLISH THE EXISTING ALARM VALVE ASSEMBLY,
CONTROL VALVES, PRESSURE SWITCH, WATER MOTOR
GONG, DRAIN PIPING, CHECK VALVE, AND FDC.
CONCEPTUAL FIRE PROTECTION RISER DETAIL
N.T.S.SCALE:
A1
KEY NOTES
STORTZ CONNECTION
EXISTING 6"
FIRE SERVICE
ELECTRIC BELL
6"
6"4"
4"
4"
4"
4"
4"
6"
6" 6"
6" 6"
4" PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
1/4" = 1'-0"
:5 :5
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP002
FI
R E P R O
TE
C
TI
O N
R
IS
ER
D
IA
G
AM
LA
N
F P
12811682
PSM PSM CMA
DSN
D E S
IG
N
2 0
E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
FIRE SERVICE
4444 4 4 4 4 4 4
E
E
E
D
E
E
E
N
DS
N
DS
N
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
E
E
E
D
E
E
E
2 3 4 5 6 7 81
A
B
C
D
N N N N N N N N N N
N
N NSTAIR 2
BASEMENT
ELEV
(INACTIVE)
STAIR 3
FIRE PROTECTION DRAWING KEYNOTES:
DEMO EXISTING ALARM VALVE ASSEMBLY, CONTROL VALVES,
PRESSURE SWITCH, WATER MOTOR GONG, DRAIN PIPING, CHECK
VALVE AND FDC (SEE DETAIL ON FP-200)
PROVIDE NEW RISER CHECK VALVE ASSEMBLY, CONTROL VALVES,
VANE TYPE WATERFLOW SWITCH, ELECTRIC BELL, DRAIN PIPING,
CHECK VALVE, AND FDC (SEE DETAIL ON FP-200)
PROVIDE DRY SIDEWALL SPRINKLERS IN THE STAIRWELL
(SEE DETAIL ON FP-200)
PROVIDE NEW UNOBSTRUCTED SPRINKLERS ON THE MAIN
(SEE DETAIL ON FP-200)
SECURE AREA BOUNDRY PENETRATION NOTES:
NEW WET SPRINKLER SYSTEM PIPING THAT PENETRATES THE
BOUNDRY OF THE SECURE AREA SHALL BE EQUIPPED WITH DIELECTRIC
BREAKS/COUPLINGS PRIOR TO EXITING THE SECURE AREA.
NEW DRY SIDEWALL SPRINKLERS THAT PENETRATES THE BOUNDRY OF
THE SECURE AREA SHALL BE ELECTRICALLY BONDED TO STRUCTURE
GROUND AT THE CLOSEST POINT BEFORE EXITING THE SECURE AREA.
THE GROUND WIRE/STRAP WILL NOT EXCEED TWO METERS IN LENGTH.
PROVIDE NEW SPRINKLERS AND PIPING IN THE STAIRWELL
(SEE DETAIL ON FP-200)
SECURE AREA BOUNDRY NOTE:
REFER TO A SERIES PLANS FOR BOUNDRY OF SECURE AREA,
REFER TO A-100.1 FOR ADDITIONAL INFORMATION.
0 2 4 8 16 32
N
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
As indicated
:5 :5
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP100.1
FI
R E P R O
TE
C
TI
O N
B
AS
EM
EN
T C O N S
TR
U C
TI
O N
P
LA
N
P H
AS
E
F P .1
12811683
PSM PSM CMA
DSN
SCALE: 1/8" = 1'-0"
BASEMENT CONSTRUCTION PLAN - PHASE 1
A1
D E S
IG
N
2 0
E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
DN
DN
2 2 2
E
E
E
E
E
E
E E E
E E E
E
E
E
E E
EE
N
N DS N DS N DS N DS N DS
N
N
N E
E
E
E
E
N
N
N
N
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E EE
E
E
E
E
E
E
E
EEE
N DS
N
DS
N
DS
E
E
E
E
E
N DS
E
E
E
E
E
E
E
E
E
E
E
N
N
2 3 4 5 6 7 81
A
B
C
D
BP
BP
BP BP
BP
BP BP
BP
BP
MENS ROOM
WOMENS
ROOM
ELEV
(INACTIVE)
ELECTRIC BELL
STAIR 1
MECHANICAL
EQUIPMENT
ROOM
STORAGE
STORAGE
111A
MACHINE
SHOP
STORAGE
111B
OFFICE
OFFICE
OFFICE
OFFICE
107A
OFFICE
LIBRARY
MACHINE
SHOP
STAIR 1
OFFICE
SWITCHGEAR
ROOM
103A
STORAGE
104A
STORAGE
FIRE PROTECTION DRAWING KEYNOTES:
PROVIDE DRY SIDEWALL SPRINKLERS IN EXISTING
STAIRWELLS (SEE DETAIL ON FP-200)
PROVIDE DRY SIDEWALL SPRINKLERS UNDER
EXTERIOR CANOPY (SEE DETAIL ON FP-200)
PROVIDE SPRINKLERS IN ENTRANCE LOBBY
(SEE DETAIL ON FP-200)
DEMOLISH EXISTING ISOLATION VALVE AND
RECONNECT PIPING (SEE DETAIL ON FP-200)
SECURE AREA BOUNDRY PENETRATION NOTES:
NEW WET SPRINKLER SYSTEM PIPING THAT PENETRATES THE
BOUNDRY OF THE SECURE AREA SHALL BE EQUIPPED WITH DIELECTRIC
BREAKS/COUPLINGS PRIOR TO EXITING THE SECURE AREA.
NEW DRY SIDEWALL SPRINKLERS THAT PENETRATE THE BOUNDRY OF
THE SECURE AREA SHALL BE ELECTRICALLY BONDED TO STRUCTURE
GROUND AT THE CLOSEST POINT BEFORE EXITING THE SECURE AREA.
THE GROUND WIRE/STRAP WILL NOT EXCEED TWO METERS IN LENGTH.
SECURE AREA BOUNDRY PENETRATION
(SEE ADDITIONAL REQUIREMENTS ON SHEET)
BP
SECURE AREA BOUNDRY NOTE:
REFER TO A SERIES PLANS FOR BOUNDRY OF SECURE AREA,
REFER TO A-100.1 FOR ADDITIONAL INFORMATION.
0 2 4 8 16 32
N
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
As indicated
:5 :5
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP101.1
FI
R E P R O
TE
C
TI
O N
S T
FL
O O R
C O N S
TR
U C
TI
O N
P
LA
N
P H
AS
E
F P .1
12811684
PSM PSM CMA
DSN
SCALE: 1/8" = 1'-0"
1ST FLOOR CONSTRUCTION PLAN - PHASE 1
A1
D E S
IG
N
2 0
E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
N
N DS
E
N 212
N 212
N 212
N 212
E
E
E
E
N
N
N
E
E
E
E
E E
E E E
D
N
N
N
N
N N N
N
N
N
N
N
N N
R
N
N 212
N 212
N
N
N
N N
N
N
N
N
N
N
N
N
N
N
D
N
N
N
N
N
N
E
N DS
E
E
E
E
E
E
EEE
EEE
E
E
E
N
E
EE
EE
E
E
EE
EEE
N DS
N
N
N
N
DDD
2 3 4 5 6 7 81
A
B
C
D
BP
STAIR 1
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
OFFICE
STAIR 2
MENS ROOM/
LOCKER
WOMENS
ROOM/
LOCKER
ELEV
(INACTIVE)
LOBBY
KITCHENETTE
SUPPLY
CHIEF
OFFICE
215A
IT CLOSET
SUPPLY
STORE
ROOM &
OFFICE
IT CLOSET
COMMON
AREA
JAN. CLOSET
STORAGE
FIRE PROTECTION DRAWING KEYNOTES:
PROVIDE DRY SIDEWALL SPRINKLERS IN EXISTING
STAIRWELLS (SEE DETAIL ON FP-200)
PROVIDE HIGH TEMPERATURE SPRINKLERS IN
SERVER ROOM (SEE DETAIL ON FP-200)
PROVIDE NEW SPRINKLERS IN UNSPRINKLED
CLOSETS (SEE DETAIL ON FP-200)
PROVIDE NEW ISOLATION VALVE AND AUXILLARY
DRAIN (SEE DETAIL ON FP-200)
SECURE AREA BOUNDRY PENETRATION NOTES:
NEW WET SPRINKLER SYSTEM PIPING THAT PENETRATES THE
BOUNDRY OF THE SECURE AREA SHALL BE EQUIPPED WITH DIELECTRIC
BREAKS/COUPLINGS PRIOR TO EXITING THE SECURE AREA.
NEW DRY SIDEWALL SPRINKLERS THAT PENETRATE THE BOUNDRY OF
THE SECURE AREA SHALL BE ELECTRICALLY BONDED TO STRUCTURE
GROUND AT THE CLOSEST POINT BEFORE EXITING THE SECURE AREA.
THE GROUND WIRE/STRAP WILL NOT EXCEED TWO METERS IN LENGTH.
SECURE AREA BOUNDRY PENETRATION
(SEE ADDITIONAL REQUIREMENTS ON SHEET)
BP
SECURE AREA BOUNDRY NOTE:
REFER TO A SERIES PLANS FOR BOUNDRY OF SECURE AREA,
REFER TO A-100.1 FOR ADDITIONAL INFORMATION.
0 2 4 8 16 32
N
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
As indicated
:5 :0
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP102.2
FI
R E P R O
TE
C
TI
O N
N D
FL
O O R
C O N S
TR
U C
TI
O N
P
LA
N
P H
AS
E
F P .2
12811685
PSM PSM CMA
DSN
SCALE: 1/8" = 1'-0"
2ND FLOOR CONSTRUCTION PLAN - PHASE 2
A1
D E S
IG
N
2 0
E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
TYPICAL HORIZONTAL DRY SIDEWALL SPRINKLER DETAIL
NOT TO SCALE
TYPICAL PENDENT SPRINKLER RETURN BEND DETAIL
NOT TO SCALE
TYPICAL PENDENT SPRINKLER INSTALLATION DETAIL
NOT TO SCALE
TYPICAL RISER CHECK VALVE ASSEMBLY DETAIL
NOT TO SCALE
TYPICAL UPRIGHT SPRINKLER INSTALATION DETAIL
NOT TO SCALE
TYPICAL UPRIGHT SPRINKLER WITH PIPE SPRIG DETAIL
NOT TO SCALE
C1
B1
C2
B2
C4
B4
BRANCHLINE
SUSPENDED CEILING
1" NIPPLE
RECESSED PENDENT SPRINKLER
1" X 1/2" R.C.
1" 90 EL.
1" X DROP
(SEE PLAN)
1" X ARMOVER PROVIDE NEW RISER CHECK VALVE*
IN THE CENTER OF CEILING TILES UNLESS
ALL SPRINKLERS ARE TO BE INSTALLED*
OTHERWISE APPROVED BY ARCHITECT/ENGINEER
PER MANUFACTURE
CEILING
WALL
ACOUSTICAL CEILING TILE
TO EXISTING
SPRINKLER SYSTEM
FROM EXISTING
FIRE SERVICE
OF THE SECURE AREA SHALL BE GROUNDED
ALL SPRINKLERS THAT PENETRATE THE BOUNDARY*
AND CONTROL VALVE ASSEMBLY
PROVIDE NEW PRESSURE RELIEF VALVE*
MECHANICAL TEE, PIPING, FITTINGS, AND SPRINKLERS.
ON THE MAIN IN THE BASEMENT AND PROVIDE NEW*
UPRIGHT SPRINKLER
BRANCHLINE
THREADED TEE
DRY SIDEWALL SPRINKLER
PROVIDE NEW OS&Y VALVES FOR*THE EXISTING BACKFLOW PREVENTER
PROVIDE NEW VANE TYPE WATERFLOW*SWITCH AND ELECTRIC BELL ASSEMBLY
PROVIDE NEW STORTZ CONNECTION*AND CHECK VALVE
PROVIDE NEW PIPING AND SUPPORTS FOR*THE EXISTING BACKFLOW PREVENTER
DEMOLISH THE EXISTING ALARM VALVE,*PRESSURE SWITCH, CONTROL VALVES,
CHECK VALVE, WATER MOTOR GONG AND
FIRE DEPARTMENT CONNECTION.
EXISTING SPRINKLER MAIN
NEW UPRIGHT SPRINKLER
NEW PIPE AND FITTINGS
NEW MECHANICAL TEE
DEMOLISH EXISTING SPRINKLERS INSTALLED DIRECTLY
EXISTING BACKFLOW
PREVENTER TO REMAIN
EXISTING HOSE VALVE
STORZ TYPE FDC
CHECK VALVE
WATERFLOW SWITCH
OS&Y VALVE
RISER CHECK ASSEMBLY
CONTROL VALVE
AND NEW DRAIN PIPING TO EXTERIOR
CONNECTIONS TO REMAIN
PIPE SUPPORT
EQ
EQ
EQ EQ
EQ EQ
EQ
EQ
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
3/10/2020
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
S
YM
D
ES
C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
U N C
LA
S S
IF
IE
D
FO
R
O
FF
IC
IA
L U S E O N
LY
SYMMES MAINI & McKEE
ASSOCIATES
1000 Massachusetts Avenue Cambridge, Massachusetts 02138 P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
LA
Y O U T N A M E
P L O
TT
E D
U S E R
CFM/LEJ
EJA
APPROVED BY JOHNATHAN JOHNS
PM&EB SUPERVISOR WITH NAVAL
SUBASE, NEW LONDON, CT
N40085-20-R-0033
1600391
D
EP
AR
TM
EN
T O F
TH
E N
AV
Y
C ry st al
La ke
R d, G ro to n, C T
C ry st al L ak e
R d
, G ro to n
, C T
D
E P
A R
T M
E N
T O
F T
H E
N A
V Y
R C M A
P ro je c ts C M A
N A V S U B A S E
N e w
Lo n d o n
C T
B ld g
P h a s e
D e ta ile d
D e s ig n R E V
IT
D e s ig n C E N
TR
A L_ F P p m o tt o la .r vt
1" = 10'-0"
:5 :0
A M
N A
V F
A C
N
E W
L O
N D
O N
B L D
G
FP200
FI
R E P R O
TE
C
TI
O N
D
ET
AI
LS
P
LA
N
F P
12811686
PSM PSM CMA
DSN
D E S
IG
N
2 0
E-
FI
N
AL
2/
IS
SU
ED
FO
R
C O N
ST
R U C T I O N
3/
| FP001 - FIRE PROTECTION NOTES AND SYMBOLS PLAN |
| FP002 - FIRE PROTECTION RISER DIAGRAM PLAN |
| FP100.1 - FIRE PROTECTION BASEMENT CONSTRUCTION PLAN - PHASE 1 |
| FP101.1 - FIRE PROTECTION 1ST FLOOR CONSTRUCTION PLAN - PHASE 1 |
| FP102.2 - FIRE PROTECTION 2ND FLOOR CONSTRUCTION PLAN - PHASE 2 |
| FP200 - FIRE PROTECTION DETAILS PLAN |
2020-04-04T10:10:26-0400
2020-04-04T10:10:51-0400
2020-04-04T10:10:56-0400
2020-04-04T10:10:59-0400
2020-04-04T10:11:03-0400
2020-04-04T10:11:06-0400
| 2020-04-05T11:18:26-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:18:47-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:18:48-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:18:48-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:18:57-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:19-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:32-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:32-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:32-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:33-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-04-05T11:19:33-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |