Attachment C - Construction Experience Project Data Sheet.docx
DOCX document 16 KB Posted
- Solicitation number
- N40085-20-R-0033
About this file
This solicitation package includes an attachment requesting construction experience project data sheets and details for a repair project at the Navy Information Operations Detachment in New London, Connecticut. The proposed construction work consists of selective demolition, replacement of an existing fire escape tower, building HVAC replacement, roof replacement, fire protection and structural repairs, plumbing replacements and bathroom renovations, loading dock repairs, hazardous material abatement, interior finish replacements, masonry and concrete repairs, lightning protection, and electrical equipment replacements. Offerors are required to provide details on up to five relevant past construction projects as a prime contractor, subcontractor, or joint venture, including award amounts, completion dates, scope of work, sustainable features, and description of self-performed work. The solicitation is issued by the Naval Facilities Engineering Command for repair work at Building 106, which provides facility support space for military personnel at the Navy base in New London, Connecticut.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DBB Repair NIOD NAVSUBASE | N40085-20-R-0033 | |
| New London, CT | Solicitation |
ATTACHMENT C
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information:
File details come from the government source that posted it. Updated .