1600391 DWG 06OF12 ENVELOPE.pdf

PDF 7 MB Posted

Attached to
REPAIR NAVY INFORMATION OPERATIONS DETACHMENT NAVSUBASE NEW LONDON, CT
Solicitation number
N40085-20-R-0033
Issued by

About this file

This solicitation is for repair and renovation work at Building 106, a Navy facility that provides support space for military personnel. The scope of work includes selective demolition, replacement of a fire escape tower, HVAC replacement, roof replacement, fire protection repairs, basement repairs and waterproofing, plumbing repairs and replacements, bathroom renovations, loading dock repairs, structural repairs, hazardous material abatement, interior finish replacement, masonry and concrete repairs, lightning protection, and electrical work. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
PPI 45 DSCN4922 MSB nameplate.JPG JPG image
PPI 45 DSC 0104 MSB.JPG JPG image
Amendment 0008.pdf PDF
B106 Pictures.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 04.pdf PDF
Amendment 03.pdf PDF
Attachment F - ALL CONTRACORs 5512_REV1.docx DOCX document
Attachment G - Contract General Requirement.docx DOCX document
Amendment 02.pdf PDF
Amendment 01.pdf PDF
1600391spec01of01-vol1.pdf PDF
Attachment B - SECNAV_ 5512_1.pdf PDF
Attachment E - Price Proposal Form.docx DOCX document
1600391 DWG 05OF12 ARCHITECTURE.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1600391 DWG 03OF12 CIVIL.pdf PDF
1600391 DWG 10OF12 PLUMBING.pdf PDF
1600391 DWG 12OF12 ELECTRICAL.pdf PDF
1600391 DWG 04OF12 STRUCTURAL.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1600391 DWG 09OF12 FIRE PROTECTION.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
1600391 DWG 11OF12 MECHANICAL.pdf PDF
1600391 DWG 08OF12 FIRE ALARM.pdf PDF
1600391 DWG 07OF12 LIFE SAFTEY.pdf PDF
1600391 DWG 02OF12 HAZMAT.pdf PDF
1600391 DWG 01OF12 GENERAL.pdf PDF
Solicitation.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3'-10"

1ST FLOOR

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

ABCD

(E) CONCRETE

STAIR AND RAMP

TO REMAIN

REMOVE (E) METAL

PANEL INFILLS (TYP.)

(E) STEEL-FRAMED

WINDOWS

3'-10"

1ST FLOOR

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

A B C D

32'-0"

MACHINE ROOM FLOOR

REMOVE (E) CONCRETE

STAIR AND STRUCTURE

INCLUDING FOUNDATION.

(E) BRICK

MASONRY TO

REMAIN

(E) EXPOSED CONCRETE

STRUCTURE TO REMAIN

(E) NORTHWEST

MASONRY STAIR

TOWER TO REMAIN

REMOVE (E) METAL

PANEL INFILLS (TYP.)

(E) LEAN-TO

STRUCTURE TO REMAIN

NOTE:

CONCRETE AND MASONRY DEMOLITION FOR

REPAIRS ARE NOT SHOWN HERE. SEE PHASE 1

ELEVATION DRAWINGS FOR REPAIR LOCATIONS.

ALSO SEE S-503 FOR CONCRETE REPAIR DETAILS

AND AE520 FOR MASONRY REPAIR DETAILS.

0 2 4 8 16 32

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

1/8" = 1'-0"

:5 :3

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AED200.1

D

EM

O

LI

TI

O N

EX

TE

R

IO

R

EA

S T

W

ES

T

EL

EV

AT

IO

N S

P H

AS

E

A E D .1

12811649

KSW ES EKO

DJD

1/8" = 1'-0"

EAST ELEVATION DEMOLITION - PHASE 1

A1

1/8" = 1'-0"

WEST ELEVATION DEMOLITION - PHASE 1

C1

(E) NORTHEAST

MASONRY STAIR

TOWER TO REMAIN

D E S

IG

N

2 0

0%

P R E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

ACD

REMOVE (E) STEEL FRAMED

WINDOWS, GLAZING AND

PRECAST CONCRETE SILLS.

COORDINATE WITH

ENVIRONMENTAL

SPECIFICATIONS FOR

REMOVAL AND DISPOSAL OF

HAZARDOUS MATERIALS.

(E) CONCRETE

STAIR AND RAMP

TO REMAIN

(E) NORTHEAST

MASONRY STAIR

TOWER TO REMAIN

3'-10"

1ST FLOOR

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

A B C D

(E) BRICK MASONRY

TO REMAIN

(E) EXPOSED CONCRETE

STRUCTURE TO REMAIN

(E) NORTHWEST

MASONRY STAIR

TOWER TO REMAIN

(E) LEAN-TO STRUCTURE

TO REMAIN

NOTE:

CONCRETE AND MASONRY DEMOLITION FOR

REPAIRS ARE NOT SHOWN HERE. SEE PHASE 1

ELEVATION DRAWINGS FOR REPAIR LOCATIONS.

ALSO SEE S-503 FOR CONCRETE REPAIR DETAILS

AND AE520 FOR MASONRY REPAIR DETAILS.

0 2 4 8 16 32

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

1/8" = 1'-0"

:5 :3

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AED200.2

D

EM

O

LI

TI

O N

EX

TE

R

IO

R

EA

S T

W

ES

T

EL

EV

AT

IO

N S

P H

AS

E

A E D .2

12811650

KSW ES EKO

DJD

1/8" = 1'-0"

EAST ELEVATION DEMOLITION - PHASE 2

A1

1/8" = 1'-0"

WEST ELEVATION DEMOLITION - PHASE 2

C1

(E) ELEVATOR PENTHOUSE (BEYOND) TO REMAIN

(E) CONCRETE

STAIR AND RAMP

TO REMAIN

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

12345678

REMOVE (E) CONCRETE

STAIR AND STRUCTURE

INCLUDING FOUNDATION

(E) METAL STAIR TO REMAIN REMOVE (E) METAL

PANEL INFILLS (TYP.)

(E) BRICK

MASONRY TO

REMAIN

(E) EXPOSED

CONCRETE

STRUCTURE TO

REMAIN

(E) ELEVATOR

PENTHOUSE

(BEYOND) TO REMAIN

(E) STEEL-FRAMED

WINDOWS

3'-10"

1ST FLOOR

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

1 2 3 4 5 6 7 8

(E) CONCRETE

STAIR AND RAMP

TO REMAIN

(E) CANOPY TO REMAIN

(E) DOOR TO

REMAIN TYP.

(E) ELEVATOR

PENTHOUSE TO

REMAIN

REMOVE (E) CONCRETE

STAIR AND STRUCTURE

INCLUDING FOUNDATION.

NOTE:

CONCRETE AND MASONRY DEMOLITION FOR

REPAIRS ARE NOT SHOWN HERE. SEE PHASE 1

ELEVATION DRAWINGS FOR REPAIR LOCATIONS.

ALSO SEE S-503 FOR CONCRETE REPAIR DETAILS

AND AE520 FOR MASONRY REPAIR DETAILS.

0 2 4 8 16 32

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

1/8" = 1'-0"

:5 :3

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AED201.1

D

EM

O

LI

TI

O N

EX

TE

R

IO

R

N O R

TH

S O U

TH

EL

EV

AT

IO

N S

P H

AS

E

A E D .1

12811651

KSW ES EKO

DJD

1/8" = 1'-0"

NORTH ELEVATION DEMOLITION - PHASE 1

A1

1/8" = 1'-0"

SOUTH ELEVATION DEMOLITION - PHASE 1

C1

(E) NORTHEAST

MASONRY STAIR

TOWER TO REMAIN

(E) BRICK

MASONRY TO

REMAIN

(E) EXPOSED

CONCRETE

STRUCTURE TO

REMAIN

12' 24' 48'

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

12345678

REMOVE (E) STEEL FRAMED WINDOWS,

GLAZING AND PRECAST CONCRETE SILLS.

COORDINATE WITH ENVIRONMENTAL

SPECIFICATIONS FOR REMOVAL AND

DISPOSAL OF HAZARDOUS MATERIALS.

(E) METAL STAIR TO REMAIN

(E) NORTHEAST

MASONRY STAIR

TOWER TO REMAIN

(E) NORTHEAST

MASONRY STAIR

TOWER TO REMAIN

(E) BRICK

MASONRY TO

REMAIN

(E) EXPOSED

CONCRETE

STRUCTURE TO

REMAIN

3'-10"

1ST FLOOR

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

1 2 3 4 5 6 7 8

REMOVE (E) STEEL FRAMED

WINDOWS, GLAZING AND

PRECAST CONCRETE SILLS.

COORDINATE WITH

ENVIRONMENTAL

SPECIFICATIONS FOR

REMOVAL AND DISPOSAL OF

HAZARDOUS MATERIALS.

(E) CONCRETE

STAIR AND RAMP

TO REMAIN

(E) CANOPY TO REMAIN

(E) ELEVATOR

PENTHOUSE TO

REMAIN

(E) BRICK

MASONRY TO

REMAIN

(E) EXPOSED CONCRETE

STRUCTURE TO REMAIN

(E) DOOR TO

REMAIN TYP.

NOTE:

CONCRETE AND MASONRY DEMOLITION FOR

REPAIRS ARE NOT SHOWN HERE. SEE PHASE 1

ELEVATION DRAWINGS FOR REPAIR LOCATIONS.

ALSO SEE S-503 FOR CONCRETE REPAIR DETAILS

AND AE520 FOR MASONRY REPAIR DETAILS.

0 2 4 8 16 32

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

1/8" = 1'-0"

:5 :3

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AED201.2

D

EM

O

LI

TI

O N

EX

TE

R

IO

R

N O R

TH

S O U

TH

EL

EV

AT

IO

N S

P H

AS

E

A E D .2

12811652

KSW ES EKO

DJD

1/8" = 1'-0"

NORTH ELEVATION DEMOLITION - PHASE 2

A1

1/8" = 1'-0"

SOUTH ELEVATION DEMOLITION - PHASE 2

C1

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

A

B

2 3 4 5 6 7 8

C

D

20'-10" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-10"

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. VISIT THE SITE TO VERIFY THE EXISTING ROOF-TOP CONSTRUCTION FLASHING

HEIGHTS, ADJACENT WALL CONSTRUCTION, ETC. FOR EACH ROOF AREA SHOWN ON

THE DRAWINGS. NOTIFY THE CONTRACTING OFFICER IN WRITING OF ANY

DIFFERENCES BETWEEN THE DRAWINGS AND EXISTING CONDITIONS THAT WILL

AFFECT THE ROOFING RECONSTRUCTION WORK.

4. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE ROOFING AND METAL WALL

PANEL MANUFACTURERS' RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE

REFERENCED STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF

ANY DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE

CONTRACT DOCUMENTS, THE CONTRACT DOCUMENTS TAKE PRECEDENCE.

5. DO NOT STOCKPILE MATERIAL ON THE ROOF AREAS. CONTRACTOR SHALL VERIFY

AVAILABLE STOCKPILE LOCATIONS WITH THE OWNER.

6. BRING TO THE ATTENTION OF THE CONTRACTING OFFICER ANY STRUCTURAL

DEFICIENCIES DISCOVERED DURING ROOF CONSTRUCTION ACTIVITIES.

IDENTIFY, REMOVE AND REPLACE (E) WET

ROOFING IN KIND, LOCATIONS SHOWN

ARE APPROXIMATE, CONFIRM EXTENT OF

WET ROOFING IN THE FIELD, TYP.

(E) MASONRY PENTHOUSE,

ROOF N.I.C

(E) EPDM

ROOFING

SYSTEM

(E) RAISED ROOF AREA,

APPROXIMATELY 2 FT.

ABOVE MAIN ROOF, VIF

A1

AE203.2

A1

AE204.2

A1

AE205.2

A1

AE200.2

A1

AE202.2

A1

AE201.2

METAL STEPS

(BID OPTION 2)

(E) METAL

PARAPET

COPING

(E) STAIR ROOF -

NOT IN CONTRACT

REPAIR FLASHING

AT RISING WALL

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

ROOFTOP DOAS UNIT (REFER TO

MECH. DWGS.), PROVIDE WOOD CURB

INTEGRATED WITH ROOFING.

PROVIDE CONTINUOUS EPDM ROOFING

AT CURBS. PROVIDE RIGID CONDUIT FOR

ROOFING PENETRATIONS AND FLASH

WITH PREFORMED BOOT FLASHING,

REMOVE AND REPLACE (E) ROOFING 1

FT. MIN. AROUND CURB.

(E)

(E)

(E)

AE511

A1

AE511

A2

AE510

A2

A1

AED200.2

A1

AED201.2

PROVIDE CONTINUOUS EPDM ROOFING.

PROVIDE RIGID CONDUIT FOR ROOFING

PENETRATIONS AND FLASH WITH

PREFORMED BOOT FLASHING, REMOVE

AND REPLACE (E) ROOFING 1 FT. MIN.

AROUND CURB.

(E) EPDM

ROOFING

SYSTEM BY

CARLISLE

A1

AED200.1

STANDING SEAM

METAL ROOF,

SEE C1/AE510

A1

AED201.1

A1

AE200.1

A1

AE201.1

C1

AED201.1

C1

AED201.2

A1

AE205.1

C1

AED200.1

C1

AED200.2

A1

AE202.1

A1

AE203.1

AE510

B2

AE510

B1

AE510

C4

(E)

LEGEND

(E) ROOF DRAIN

(E) MECHANICAL EQUIPMENT

(E) ROOF HATCH

METAL STAIRS WITH HANDRAIL

RIDGE OF (E) ROOFING

VALLEY OF (E) ROOFING

DIRECTION OF SLOPE OF (E) ROOFING

EXISTING VENT

VENT, SEE A4/AE511

BALLASTED GUARD RAIL, SEE B4/AE510

ROOFTOP WALKWAY PAD

REPLACE ROOF PER DETAIL C1/AE510 (NOTE -

EXTENT EXAGGERATED FOR CLARITY)

MECHANICAL CURB, SEE A3/AE510,

COORDINATE WITH MEP FOR EXACT LOCATIONS

CONDUIT PENETRATION, SEE MECH. DWGS.

DUCT PENETRATION, SEE A4/AE510

0 2 4 8 16 32

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

1/8" = 1'-0"

:5 :1

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE103.2

R O O F P

LA

N

P H

AS

E

A E .2

12811653

KSW ES EKO

DJD

1/8" = 1'-0"

ROOF PLAN - PHASE 2

A1

NORTH

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

ABCD

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

S-501

C2

TYP.

(E) CONCRETE

STAIR AND

RAMP

(E) ELEVATOR PENTHOUSE (BEYOND)

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :1

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE200.1

EA

S T

EL

EV

AT

IO

N

P H

AS

E 1A E .1

12811654

KSW ES EKO

DJD

3/16" = 1'-0"

EAST ELEVATION - PHASE 1

A1

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

ABCD

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

TYP.AE520

C4

(E) CONCRETE

STAIR AND

RAMP

(E) ELEVATOR PENTHOUSE (BEYOND)

AE520

B2

TYP.

NOTE: USE QUANTITES INCLUDED IN THE TABLE

ABOVE FOR DEVELOPING PRICING, DO NOT TAKE-

OFF QUANTITES FROM THE ELEVATION SHEETS.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :1

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE200.2

EA

S T

EL

EV

AT

IO

N

P H

AS

E 2A E .2

12811655

KSW ES EKO

DJD

3/16" = 1'-0"

EAST ELEVATION - PHASE 2

A1

FACADE REPAIR QUANTITIES - PROJECT TOTALS

CONCRETE SPALLS

(SF)

CONCRETE CRACKS

(LF)

BRICK REPOINTING

(SF)

REPLACEMENT BRICK

(EA)

150 20 1100 100

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

45678

(E) VENT OPENINGS, INFILL

WITH CONCRETE

M A

T C

H L

IN

E

S

E

.1

S-501

C2

(E) ELEVATOR

PENTHOUSE

BEYOND

(E) MASONRY NORTHEAST STAIR TOWER

(E) METAL STAIR

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :1

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE201.1

N O R

TH

EL

EV

AT

IO

N

A

P H

AS

E

A E .1

12811656

KSW ES EKO

DJD

3/16" = 1'-0"

NORTH ELEVATION A - PHASE 1

A1

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

45678

M A

T C

H L

IN

E

S

.2

AE520

C4

(E) ELEVATOR

PENTHOUSE

BEYOND

(E) MASONRY NORTHEAST

STAIR TOWER

AE520

B2

(E) METAL STAIR

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE201.2

N O R

TH

EL

EV

AT

IO

N

A

P H

AS

E

A E .2

12811657

KSW ES EKO

DJD

3/16" = 1'-0"

NORTH ELEVATION A - PHASE 2

A1

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

STANDING SEAM METAL

ROOF WITH HUNG

GUTTER AND

DOWNSPOUT. SEE

AE103.2 FOR PLAN.

CMU WALL REFER TO

STRUCTURAL DWGS. COATED

WITH WATER-RESISTANT

COATING, EXTEND COATING

ONTO CONCRETE 6" MIN. SEE

SPEC. SECTION 09 90 00.

(E) NORTHWEST

MASONRY STAIR

TOWER

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS, OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

DOOR, REFER TO ARCH

DRAWINGS

M A

T C

H L

IN

E

S E

E A

E .1

AE520

A2

AE520

A3

AE520

A1

S-501

C2

CONCRETE FOUNDATION

WALL, REFER TO

STRUCTURAL DRAWINGS.

SIM. B1/AE520

NOTE: LEAN-TO STRUCTURE ON WEST

ELEVATION NOT SHOWN FOR CLARITY.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE202.1

N O R

TH

EL

EV

AT

IO

N

B

P H

AS

E

A E .1

12811658

KSW ES EKO

DJD

3/16" = 1'-0"

NORTH ELEVATION B - PHASE 1

A1

(E) VENT OPENINGS, INFILL

OPENINGS WITH CONCRETE

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

(E) NORTHWEST

MASONRY STAIR

TOWER

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS, OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

REPAIR (E) EPDM

ROOFING AT RISING

WALL BEYOND, SEE

DETAIL A2/AE511.

AE520

B1

EXTENT

OF DETAIL

M A

T C

H L

IN

E

S E

E A

E .2

NOTE: LEAN-TO STRUCTURE ON WEST

ELEVATION NOT SHOWN FOR CLARITY. LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE202.2

N O R

TH

EL

EV

AT

IO

N

B

P H

AS

E

A E .2

12811659

KSW ES EKO

DJD

3/16" = 1'-0"

NORTH ELEVATION B - PHASE 2

A1

EXTEND ROOFING OVER TOP

OF SILICONE SHEET TO

PROVIDE WATERTIGHT

TRANSITION BED ROOFING IN

SILICONE SEALANT OVER

SHEET SEAL.

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

1 2 3 4

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

(E) CONCRETE STAIR AND RAMP

(E) DOOR TYP.

(E) CANOPY

STANDING SEAM METAL

ROOF WITH HUNG

GUTTER

CMU WALL REFER TO

STRUCTURAL DWGS.

COATED WITH WATER-

RESISTANT COATING,

SEE 09 90 00. EXTEND

COATING ONTO

CONCRETE 6" MIN.

CONCRETE

FOUNDATION WALL,

REFER TO

STRUCTURAL

DRAWINGS.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE203.1

S O U

TH

EL

EV

AT

IO

N

A

P H

AS

E

A E .1

12811660

KSW ES EKO

DJD

3/16" = 1'-0"

SOUTH ELEVATION A - PHASE 1

A1

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

1 2 3 4

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

(E) CONCRETE STAIR AND RAMP

(E) DOOR TYP.

(E) CANOPY

PREPARE STEEL TENSION ROD

SURFACES AND PAINT TYP. REFER

TO 09 90 00. REMOVE AND RE-SET

EDGE METAL AS NEEDED.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE203.2

S O U

TH

EL

EV

AT

IO

N

A

P H

AS

E

A E .2

12811661

KSW ES EKO

DJD

3/16" = 1'-0"

SOUTH ELEVATION A - PHASE 2

A1

M A

T C

H L

IN

E

S

.2

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

5 6 7 8

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

(E) CONCRETE STEPS AND RAMP

(E) CANOPY

AE520

C4

(E) ELEVATOR DOOR

(E) ELEVATOR PENTHOUSE

TYP.

AE520

B2

(E) DOOR TO REMAIN

PREPARE STEEL TENSION ROD

SURFACES AND PAINT TYP. REFER TO 09

90 00. REMOVE AND RE-SET EDGE METAL

AS NEEDED.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE204.2

S O U

TH

EL

EV

AT

IO

N

B

P H

AS

E

A E .2

12811662

KSW ES EKO

DJD

3/16" = 1'-0"

SOUTH ELEVATION B - PHASE 2

A1

M A

T C

H L

IN

E

S

.2

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

A B C D

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

DOWN

LEADER

HUNG GUTTER,

SLOPE 1/16" PER FT.

STANDING SEAM

METAL ROOF SEE

DETAIL C2/AE510

(E) VENT OPENINGS,

INFILL OPENINGS WITH

CONCRETE, TYP.

AE510

C4

AE510

B1

AE510

B2

S-501

C2

(E) NORTHWEST

MASONRY STAIR

TOWER

ATTACHMENT STRAPS

ROUGHLY 2' FROM TOP

AND BOTTOM. STRAP

FASTENERS WITHIN CMU

WALL SHALL BE INSTALLED

INTO MORTAR JOINTS.

CONCRETE FOUNDATION

WALL, REFER TO

STRUCTURAL DWGS.

CMU WALL REFER TO

STRUCTURAL DWGS. COATED

WITH ELASTOMERIC WATER-

RESISTANT COATING, EXTEND

COATING ONTO CONCRETE

FOUNDATION WALL 6" MIN.

CONCRETE REPAIR

EXTENDS BEHIND (E)

STRUCTURE. EXECUTE

SPECIFIED REPAIRS PRIOR

TO ERECTING. SEE AE205.2

FOR LOCATIONS.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE205.1

W

ES

T

EL

EV

AT

IO

N

P H

AS

E 1A E .1

12811663

KSW ES EKO

DJD

3/16" = 1'-0"

WEST ELEVATION - PHASE 1

A1

TYP.

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

14'-4"

2ND FLOOR

24'-10"

ROOF

0"

EXISTING GRADE

A B C D

GENERAL NOTES:

1. REPAIRS AND ALTERATIONS ARE DESIGNED IN ACCORDANCE WITH THE FOLLOWING I-

CODES:

2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO

ORDERING MATERIALS OR STARTING CONSTRUCTION. DIMENSIONS OF EXISTING

CONSTRUCTION SHOWN ON THE DRAWINGS ARE BASED ON LIMITED SAMPLE

MEASUREMENTS AND EXISTING DRAWINGS. ACTUAL DIMENSIONS AND

CONSTRUCTION MAY VARY FROM THAT SHOWN.

3. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURERS'

RECOMMENDATIONS AND GUIDE SPECIFICATIONS, AND THE REFERENCED

STANDARDS LISTED IN THE PROJECT SPECIFICATIONS. IN THE CASE OF ANY

DISCREPANCIES BETWEEN THE MANUFACTURER'S INFORMATION AND THE CONTRACT

DOCUMENTS, THE MORE STRINGENT REQUIREMENTS TAKE PRECEDENCE.

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL EXISTING BUILDING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE 1-200-01

(E) NORTHWEST

MASONRY STAIR

TOWER

EXECUTE SPECIFIED CONCRETE

REPAIRS AT SURFACES TO RECIEVE

NEW STRUCTURE PRIOR TO ERECTING.

COORDINATE WITH PHASE 1.

LEGEND

SPALLED (E) CONCRETE, SEE S-503, SEE AE200.1

FOR QUANTITES

CRACKS IN (E) CONCRETE, REPAIR PER DETAIL

B4/S501, SEE AE200.1 FOR QUANTITES

BRICK, REMOVE AND REPLACE CRACKED OR

SPALLED BRICK PER DETAIL C3/AE520, SEE AE200.1

FOR QUANTITES

REPOINT (E) MORTAR JOINTS, PER DETAIL C2/AE520

REMOVE (E) WINDOWS AND (E) PRECAST

CONCRETE SILL. INFILL WITH MASONRY

(E) EXPOSED CONCRETE FRAME

CONCRETE FOUNDATION, REFER TO STRUCTURAL

DRAWINGS

CMU WALL, REFER TO STRUCTURAL DRAWINGS.

COAT WITH ELASTOMERIC WATER-RESISTANT

COATING

20 64 10 14 22

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE205.2

W

ES

T

EL

EV

AT

IO

N

P H

AS

E 2A E .2

12811664

KSW ES EKO

DJD

3/16" = 1'-0"

WEST ELEVATION - PHASE 2

A1

(E) CONCRETE

STAIR AND

RAMP

PREPARE (E) LEAN-TO STEEL

COLUMN AND SADDLE

SURFACES AND PAINT, TYP.

REFER TO 09 90 00.

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

(E) CONCRETE

WAFFLE SLAB

TRANSITION

TO (E) ROOFING ROOFING

(E) ROOFING

TO REMAIN

4" 4"

4" MIN. LAP TO

(E) VAPOR BARRIER

(E) VAPOR

BARRIER

(E) INSULATION

(E) COVERBOARD

(E) EPDM MEMBRANE

(E) FASTENER WITH

WASHER PLATE

LAP SEALANT

FASTENER WITH

WASHER PLATE

INSULATION;

THICKNESS AND

SLOPE TO MATCH

EXISTING

COVERBOARD

FULLY ADHERED EPDM MEMBRANE

NOTE:

SEE ROOF PLAN FOR

EXTENTS OF REPLACEMENT.

SEAM ADHESIVE TAPE

PREFABRICATED

ALUMINUM PANEL

3/4" PLYWOOD, FASTEN

TO METAL DECK

@ 6" ALONG EDGES

@ 12" IN FIELD

/8

2"

BETWEEN PANELS

1/16" MIN. GAP

DOUBLE LOCK STANDING SEAM,

SPACE 20" O.C. MAX., ORIENT

PARALLEL WITH SLOPE OF ROOF

PREFABRICATED STAINLESS

STEEL CLEAT, 2" WIDE,

SPACED AT 6" O.C. FOLD INTO

STANDING SEAM

CONTINUOUS SELF-

ADHERED UNDERLAYMENT

CONTINUOUS BREATHER

SHEET AND ROOF MAT

METAL DECK, SEE

STRUCTURAL DWGS.

REGLET SET ALUMINUM FLASHING; EXTEND

3" MIN. BEYOND ROOF BOTH SIDES.

M

IN

STANDING SEAM METAL ROOFING; TURN UP

TOP EDGE AND SEAL WITH SEALANT

METAL COUNTER FLASHING. EXTEND

3 IN. BEYOND ROOF BOTH SIDES

M

IN

3/4" PLYWOOD SHEATHING

(E) CONCRETE

METAL DECK AND

FRAMING, SEE

STRUCTURAL DWGS.

CONTINUOUS MEMBRANE UNDERLAYMENT, BREATHER

SHEET, AND ROOF MAT (NOT SHOWN), EXTEND ONTO WALL

BACKER ROD AND SEALANT,

SEE DETAIL C1/AE520

CONTINUOUS Z-CLOSURE

CUT REGLET INTO (E) CONCRETE

METAL DECK AND

FRAMING, SEE

STRUCTURAL DWGS.

STAINLESS

STEEL STRAP

4" ALUMINUM

GUTTER AND

DOWNSPOUT

STAINLESS

STEEL BRACKET

CMU WALL SEE

STRUCTURAL DWGS.

STANDING SEAM

METAL ROOFING

BREATHER SHEET AND ROOF MAT

CONTINUOUS SELF-

ADHERED UNDERLAYMENT

CONTINUOUS EAVE

STARTER FLASHING

3/4" PLYWOOD

MASONRY BOND BEAM, SEE

STRUCTURAL DRAWINGS

2X4 WOOD BLOCKING, ANCHOR

WITH 3 1/4 IN. MASONRY ANCHORS,

1/4 IN. DIAMETER @ 12 IN. O.C.

PREFABRICATED

ALUMINUM PANEL

PREFABRICATED STAINLESS

STEEL CLEAT, 2" WIDE,

SPACED AT 12" O.C. FOLD

INTO STANDING SEAM

METAL DECK SEE

STRUCTURAL DWGS.

ALUMINUM

FLASHING WITH

DRIP EDGE

CMU WALL SEE

STRUCTURAL

DWGS.

TYP. STANDING

SEAM ROOFING

ASSEMBLY, SEE

C2/AE510.

/2

M

IN

2X6 WOOD

BLOCKING

GUARD RAIL (TYP.)

COUNTERWEIGHT

WALKWAY PADS

EPDM ROOFING

ASSEMBLY

NOTE:

DO NOT PENETRATE ROOF MEMBRANE.

(E) CONCRETE

WAFFLE SLAB

/2

ROOFING

ASSEMBLY

(E) CONCRETE WAFFLE SLAB

/2

TREATED WOOD

BLOCKING

EPDM STRIP FLASHING

FASTENER, PER MANUFACTURER, TO BE

COMPATIBLE WITH TREATED WOOD BLOCKING TYP.

ALUMINUM COUNTERFLASHING

FASTENER

MECHANICAL UNIT, REFER TO MECH. DWGS.

EPDM FLASHING

SEALANT

MECHANICAL UNIT

CURB FILLED WITH

BATT INSULATION

SEAM ADHESIVE TAPE

REMOVE AND REPLACE ROOFING 1 FT. MIN.

BEYOND PENERATION IN ALL DIRECTIONS.

SEE DETAIL C1/AE510.

EPDM ROOFING

ASSEMBLY

(E) CONCRETE

WAFFLE SLAB

/4

TREATED WOOD

BLOCKING

FASTENER, PER MANUFACTURER,

TO BE COMPATIBLE WITH

TREATED WOOD BLOCKING TYP.

EPDM FLASHING

SEALANT

M

IN

NOTES:

1. IF THE DUCT WILL BE WATERPROOFED AND

INSULATED, EXTEND WATERPROOFING AND

INSULATION ONTO METAL FLASHING ON

DUCT, TO ACT AS COUNTERFLASHING.

DUCTWORK, SHOWN

SCHEMATICALLY.

ALUMINUM COUNTERFLASHING

SEALANT OVER

EXPOSED FASTENERS

REMOVE AND REPLACE

ROOFING 1 FT. MIN. BEYOND

DUCT PENETRATION ON ALL

SIDES. SEE DETAL C1/AE510.

SEAM ADHESIVE TAPE

CONTINUOUS

BUTYL TAPE TYP.

ROOFING

ASSEMBLY

(E) CONCRETE WAFFLE SLAB

/2

EPDM STRIP FLASHING

FASTENER, PER MANUFACTURER, TO BE

COMPATIBLE WITH TREATED WOOD BLOCKING TYP.

ALUMINUM CAP FLASHING

FASTENER

EPDM ROOFING, EXTEND UP AND OVER CURB

SEAM ADHESIVE TAPE

PREFABRICATED METAL CURB, SEE

MECHANICAL DRAWINGS.

REMOVE AND REPLACE ROOFING

1 FT. MIN. BEYOND PENERATION

IN ALL DIRECTIONS. SEE DETAIL

C1/AE510.

M

IN

TREATED WOOD

BLOCKING

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

As indicated

:5 :2

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE510

TY

P

IC

AL

R O O F D

ET

AI

LS

A E

12811665

KSW ES EKO

DJD

NTS

TYPICAL TRANSITION AT EXISTING ROOFING

C1

NTS

TYPICAL STANDING SEAM METAL ROOF - SECTION

C2

NTS

METAL ROOF AT RISING WALL

C4

NTS

STANDING SEAM ROOF EDGE AT GUTTER

B1

NTS

RAKE AT STANDING SEAM METAL ROOF EDGE

B2

NTS

BALLASTED GUARD RAIL

B4

NTS

FLASHING AT MECHANICAL CURB

A2

1 1/2" = 1'-0"

FLASHING AT DUCT PENETRATION

A4

1 1/2" = 1'-0"

FLASHING AT PRE-FABRICATED METAL MECHANICAL CURB

A3

D E S

IG

N

2 0

E-

FI

N

AL

2/

IS

SU

ED

FO

R

C O N

ST

R U C T I O N

3/

(E) ROOF SLAB

STAINLESS STEEL

HOSE CLAMP

SEALANT TYP.

EPDM FLASHING, TYP.

/4

M

IN

1/2" GALV A36 BASE PLATE

GALV STEEL STAIR

STRINGER AND TREADS

HSS 4 X 0.250

(GALV)

SEAM ADHESIVE TAPE, TYP.

EXTEND VAPOR

RETARDER MEMBRANE

ONTO STEEL POST

EPDM

ROOFING

SYSTEM

REMOVE AND REPLACE

ROOFING 1 FT. BEYOND

POST, SEE C1/AE510

(4) 1/2" Ø GALV. EXPANSION

ANCHORS WITH 2 1/4" EMBED

(4) 3/4" Ø GALV A307 BOLTS

1/2" GALV A36 CONNECTOR PLATES

3/16

1/2" GALV A36 GUSSET PLATES

3/16

3/16

COORDINATE STRINGER GEOMETRY AT TOP

OF STAIR WITH EXISTING ROOF STRUCTURE.

(E) CONCRETE

WAFFLE SLAB

SEAM ADHESIVE

TAPE

(E)

MASONRY

WALL

EPDM BASE FLASHING

(E) BACKER ROD

AND SEALANT

TERMINATION

BAR FASTENED

12 IN. O.C.

(E) VAPOR

RETARDER

(E) EPDM

ROOF

SYSTEM

NOTE:

EXTEND EPDM EXPANSION JOINT

MIN. 3 IN. BEYOND ROOF EDGE AND

3 IN BELOW ROOF AT EDGES.

BACKER ROD

/1

/1

(E) CONCRETE SLAB

TERMINATION BAR

AND SEALANT

EPDM

ROOFING

SYSTEM

PRE MOLDED BOOT

FLASHING

SEAL OR ADHERE

VAPOR RETARDER TO

PIPE (TYP.)

PIPE

SEALANT

M

IN

HOSE CLAMP

(E) CONCRETE

WAFFLE SLABREMOVE AND REPLACE

ROOFING 1 FT. BEYOND

PENETRATION IN ALL

DIRECTIONS. SEE

DETAIL C1/AE510.

SEAM ADHESIVE

TAPE

NOTE:

PROTECT EXISTING ROOFING FROM WATER

AND DAMAGE DURING CORING OPERATIONS.

/1

V E

N T

P

IP

E H

E

IG

H T

P E

R M

E C

H D

W G

S

BACKER ROD

AND SEALANT

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SATISFACTORY TO

APPROVED

ACTIVITY

3/10/2020

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

S

YM

D

ES

C R

IP

TI

O N

D

AT

E

AP

P R

DRAWFORM REVISION: 12 APRIL 2018

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N C

LA

S S

IF

IE

D

FO

R

O

FF

IC

IA

L U S E O N

LY

F

IL

E

N A M E

LA

Y O U T N A M E

P L O

TT

E D

U S E R

CFM/LEJ

EJA

APPROVED BY JOHNATHAN JOHNS

PM&EB SUPERVISOR WITH NAVAL

SUBASE, NEW LONDON, CT

N40085-20-R-0033

1600391

D

EP

AR

TM

EN

T O F

TH

E N

AV

Y

C ry st al

La ke

R d, G ro to n, C T

C ry st al L ak e

R d

, G ro to n

, C T

D

E P

A R

T M

E N

T O

F T

H E

N A

V Y

I:

B O S P ro je c ts .0 B D ra w in g s W o rk in g S e t\ R e vi t\ L O C A L

U S E R S

JC

V a rn e y\ .0 B R jc va rn e y.

rv t

3" = 1'-0"

:5 :3

A M

P R

O J E

C T

R M

-1

R

E P

A

IR

N A

V Y

I N

F

O P

E R

A T

IO

N

S D

E T

A C

H M

E N

T

B L D

G

AE511

TY

P

IC

AL

R O O F D

ET

AI

LS

A E

12811666

KSW ES EKO

DJD

NTS

TYPICAL STAIR SUPPORT

A1

NTS

EPDM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .