Attachment_D_-_As-Built_Drawings.pdf

PDF 1 MB Posted

Attached to
Max Brewer Causeway Shoreline Restoration Project
Solicitation number
B-8-26-29
Issued by
Brevard County, Florida

About this file

This is an as-built survey and record drawing for the Florida Coast to Coast Trailhead at Parrish Park, prepared by MacGillivray & Co Surveyors & Mappers, LLC for C&D Construction in Brevard County, Florida. The three-sheet survey document, dated August 13, 2025, with field work completed on August 20, 2025, depicts the completed paving and storm drainage infrastructure for the project located in Section 21, Township 35 South, Range 35 East. The as-built drawings show the installed storm drainage system consisting of 12-inch and 6-inch high-density polyethylene (HDPE) and polyvinyl chloride (PVC) storm pipes, drainage structures including two storm drainage systems designated as S-100 and S-101 with recorded invert elevations, concrete sidewalks (5-foot and 10-foot widths), pavement with light poles, ramps, and stairs. The survey includes detailed spot elevations, station references along the curved alignment (ranging from station 102 to 115), and measurements of all improvements from centerlines of pipes and structures. The survey was certified by Florida Licensed Surveyor Dolly Ojala Carwile (PSM No. 6878) and references the Florida State Plane Coordinate System, East Zone, NAD83/11, with elevations based on NAVD88 and tied to established National Geodetic Survey monuments.

The as-built survey documentation explicitly states this is not a boundary survey, title certification, or zoning verification, and notes that underground and above-ground improvements were not located unless otherwise shown on the drawings. All dimensions are measured from centerlines of pipes and structures, and the survey was prepared according to standards set forth in Florida Administrative Code Chapter 5J-17, pursuant to Florida Statutes Chapters 177 and 472. The document includes comprehensive legends identifying over 60 surveying symbols and abbreviations used throughout the three sheets, with matchline references connecting the three sheets for complete project representation.

View the file

Other files

File Type Posted
Notice_of_Award.pdf PDF
Public_Meeting_Notice.pdf PDF
Bid_Tabulation_-_Notice_of_Intended_Award.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Pre-bid_Sign_In_Sheet.pdf PDF
Addendum_1.pdf PDF
Attachment_F_-_SJRWMD_Permit.pdf PDF
Attachment_A_-_Price_Sheet.xlsx XLSX spreadsheet
Attachment_C_-_Drawings.pdf PDF
Attachment_D_-_As-Built_Drawings.pdf PDF
B-8-26-29_INV_&_SPECS.pdf PDF
Attachment_B_-Technical_Specifications.pdf PDF
Attachment_E_-_Geotechnical_Report.pdf PDF
Attachment_C_-_Drawings.pdf PDF
B-8-26-29_INV_&_SPECS.pdf PDF
Attachment_B_-Technical_Specifications.pdf PDF
Attachment_E_-_Geotechnical_Report.pdf PDF
Attachment_A_-_Price_Sheet.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PC: 103+17.40

PC: 107+43.36

PT: 102+09.01

PT: 106+99.83

PRC: 105+96.30

20 LF ~ 12" HDPE STORM

24 LF ~ 12" HDPE STORM @ 0.25%

LIGHT POLE (TYPICAL)

55 LF ~ PVC STORM

6" WALL

RAMP

STAIRS

BACK OF SIDEWALK/FRONT OF WALL

S-100

TOP=2.53

SE INV=-1.90

INV=-1.71 -1.84

TOP OF STORM

TOP OF STORM

TOP OF STORM

3.7

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

54 LF ~ PVC STORM

54 LF ~ PVC STORM

54 LF ~ PVC STORM

54 LF ~ PVC STORM

BACK OF TYPE "F" CURB

BACK OF TYPE "F" CURB

BACK OF TYPE "F" CURB

BACK OF TYPE "F" CURB

5' CONCRETE SIDEWALK

5' CONCRETE SIDEWALK

10' CONCRETE SIDEWALK

3.04

2.98

2.94

2.94

2.92

2.95

2.84

2.92

2.83

4.89

5.44

5.08

4.8

4.5

3.54

3.48

3.44

3.44

3.42

3.45

3.34

3.42

3.33

1.

2.40 2.2

2.412.2

1.99

2.582.4

1.92

2.4

3.0

2.8

2.9

3.0

3.1 2 2.80

3.13

3.00

2.66

2.71

2.72

2.72

3.05

2.61

2.61

2.93

2.98

2.56

2.69

2.96

3.00

2.

2.86

2.8

2.

1.47

1.

1.3

1.33

1.45

1.4

1.

1.

2.

1.84 2.49

5.39

5.67 5.87

5.

5.94

5.58

5.

5.0

2.0

4.53

4.46

4.3

4.4

4.4

4.4

4.02

3.

4.1

4.2

3.87 3.38

4.

4.

3.51

3.90

3.

4.1

4.1

3.88 3.45

4.1 5 4.0

3.52

3.77

3.

3.713.35

3.30

3.78

2.7

2.8

2.7

4.51

3.47

3.20

3.16

3.16

3.10

3.09

3.01

2.83

2.86

2.86

2.84

2.87

2.84

2.85

2.91

2.98

2.98

2.92

2.87

2.9

© 2024 Microsoft Corporation © 2024 TomTom

PROJECT AREA

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

O F

Location Map Scale 1" = 1000'

Notes

1. THIS IS AN AS-BUILT OR RECORD SURVEY AND IS NOT TO BE CONSTRUED AS ANY OTHER TYPE OF SURVEY.

2. THIS IS NOT A BOUNDARY SURVEY.

3. ADDITIONS OR DELETIONS TO THIS AS-BUILT SURVEY BY OTHER THAN THE SIGNING PARTY IS PROHIBITED WITHOUT

THE WRITTEN PERMISSION OF THE SIGNING SURVEYOR.

4. THIS SURVEY IS CERTIFIED TO THE DATE OF LAST FIELD WORK ONLY, AND NOT THE SIGNING DATE.

5. THIS MAP IS NOT A CERTIFICATION OF TITLE, ZONING, SETBACKS OR FREEDOM OF ENCUMBRANCES AND WAS

PREPARED WITHOUT BENEFIT OF ABSTRACT OF TITLE AND ALL MATTERS OF TITLE SHOULD BE REFERRED TO AN

ATTORNEY AT LAW.

6. PARCEL IS SUBJECT TO EASEMENTS, RESTRICTIONS, RESERVATIONS AND RIGHTS OF WAY OF RECORD. (RECORDED, UNRECORDED, WRITTEN AND UNWRITTEN).

7. UNDERGROUND AND ABOVE GROUND IMPROVEMENTS WERE NOT LOCATED. UNLESS OTHERWISE SHOWN.

8. SURVEY BASED ON DESCRIPTION PROVIDED BY THE CLIENT.

9. THIS SURVEY WAS NOT INTENDED TO DELINEATE OR DEFINE ANY WETLANDS, ENVIRONMENTALLY SENSITIVE AREAS, WILDLIFE HABITATS OR JURISDICTIONAL LINES OF ANY FEDERAL, STATE, REGIONAL OR LOCAL AGENCY, BOARD, COMMISSION OR OTHER ENTITY.

10. HORIZONTAL DATUM BASED ON FLORIDA STATE PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM OF 1983, 2011 ADJUSTMENT (NAD83/11), US SURVEY FEET, AS ESTABLISHED FROM FLORIDA PERMANENT REFERENCE

NETWORK.

11. ELEVATIONS SHOWN HEREON ARE BASED UPON SITE DEVELOPMENT BENCHMARKS. REFERENCED TO NATIONAL GEODETIC SURVEY MONUMENTS; DESIGNATION: #R 485, PID #AJ5512, HAVING AN ELEVATION OF 3.44 FEET & #UC 13, PID #AK0753, HAVING AN ELEVATION OF 15.90, NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).

12. ALL SHEETS MUST BE TOGETHER, NEITHER IS FULL AND COMPLETE WITHOUT THE OTHER.

ALL DIMENSIONS SHOWN HEREON ARE FROM C/L OF PIPE.

ALL DIMENSIONS SHOWN HEREON ARE FROM C/L OF STRUCTURE.

I HEREBY AFFIRM THAT THIS SURVEY REPRESENTED HEREON IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. IT HAS BEEN PREPARED IN ACCORDANCE WITH THE STANDARDS SET FORTH IN CHAPTER 5J-17, F.A.C., PURSUANT TO CHAPTERS 177 AND 472, FLORIDA STATUTES.

THIS MAP IS NOT VALID WITHOUT THE ORIGINAL SIGNATURE AND RAISED SEAL OR DIGITAL

AUTHORIZATION OF THE FLORIDA LICENSED SURVEYOR AND MAPPER. UNLESS IT BEARS THE

SIGNATURE AND SEAL OF THE LAND SURVEYOR LISTED, THIS DRAWING, SKETCH, PLAT OR MAP IS NOT VALID AND IS FOR INFORMATIONAL PURPOSES ONLY. DIMENSIONS OF IMPROVEMENTS SHOWN

SHOULD NOT BE USED TO RECONSTRUCT BOUNDARY LINES.

DOLLY OJALA CARWILE, PSM DATE SIGNED

FLORIDA LICENSED SURVEYOR NO. 6878

Feet

0 10 20 40

1" = 20'

PROJECT NO:

C

LI

EN

T:

SU

R

VE

Y:

PR

O

JE

C

T:

LO

C

AT

IO

N

D

AT

E:

D

ES

C

R

IP

TI

O

N

R

EV

BY

DATE OF LAST FIELD WORK:

FIELD BOOK & PAGE:

SCALE:

DRAWN:

CHECKED:

DATE:

SHEET:

OF

8/20/2025

C :\U se rs

\J am ie (W or k)

\O ne

D riv e

- m ac gi lliv ra ys ur ve yi ng .c om \A ct iv e Jo bs \C

-0

P ar ris h Pa rk \C

-0

C

AD

\C

-0

P ar ris h Pa rk

As -B ui lt.

dw g

PO

B ox

D el to na , F

L

9-

7-

0-w w w .m ac gi lliv ra ys ur ve yi ng .c om Li ce ns ed B us in es s

N o.

M a cG il li v ra y

C o S u rv ey or s

M a p p er s, L L

C

FL

O

R

ID

A C

O

AS

T

TO

C O

AS

T

TR

AI

LH

EA

D

AT

P

AR

R

IS

H P

AR

K

SE

C

TI

O

N

1, T

O W

N

SH

IP

SO

U

TH

, R

AN

G E

E

AS

T

BR

EV

AR

D

C O

U N

TY

, F

LO

R

ID

A

PA

VI

N G

S

TO

R

M

AS

-B U

IL

T

C &D

C O

N

ST

R U

C

TI

O N

1" = 20'

JCC/JTG

DOC

VARIES

8/13/2025

C06-001

1 3

Legend

= FOUND CONCRETE MONUMENT

= FOUND IRON AND CAP

= FOUND NAIL AND DISC

= SET 5/8" IRON ROD AND CAP

= SET NAIL AND DISC

= BENCHMARK

= NO CORNER FOUND

= AIR RELEASE VALVE

= ARC LENGTH

= ASPHALT

= BACK FLOW PREVENTOR

= BACK OF CURB

= CABLE RISER

= CALCULATED

= CENTERLINE

= CONCRETE

= CONCRETE

= CORRUGATED METAL PIPE

= DEED BOOK

= DELTA ANGLE

= DRAINAGE EASEMENT

= DRAINAGE MANHOLE

= DUCTILE IRON PIPE

= EDGE OF PAVEMENT

= ELECTRIC MANHOLE

= ELLIPTICAL REINFORCED CONCRETE PIPE

= FINISHED FLOOR

= FIRE HYDRANT

= FLARED END SECTION

= FLOW LINE

= FORCE MAIN

= FORCEMAIN BEND

= FORCEMAIN PLUG VALVE

= FORCEMAIN TEE

= FORCEMAIN VALVE

= GATE VALVE

= GRADE BREAK

= GROUND

= HIGH DENSITY POLYETHYLENE PIPE

= INVERT ELEVATION

= IRRIGATION

= MEASURED

= MITERED END SECTION

= NOT ACCESSABLE

= OFFICIAL RECORDS BOOK

= OFFSET

= ORIFICE

= OUTER DIAMETER

= PAGE

= PLAT BOOK

= POINT OF BEGINNING

= POINT OF COMMENCEMENT

= POINT ON LINE

= POLYETHYLENE PIPE

= PROPERTY CORNER

= PUBLIC UTILITY EASEMENT

= RADIUS

= RECORD

= REDUCER

= REINFORCED CONCRETE PIPE

= REUSE BEND

= REUSE LINE

= REUSE TEE

= REUSE VALVE

= RIGHT-OF-WAY

= SANITARY LATERAL CLEANOUT

= SEWER MANHOLE

= SKIMMER

= SLOTTED REINFORCED CONCRETE PIPE

= SPOT ELEVATION

= STATION O/S

= TELEPHONE MANHOLE

= TELEPHONE RISER

= TOE OF SLOPE

= TOP OF BANK

= UTILITY POLE

= WATER BEND

= WATER ELEVATION

= WATER LINE

= WATER MAIN

= WATER SERVICE

= WATER TEE

= WATER VALVE

= WELL

NCF

ARV

L

ASP

BFP

BOC

(C)

CL

CONC

CMP

DB

Δ

DE

DIP

EP

ERCP

FF

FES

FL

FM

FMB

FMPV

FMT

GB

GR

HDPE

INV

IRR

(M)

MES

NA

ORB

O/S

ORF

OD

PG

PB

POB

POC

POL

PVC

PCOR

PUE

RAD

(R)

RED

RCP

RB

RL

RT

RV

RW

CLO

SMH

SKMR

SRCP

+90.0 O/S

TMH

TR

BOB

TOB

WB

WEL

WL

WM

WS

WT

WV

= EDGE OF CONCRETEECO

= CHAIN LINK FENCECLF

MATCHLINE - SEE SHEET 3 OF 3

= FRONT OF WALKFOW

AutoCAD SHX Text A

AutoCAD SHX Text Revised per comments

AutoCAD SHX Text

KRS

AutoCAD SHX Text 10/23/24

AutoCAD SHX Text

ST

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

PC: 110+28.52

PC: 112+59.66

PT: 109+35.79

PT: 112+37.15

PT: 113+72.87

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

TOP OF STORM

2.76

2.71

2.73

BACK OF SIDEWALK/FRONT OF WALL

55 LF ~ PVC STORM

55 LF ~ PVC STORM

55 LF ~ PVC STORM

55 LF ~ PVC STORM

55 LF ~ PVC STORM

BACK OF TYPE "F" CURB

BACK OF TYPE "F" CURB

2.86

3.00

2.94

2.98

2.98

3.03

3.00

3.14

3.04

3.15

3.02

3.11

3.15

3.16

3.11

3.22

3.32

3.33

3.30

3.18

3.23

3.27

3.23

3.30

3.24

3.33

3.22

3.29

3.22

3.15

3.11 3.63

3.40

3.42

3.33

3.36

3.50

3.44

3.48

3.48

3.53

3.50

3.64

3.54

3.65

3.52

3.61

3.65

3.66

3.61

3.72

3.82

3.83

3.80

3.68

3.73

3.77

3.73

3.80

3.74

3.83

3.72

3.79

3.72

3.65

3.85

3.90

4.13

3.61

2.

2.682.5

2.3

2.802.7

2.

2.852.7

2.06

2.512.3

2.60

3.05

3.13 2.68

2.79

3.23

3.30

2.90

2.88

3.24

3.24

2.82

2.82

3.30

3.28 2.88

3.

3.

3.16

3.

3.

3.

3.1

3.13

3.25

2.87

2.81

2.9

3.0

2.9

2.90

2.92

2.9

3.27

3.27

2.78

2.83

2.9

2.9

2.9

2.9

2.7

3.

2.73

2.8

3.

2.75

2.9

3.12

2.9

2.9

3.0

3.0

2.88

2.93

2.95

3.04

3.08

3.08

3.15

3.17

3.12

3.22

3.14

3.12

3.03

S-101

TOP=2.70 2.65

INV=-2.59

3.02

3.17

3.05

3.01

3.15

3.12

3.05

3.12

3.11

3.18

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

O F

PROJECT NO:

C

LI

EN

T:

SU

R

VE

Y:

PR

O

JE

C

T:

LO

C

AT

IO

N

D

AT

E:

D

ES

C

R

IP

TI

O

N

R

EV

BY

DATE OF LAST FIELD WORK:

FIELD BOOK & PAGE:

SCALE:

DRAWN:

CHECKED:

DATE:

SHEET:

OF

8/20/2025

C :\U se rs

\J am ie (W or k)

\O ne

D riv e

- m ac gi lliv ra ys ur ve yi ng .c om \A ct iv e Jo bs \C

-0

P ar ris h Pa rk \C

-0

C

AD

\C

-0

P ar ris h Pa rk

As -B ui lt.

dw g

PO

B ox

D el to na , F

L

9-

7-

0-w w w .m ac gi lliv ra ys ur ve yi ng .c om Li ce ns ed B us in es s

N o.

M a cG il li v ra y

C o S u rv ey or s

M a p p er s, L L

C

FL

O

R

ID

A C

O

AS

T

TO

C O

AS

T

TR

AI

LH

EA

D

AT

P

AR

R

IS

H P

AR

K

SE

C

TI

O

N

1, T

O W

N

SH

IP

SO

U

TH

, R

AN

G E

E

AS

T

BR

EV

AR

D

C O

U N

TY

, F

LO

R

ID

A

PA

VI

N G

S

TO

R

M

AS

-B U

IL

T

C &D

C O

N

ST

R U

C

TI

O N

1" = 20'

JCC

DOC

VARIES

8/13/2025

C06-001

2 3

Legend

= FOUND CONCRETE MONUMENT

= FOUND IRON AND CAP

= FOUND NAIL AND DISC

= SET 5/8" IRON ROD AND CAP

= SET NAIL AND DISC

= BENCHMARK

= NO CORNER FOUND

= AIR RELEASE VALVE

= ARC LENGTH

= ASPHALT

= BACK FLOW PREVENTOR

= BACK OF CURB

= CABLE RISER

= CALCULATED

= CENTERLINE

= CONCRETE

= CONCRETE

= CORRUGATED METAL PIPE

= DEED BOOK

= DELTA ANGLE

= DRAINAGE EASEMENT

= DRAINAGE MANHOLE

= DUCTILE IRON PIPE

= EDGE OF PAVEMENT

= ELECTRIC MANHOLE

= ELLIPTICAL REINFORCED CONCRETE PIPE

= FINISHED FLOOR

= FIRE HYDRANT

= FLARED END SECTION

= FLOW LINE

= FORCE MAIN

= FORCEMAIN BEND

= FORCEMAIN PLUG VALVE

= FORCEMAIN TEE

= FORCEMAIN VALVE

= GATE VALVE

= GRADE BREAK

= GROUND

= HIGH DENSITY POLYETHYLENE PIPE

= INVERT ELEVATION

= IRRIGATION

= MEASURED

= MITERED END SECTION

= NOT ACCESSABLE

= OFFICIAL RECORDS BOOK

= OFFSET

= ORIFICE

= OUTER DIAMETER

= PAGE

= PLAT BOOK

= POINT OF BEGINNING

= POINT OF COMMENCEMENT

= POINT ON LINE

= POLYETHYLENE PIPE

= PROPERTY CORNER

= PUBLIC UTILITY EASEMENT

= RADIUS

= RECORD

= REDUCER

= REINFORCED CONCRETE PIPE

= REUSE BEND

= REUSE LINE

= REUSE TEE

= REUSE VALVE

= RIGHT-OF-WAY

= SANITARY LATERAL CLEANOUT

= SEWER MANHOLE

= SKIMMER

= SLOTTED REINFORCED CONCRETE PIPE

= SPOT ELEVATION

= STATION O/S

= TELEPHONE MANHOLE

= TELEPHONE RISER

= TOE OF SLOPE

= TOP OF BANK

= UTILITY POLE

= WATER BEND

= WATER ELEVATION

= WATER LINE

= WATER MAIN

= WATER SERVICE

= WATER TEE

= WATER VALVE

= WELL

NCF

ARV

L

ASP

BFP

BOC

(C)

CL

CONC

CMP

DB

Δ

DE

DIP

EP

ERCP

FF

FES

FL

FM

FMB

FMPV

FMT

GB

GR

HDPE

INV

IRR

(M)

MES

NA

ORB

O/S

ORF

OD

PG

PB

POB

POC

POL

PVC

PCOR

PUE

RAD

(R)

RED

RCP

RB

RL

RT

RV

RW

CLO

SMH

SKMR

SRCP

+90.0 O/S

TMH

TR

BOB

TOB

WB

WEL

WL

WM

WS

WT

WV

= EDGE OF CONCRETEECO

= CHAIN LINK FENCECLF

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T

O F

Feet

0 10 20 40

1" = 20'

AutoCAD SHX Text

ST

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text Revised per comments

AutoCAD SHX Text

KRS

10/23/24

PI: 115+35.43

PI: 114+86.97

PI: 115+23.48

PI: 115+59.95

PT: 113+72.87

TOP OF STORM

TOP OF STORM

TOP OF STORM

2.73

2.73

2.74

2.72

2.65

2.61

55 LF ~ PVC STORM

55 LF ~ PVC STORM

3.35

2.92

2.91

3.04

3.17 3.1

3.7

4.2

4.4

4.0

5.1 25.4

5.4

5.0

4.6

4.57

4.48

4.5 24.9

4.7

4.2 13.

3.

673.54

3.41

3.42

3.85

2.41

2.882.7

2.23

5.6 25.9

5.9

5.5

5.1

5.07

4.98

3.

3.

3.

3.

3.

3.

3.

3.

2.7

3.5

2.9

2.7

2.92

3.3

3.1

3.1

3.15

3.08

3.12

3.03

3.04

3.10

3.06

3.00

PT: 102+09.01

LIGHT POLE (TYPICAL)

MATCHLINE - SEE SHEET 2 OF 3

PROJECT NO:

C

LI

EN

T:

SU

R

VE

Y:

PR

O

JE

C

T:

LO

C

AT

IO

N

D

AT

E:

D

ES

C

R

IP

TI

O

N

R

EV

BY

DATE OF LAST FIELD WORK:

FIELD BOOK & PAGE:

SCALE:

DRAWN:

CHECKED:

DATE:

SHEET:

OF

8/20/2025

C :\U se rs

\J am ie (W or k)

\O ne

D riv e

- m ac gi lliv ra ys ur ve yi ng .c om \A ct iv e Jo bs \C

-0

P ar ris h Pa rk \C

-0

C

AD

\C

-0

P ar ris h Pa rk

As -B ui lt.

dw g

PO

B ox

D el to na , F

L

9-

7-

0-w w w .m ac gi lliv ra ys ur ve yi ng .c om Li ce ns ed B us in es s

N o.

M a cG il li v ra y

C o S u rv ey or s

M a p p er s, L L

C

FL

O

R

ID

A C

O

AS

T

TO

C O

AS

T

TR

AI

LH

EA

D

AT

P

AR

R

IS

H P

AR

K

SE

C

TI

O

N

1, T

O W

N

SH

IP

SO

U

TH

, R

AN

G E

E

AS

T

BR

EV

AR

D

C O

U N

TY

, F

LO

R

ID

A

PA

VI

N G

S

TO

R

M

AS

-B U

IL

T

C &D

C O

N

ST

R U

C

TI

O N

1" = 20'

JCC

DOC

VARIES

8/13/2025

C06-001

3 3

Legend

= FOUND CONCRETE MONUMENT

= FOUND IRON AND CAP

= FOUND NAIL AND DISC

= SET 5/8" IRON ROD AND CAP

= SET NAIL AND DISC

= BENCHMARK

= NO CORNER FOUND

= AIR RELEASE VALVE

= ARC LENGTH

= ASPHALT

= BACK FLOW PREVENTOR

= BACK OF CURB

= CABLE RISER

= CALCULATED

= CENTERLINE

= CONCRETE

= CONCRETE

= CORRUGATED METAL PIPE

= DEED BOOK

= DELTA ANGLE

= DRAINAGE EASEMENT

= DRAINAGE MANHOLE

= DUCTILE IRON PIPE

= EDGE OF PAVEMENT

= ELECTRIC MANHOLE

= ELLIPTICAL REINFORCED CONCRETE PIPE

= FINISHED FLOOR

= FIRE HYDRANT

= FLARED END SECTION

= FLOW LINE

= FORCE MAIN

= FORCEMAIN BEND

= FORCEMAIN PLUG VALVE

= FORCEMAIN TEE

= FORCEMAIN VALVE

= GATE VALVE

= GRADE BREAK

= GROUND

= HIGH DENSITY POLYETHYLENE PIPE

= INVERT ELEVATION

= IRRIGATION

= MEASURED

= MITERED END SECTION

= NOT ACCESSABLE

= OFFICIAL RECORDS BOOK

= OFFSET

= ORIFICE

= OUTER DIAMETER

= PAGE

= PLAT BOOK

= POINT OF BEGINNING

= POINT OF COMMENCEMENT

= POINT ON LINE

= POLYETHYLENE PIPE

= PROPERTY CORNER

= PUBLIC UTILITY EASEMENT

= RADIUS

= RECORD

= REDUCER

= REINFORCED CONCRETE PIPE

= REUSE BEND

= REUSE LINE

= REUSE TEE

= REUSE VALVE

= RIGHT-OF-WAY

= SANITARY LATERAL CLEANOUT

= SEWER MANHOLE

= SKIMMER

= SLOTTED REINFORCED CONCRETE PIPE

= SPOT ELEVATION

= STATION O/S

= TELEPHONE MANHOLE

= TELEPHONE RISER

= TOE OF SLOPE

= TOP OF BANK

= UTILITY POLE

= WATER BEND

= WATER ELEVATION

= WATER LINE

= WATER MAIN

= WATER SERVICE

= WATER TEE

= WATER VALVE

= WELL

NCF

ARV

L

ASP

BFP

BOC

(C)

CL

CONC

CMP

DB

Δ

DE

DIP

EP

ERCP

FF

FES

FL

FM

FMB

FMPV

FMT

GB

GR

HDPE

INV

IRR

(M)

MES

NA

ORB

O/S

ORF

OD

PG

PB

POB

POC

POL

PVC

PCOR

PUE

RAD

(R)

RED

RCP

RB

RL

RT

RV

RW

CLO

SMH

SKMR

SRCP

+90.0 O/S

TMH

TR

BOB

TOB

WB

WEL

WL

WM

WS

WT

WV

= EDGE OF CONCRETEECO

= CHAIN LINK FENCECLF

Feet

0 10 20 40

1" = 20'

MATCHLINE - SEE SHEET 1 OF 3

AutoCAD SHX Text

ST

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text Revised per comments

AutoCAD SHX Text

KRS

10/23/24

Sheets and Views
C06-001 Parrish Park - As-Built-MGC (1)
C06-001 Parrish Park - As-Built-MGC (2)
C06-001 Parrish Park - As-Built-MGC (3)
2025-08-21T13:57:03-0400
Dolly O Carwile

File details come from the government source that posted it. Updated .