This document contains an estimated construction cost worksheet template and a pre-solicitation notice for a federal contract opportunity.

The cost worksheet template lists construction divisions and line items with unit costs and quantities to calculate total costs. It is intended for offerors to use in developing their cost estimates for the project. The pre-solicitation notice is for project number 899-030 to expand gravesites and construct a new bathroom at the National Memorial Cemetery of the Pacific in Honolulu, Hawaii. The solicitation will be issued on or about July 15, 2021 as an Invitation for Bid with an estimated value between $5-10 million. The opportunity is set aside only for verified Service-Disabled Veteran-Owned Small Businesses. Offerors must register in the System for Award Management and Vendor Information Pages databases. The contracting officer contact is provided for any questions prior to responses being due.

View the file

Other files

File Type Posted
IFB Lump Sum Division Spreadsheet.xlsx XLSX spreadsheet
36C78621B0012 0003.docx DOCX document
Questions and Answers (cont.).docx DOCX document
ADD-1_Specifications.pdf PDF
ADD-1_Irrigation Plan Sheets.pdf PDF
15785_Addendum-1_Narrative.pdf PDF
ADD-1_Electrical Plan Sheets.pdf PDF
Existing Public Restroom As-builts.pdf PDF
36C78621B0012 0002.docx DOCX document
ADD-1_Public Restroom Plan sheets.pdf PDF
ADD-1_General Site and Colubmarium Plan Sheets.pdf PDF
04 Final Design NMCP 899CM3030 Columbarium_PG 27-51_210815.pdf PDF
11 Final Design NMCP 899CM3030 Option1 Columbarium_PG 119-137_210815.pdf PDF
03 Final Design NMCP 899CM3028_IC3029_CM3030_PG 12-26_210815.pdf PDF
02 Final Design NMCP 899CM3028_IC3029_CM3030_PG 01-11_210815.pdf PDF
07 Final Design NMCP 899CM3028 Road Improvements_PG 83-91_210815.pdf PDF
06 Final Design NMCP 899IC3029_CM3030 New Restroom_PG 65-82_ 210815.pdf PDF
10 Final Design NMCP 899CM3030 Electrical_Comm_PG 108-118_210815.pdf PDF
09 Final Design NMCP 899IC3029_CM3030 Structural_PG 99-107_210815.pdf PDF
05 Final Design NMCP 899CM3030 Site Furnishings_PG 52-64_210815.pdf PDF
01 Final Specifications NMCP 899CM3028_IC3029_CM3030_210815.pdf PDF
08 Final Design NMCP 899CM3030 Irrigation_PG 92-98_210815.pdf PDF
Wage Determination.txt TXT text file
NMCP_Expansion and Improvements IFB Scope of Work.docx DOCX document
36C78621B0012_1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DescriptionUnitCost/Unit# UnitsTotal CostRemarks
Offeror shall use and edit to fit Task Order Project
Division 01 - General Requirements
Project set-upL.S.$0.000$0.00
CoordinationL.S.$0.000$0.00
General DemolitionL.S.$0.000$0.00
Selective demo. GWB / Act ceilingSF$0.000$0.00
Selective demo. of floor fin and floor prep.SF$0.000$0.00
Selective demo. WallsEach$0.000$0.00
Selective demolition & salvageEach$0.000$0.00
Job supervision and misc. laborWeek$0.000$0.00
Mobilization / DemobilizationJob$0.000$0.00
Division 02 - Existing Conditions
$0.000$0.00
Division 03 - Concrete
Concrete floor trenching and infillL.S.$0.000$0.00
Concrete floor prep., flash patchL.S.$0.000$0.00
Division 04 - Masonry
$0.000$0.00
Division 05 - Metals
Misc. equipment supportsL.S.$0.000$0.00
Modification to Metal Window frameEach$0.000$0.00
Division 06 - Wood, Plastics, and Composites
Misc. blocking, framingL.S.$0.000$0.00
Chair RailLF$0.000$0.00
Blocking for CaseworkL.S.$0.000$0.00
Wood Trim (At Tech Station)LF$0.000$0.00
Plywood and wood trim (at Lockers)LF$0.000$0.00
Coat RodEach$0.000$0.00
Division 07 -Thermal & Moisture Protection
FirestoppingLF$0.000$0.00
Joint sealantsLF$0.000$0.00
Division 08 - Openings
New Door and Mtl. FrameEach$0.000$0.00
New Lead-lined door and frame assemblyEach$0.000$0.00
Modifications to existing lead windowsEach$0.000$0.00
Division 09 - Finishes
Acoustical ceiling tileSF$0.000$0.00
Existing Wall PatchingSF$0.000$0.00
Metal stud, gyp.board assembliesLF$0.000$0.00
GWB over exist framingLF$0.000$0.00
PaintSF$0.000$0.00
Vinyl BoarderLF$0.000$0.00
Resilient baseLF$0.000$0.00
Sheet Vinyl flooring and accessoriesSF$0.000$0.00
CarpetYr$0.000$0.00
Division 10 - Specialties
Hospital Curtain and TrackLF$0.000$0.00
Toilet and Bath AccessoriesEach$0.000$0.00
Casework Base and WallLF$0.000$0.00
CountertopsLF$0.000$0.00
Countertops with supportsLF$0.000$0.00
P. Lam ShelvingLF$0.000$0.00
Med. CabinetEach$0.000$0.00
LockersEach$0.000$0.00
Wall HooksL.S.$0.000$0.00
White BoardEach$0.000$0.00
Division 11 - Equipment
$0.000$0.00
Division 12 - Furnishings
-$0.000$0.00

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 22 - Plumbing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 23 - HVAC
RemovalsLS$0.000$0.00
Computer Room A/C % HumidifierEach$0.000$0.00
Electric Reheat CoilsEach$0.000$0.00
Fan Coil UnitEach$0.000$0.00
DuctworkLS$0.000$0.00
RGD'sEach$0.000$0.00
HVAC InsulationLS$0.000$0.00
Temperature ControlsLS$0.000$0.00
Test and BalanaceLS$0.000$0.00
Division 25 - Intergrated Automation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 26 - Electrical
General Conditions and Administration-$0.000$0.00
Allowance-$0.000$0.00
Wiring DevicesEach$0.000$0.00
Wiring Device CircuitingEach$0.000$0.00
Light Fixtures & CircuitingEach$0.000$0.00
Specialty Light Fixtures & CircuitingEach$0.000$0.00
Relocate Panel board & circuitsEach$0.000$0.00
Relocate Nurse CallLS$0.000$0.00
Telephone / DataEach$0.000$0.00
Cath Equipment Connections & FeederLS$0.000$0.00
HVAC Equipment ConnectionsLS$0.000$0.00
DemolitionLS$0.000$0.00
Division 27 - Communications
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 28 - Electronic Safety and Security
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 31 - Earthwork
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 32 - Exterior Improvements
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 33 - Utilities
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 34 - Transportation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 35 - Waterway and Marine Construction
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 40 - Process Interconnections
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 41 - Material Processing and Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 42 - Process Heating, Cooling, and Drying
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 43 - Process Gas and Liquid Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 44 - Pollution and Waste Control
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 45 - Industry-Specific Manufacturing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 46 - Water and Wastewater Equipment
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 48 - Electrical Power Generation
TBDLS$0.000$0.00
TBD-$0.000$0.00
General Construction Subtotal$0.00
Mechanical, Electrical, Plumbing Subtotal$0.00

Total Base Construction Cost $0.00

Overhead0%$0.00
Profit0%$0.00
Bonding (If applicable)0%$0.00

Total Estimated Construction Cost $0.00

&8B & J Multi Services

Relace Water Main&"Arial,Bold"Estimated Construction
Cost Worksheet&8VA-528-07-RP-0135

Project # 528A8-04-808

File details come from the government source that posted it. Updated .