03 Final Design NMCP 899CM3028_IC3029_CM3030_PG 12-26_210815.pdf
PDF 18 MB Posted
- Solicitation number
- 36C78621B0012
About this file
This notice is for a solicitation to provide expansion and renovation services at the National Memorial Cemetery of the Pacific in Honolulu, Hawaii. The Department of Veterans Affairs intends to issue solicitation number 36C78621B0012 for project number 899-030, which includes gravesite expansion and construction of a new bathroom facility. The total value of the contract is estimated between $5 million and $10 million. The solicitation will be set aside exclusively for service-disabled veteran-owned small businesses, who must be verified as such in the Vendor Information Pages database. Responses are due on or around July 15, 2021 and the contract will be awarded using an Invitation for Bid process. The point of contact for any questions is the administrative contracting officer Auvorie Benson.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es s he et s\
5_ o_ co ns t a cc es s an d ph as in g.
dw g ed it:
jd ei tn er s av ed
:7 /1
2/
:1
PM
p lo t:7
/1 4/
:5
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
OF 138
07/15/21
EXP. 06/30/22
N
0 100' 200'
PUOW
AIN
A D
RIV
E
MALL DRIVE N
MALL DRIVE S
INNER DRIVE
INNER DRIVE
O
UT
ER
D
RI
VE
O
UTER DRIVE
OUTER DRIVE
OVERLOOK
LINK DRIVE
EXISTING
MAINTENANCE
FACILITY
LEGEND
TEMPORARY CONSTRUCTION FENCE
CONTRACTOR STAGING AREA
CONTRACTOR HAUL ROUTE
GENERAL NOTES
CNJWD
OVERLOOK PATH
LIMITED CONTRACTOR
STAGING (ON-SITE)
CONTRACTOR SHALL
MAINTAIN ACCESS TO
TUNNEL AT ALL TIMES
CONSTRUCTION LINE ITEMS
CLIN NAME DESCRIPTION
BASE BID - CLIN 1
DEMOLISH EXISTING PUBLIC
RESTROOM, CONSTRUCT
COLUMBARIUM 14(NORTH) AND
RECONSTRUCT OUTER DRIVE
SOUTH
Work includes but is not limited to, general construction, alterations, site preparation, mass excavation and earthwork, roads, walks, grading, drainage encompassing the area defined within the project plans.
Demolish and remove public restroom, currently located adjacent to where columbaria court 14 will be constructed. Demolish and remove all associated infrastructure that will no longer be required to support restroom, to include utility lines. Construct 3,392-niche columbaria including all associated walks, utilities, irrigation, landscaping and drainage. Reconstruct Outer Drive South, install associated concrete curb and gutter, concrete sidewalks and asphalt paving. Install utilities including domestic water, irrigation and electrical / communication duct banks.
BASE BID - CLIN 2
CONSTRUCT NEW PUBLIC
RESTROOM AND RECONSTRUCT
OUTER DRIVE NORTH
Construct new public restroom adjacent to existing columbarium court 13. Install all associated infrastructure required to make the new facility complete and usable, including but not limited to; new sanitary sewer, new potable water, new electrical, new communication and irrigation upgrades.
Improvements also include reconstruction of roadways and parking lots as outlined in the plans and specifications.
BASE BID - CLIN 3 ROADWAY IMPROVEMENTS
This includes improvements made to Inner Drive, Link Drive and Memorial Drive as identified on the plans (D-400 Series, CP400 Series, CG400 Series, LP400 Series). Included, but not limited to; the reconstruction of parking lots and concrete sidewalks, selective concrete curb and gutter replacement, mill and overlay of asphalt pavement sections, utility improvements, irrigation, and restoration.
BASE BID - CLIN 4
ELECTRICAL AND
COMMUNICATIONS
IMPROVEMENTS
Construct new service connections to Columbarium Court 14. Construct new concrete ductbanks within Outer Drive North and South. Complete testing of existing medium voltage conductors from the Administration building to Columbarium Court 13 as noted on the plans. Construct new communication services from the new public restroom to the existing maintenance facility including but not limited to, concrete ductbanks and associated elements to provide a complete system to the existing maintenance facility and new public restroom.
OPTION 1 COLUMBARIUM 14(SOUTH) AND
OVERLOOK PATH
This includes replacement of the overlook path from Outer Drive South to the Overlook and associated improvements as outlined in the plans and specifications. Construct 2,872-niche columbaria including all associated walks, utilities, landscaping, drainage. Alternate 1 shall include credit for those improvements identified in the BASE BID that will not be constructed if selected.
SITE ACCESS
1. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES
WITH VA NMCP (NATIONAL MEMORIAL CEMETERY OF THE PACIFIC) AND
MINIMIZE IMPACTS TO THE CEMETERY ACTIVITIES. CONSTRUCTION
ACTIVITIES MAY BE RESTRICTED DURING COMMITTAL SERVICES AND MUST
BE COORDINATED WITH NMCP ON DAILY BASIS.
2. THE CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE
PLAN TO BE APPROVED BY CONTRACTING OFFICER REPRESENTATIVE (COR)
BEFORE CONSTRUCTION. THE SEQUENCING PLAN INCLUDED IN THE
CONTRACT DOCUMENTS SHALL BE INCORPORATED INTO THE
CONTRACTOR'S CONSTRUCTION SEQUENCE PLAN. SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION
3. CONSTRUCTION TRAFFIC ENTERING AND EXITING THE CEMETERY SHALL BE
LIMITED TO THE MOST DIRECT ROUTE TO THE AREA OF WORK. ALL DAMAGE
TO EXISTING CEMETERY ELEMENTS SHALL BE REPAIRED TO MATCH
EXISTING SECTION BY CONTRACTOR AT NO COST TO THE GOVERNMENT.
4. CONSTRUCTION VEHICLE PARKING (INCLUDING WORKER VEHICLES) LIMITED
TO WORK ZONES ONLY. NO PARKING WILL BE PERMITTED ON CEMETERY
ROADS.
5. THE CONTRACTOR IS REQUIRED TO VERIFY PARKING FOR ALL
CONSTRUCTION PERSONNEL WITH COR.
6. MAINTAIN OPEN ACCESS TO ALL PARTS OF CEMETERY AT ALL TIMES.
SCHEDULE LIMITED ROAD CLOSURES FOR UTILITY WORK WITH COR A
MINIMUM OF 14 DAYS IN ADVANCE.
7. THE CONTRACTOR SHALL PROVIDE TEMPORARY CHAIN LINK FENCE AND
TEMPORARY SIGNAGE TO PREVENT ACCESS BY THE PUBLIC TO THE
CONSTRUCTION AND STAGING AREAS.
8. MAINTAIN ALL ROADS IN CLEAR, SAFE CONDITION. ONGOING STREET
SWEEPING SHALL BE EMPLOYED.
9. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY FACILITIES, FENCING,
CONSTRUCTION DEBRIS AND SIGNAGE BEFORE PROJECT COMPLETION.
STOCKPILES / MATERIAL STAGING
1. STOCK PILE / MATERIAL STAGING LOCATIONS ON SITE ARE LIMITED TO
WORK ZONE AREAS ONLY. IF REQUIRED THE CONTRACTOR SHALL
PROCURE ADDITIONAL STOCKPILE LOCATIONS OFF SITE, AND SUBMIT THE
LOCATIONS TO THE COR FOR APPROVAL.
DELIVERIES
1. CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS WITH COR AND
NMCP STAFF THAT OCCUR DURING DAILY CEMETERY OPERATIONS.
CRITICAL CONSTRUCTION NOTES:
ACCESS TO EXISTING INTERMENT SECTIONS, HONOLULU MEMORIAL AND OVERLOOK:
1. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL INTERMENT SECTIONS, COLUMBARIUM
COURTS AND MEMORIAL WALLS AT ALL TIMES.
2. CLOSURE OF THE OVERLOOK PATH AND OVERLOOK SHALL BE COORDINATED WITH
CEMETERY STAFF AND THE COR A MINIMUM OF 14 DAYS PRIOR TO WORK OCCURRING
IN THE AREA. CLOSURE OF THE OVERLOOK SHALL BE MINIMIZED TO THE EXTENT
POSSIBLE.
NIGHT AND WEEKEND WORK:
1. NIGHT AND WEEKEND WORK WILL BE REQUIRED TO COMPLETE IMPROVEMENTS
ADJACENT TO MEMORIAL DRIVE, THE MAIN CEMETERY FLAG POLE AND PUOWANIA
DRIVE. THE CONTRACTOR SHALL COORDINATE WITH CEMETERY STAFF AND COR A
MINIMUM OF 14 DAYS PRIOR TO ANY WORK OCCURRING IN THESE AREAS.
1 OVERALL SITE - CONSTRUCTION OPPERATIONS PLAN
1" = 100'
O-100
CONSTRUCTION ACCESS AND
PHASING
CNJWD
1. MALL DRIVE, INNER DRIVE, AND OUTER DRIVE ARE ALL
ONE-WAY STREETS COUNTER-CLOCKWISE.
2. UTILITY REPLACEMENT WORK TO BE ON-GOING
THROUGHOUT THE DURATION OF THE PROJECT.
COORDINATE UTILITY REPLACEMENT WITH EACH
RESPECTIVE ROAD BEING REPLACED.
PROJECT DURATION
COLUMBARIA 14
MEMORIAL DRIVE
INNER & LINK DRIVE
NEW RESTROOM / OUTER DRIVE NORTH
ELECTRICAL / COMM UPGRADES
SHEET NOTES
PHASING PLAN
EXISTING
COLUMBARIA
COURT 13
BASE BID:
COLUMBARIA14 (NORTH)
AND OUTER DRIVE SOUTH
OPTION 1:
COLUMBARIA 14(SOUTH)
AND OVERLOOK PATH
BASE BID:
ROAD IMPROVEMENTS
BASE BID:
NEW PUBLIC RESTROOM
AND OUTER DRIVE
NORTH IMPROVEMENTS
HONOLULU
MEMORIAL
EXISTING COLUMBARIA
COURTS 12-6
EXISTING COLUMBARIA
COURTS 1-5
EXISTING COMMITTAL
PLAZA
OUTER DRIVE SOUTH
12 137
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es s he et s\
5_ o_ co ns t a cc es s an d ph as in g.
dw jd ei av ed
:7 /1
2/
:1 lo t:7
/1 4/
:5
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
OF 138
07/15/21
EXP. 06/30/22
0 30' 60'
LEGEND
TEMPORARY CONSTRUCTION FENCE
CONTRACTOR STAGING AREA
KEY ACCESS ROUTES TO REMAIN
OPEN TO VISITORS.
EXISTING ASPHALT PAVEMENT
FULL DEPTH ASPHALT PAVEMENT
REPLACEMENT
1 COLUMBARIA COURT 14 - BASE BID OPERATIONS PLAN
1" = 30'
TEMPORARY CHAIN LINK FENCE
WITH VISUAL SCREENING
SHALL BE PLACED OUTSIDE OF
ALL INTERMENT SECTIONS.
TEMPORARY CONSTRUCTION
FENCE ON SUPPORT STANDS MAY
BE UTILIZED IN LIEU OF DRIVEN
POSTS WHERE OCCASIONAL
ADJUSTMENTS MAY BE
REQUIRED.
TERMINATE TEMPORARY
CONSTRUCTION FENCE INTO
EXISTING VEGETATION
TERMINATE TEMPORARY
CONSTRUCTION FENCE INTO
EXISTING VEGETATION
PROVIDE LOCKABLE SWING
GATES AT ACCESS POINTS.
FIELD LOCATE.
2 PUBLIC RESTROOM BUILDING OPPERATIONS PLAN
1" = 30'
TERMINATE TEMPORARY
CONSTRUCTION FENCE
AT END COLUMN OF
COLUMBARIA.
TEMPORARY CONSTRUCTION
FENCE ON SUPPORT STANDS MAY
BE UTILIZED IN LIEU OF DRIVEN
POSTS WHERE OCCASIONAL
ADJUSTMENTS MAY BE REQUIRED
PROVIDE LOCKABLE
SWING GATE AT
ACCESS POINTS.
FIELD LOCATE
ACCESS SHALL BE MAINTAINED
TO COLUMBARIA COURT 13 FOR
DURATION OF PROJECT
TEMPORARY CONSTRUCTION
FENCE SHALL BE LOCATED
OUTSIDE OF ALL INTERMENT
SECTIONS
COLUMBARIA COURT 13
INTERMENT SECTION U
INTERMENT SECTION M
INTERMENT SECTION I
EXISTING FLAG POLE
GENERAL NOTES
SITE ACCESS
1. FIELD LOCATE AND INSTALL LOCKABLE SWING GATES AT
ACCESS POINTS OF TEMPORARY CONSTRUCTION FENCING.
2. TEMPORARY ROCK CONSTRUCTION ENTRANCES SHALL BE
INSTALLED AT ACCESS POINTS TO PREVENT SEDIMENT
TRACKING AWAY FROM CONSTRUCTION AREAS. REFER TO
EROSION CONTROL PLANS AND SWPPP FOR ADDITIONAL
INFORMATION.
INTERMENT SECTION 2
INTERMENT SECTION L
0 30' 60'
OUTER DRIVE
OUTER DRIVE
PUOW
AIN
A D
RIV
E
MALL
D
RIV
E N
3 MAINTENANCE PARKING / CONSTRUCTION STAGGING AREA
1" = 30'
TERMINATE TEMPORARY
CONSTRUCTION FENCE
TO CONTINUE TO EDGE
OF ROCK OUTCROPPING.
PROVIDE LOCKABLE
SWING GATE AT
ACCESS POINTS.
FIELD LOCATE
ACCESS SHALL BE MAINTAINED
TO EXISTING TUNNELS
DURATION OF PROJECT
TEMPORARY CONSTRUCTION
FENCE SHALL BE LOCATED
OUTSIDE OF ALL INTERMENT
SECTIONS
0 30' 60'
OUTER DRIVE SOUTH
CNJWD
0 30' 60'
1 COLUMBARIA COURT 14 - OPERATIONS PLAN
1" = 30'
TEMPORARY CHAIN LINK FENCE
WITH VISUAL SCREENING
SHALL BE PLACED OUTSIDE OF
ALL INTERMENT SECTIONS.
TEMPORARY CONSTRUCTION
FENCE ON SUPPORT STANDS MAY
BE UTILIZED IN LIEU OF DRIVEN
POSTS WHERE OCCASIONAL
ADJUSTMENTS MAY BE
REQUIRED.
TERMINATE TEMPORARY
CONSTRUCTION FENCE INTO
EXISTING VEGETATION
TERMINATE TEMPORARY
CONSTRUCTION FENCE INTO
EXISTING VEGETATION
PROVIDE LOCKABLE SWING
GATES AT ACCESS POINTS.
FIELD LOCATE.
INTERMENT SECTION 2
INTERMENT SECTION L
OUTER DRIVE
O-101
CONSTRUCTION ACCESS &
PHASING ENLARGMENTS
N N
N
N
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es s he et s\
5_ o_ co ns t a cc es s an d ph as in g.
dw jd ei av ed
:7 /1
2/
:1 lo t:7
/1 4/
:5
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
OF 138
07/15/21
EXP. 06/30/22
CNJWD
FA
BR
IC
W
ID
TH
3'
10'-0" MAXIMUM10'-0" MAXIMUM
6"
3' -6
" M
IN
12" MIN. DIA.
CONCRETE BASE ONLY ON
LINE POSTS TO BE EQUALLY SPACED
2"
CORNER, END, OR PULL POST
BRACE RAIL
CLIPS (TYP.)
LINE POST
(9 GAGE, 2" MESH)
BOTTOM OF FABRIC
LINE POST
TENSION WIRE
GRADE
HOG RINGS (TYP.)
CHAIN-LINK FABRIC
TRUSS ROD
(3/8" MIN. DIA.)
TIE WIRES OR 7
FE
ET
TENSION WIRE
FABRIC SHALL HAVE UPWARD TWIST
CORNERS & GATE POSTS
NOTE:
1. PROVIDE GREEN VISUAL SCREEN. SCREEN TO BE WIND PERMEABLE FABRIC, SECURED WITH SUFFICIENT NON-MARKING FASTNERS TO
REMAIN SOUNDLY IN PLACE.
2. PROVIDE LOCKABLE SWING GATE(S) AT ACCESS POINTS. FIELD LOCATE.
3. WHERE TEMPORARY CONSTRUCTION FENCE MAY REQUIRE ADJUSTMENT IN TRANSITION AREAS, SUPPORT STANDS MAY BE USED IN LIEU
OF DRIVEN POSTS. THESE SUPPORTS SHALL BE WEIGHTED DOWN TO PREVENT UNWANTED MOVEMENT IN THE FENCE.
AS REQUIRED
AS REQUIRED
6" MINIMUM
1"-2" WASHED ROCK
1 TEMPORARY CONSTRUCTION FENCE (CHAIN-LINK)
NTS 2 ROCK CONSTRUCTION ENTRANCE
NTS
3 EXISTING TREE PROTECTION DETAIL
NTS
INFILL AGGREGATE
GEOCELL SYSTEM
INFILL AGGREATE
GEOTEXTILE
SUBGRADE
NOTES:
1. PROVIDE GEOTEXTILE SEPARATION LAYER.
2. WHERE REQUIRED, PLACE AND COMPACT SUBBASE MATERIAL TO A MINIMUM 95% STANDARD PROCTOR.
3. EXPAND THE GEOCELL SECTIONS INTO POSITION AND CONNECT THE END TO END AND INTERLEAF
CONNECTIONS WITH ATRA KEYS.
4. PLACE THE SPECIFIED INFILL MATERIAL TO 2 INCHES ABOVE CELL WALLS AND COMPACT TO A MINIMUM
95% STANDARD PROCTOR.
5. PROVIDE ADDITIONAL SURFACE MATERIAL, AS SPECIFIED.
TYPICAL TREE ROOT PROTECTION SYSTEM
ISOMETRIC
TYPICAL TREE ROOT PROTECTION SYSTEM
CROSS SECTION
TREE PROTECTION
AREA - DO NOT ENTER
TEMPORARY
FENCING
FENCE POST
TEMPORARY
SIGNS
CRITICAL ROOT ZONE
TREE PROTECTION AREA
1. UNDER THE GUIDANCE OF AN CERTIFIED ARBORIST AND THE COR, ERECT
TEMPORARY POSTS, FENCING AND SIGNS AT THE CRITICAL ROOT ZONE LIMIT
OR AS DIRECTED OTHERWISE.
2. TREE PROTECTION SHALL BE ERECTED TO PROVIDE A CONTINUOUS
BARRICADE BETWEEN THE TREE AND WORK AREA PRIOR TO ANY
CONSTRUCTION ACTIVITY.
3. ANY WORK REQUIRED WITHIN THE CRITICAL ROOT ZONE AREA SHALL BE
CONDUCTED UNDER FULL TIME OBSERVATION OF A CERTIFIED ARBORIST.
4. REFER TO SPECIFICATION SECTION 02 35 00 TREE PROTECTION AND
PRESERVATION FOR ADDITIONAL REQUIREMENTS.
4 TREE ROOT PROTECTION DETAIL
NTS
O-501
CONSTRUCTION ACCESS &
PHASING DETAILS
LEGEND
EXISTING ASPHALT PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE CONCRETE PAVEMENT
REMOVE PAVERS
REMOVE CURB & GUTTER
REMOVE WATERLINE
REMOVE SANITARY SEWER
REMOVE UNDERGROUND ELECTRIC
REMOVE UNDERGROUND COMMUNICATION
CONSTRUCTION LIMITS
SILT FENCE
BIO-ROLL
FULL DEPTH SAWCUT
REMOVE TREE
REMOVE SIGN
REMOVE HYDRANT
TREE PROTECTION FENCE
KEY NOTES
REMOVE EXISTING PUBLIC RESTROOM AND ALL ASSOCIATED
INFRASTRUCTURE AND UTILITY LINES
REMOVE DOMESTIC WATERMAIN
REMOVE SANITARY SEWER
REMOVE UNDERGROUND ELECTRIC LINE
REMOVE STORM MANHOLE STRUCTURE
REMOVE SANITARY MANHOLE STRUCTURE
CAP AND ABANDON UTILITY LINE IN-PLACE
REMOVE SIGN AND ASSOCIATED CONCRETE FOOTING AND BASE
FULL DEPTH
REMOVE FLOWER WATERING STATION
REMOVE BOLLARDS AND ASSOCIATED CONCRETE FOOTING AND
BASE FULL DEPTH
FULL DEPTH SAW-CUT TO OCCUR AT NEAREST PAVING JOINT
OUTSIDE THE LIMIT OF WORK
PROTECT AND RE-INSTALL MONUMENT (TYP.)
REMOVE BENCH AND ASSOCIATED CONCRETE FOOTING AND BASE
FULL DEPTH
REMOVE RETAINING WALL AND ASSOCIATED CONCRETE FOOTING
AND BASE FULL DEPTH
TRANSPLANT EXISTING PALMS. SEE LP SERIES FOR ADDITIONAL
INFORMATION
PROTECT EXISTING SECTION MARKER TO REMAIN
INTERMENT SECTION L
INTERMENT SECTION H
INTERMENT SECTION G
INTERMENT SECTION 2
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ de m o.
dw m to lk ki ne n sa ve d:
7/
/2
3:
P
M lo t:7
/1 4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
DEMOLITION PLAN
N
1 BASE BID - DEMOLITION PLAN
SCALE: 1" = 20'
0 20' 40'
VICINITY MAP
DEMOLITION NOTES
1. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER UNLESS DIRECTED OTHERWISE. ( SEE GEOTECHNICAL REPORT BY KOKUA
GEOTECHNICAL, LLC DATED JUNE 23, 2020)
2. EXISTING ASPHALT, CONCRETE, AND CONCRETE CURB TO BE REMOVED AND DISPOSED OF OFFSITE. DISPOSE OF ACCORDING TO LOCAL AND STATE POLLUTION REGULATION
STANDARDS.
3. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS AND DISPOSAL CERTIFICATIONS.
4. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO BEGINNING DEMOLITION WORK.
5. ALL EXISTING BURIED UTILITY LINE LOCATIONS ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION EXISTING UTILITIES PRIOR TO EXCAVATION, DEMOLITION
OR RECONNECTION. CONTRACTOR SHALL VERIFY BURIED UTILITY LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION CENTER.
6. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
7. INSTALL SILT FENCE ON ALL DOWN SLOPE AREAS PER SWPPP PLANS AND ADJUST AND/OR REINSTALL AS NECESSARY FOR PAVEMENT REMOVALS. SEE EROSION CONTROL PLAN FOR
DETAILS.
8. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION PERMITS TO CARRY OUT THE ENTIRE PROJECT. PERMITS SHALL BE IN-PLACE PRIOR TO BEGINNING ANY
CONSTRUCTION ACTIVITIES. NOTIFY APPROPRIATE UTILITY COMPANIES OF ANY AND ALL PROPOSED WORK.
9. REFER TO IRRIGATION PLANS FOR DEMOLITION OF EXISTING IRRIGATION ITEMS.
CONTRACTOR SHALL MAINTAIN
ACCESS TO THE OVERLOOK. IF
ACCESS WILL BE UNAVAILABLE, THE
CONTRACTOR SHALL NOTIFY &
COORDINATE WITH THE COR &
CEMETERY STAFF A MINIMUM OF 14
DAYS IN ADVANCE.
REMOVE ALL CONCRETE
WALLS, BENCHES & PLANTERS
FULL DEPTH
TREE PRESERVATION & PROTECTION NOTES
1. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION RELATED ACTIVITIES OCCURRING ON SITE.
2. WHERE CONSTRUCTION ACTIVITIES IMPEDE THE CRITICAL ROOT ZONE OF TREES, THE CONTRACTOR SHALL FOLLOW
PROCEDURES OUTLINED IN SPECIFICATION 02 35 00
APPROXIMATE CRITICAL ROOT ZONE:
WHERE CONSTRUCTION ACTIVITY WILL IMPEDE
THE CRITICAL ROOT ZONE, CONTRACTOR SHALL
INSTALL TREE ROOT PROTECTION SYSTEM ONCE
EXISTING PAVEMENT HAS BEEN REMOVED. CAP AND
ABANDON IN PLACE ALL EXISTING UTILITIES WITHIN
CRITICAL ROOT ZONE.
EH MT 15
D-101
FULL DEPTH ASPHALT PAVEMENT
RECONSTRUCTION
EXISTING ASPHALT PAVEMENT
NEW CONCRETE PAVEMENT
EXISTING CONCRETE PAVEMENT
NEW CURB AND GUTTER
INTERMENT SECTION LIMITS
CONSTRUCTION LIMITS
KEY NOTES
NEW ROLL CURB. SEE DETAIL 5/CD101
NEW PEDESTRIAN CONCRETE PAVEMENT. SEE DETAIL 1/CD101
NEW ASPHALT PAVEMENT. SEE DETAIL 2/CD101
NEW VERTICAL CURB. SEE DETAIL 7/CD101
NEW CONCRETE VALLEY GUTTER. SEE DETAIL 8/CD101
PROTECT MEMORIAL PAVERS TO REMAIN
VERTICAL CURB TO ROLL CURB/ VALLEY GUTTER/ FLUSH CURB
TRANSITION. SEE DETAIL 11/CD101
ROLL CURB TO CONCRETE VALLEY GUTTER & VERTICAL CURB
TRANSITION. SEE DETAIL 12/CD101
FLUSH CURB. SEE DETAIL 4/CD101
ROLL CURB TO FLUSH CURB/ VALLEY GUTTER. SEE DETAIL 13/CD101
HANDICAP STALL. SEE DETAIL 5/CD102
LANDSCAPE CURB. SEE DETAIL 8/CD101
FULL DEPTH SAW-CUT
PEDESTRIAN CROSSWALK. SEE DETAIL 1/CD103
PEDESTRIAN CROSSWALK. SEE DETAIL 2/CD103
NEW RETAINING WALL. SEE STRUCTURAL
NEW FLOWER WATERING STATION. SEE DETAIL 1/LS107
MILL & OVERLAY ASPHALT PAVEMENT. SEE DETAIL 3/CD101
NEW WHEEL STOP. SEE DETAIL 8/CD103
23+00
24+00 25+00
26+00
27+00
28+00
PT: 23+18.60
PC: 23+55.74
PT
: 2
4+
.0
PC
: 2
6+
.1
PT: 27+28.89
23+00
24+00 25+00
26+00
27+00
28+00
SAW-CUT
Station=23+39.34
SAW-CUT
Station=27+84.91
INTERMENT SECTION L
INTERMENT SECTION H
INTERMENT SECTION 2 12.0'
CURB TRANSITION
Station=27+38.42
Offset=11.000
PC: 23+55.74
PC: 26+48.10
PT: 23+18.60
PT
: 2
4+
.0
PT: 27+28.89
0.
23+00
0.
0.
0.
9.
24+00
1.
1.
3.
2.
25+00
5.
4.
6.
5.
26+00
6.
7.
7.
8.
27+00
5.
5.
3.
28+00
0.
28+50
-2.04%
3.49%
1.17%
2.79%-1.87%
-4.97%
2.45%
PVI STA = 25+69.16
PVI ELEV = 415.79
A.D. = -2.32% K = 12.91
30.00' VC
BV
C
S:
5+
.1
BV
C
E:
.2
EV
C
S:
5+
.1
EV
C
E:
.9
PVI STA = 26+82.75
PVI ELEV = 417.76
A.D. = -4.66% K = 8.59
40.00' VC
BV
C
S:
6+
.7
BV
C
E:
.2
EV
C
S:
7+
.7
EV
C
E:
.3
HIGH PT. STA = 26+86.71
HIGH PT ELEV = 417.54
PVI STA = 27+31.24
PVI ELEV = 416.86
A.D. = -3.11% K = 9.66
30.00' VC
BV
C
S:
7+
.2
BV
C
E:
.1
EV
C
S:
7+
.2
EV
C
E:
.1
-2.04%
3.49%
1.17%
2.79%-1.87%
-4.97%
2.45%
PV
IS
: 2 3+
.3
PV
IE
: 4
.2
PV
IS
: 2 7+
.9
PV
IE
: 4
.1
PVI STA = 26+82.75
PVI ELEV = 417.76
A.D. = -4.66% K = 8.59
40.00' VC
BV
C
S:
6+
.7
BV
C
E:
.2
EV
C
S:
7+
.7
EV
C
E:
.3
HIGH PT. STA = 26+86.71
HIGH PT ELEV = 417.54
PVI STA = 27+31.24
PVI ELEV = 416.86
A.D. = -3.11% K = 9.66
30.00' VC
BV
C
S:
7+
.2
BV
C
E:
.1
EV
C
S:
7+
.2
EV
C
E:
.1
PVI STA = 25+69.16
PVI ELEV = 415.79
A.D. = -2.32% K = 12.91
30.00' VC
BV
C
S:
5+
.1
BV
C
E:
.2
EV
C
S:
5+
.1
EV
C
E:
.9
PVI STA = 26+42.84
PVI ELEV = 416.65
A.D. = 1.62% K = 18.51
30.00' VC
BVCS: 26+27.84
BVCE: 416.47
EVCS: 26+57.84
EVCE: 417.07
PVI STA = 23+69.81
PVI ELEV = 409.59
A.D. = 4.49% K = 11.13
50.00' VC
BV
C
S:
3+
.8
BV
C
E:
.1
EV
C
S:
3+
.8
EV
C
E:
.2
LOW PT. STA = 23+67.57
LOW PT ELEV = 409.87
PVI STA = 24+42.80
PVI ELEV = 411.38
A.D. = 1.04% K = 47.89
50.00' VC
BV
C
S:
4+
.8
BV
C
E:
.7
EV
C
S:
4+
.8
EV
C
E:
.2
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ si te
.d w m to lk ki ne d:
7/
/2
2:
lo t:7
/1 4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
C-101
SITE PLAN & PROFILE
N
SITE PLAN NOTES
1 BASE BID - SITE PLAN - PLAN VIEW
SCALE: 1" = 20'
0 20' 40'
MTEH
1. ALL HANDICAPPED STALLS AND ACCESS RAMPS SHALL COMPLY WITH
CURRENT ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY
STANDARDS.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT THE ENTIRE PROJECT.
PERMITS SHALL BE IN-PLACE PRIOR TO BEGINNING ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE UTILITY COMPANIES OF ANY AND ALL
PROPOSED WORK.
9.0 '18.0'
6.
0'
R 15.0'
4.8'
R
.0
6.
0'
R40.0'
R40.0'
R40.0'
R40.0'
22.0'
2 BASE BID - SITE PLAN - PROFILE VIEW - STA. 23+00 - 29+00
SCALE: H: 1" = 20' V: 1" = 5'
3 BASE BID - HORIZONTAL GEOMETRY - STA. 23+00 - 29+00
SCALE: NTS
R1 5.
0'
22.0'
R15.0'
4 POINT TABLE
SCALE: NTS
SEE LC-SERIES SHEETS
FOR BASE BID
COLUMBARIUM 14 DETAILS
PROPOSED GRADE
EXISTING GROUND
.0
10.1'
11.0'
PROPOSED ELEVATION
EXISTING ELEVATION
LEGEND
OUTER DRIVE SOUTH 9
19 TYP.
VICINITY MAP
R2.0'
.8'
KEY NOTES
959.4
TBC 800.1
FL 800.1
TC 800.1
X.X%
CONSTRUCTION LIMITS
SILT FENCE
BIO-ROLL
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NEW CURB AND GUTTER
INTERMENT SECTION LIMITS
SOIL BORING LOCATION
SLOPE PERCENTAGE ARROW
INLET PROTECTION
TREE PROTECTION
SPOT ELEVATION
FLOW LINE OF CURB
TOP BACK OF CURB
TOP OF CONCRETE
TOP / BOTTOM OF WALL
SILT FENCE. SEE DETAIL 15/CD101
INLET SEDIMENT PROTECTION. SEE DETAIL 16/CD101
BIO-ROLL. SEE DETAIL 17/CD101
PEDESTRIAN RAMP LANDING. MAX 2% SLOPE IN ALL
DIRECTIONS
ADD ADJUSTING RINGS TO EXISTING STRUCTURE TO
MATCH PROPOSED SIDEWALK ELEVATION.
TW 800.1
BW 800.1
23+00
24+00 25+00
26+00
27+00
28+00
PC
: 2
2+
.0
PT: 23+18.60
PC: 23+55.74
PT
: 2
4+
.0
PC
: 2
6+
.1
PT: 27+28.89
INTERMENT SECTION L
INTERMENT SECTION H
434436437438
443444
R 427.02
R 433.62
R 410.21
R 410.62
R 416.20
R 419.45
R 424.66 R 424.44
R 427.76
R 429.11
R 433.26 R 433.22
R 433.59
R 433.70
R 433.61
R 433.78
R 440.60
R 440.98
R 440.89 R 442.03
R 442.57
ME FL 409.47
FL 409.80
TBC 410.30
FL 409.73
TBC 410.23
FL 416.68
TBC 417.09
FL 414.60
TBC 415.02ME FL 413.94
ME FL 414.25
TBC 415.27
FL 414.85
TBC 417.39
FL 416.89
TBC 417.61
FL 417.11
TBC 411.42
FL 410.92
ME FL 409.97
TC 416.33
TC 416.94
FL 416.57
TBC 417.07
TBC 412.89
FL 412.39
TBC 412.20
FL 411.70
TBC 411.88
FL 411.38
TC 412.99
TC 412.32
FL 410.57
TBC 411.07
TBC 417.12
FL 416.70
FL 416.00
TBC 416.50
TBC 417.20
FL 416.70
TC 417.28
TBC 416.61
FL 416.57
TBC 416.54
FL 416.50
TC 416.63TC 416.70
TBC 416.91
FL 416.41
TC 417.00
416.60 416.43
415.88416.06416.23
416.34 416.15 1.2%
1.4%
8.2%
6.2%
TBC 417.00TBC 417.28 TBC 417.13TBC 417.21
TBC 417.15
FL 416.65
TBC 416.93
FL 416.43
TBC 416.96
FL 416.46
+0
FL 417.32
TBC 417.37
FL 417.31
TBC 417.36
TC 417.57
FL 417.56
TBC 418.06
FL 417.66
TBC 418.16
2.0%
0.
9%
0.
7%
FL 417.27
TBC 417.69
FL 417.26
TBC 417.76
FL 417.63
TBC 417.67
FL 417.72
TBC 417.76
TC 417.66
TC 417.71
TC 417.62
TBC 417.66TBC 417.74
24+00
R 409.66
8.
1%
6.
1%
TC 411.09
TC 411.15
TBC 410.65
FL 410.15
FL 409.84
TBC 409.89FL 410.45
TBC 410.95
FL 409.69
TBC 409.73
FL 409.66
TBC 410.16
TC 409.73
TC 409.58
TC 410.03
TBC 410.89
FL 410.39
TBC 410.30
FL 410.26
TBC 410.15
FL 410.11
TBC 410.58
FL 410.08
TC 410.65
TC 410.73TC 411.03
TC 410.79
TC 410.26
TC 410.17
TC 410.07
TC 409.95
TC 411.21
TBC 410.65
TBC 410.57
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ gr ad in g.
dw eh ed m an av ed :7
/1 4/
:2 lo t:7 /1
4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
CG101
GRADING PLAN
N
1 BASE BID - GRADING PLAN
SCALE: 1" = 20'
0 20' 40'
MTEH
3 INSET B
SCALE: 1"=5'
N0 5' 10'
SEE INSET B
2 INSET A
SCALE: 1"=5'
N 0 5' 10'
4 INSET C
SCALE: 1"=5'
N0 5' 10'
SEE INSET A
SEE INSET C
4 4
TYP.
GRADING PLAN NOTES
1. EXISTING TOPOGRAPHIC AND UTILITY INFORMATION PROVIDED BY THE OWNER ON A SURVEY PREPARED BY ANDERSON ENGINEERING. ALL EXISTING BURIED UTILITY LINE LOCATIONS
ARE APPROXIMATE ONLY. CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING EXITING UTILITIES PRIOR TO EXCAVATION, DEMOLITION OR RECONNECTION. CONTRACTOR SHALL VERIFY
BURIED UTILITY LOCATIONS WITH "811" UNDERGROUND UTILITIES LOCATION CENTER.
2. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO BEGINNING WORK.
3. ESTIMATED ALLOWABLE ROCK EXCAVATION QUANTITY FOR BASE BID WORK = 8,000 CY
VICINITY MAP
NEW UNDERGROUND COMMUNICATION
NEW UNDERGROUND ELECTRIC
NEW 6" SANITARY SEWER
NEW 4" DOMESTIC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
WATERMAIN TIE-IN. SEE DETAIL 1/CD102
CAP UTILITY LINE AND SURVEY END POINT FOR FUTURE
SYSTEM UPGRADES
NEW GATE VALVE. SEE DETAIL 5/CD103
NEW 8" DIA. SURFACE DRAIN. SEE DETAIL 4/CD103
NEW ROOF DRAIN DOWNSPOUT CONNECTION. SEE DETAIL
3/CD103
NEW COLUMBARIA FLOWER STRIP CLEANOUT. SEE DETAIL
6/CD103
NEW GREENSPACE CLEANOUT. SEE DETAIL 7/CD103
NEW 4" PVC PERFORATED DRAINTILE
NEW 6" PVC SOLID DRAINTILE
N/A
NEW 34" TYPE K COPPER WATER SERVICE
NEW 1" PVC WATERMAIN
LEGEND
NEW UNDERGROUND ELECTRIC
NEW UNDERGROUND COMMUNICATION
NEW 2" DOMESTIC WATERMAIN
NEW 4" DOMESTIC WATERMAIN
NEW 34" WATERMAIN SERVICE
NEW 1" PVC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
NEW SANITARY SEWER
NEW WATERMAIN FITTINGS
NEW SANITARY SEWER MANHOLE
NEW STORM SEWER
NEW DRAINTILE
NEW STORM SEWER STRUCTURES
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER STRUCTURES
EXISTING WATERLINE
INTERMENT SECTION LIMITS
KEY NOTES
W6
W 3 w1 w1
23+00
24+00 25+00
26+00
27+00
28+00
PT: 23+18.60
PC: 23+55.74
PT
: 2
4+
.0
PC
: 2
6+
.1
PT: 27+28.89
C O w1 w1 w1 w1 w1 w1 w w3 w 1 w 1 w 1 w 1
W6 W6 W6 W6 W6 W6 W6
W6
W6
W
W
0+00
1+00
2+
3+00
4+
5+
6+00 7+00
7+81
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C
OC
O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
CO
C O
C O
60 LF 12" HDPE @ 0.83% 116 LF 12" HDPE @ 1.31%
16 LF 12" HDPE @ 18.89%
25 LF 12" HDPE @ 14.75%
28 LF 12" HDPE @ 7.89%
31 LF 6" HDPE
ST @ 1.00%
26 LF 6" HDPE @ 1.00%
18 LF 6" HDPE
ST @ 16.97%
123 LF 18" HDPE @ 0.87%
68 LF 18" HDPE @ 8.83%
215 LF 18" HDPE @ 3.00% 59 LF 18" HDPE @ 3.00%
71 LF 18" HDPE @ 2.99%
16 LF 12" HDPE
ST @ 15.40%
26 LF 12" HDPE @ 1.00%
19 LF 12" HDPE @ 32.07%
89 LF 6" HDPE @ 1.00%
31 LF 18" HDPE @ 1.76%
BP
: 0
+0 0.
EP
: 7
+8 1.
PI
: 0
+6 0.
PI
: 1
+7 6.
PI
: 1
+9 2.
PI: 2+17.87
PI: 2+45.60
PI: 3+68.79
PI: 3+88.58
PI: 4+36.86
PI: 5+07.65
PI
: 7
+2 2.
CBMH-101
RIM ???
INV 438.42 (12" OUT)
CBMH-102
RIM ???
INV 437.92 (12" IN)
INV 437.81 (12" OUT)
CBMH-103
RIM ???
INV 436.29 (12" IN)
INV 434.29 (12" OUT)
CBMH-104
RIM ???
INV 431.26 (12" IN)
INV 429.26 (12" OUT)
INV 431.26 (12" IN)
CBMH-201
RIM ???
INV 430.65 (6" IN)
INV 430.65 (6" OUT)
CBMH-200
RIM ???
INV 430.95 (6" OUT)
CBMH-203
RIM ???
INV 430.05 (6" IN)
INV 430.05 (6" OUT)CBMH-202
RIM ???
INV 430.35 (6" IN)
INV 430.35 (6" OUT)
CBMH-204
RIM ???
INV 429.74 (6" IN)
INV 429.74 (6" OUT)
CBMH-206
RIM ???
INV 428.59 (6" IN)
INV 428.59 (6" OUT)
CBMH-105
RIM ???
INV 425.50 (6" IN)
INV 425.50 (12" IN)
INV 423.50 (12" OUT)
INV 425.50 (6" IN)
CBMH-302
RIM ???
INV 422.04 (6" IN)
INV 422.04 (6" IN)
INV 422.04 (12" OUT)
CBMH-107
RIM ???
INV 419.53 (18" IN)
INV 419.53 (18" OUT)
INV 419.53 (12" IN)
CBMH-301
RIM ???
INV 423.14 (6" IN)
INV 423.14 (6" IN)
CBMH-106
RIM ???
INV 421.31 (6" IN)
INV 421.31 (12" IN)
INV 420.60 (18" OUT)
CBMH-109
RIM ???
INV 413.52 (18" IN)
INV 413.52 (18" IN)
INV 413.52 (18" OUT)
CBMH-110
RIM ???
INV 411.40 (18" IN)
INV 411.40 (18" OUT)
CBMH-111
RIM ???
INV 404.96 (18" IN)
INV 404.96 (18" OUT)
CBMH-701
RIM ???
INV 437.32 (6" IN)
INV 437.32 (12" OUT)
CB-113
RIM ???
INV 404.86 (12" OUT)
CBMH-112
RIM ???
INV 403.20 (18" IN)
INV 403.20 (18" OUT)
INV 404.60 (12" IN)
CBMH-400
RIM ???
INV 414.07 (18" OUT)
CBMH-205
RIM ???
INV 429.48 (6" IN)
INV 429.48 (6" OUT)
C O
C O
CO
CO
C O
89 LF 6" HDPE @ 1.00%
31 LF 6" HDPE
ST @ 1.00%
30 LF 6" HDPE
ST @ 1.00%
29 LF 6" HDPE
ST @ 1.00%
ME 443.68
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ ut ilit ie s.
dw m to lk ki ne d:
7/
/2
:3
AM
lo t:7 /1
6/
:1
AM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
CU101
UTILITY PLAN
N
SHEET NOTES
1 BASE BID - UTILITY PLAN
SCALE: 1" = 20'
0 20' 40'
MTEH
VICINITY MAP
1. CONTRACTOR TO PROVIDE INLET PROTECTION ON ALL STORM DRAIN INLETS PER DETAILS 16/CD101 AND 19/CD101
2. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
3. WATERMAIN SHALL COMPLY WITH INSTALLATION REQUIREMENTS PER LATEST EDITION OF HAWAII WATER SYSTEM STANDARDS.
STRUCTURE SCHEDULE
STRUCTURE SIZE CASTING (OR APPROVED
EQUAL)
CBMH-101 18" DIA. HDPE NYLOPLAST DUCTILE IRON 18"
DROP-IN GRATE
CBMH-102 18" DIA. HDPE NYLOPLAST DUCTILE IRON 18"
DROP-IN GRATE
CBMH-103 18" DIA. HDPE NYLOPLAST DUCTILE IRON 18"
DROP-IN GRATE
CBMH-104 48" DIA. CONCRETE NEENAH R-2501
CBMH-105 48" DIA. CONCRETE NEENAH R-2501
CBMH-106 48" DIA. CONCRETE NEENAH R-2501
CBMH-107 48" DIA. CONCRETE NEENAH R-2501
CBMH-109 60" DIA. CONCRETE NEENAH R-2501
CBMH-110 TYPE D (1) TYPE B (1)
CBMH-111 TYPE D (1) TYPE B (1)
CBMH-112 TYPE D (1) TYPE B (1)
CBMH-113 TYPE D (1) TYPE B (1)
CBMH-200 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-201 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-202 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-203 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-204 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-205 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-301 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-302 10" DIA. HDPE NYLOPLAST DUCTILE IRON 10"
DROP IN GRATE
CBMH-400 48" DIA. CONCRETE NEENAH R-2501
CBMH-701 18" DIA. HDPE NYLOPLAST DUCTILE IRON 18"
DROP-IN GRATE
(1) HDOT STANDARD PLAN H-01D
SEE SHEET CU102 FOR
PROPOSED STORM PROFILE
14 13
18"x6" TEE
NOTE:
ELECTRICAL AND COMMUNICATION UTILITIES
SHOWN FOR REFERENCE ONLY. REFER TO
ELECTRICAL AND TECHNOLOGY PLANS FOR
ADDITIONAL BASE BID REQUIREMENTS.
EXCAVATION FOR UTILITY TRENCHES SHALL NOT
IMPEDE INTERMENT SECTION AND COLUMBARIA FOOTINGS.
NEW 6" SANITARY SEWER
NEW 4" DOMESTIC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
WATERMAIN TIE-IN. SEE DETAIL 1/CD102
CAP UTILITY LINE AND SURVEY END POINT FOR FUTURE
SYSTEM UPGRADES
NEW GATE VALVE. SEE DETAIL 5/CD103
NEW 8" DIA. SURFACE DRAIN. SEE DETAIL 4/CD103
NEW ROOF DRAIN DOWNSPOUT CONNECTION. SEE DETAIL
3/CD103
NEW COLUMBARIA FLOWER STRIP CLEANOUT. SEE DETAIL
6/CD103
NEW GREENSPACE CLEANOUT. SEE DETAIL 7/CD103
NEW 4" PVC PERFORATED DRAINTILE
NEW 6" PVC SOLID DRAINTILE
N/A
NEW 34" TYPE K COPPER WATER SERVICE
NEW 1" PVC WATERMAIN
LEGEND
NEW UNDERGROUND ELECTRIC
NEW UNDERGROUND COMMUNICATION
NEW 2" DOMESTIC WATERMAIN
NEW 4" DOMESTIC WATERMAIN
NEW 34" WATERMAIN SERVICE
NEW 1" PVC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
NEW SANITARY SEWER
NEW WATERMAIN FITTINGS
NEW SANITARY SEWER MANHOLE
NEW STORM SEWER
NEW DRAINTILE
NEW STORM SEWER STRUCTURES
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER STRUCTURES
EXISTING WATERLINE
INTERMENT SECTION LIMITS
KEY NOTES
W6
W 3 w1 w1
2.
2.
0+00
2.
5.
2.
5.
1+00
1.
7.
4.
1.
2+00
4.
4.
4.
3.
3+00
4.
5.
4.
6.
3+69
60 LF 12" HDPE @ 0.83%
116 LF 12" HDPE @ 1.31%
16 LF 12" HDPE @ 18.89%
25 LF 12" HDPE @ 14.75%
28 LF 12" HDPE @ 7.89%
123 LF 18" HDPE @ 0.87%
CBMH-107
RIM 424.44
INV 419.53 (N)
INV 419.53 (SE)
INV 419.53 (SW)
C
BM
H -1
R
IM
.6
IN
V
1.
(N W
IN
V
0.
(S
C
BM
H -1
R
IM
.1
IN
V
5.
(N W
IN
V
3.
(S E)
IN
V
5.
(S
C
BM
H -1
R
IM
.9
IN
V
1.
(S W
IN
V
9.
(S E)
IN
V
1.
(N
E)
C
BM
H -1
R
IM
.8
IN
V
6.
(S
IN
V
4.
(N
E)
C
BM
H -1
R
IM
.0
IN
V
7.
(S
IN
V
7.
(N
CBMH-101
RIM 442.57
INV 438.42 (N)
4.
6.
3+69
1.
9.
4+00
8.
8.
6.
7.
5+00
5.
5.
4.
4.
6+00
2.
2.
1.
1.
7+00
9.
0.
9.
9.
7+81
68 LF 18" HDPE @ 8.83%
C
BM
H -1
R
IM
.4
IN
V
3.
(N W
IN
V
3.
(S
IN
V
3.
(E
71 LF 18" HDPE @ 2.99%
C
BM
H -1
R
IM
.2
IN
V
1.
(W
IN
V
1.
(N
215 LF 18" HDPE @ 3.00%
C
BM
H -1
R
IM
.6
IN
V
4.
(S
IN
V
4.
(N
59 LF 18" HDPE @ 3.00%
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ ut ilit ie s.
dw m to lk ki ne d:
7/
/2
:3 lo t:7 /1
4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
CU102
UTILITY PROFILE
N
1 BASE BID - STORM PROFILE - STA. 0+00 - 3+69.13
SCALE: H: 1" = 20' V: 1" = 5'
0 20' 40'
MTEH
2 BASE BID - STORM PROFILE - STA. 3+69.13 - 7+80.63
SCALE: H: 1" = 20' V: 1" = 5'
PROPOSED GRADE
EXISTING GROUND
PROPOSED ELEVATIONEXISTING ELEVATION
PROPOSED GRADE
EXISTING GROUND
PROPOSED ELEVATIONEXISTING ELEVATION
SHEET NOTES
1. CONTRACTOR TO PROVIDE INLET PROTECTION ON ALL STORM DRAIN INLETS PER DETAILS 16/CD101 AND 19/CD101
2. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
3. WATERMAIN SHALL COMPLY WITH INSTALLATION REQUIREMENTS PER LATEST EDITION OF HAWAII WATER SYSTEM STANDARDS.
6" PVC IRRIGATION LINE
4" PVC DOMESTIC LINE VICINITY MAP
1" WATERLINE
1.5' MIN. COVER
1.5' MIN.
COVER
1" WATERLINE
6" SOLID PVC
DRAINTILE
NEW 6" SANITARY SEWER
NEW 4" DOMESTIC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
WATERMAIN TIE-IN. SEE DETAIL 1/CD102
CAP UTILITY LINE AND SURVEY END POINT FOR FUTURE
SYSTEM UPGRADES
NEW GATE VALVE. SEE DETAIL 5/CD103
NEW 8" DIA. SURFACE DRAIN. SEE DETAIL 4/CD103
NEW ROOF DRAIN DOWNSPOUT CONNECTION. SEE DETAIL
3/CD103
NEW COLUMBARIA FLOWER STRIP CLEANOUT. SEE DETAIL
6/CD103
NEW GREENSPACE CLEANOUT. SEE DETAIL 7/CD103
NEW 4" PVC PERFORATED DRAINTILE
NEW 6" PVC SOLID DRAINTILE
N/A
NEW 34" TYPE K COPPER WATER SERVICE
NEW 1" PVC WATERMAIN
LEGEND
NEW UNDERGROUND ELECTRIC
NEW UNDERGROUND COMMUNICATION
NEW 2" DOMESTIC WATERMAIN
NEW 4" DOMESTIC WATERMAIN
NEW 34" WATERMAIN SERVICE
NEW 1" PVC WATERMAIN
NEW 6" IRRIGATION WATERMAIN
NEW SANITARY SEWER
NEW WATERMAIN FITTINGS
NEW SANITARY SEWER MANHOLE
NEW STORM SEWER
NEW DRAINTILE
NEW STORM SEWER STRUCTURES
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER STRUCTURES
EXISTING WATERLINE
INTERMENT SECTION LIMITS
KEY NOTES
W6
W 3 w1 w1
23 LF 6" PVC @ 16.61%
C O w1 w1 w1 w1 w1 w1 w1 w1 w1 w1 w1 w1
W 3 w w w w 1 w 1 w 1 w 1 w 1 w 1 w 1
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C
OC
O
C O
C O
C O
C O
C O
C O
C O
C O
RIM 437.09
INV 436.07
16 LF 6" PVC @ 1.00%
RIM 436.89
INV 433.57
15 LF 4" PERF. PVC @ 0.50%
RIM 437.42
INV 433.47
5 LF 6" PVC @ 1.00%
9 LF 6" PVC @ 29.53%
INV 435.39
RIM 437.02
INV 435.50
41 LF 6" PVC @ 1.00%
38 LF 4" PERF. PVC @ 0.50%
37 LF 4" PERF. PVC @ 0.50%
INV 433.38
INV 435.32
8 LF 6" PVC @ 31.24%
2 LF 6" PVC @ 23.83%
INV 432.86
RIM 436.43
INV 435.40
INV 435.32
15 LF 4" PERF. PVC @ 0.50%
39 LF 4" PERF. PVC @ 0.50%
INV 432.67
9 LF 6" PVC @ 30.41%
19 LF 6" PVC @ 1.00%
RIM 436.39
INV 435.01
RIM 436.25
INV 432.73
9 LF 4" PERF. PVC @ 0.50%
2 LF 6" PVC @ 5.46%
INV 432.68
INV 432.56
11 LF 6" PVC @ 1.00%
31 LF 6" PVC @ 1.00%
RIM 435.97
INV 432.62
INV 434.82
INV 432.25
INV 432.57
INV 432.22
8 LF 6" PVC @ 32.99%
2 LF 6" PVC @ 13.98%
3 LF 6" PVC @ 1.00%
8 LF 6" PVC @ 1.00%
RIM 435.89
INV 434.90
15 LF 4" PERF. PVC @ 0.50%
INV 434.82
INV 432.06
8 LF 6" PVC @ 32.68% RIM 435.81
INV 434.36
RIM 435.70
INV 433.14
39 LF 4" PERF. PVC @ 0.50%
40 LF 4" PERF. PVC @ 0.50%
43 LF 6" PVC @ 1.00%
INV 434.16
INV 432.94
INV 431.63
8 LF 6" PVC @ 32.25%
2 LF 6" PVC @ 59.64%
RIM 435.25
INV 434.24
15 LF 4" PERF. PVC @ 0.50%
INV 434.16
9 LF 6" PVC @ 30.58%
17 LF 6" PVC @ 1.00%
INV 431.45 RIM 435.21
INV 433.69
RIM 435.07
INV 432.61
40 LF 4" PERF. PVC @ 0.50%
42 LF 6" PVC @ 1.00%
40 LF 4" PERF. PVC @ 0.50%
INV 433.49
INV 431.03
INV 432.41
8 LF 6" PVC @ 30.84%
2 LF 6" PVC @ 67.79%
2 LF 6" PVC @ 1.00%
INV 430.57
RIM 429.84
INV 423.45
RIM 427.81
INV 426.67
4 LF 6" PVC @ 2.34%
40 LF 4" PERF. PVC @ 0.50%
26 LF 6" PVC @ 1.00%
INV 426.47
INV 422.67
INV 422.73
RIM 424.91
INV 423.56
RIM 427.63
INV 423.54
RIM 427.82
INV 426.67
RIM 427.85
INV 426.55
40 LF 4" PERF. PVC @ 0.50%
INV 426.47
L
F 4"
P
ER
F.
P
VC
.5
0%
L
F 4"
P
ER
F.
P
VC
.5
0%
INV 423.38
INV 423.39
24 LF 4" PERF. PVC @ 0.50%21 LF 4" PERF. PVC @ 0.50%
INV 423.27
INV 423.27
L
F 6"
P
VC
9.
31 LF 6" PVC @ 1.00%
L
F 6"
P
VC
.0 0%
20 LF 6" PVC @ 1.00%
INV 418.74
INV 419.12
INV 421.41
INV 420.40
INV 420.23
INV 419.43
INV 419.45
34 LF 4" PERF. PVC @ 0.50% 2 LF 4" PERF. PVC @ 42.82%
L
F 4"
P
ER
F.
P
VC
.5
0%
4 LF 6" PVC @ 19.60%
10 LF 6" PVC @ 7.83%
RIM 423.20
INV 419.65
RIM 424.68
INV 421.58
15 LF 4" PERF. PVC @ 0.50%
INV 426.47
RIM 429.13
INV 428.00
RIM 429.08
INV 427.48
40 LF 4" PERF. PVC @ 0.50%
RIM 428.94
INV 425.21
RIM 428.51
INV 427.35
RIM 428.44
INV 426.78
RIM 428.29
INV 425.16
39 LF 4" PERF. PVC @ 0.50%
42 LF 6" PVC @ 1.00%
18 LF 6" PVC @ 1.00%
INV 425.01
INV 425.25
INV 427.92
INV 427.28
INV 424.83
15 LF 4" PERF. PVC @ 0.50%
8 LF 6" PVC @ 33.33%
3 LF 6" PVC @ 5.48%
7 LF 6" PVC @ 36.29%
INV 427.28
INV 424.65
29 LF 6" PVC @ 1.09%
INV 424.61
15 LF 4" PERF. PVC @ 0.50%
4 LF 6" PVC @ 1.00%
31 LF 4" PERF. PVC @ 0.50%
29 LF 4" PERF. PVC @ 0.50%INV 426.64
INV 424.29
INV 425.01
INV 424.20
8 LF 6" PVC @ 31.24%
1 LF 6" PVC @ 6.27%
2 LF 6" PVC @ 35.18%
17 LF 6" PVC @ 12.41%
INV 435.99
INV 423.00
17 LF 6" PVC @ 1.00%
42 LF 6" PVC @ 1.00%
INV 422.49
6 LF 6" PVC @ 66.27%
3 LF 6" HDPE @ 1.00%
INV 422.07
5 LF 6" PVC @ 75.79%
6 LF 6" PVC @ 1.00%
5 LF 6" PVC @ 87.94%
13 LF 6" PVC @ 1.00%
14 LF 6" PVC @ 2.83%
INV 433.27
INV 433.42
9 LF 4" PERF. PVC @ 0.50%
8 LF 6" PVC @ 34.25%
2 LF 6" PVC @ 1.00%
CBMH-301
RIM 427.02
INV 423.14 (6" IN)
INV 423.14 (6" OUT)
CBMH-105
RIM 429.11
INV 425.50 (6" IN)
INV 425.50 (12" IN)
INV 423.50 (12" OUT)
INV 425.50 (6" IN)
C O
C O
CO
C O
RIM 443.42
INV 439.90
INV 439.70
INV 439.28
INV 439.10
INV 438.67
RIM 442.63
INV 438.48
INV 438.48
RIM 441.00
INV 437.38
60 LF 4" PERF. PVC @ 1.06%
15 LF 6" PVC @ 43.59%
19 LF 4" PERF. PVC @ 1.00%
46 LF 4" PERF. PVC @ 1.00%
43 LF 4" PERF. PVC @ 1.00%
17 LF 4" PERF. PVC @ 1.00%
42 LF 4" PERF. PVC @ 1.00%
20 LF 4" PERF. PVC @ 1.00%
RIM 443.51
INV 441.85
82 LF 4" PERF. PVC @ 0.50%
58 LF 4" PERF. PVC @ 0.50%
INV 441.44
INV 441.15
INV 441.12
3 LF 6" PVC @ 1.00%
INV 438.02
C O
8 LF 6" PVC @ 1.00%
RIM 435.94
INV 432.14
INV 432.14
INV 431.01
6 LF 6" PVC @ 22.73%
13 LF 6" PVC @ 32.41%
C O
C O
CO
CO
C O
6 LF 6" PVC @ 1.63%
RIM 428.84
INV 425.34
RIM 433.83
INV 430.16
INV 429.81
RIM 433.55
INV 429.01
INV 429.00
10 LF 6" PVC @ 31.64%
80 LF 4" PERF. PVC @ 1.00%35 LF 4" PERF. PVC @ 1.00%
CBMH-106
RIM 424.66
INV 421.31 (6" IN)
INV 421.31 (12" IN)
INV 420.60 (18" OUT)
16 LF 6" PVC @ 2.34%INV 423.37
10 LF 6" PVC @ 55.44%
RIM 434.02
INV 429.17
INV 429.17
27 LF 4" PERF. PVC @ 1.00%
INV 429.44 40 LF 4" PERF. PVC @ 1.00%
41 LF 4" PERF. PVC @ 1.00%
INV 429.84
RIM 433.92
INV 430.25
CBMH-701
RIM 440.60
INV 437.32 (6" IN)
INV 437.32 (12" OUT)
ME 443.68
15 LF 6" PVC @ 31.64%
3 LF 6" PVC @ 3.90%
4 LF 6" PVC @ 13.54%
69 LF 6" PVC @ 3.90%
5 LF 6" PVC @ 5.00%
4 LF 6" PVC @ 5.00%
INV 425.94
INV 426.05
RIM 429.13
INV 426.61
INV 428.73
INV 428.99RIM 432.05
INV 429.18
10 LF 6" PVC @ 31.64%
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ ut ilit ie s.
dw m to lk ki ne d:
7/
/2
:3 lo t:7 /1
4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
CU103
UTILITY PLAN - COLUMBARIA
DRAINTILE
N
SHEET NOTES
1 BASE BID - UTILITY PLAN - CLEANOUT & INVERT ELEVATIONS
SCALE: 1" = 10'
0 10' 20'
MTEH
1. CONTRACTOR TO PROVIDE INLET PROTECTION ON ALL STORM DRAIN INLETS PER DETAILS 16/CD101 AND 19/CD101
2. CONTRACTOR TO COORDINATE WITH COR, UTILITY COMPANIES AND CITY FOR TEMPORARY UTILITY CONNECTION/DISCONNECTS.
3. WATERMAIN SHALL COMPLY WITH INSTALLATION REQUIREMENTS PER LATEST EDITION OF HAWAII WATER SYSTEM STANDARDS.
VICINITY MAP
TIE IN 6" PVC DRAINTILE TO 18" HDPE
AT ELEVATION 417.98
SEE DETAIL 8/LD110 FOR
TRENCH DRAIN TRANSITION
KEY NOTES
X.X%
CONSTRUCTION LIMITS
SILT FENCE
BIO-ROLL
EROSION CONTROL BLANKET
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NEW CURB AND GUTTER
INTERMENT SECTION LIMITS
SLOPE PERCENTAGE ARROW
INLET PROTECTION
TREE PROTECTION
SILT FENCE. SEE DETAIL 15/CD101
INLET SEDIMENT PROTECTION. SEE DETAIL 16/CD101
BIO-ROLL. SEE DETAIL 17/CD101
EROSION CONTROL BLANKET. SEE DETAIL 18/CD101
23+00
24+00 25+00
26+00
27+00
28+00
29+00
PC
: 2
2+
.0
PT: 23+18.60
PC: 23+55.74
PT
: 2
4+
.0
PC
: 2
6+
.1
PT: 27+28.89
PC: 28+78.64
R 427.02
R 433.62
R 410.21
R 410.62
R 416.20
R 419.45
R 424.66
R 424.44
R 427.76
R 429.11
R 433.26 R 433.22
R 433.59
R 433.70
R 433.61
R 433.78
R 440.60
R 440.98
R 440.89 R 442.03
R 442.57
INTERMENT SECTION L
INTERMENT SECTION H
INTERMENT SECTION 2
.2
.9
.0
.5
.4
.8
15.5%
5 41
410410410
415415
413414
R 420.23
R 409.66
Geotechnical Engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 c iv il\ _0 ca d fil es b id d oc s\ _0 sh ee ts
\1
_b as e bi d_ er os io n co nt ro l.d w m to lk ki ne d:
7/
/2
4:
lo t:7 /1
4/
:0
PM
Office of Design and Construction Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785
NMCP
GRAVESITE EXPANSION AND
CEMETERY IMPROVEMENTS
899CM3030
JULY 15, 2021
HONOLULU, HAWAII
BIDDING DOCUMENTS
BIDDING DOCUMENTS
Date:
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering
EC Design Group, Ltd 400 5th St.
West Des Moines, IA 50265
(515) 225-6365 Erik Christiansen
Cost Estimating, Scheduling, Value Engineering
Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596
(310) 207-6900 Tommy Vest
Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797
(808) 397-6974 Tim (Xiaobin) Lin
BASE BID
07/15/21
EXP. 04/30/22
OF 138
CE101
EROSION CONTROL PLAN
N
1 BASE BID - GRADING PLAN
SCALE: 1" = 20'
0 20' 40'
MTEH
TYP.
VICINITY MAP
PROJECT DESCRIPTION/LOCATION
THE NATIONAL MEMORIAL CEMETERY OF THE PACIFIC (NMCP), HAWAII GRAVESITE EXPANSION
AND CEMETERY IMPROVEMENTS IS LOCATED IN THE CITY OF HONOLULU IN HONOLULU COUNTY
BOUNDED ON THE NORTH BY PUOWAINA DRIVE, WEST AND SOUTH BY PROSPECT STREET AND
THE EAST BY AUWIOLIMU STREET. THE PROPERTY EXTENDS SOUTH FROM COMMERCIAL
PROPERTY TO THE NORTH AND NORTH FROM COMMERICIAL PROPERTY TO THE SOUTH ,
LOCATED IN OAHU WATERSHED. THE PROPOSED SITE ENCOMPASSES 118 ACRES.
THE PLANNED SCOPE OF THE PROJECT INCLUDES:
· THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS
GRADING OF THE SITE FOR THE CONSTRUCTION OF NEW COLUMBARIA AND UPGRADING
ROADS AND UTILITIES.
· GRADING AS REQUIRED FOR THE INSTALLATION OF THE STRUCTURES, ROADS, AND
PARKING LOTS.
· PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB, GUTTER, AND SIDEWALKS
THROUGHOUT THE SITE..
RECEIVING WATERS
THESE WATERS ARE LOCATED WITHIN ON MILE (AERIAL RADIUS) OF THE PROJECT LIMITS AND
RECEIVE RUNOFF FROM THE PROJECT SITE. DUE TO THE PROXIMITY OF THE RECEIVING
WATERS, THE BMPS DESCRIBED IN APPENDIX A OF THE NPDES PERMIT MAY APPLY TO ALL
AREAS OF THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .