Questions and Answers (cont.).docx

DOCX document 15 KB Posted

Attached to
Y1PZ--NMCP Gravesite Expansion and New Bathroom_ Project # 899-030
Solicitation number
36C78621B0012
Issued by

About this file

This document contains questions and answers regarding a federal landscaping contract opportunity. The opportunity requires landscape contractors to be certified by the Professional Landcare Network, though certification by a labor union may substitute if the union can prove its workforce is similarly certified. Offerors must use a revised cost estimate worksheet that includes contract line items. The period of performance is 365 calendar days from notice to proceed, though if an option for additional work is not exercised within 120 days, that work must be completed within 245 days of its notice.

The related federal contract opportunity is a solicitation for gravesite expansion and new bathroom construction at the National Memorial Cemetery of the Pacific in Hawaii. It is set aside for verified service-disabled veteran-owned small businesses and will be awarded on a lowest price technically acceptable basis. Offerors must register in beta.SAM.gov and acknowledge any amendments, which will be posted rather than mailed. The estimated award date is July 15, 2021. The point of contact is provided for any questions.

View the file

Other files

File Type Posted
IFB Lump Sum Division Spreadsheet.xlsx XLSX spreadsheet
36C78621B0012 0003.docx DOCX document
ADD-1_Specifications.pdf PDF
ADD-1_Irrigation Plan Sheets.pdf PDF
15785_Addendum-1_Narrative.pdf PDF
ADD-1_Electrical Plan Sheets.pdf PDF
Existing Public Restroom As-builts.pdf PDF
36C78621B0012 0002.docx DOCX document
ADD-1_Public Restroom Plan sheets.pdf PDF
ADD-1_General Site and Colubmarium Plan Sheets.pdf PDF
04 Final Design NMCP 899CM3030 Columbarium_PG 27-51_210815.pdf PDF
11 Final Design NMCP 899CM3030 Option1 Columbarium_PG 119-137_210815.pdf PDF
03 Final Design NMCP 899CM3028_IC3029_CM3030_PG 12-26_210815.pdf PDF
02 Final Design NMCP 899CM3028_IC3029_CM3030_PG 01-11_210815.pdf PDF
07 Final Design NMCP 899CM3028 Road Improvements_PG 83-91_210815.pdf PDF
06 Final Design NMCP 899IC3029_CM3030 New Restroom_PG 65-82_ 210815.pdf PDF
10 Final Design NMCP 899CM3030 Electrical_Comm_PG 108-118_210815.pdf PDF
09 Final Design NMCP 899IC3029_CM3030 Structural_PG 99-107_210815.pdf PDF
05 Final Design NMCP 899CM3030 Site Furnishings_PG 52-64_210815.pdf PDF
01 Final Specifications NMCP 899CM3028_IC3029_CM3030_210815.pdf PDF
08 Final Design NMCP 899CM3030 Irrigation_PG 92-98_210815.pdf PDF
Wage Determination.txt TXT text file
NMCP_Expansion and Improvements IFB Scope of Work.docx DOCX document
36C78621B0012_1.docx DOCX document
Attachment-_Contractor Cost Estimate Worksheet.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Questions

· Landscape Installer Requirement - Specs say that as a landscape contractor, we need to be a member of the Professional Landcare Network and be certified by them. We are signatory to the Local 368 AFL CIO laborers union and our workers come from them and are certified by them. Can this be waived for us to bid and do the work?

· Only if the Labor Union can prove their labor workforce is certified Professional Landcare Network. Otherwise, the answer is No. Contractor must meet the spec and provide the certifications. This ensures the company is educated and trained in proper application and installation methods which promote best practices of the industry when it comes to installation, maintenance and irrigation construction.

· Contractor Cost Estimate Worksheet - For the contractor cost estimate worksheet, are we going to provide the worksheet per CLIN/ITEMS or just one worksheet that combines all CLIN/ITEMS?

· Please see revised attachment “IFB Lump Sum Division Spreadsheet” that will include CLINS. This will be required with the Bid Package in place of the original estimate spreadsheet.

· What is the expected period of performance if Option 1 (CLIN 0005) is not awarded at the time of award?

· The anticipated completion of this project is 365 calendar days after receipt of Notice to Proceed (including Option 1 (CLIN 0005).

· If Option 1 is not accepted within 120 calendar days of original Notice to Proceed, the completion of Option 1 work is 245 calendar days after receipt of Notice to Proceed of Option 1.

File details come from the government source that posted it. Updated .