This pre-solicitation notice announces an upcoming Invitation for Bid for the NMCP Gravesite Expansion and New Bathroom Project at the National Memorial Cemetery of the Pacific in Honolulu, Hawaii. The project has an estimated value between $5-10 million and is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. Responses are due on or around July 15, 2021 unless otherwise amended. Interested parties must register in SAM, Beta SAM, and Vendor Information Pages and be verified as an SDVOSB. The work includes gravesite expansion and construction of new bathrooms. The National Cemetery Administration of the Department of Veterans Affairs will issue and administer the contract.

View the file

Other files

File Type Posted
IFB Lump Sum Division Spreadsheet.xlsx XLSX spreadsheet
36C78621B0012 0003.docx DOCX document
Questions and Answers (cont.).docx DOCX document
ADD-1_Specifications.pdf PDF
ADD-1_Irrigation Plan Sheets.pdf PDF
15785_Addendum-1_Narrative.pdf PDF
ADD-1_Electrical Plan Sheets.pdf PDF
Existing Public Restroom As-builts.pdf PDF
36C78621B0012 0002.docx DOCX document
ADD-1_Public Restroom Plan sheets.pdf PDF
ADD-1_General Site and Colubmarium Plan Sheets.pdf PDF
04 Final Design NMCP 899CM3030 Columbarium_PG 27-51_210815.pdf PDF
11 Final Design NMCP 899CM3030 Option1 Columbarium_PG 119-137_210815.pdf PDF
03 Final Design NMCP 899CM3028_IC3029_CM3030_PG 12-26_210815.pdf PDF
02 Final Design NMCP 899CM3028_IC3029_CM3030_PG 01-11_210815.pdf PDF
07 Final Design NMCP 899CM3028 Road Improvements_PG 83-91_210815.pdf PDF
06 Final Design NMCP 899IC3029_CM3030 New Restroom_PG 65-82_ 210815.pdf PDF
09 Final Design NMCP 899IC3029_CM3030 Structural_PG 99-107_210815.pdf PDF
05 Final Design NMCP 899CM3030 Site Furnishings_PG 52-64_210815.pdf PDF
01 Final Specifications NMCP 899CM3028_IC3029_CM3030_210815.pdf PDF
08 Final Design NMCP 899CM3030 Irrigation_PG 92-98_210815.pdf PDF
Wage Determination.txt TXT text file
NMCP_Expansion and Improvements IFB Scope of Work.docx DOCX document
36C78621B0012_1.docx DOCX document
Attachment-_Contractor Cost Estimate Worksheet.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CO

w w w1

434.57

429.11

431.93432.03432.05

3.

9%

429.49 430.16

434.43

432.69432.49

4.

3%

3.

8%

0+

1+

2+

3+

4+

5+

6+

7+00

8+00

+0

+0

+0

+0

+0

28+00

29+00

30+00

31+00

32+00

33+00

34+00

35+00

36+00 37+00

38+00

+0

+0

+0

+0

+5

BP: 0+00.00

PC: 3+18.96

PT: 5+26.18

PC: 5+39.06

PT: 7+25.65

PC: 7+57.53

PT: 22+38.21

PC: 22+56.01

PT: 23+18.60

PC: 23+55.74

PT: 24+16.01

PC: 26+48.10

PT: 27+28.89

PC: 28+78.64

PT: 3

2+08.45

PC: 3

3+32.53

PC

C: 3

4+

.17

PC

C:

5+

.3

PC

C:

5+

.6

P T:

6+

.6

P

C : 3

6+

.8

PT: 37+07.31

PC

: 37+33.35

PT: 38+23.51

PC: 38+42.28

PCC: 38+46.15

PT: 39+58.04

EP: 42+53.65

LEGEND

MILL AND OVERLAY ASPHALT PAVEMENT

FULL DEPTH ASPHALT PAVEMENT

RECONSTRUCTION

EXISTING ASPHALT PAVEMENT

NEW CONCRETE PAVEMENT

EXISTING CONCRETE PAVEMENT

NEW CURB AND GUTTER

INTERMENT SECTION LIMITS

CONSTRUCTION LIMITS

KEY NOTES

NEW ROLL CURB. SEE DETAIL 5/CD101

NEW PEDESTRIAN CONCRETE PAVEMENT. SEE DETAIL 1/CD101

NEW ASPHALT PAVEMENT. SEE DETAIL 2/CD101

NEW VERTICAL CURB. SEE DETAIL 7/CD101

NEW CONCRETE VALLEY GUTTER. SEE DETAIL 8/CD101

PROTECT MEMORIAL PAVERS TO REMAIN

VERTICAL CURB TO ROLL CURB/ VALLEY GUTTER/ FLUSH CURB

TRANSITION. SEE DETAIL 11/CD101

ROLL CURB TO CONCRETE VALLEY GUTTER & VERTICAL CURB

TRANSITION. SEE DETAIL 12/CD101

FLUSH CURB. SEE DETAIL 4/CD101

ROLL CURB TO FLUSH CURB/ VALLEY GUTTER. SEE DETAIL 13/CD101

HANDICAP STALL. SEE DETAIL 5/CD102

LANDSCAPE CURB. SEE DETAIL 8/CD101

FULL DEPTH SAW-CUT

PEDESTRIAN CROSSWALK. SEE DETAIL 1/CD103

PEDESTRIAN CROSSWALK. SEE DETAIL 2/CD103

NEW RETAINING WALL. SEE STRUCTURAL

NEW FLOWER WATERING STATION. SEE DETAIL 1/LS107

MILL & OVERLAY ASPHALT PAVEMENT. SEE DETAIL 3/CD101

NEW WHEEL STOP. SEE DETAIL 8/CD103

Geotechnical Engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h:

y

:\1

\1 c iv il\ _0 ca d fil es s he et s\

5_ ad d al t 4

_s ite p la n.

dw g ed it:

eh ed m an s av ed

:7 /2

6/

0:

A M p lo t:7 /2

6/

0:

A M

Office of Design and Construction Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15785

NMCP

GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

899CM3030

JULY 15, 2021

HONOLULU, HAWAII

BIDDING DOCUMENTS

BIDDING DOCUMENTS

Date:

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering

EC Design Group, Ltd 400 5th St.

West Des Moines, IA 50265

(515) 225-6365 Erik Christiansen

Cost Estimating, Scheduling, Value Engineering

Leland Saylor Associates 1777 Oakland Blvd #103 Walnut Creek, CA 94596

(310) 207-6900 Tommy Vest

Kokua Geotech, LLC 94-974 Pakela St., Suite 109 Waipahu, HI 96797

(808) 397-6974 Tim (Xiaobin) Lin

BASE BID

07/15/21

EXP. 04/30/22

OF 138

N

0 60' 120'

C-501

MTEH

1 ADD ALT 4 - OVERALL SITE PLAN

SCALE: 1" = 60'

OVERALL SITE PLAN

OUTE

R D

RIV

E

SO

UTH

OUTE

R D

RIV

E N

ORTH

VICINITY MAP

O U

TE

R

D R

IV

E

SO

U

TH

PUOWAINA DRIVE

2 CROSS SECTION A-A: TYPICAL TRENCH SECTION FOR ELECTRICAL & COMMUNICATION DUCTBANKS

SCALE: NTS

PROTECT EXISTING CURB TO REMAIN

2.0' 24" MIN.

30" MAX.

3.

0'

M

IN

2.

5'

M

IN

FUTURE CONCRETE DUCT

BANK FOR ELECTRICAL

CONCRETE DUCT

BANK FOR COMMUNICATION

FUTURE 6"

IRRIGATION WATERMAIN

FUTURE 4"

DOMESTIC WATERMAIN

APPROXIMATE

TRENCH EXTENTS

7.0' 2.0'

CROSS SECTION A-A

SEE DETAIL 2/C-501

12" MIN.

108 137

S

S

SD

GENERAL ELECTRICAL AND TECHNOLOGY EQUIPMENT SCHEDULE

A1

E

E

OC

D

K

HUBBELL

LEVITON

PASS & SEYMOUR

COOPER

ALL SWITCH, RECEPTACLE, AND OUTLET COLORS SHALL BE VERIFIED WITH ARCHITECT,

UNLESS INDICATED OTHERWISE.

1 DEVICE

COLOR

HUBBELL

LEVITON

PASS & SEYMOUR

COOPER

ALL SWITCHES, RECEPTACLES, AND OUTLETS SHALL BE COMPLETE WITH #302 STAINLESS

STEEL COVERPLATES IN FINISHED SPACES WHERE WALLS ARE FINISHED; #302 STAINLESS

STEEL COVERPLATES IN UNFINISHED SPACES FOR FLUSH BOXES; AND GALVANIZED STEEL

COVERPLATES IN UNFINISHED SPACES FOR SURFACE MOUNTED BOXES. WHERE SEVERAL

DEVICES ARE GANGED TOGETHER, THE COVER PLATE SHALL BE OF THE GANGED STYLE FOR

THE NUMBER OF DEVICES USED.

2 COVER

PLATES

HUBBELL HBL1221

LEVITON 1221-2

PASS & SEYMOUR PS20AC1

COOPER AH2221

SWITCH, SINGLE POLE, SINGLE THROW, 120/277 VOLT, 20 AMP. TOGGLE HANDLE, MAINTAINED

CONTACT, SIDE AND BACK WIRED,

HUBBELL HBL1221L

LEVITON 1221-2L

PASS & SEYMOUR

PS20AC1-L

COOPER AH2221L

SWITCH, KEY LOCK TYPE, SINGLE POLE, SINGLE THROW, 120/277 VOLT 20 AMP MAINTAINED

CONTACT, SIDE AND BACK WIRED, PROVIDE KEY TO OWNER,

WATT STOPPER

DT 300 SERIES

HUBBELL INC.

OMNI-DT2000 OR

ATD2000C

GREENGATE OAC-DT

LEVITON OSC##-MOW

OCCUPANCY SENSOR, CEILING MOUNTED 360 DEGREE, DUAL TECHNOLOGY PASSIVE

INFRARED/ULTRASONIC FREQUENCY GREATER THAN 40 KHz, DUAL SENSING VERIFICATIONS

(REQUIRES BOTH TECHNOLOGIES TO ACTIVATE), EITHER TECHNOLOGY MAINTAINS ON

STATUS, INTEGRATED AMBIENT LIGHT LEVEL SENSOR (2-200 FC RANGE), ADJUSTABLE

SENSITIVITY AND TIME DELAY, INTEGRATED ISOLATED RELAY CONTACT, 5 YEAR WARRANTY.

SENSOR SHALL CONTROL ALL CIRCUITS IN AREA, UNLESS NOTED OTHERWISE. INITIAL

SETTINGS: TIME DELAY 10 MINUTES, AMBIENT SENSOR 40FC. CONTRACTOR SHALL SUBMIT

MANUFACTURER SUPPLIED SENSOR COVERAGE DRAWING FOR SHOP DRAWING REVIEW.

PARAGON CW-201-70

TORK 2107

INTERMATIC K4236

PHOTOCELL, 120/277 VOLT, 1800 V.A. RATED, SINGLE POLE, SINGLE THROW CONTACT,

WEATHERPROOF AND CORROSION PROOF ENCLOSURE. MOUNT FACING NORTH. U.L. LISTED.

PC

9 HUBBELL

GFTR20/RW57300

LEVITON

GFWT2/5977-CL

PASS & SEYMOUR

2097TRWR/WIUC10-C

COOPER WRSGF20/WIU-1

RECEPTACLE, GROUND FAULT DUPLEX, WEATHER RESISTANT, WEATHERPROOF

COVERPLATE, 125 VOLT, 20 AMP, 3 WIRE GROUNDING TYPE, N.E.M.A. 5-20R. TEST AND RESET

BUTTONS IN IMPACT RESISTANT THERMOPLASTIC FACE, NEMA 3R RATED WHILE IN USE, CAST

ALUMINUM, NON-LOCKING, STANDARD DEPTH, VERTICAL MOUNT.

W

REFER TO SPECIFICATIONSELECTRICAL CONNECTION TO EQUIPMENT AND MOTORS, SIZE PER N.E.C. COORDINATE

REQUIREMENTS WITH CONTRACTOR FURNISHING EQUIPMENT OR MOTOR. REFER TO

SPECIFICATIONS AND GENERAL INSTALLATION NOTES FOR TERMINATIONS TO MOTORS.

RECEPTACLE, DUPLEX, 125 VOLT, 20 AMP,3 WIRE GROUNDING TYPE, N.E.M.A.

5-20R, IMPACT RESISTANT THERMOPLASTIC FACE, STEEL BACK STRAP.

HUBBELL 5352A

LEVITON 5362-S

PASS & SEYMOUR 5362

COOPER 5352

HUBBELL GF20L

LEVITON GFNT2

PASS & SEYMOUR 2097

COOPER SGF20

RECEPTACLE, GROUND FAULT DUPLEX, 125 VOLT, 20 AMP, 3 WIRE GROUNDING

TYPE, N.E.M.A. 5-20R. TEST AND RESET BUTTONS IN IMPACT RESISTANT

THERMOPLASTIC FACE.

13 SQUARE D 7440

MINI-POWER ZONE

GENERAL ELECTRIC

CUTLER-HAMMER

SIEMENS

PACKAGED POWER PANELBOARD, CONSISTING OF A PRIMARY BREAKER, 25 KVA DRY TYPE

TRANSFORMER, SECONDARY PROTECTION AND A 240/120 VOLT, 1 PHASE PANELBOARD.

SURFACE MOUNT NEMA 3R ENCLOSURE, GROUND BUS, REFER TO SCHEDULES FOR SIZE AND

CONFIGURATION, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

'MPC-1'

19 FIBER OPTIC SPLICE CASE FOR EXTERIOR USE. PROVIDES UP TO (3) FIBER ENTRANCE PORTS

FOR FIBER SPLICING OF UP TO 36 SINGLE FUSION SPLICES AND 72 WITH AN EXPANDED

OPTION. INCLUDES MOUNTING IN HANDHOLES, LOCK-TAPE SEALING SYSTEM, PERMANENT

NEOPRENE GASKET SYST.

PERFORMED LINE PRODUCTS

COYOTE RUNT CLOSURE KIT

OR PRE-APPROVED EQUAL.

SC-FSC-1

18 WALL MOUNTED SPLICE HOUSING. ACCOMMODATES EITHER 16 0.2" (TYPE 2S OR 2R) OR 11 0.4"

(TYPE 4S OR 4R) SPLICE TRAYS. FRONT LOCKING DOOR, SLIDE OUT RAILS TO FACILITATE

FRONT ACCESS. DIMENSION:13.5" X 22.5" X 2.5" (H X W XD).

PROVIDE WITH CLAMP AND GROUNDING.

CORING SPLICE HOUSING

WSH-16SPT SPLICE TRAY

M67-112

OR PRE-APPROVED EQUAL.

SC-FDC-1

ALLIED TELESIS

MMC200-SERIES

20 COPPER TO FIBER MINI MEDIA AND RATE CONVERTER. FIXED SC/ST/LC OR SFP (100MB OR

1000MB) OPTICS. 12VDC POWER SUPPLY AND POWER CONSUMPTION IS 140mA@12VTYPICAL.

WALL MOUNTABLE USING MMCWLMT. VIRTUAL LAN SUPPORT. THE TWISTED-PAIR COPPER

PORT HAS AN RJ-45 CONNECTOR SUPPORTING EITHER 100MBPS OR 1000MBPS.

REFER TO SPECIFICATIONS FOR FIBER TYPE AND MORE INFORMATION.

SC-MEDIA-1

HUBBELL/QUAZITE

PG2436BB18

PG2436HAOO

CARSON INDUSTRIES

H SERIES

ARMORCAST

HIGHLINE PRODUCTS

SYNERTECH

HANDHOLE, COMPOSITE POLYMER CONCRETE BODY AND COVER. STAINLESS STEEL

HARDWARE. BOLTED NON-SKID COVER RATED FOR 10,000 LB. DESIGN LOAD OCCASIONAL

NON-DELIBERATE VEHICULAR TRAFFIC. STACK UNITS TO ACHIEVE DEPTH SHOWN ON PLANS.

UNITS IN LANDSCAPED AREAS SHALL BE GREEN IN COLOR. 48"W, 48"L, 36"D OR DIMENSIONS

AS SHOWN ON PLANS.

10 HH-#

ITEM

NO.

SYMBOL DESCRIPTION APPROVED MANUFACTURERS

THE SYMBOLS AND THE EQUIPMENT SCHEDULE ARE FOR THE CONVENIENCE OF THE CONTRACTOR. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR

VERIFICATION OF QUANTITIES AND SHALL FURNISH ALL MATERIAL REQUIRED, WHETHER SPECIFIED OR NOT, TO PRODUCE A SATISFACTORY WORKING

SYSTEM.

CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE BUT ARE GIVEN ONLY TO AID THE CONTRACTOR IN THE SEARCH FOR MATERIAL. NO

MATERIAL SHALL BE ORDERED BY MANUFACTURER AND CATALOG NUMBER ONLY. EACH CONTRACTOR SHALL FIRST READ THE COMPLETE

DESCRIPTION OF THE MATERIAL ON THESE DRAWINGS AND SPECIFICATIONS. THE FIRST MANUFACTURER LISTED IS THE BASIS OF DESIGN. "STANDARD

COLOR" INDICATES FACTORY FINISH AVAILABLE AT NO ADDITIONAL CHARGE.

15 JOHNSON CONTROLS -

SIMPLEX

NOTIFIER BY HONEYWELL

SIEMENS FIRE SAFETY

EDWARDS - EST

FIRE ALARM CONTROL PANEL, ADDRESSABLE SYSTEM, FEATURING INTERFACE WITH ANALOG

SENSING INITIATING DEVICES, EXPANDABLE MODULAR DESIGN, MICROPROCESSOR BASED

ELECTRONICS, 120 VAC OPERATION, SURFACE MOUNT. REFER TO SPECIFICATIONS FOR

COMPLETE REQUIREMENTS.

FAP-1

SMOKE DETECTOR, ADDRESSABLE, ANALOG PHOTOELECTRIC SENSOR, 24 VDC, 2-PIECE

DESIGN, LOW-PROFILE MOUNTING BASE WITH MULTI-FUNCTION LED INDICATOR, COMPLETE

WITH MOUNTING HARDWARE AND BACKBOX.

17 JOHNSON CONTROLS -

SIMPLEX

NOTIFIER BY HONEYWELL

SIEMENS FIRE SAFETY

EDWARDS - EST

JOHNSON CONTROLS -

SIMPLEX

NOTIFIER BY HONEYWELL

SIEMENS FIRE SAFETY

EDWARDS - EST

FIRE ALARM CEILING AUDIO/VISUAL NOTIFICATION APPLIANCE, ELECTRONIC HORN

WITH SELECTABLE CONTINUOUS OR TEMPORAL TONE, SELECTABLE SOUND OUTPUT,

AND HIGH-INTENSITY STROBE, WHITE HOUSING WITH RED LETTERING OR PICTOGRAM,

SEMI-FLUSH CEILING MOUNT, 24 VDC.

CANDELA RATINGS: A1=15, A3=30, A7=75, A9=95, AH=115, AS=177. CANDELA

RATING SHALL BE VISIBLE FROM THE OUTSIDE OF THE DEVICE.

11 GROVE CONCRETE

UTILITY CONCRETE

PRODUCTS, LLC

HARTFORD CONCRETE

PRODUCTS

OR APPROVED EQUAL

MANHOLE, CONCRETE BODY AND COVER. TYPE 20,000 LB. DESIGN LOAD OCCASIONAL

NON-DELIBERATE VEHICULAR TRAFFIC. 8'W X 10'L . ACCESSORIES PER THE SPECIFICATIONS.

REFER TO DETAIL 8/E500.

MH-#

HUBBELL/QUAZITE

B14363636M

CARSON INDUSTRIES

ARMORCAST

HIGHLINE PRODUCTS

SYNERTECH

21 HANDHOLE COMPOSITE POLYMER CONCRETE BODY AND COVER. STAINLESS STEEL

HARDWARE BOLTED NON-SKID COVER RATED FOR 15,000LB. DESIGN LOAD OCCASIONAL

NON-DELIBERATE VEHICULAR TRAFFIC. STACK UNITS TO ACIEVE DEPTH SHOWN ON PLANS.

UNITS IN LANDSCAPED AREAS SHALL BE GREEN IN COLOR. “COMMUNICATIONS” LOGO ON

HANHOLE COVER. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS. PW-HH-1 =

36”X36"X36”(WXLXH).

PW-HH-1

14 SQUARE D 7440

MINI-POWER ZONE

GENERAL ELECTRIC

CUTLER-HAMMER

SIEMENS

OUTDOOR RATED PACKAGED POWER PANELBOARD, CONSISTING OF A PRIMARY

BREAKER, 5 KVA DRY TYPE TRANSFORMER, SECONDARY PROTECTION AND A

240/120 VOLT, 1 PHASE PANELBOARD. WALL MOUNT NEMA 3R ENCLOSURE,

GROUND BUS, REFER TO SCHEDULES FOR SIZE AND CONFIGURATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

'MPC-2'

ELECTRICAL ABBREVIATION KEY

AFF ABOVE FINISHED FLOOR

N.C. NORMALLY CLOSED

NIC NOT IN CONTRACT

N.O. NORMALLY OPEN

ABBR: DESCRIPTION:

TYP TYPICAL

C CONDUIT

UNO UNLESS NOTED OTHERWISE

GFI GROUND FAULT INTERRUPTER

1. ##-### INDICATES ELECTRICAL EQUIPMENT DEFINED IN ELECTRICAL SCHEDULES OR

SPECIFICATION. REFER TO DRAWINGS CONTAINING ELECTRICAL SCHEDULES. PERMANENT

NAMEPLATE SHALL MATCH FINAL EQUIPMENT NOMENCLATURE, NOT ELECTRICAL

EQUIPMENT TAG NAME, REFER TO SPECIFICATIONS.

2. {L###} INDICATES THE LIGHTING SEQUENCE OF OPERATION FOR THE SPACE. REFER TO THE

LIGHTING SEQUENCE OF OPERATION MATRIX ON SHEET E600.

3. "SE" INDICATES LUMINAIRE IS SWITCHED/CONTROLLED DURING NORMAL OPERATION AND

OPERATES FROM EMERGENCY BATTERY UPON LOSS OF POWER.

4. INDICATES CONTINUATION TO MATCHING MARKER NUMBER ON ANOTHER SHEET,

REFER TO ADJACENT KEYED NOTED FOR SHEET NUMBER FOR CONTINUATION.

LUMINAIRE KEY:

DEVICE KEY:

ELECTRICAL MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

H MOUNT ORIENTED HORIZONTALLY

ELECTRICAL GENERAL NOTES:

LUMINAIRE

F1 = FIXTURE TAG

1 = CIRCUIT NUMBER

a = SWITCH DESIGNATION

*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS

INFORMATION. EX: F1 / 1 / a / NL

DEVICE

A = MOUNTING (IF APPLICABLE)

1 = CIRCUIT NUMBER

*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS

INFORMATION. EX: A / 1

E#

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDS FOR

ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATION DETAILS

ON THIS PAGE FOR ADDITIONAL INFORMATION.

2. CIRCUIT NUMBERS ARE SHOWN FOR CIRCUIT IDENTIFICATION. CIRCUITING SHALL AGREE

WITH NUMBERING ON THE PANEL PROVIDED. COMMON NEUTRALS MAY NOT BE USED FOR

BRANCH CIRCUITS. BALANCE THE LOAD ON PANEL AS EVENLY AS POSSIBLE BETWEEN

EACH PHASE.

3. FLUSH MOUNT ALL LIGHTING CONTROL DEVICES AT +42" FROM FLOOR (CENTERLINE

DIMENSION), EXCEPT WHERE OTHERWISE NOTED. DEVICES MAY BE SURFACE MOUNTED

WHEN CONDUIT IS SPECIFIED EXPOSED.

4. FLUSH MOUNT ALL DUPLEX RECEPTACLES AND TECHNOLOGY OUTLETS AT +18" FROM

FLOOR (CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. RECEPTACLES AND

OUTLETS MAY BE SURFACE MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.

5. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILING MOUNTED DEVICES AND

EQUIPMENT WITH LUMINAIRES, SPRINKLER, AND CEILING DIFFUSERS. CENTER ALL DEVICES

IN CEILING TILE PATTERN. SMOKE DETECTORS AND OCCUPANCY/VACANCY SENSORS

SHALL BE LOCATED NO CLOSER THAN 3 FEET TO AN AIR SUPPLY DIFFUSER OR RETURN

GRILLE.

6. CONTRACTOR SHALL VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT

LOCATIONS WITH ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS.

PRIOR TO MAKING THE ACTUAL ELECTRICAL INSTALLATION, THIS CONTRACTOR SHALL

ADJUST RECEPTACLES, OUTLETS, OR CONNECTION LOCATIONS TO ACCOMMODATE

FURNITURE AND/OR EQUIPMENT.

7. ELECTRICAL AND TECHNOLOGY EQUIPMENT SHALL BE MOUNTED TO AVOID IMPEDANCE OF,

OPERATION OF, AND/OR ACCESS TO ELECTRICAL AND MECHANICAL EQUIPMENT. ALL

MOUNTING OF ELECTRICAL AND TELECOMMUNICATIONS EQUIPMENT, ON EQUIPMENT

SUPPLIED BY ANOTHER CONTRACTOR, SHALL BE APPROVED IN ADVANCE BY THE OTHER

CONTRACTOR.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

9. ALL WELDING SHALL BE ACCORDING TO AMERICAN WELDING SOCIETY STANDARDS.

CONTRACTOR SHALL FURNISH TO THE ARCHITECT/ENGINEER CERTIFICATES QUALIFYING

EACH WELDER, PRIOR TO START OF WORK. THE ARCHITECT/ENGINEER RESERVES THE

RIGHT TO REQUIRE QUALIFYING DEMONSTRATION, AT THE CONTRACTOR'S EXPENSE, OF

ANY WELDERS ASSIGNED TO THE JOB.

10. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER ELECTRICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

ELECTRICAL INSTALLATION NOTES:

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

LINE TYPE AND TAG KEY:

SECURITY CONTRACTORS.C.

CIVIL CONTRACTORC.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

CONSTRUCTION MANAGERC.M.

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

WADE ROSS

WADE ROSS

MATT SNYDER

JAYSON STICKROD

DESCRIPTION: PERSON:

BUILDING CODE: IBC 2012 EDITION

FIRE CODE: IFC 2012 EDITION

PLUMBING CODE: IPC 2012 EDITION

MECHANICAL CODE: IMC 2012 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2017 EDITION

LIFE SAFETY CODE: NFPA 101 CURRENT EDITION

ENERGY CONSERVATION CODE: IECC 2015

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

M

A X

20" MAX.

M

A X

20"-25" MAX.

M

A X

M

IN

. 4

M

A X

M

A X

10" MAX. 10"-24" MAX.

ADA GUIDELINES - FRONT ACCESS

ADA STANDARDS FOR ACCESSIBLE DESIGN

INSTALL ABOVE COUNTER

DEVICE AT 44" ABOVE

FINISHED FLOOR.

INSTALL ABOVE COUNTER

DEVICE AT 40" ABOVE

FINISHED FLOOR.

INSTALL DEVICE AT 18"

ABOVE FINISHED FLOOR.

ADA GUIDELINES - SIDE ACCESS

INSTALL DEVICE AT 44"

ABOVE FINISHED FLOOR.

INSTALL DEVICE AT 42"

ABOVE FINISHED FLOOR.

1. THE LOCATION OF THE CONDUIT, HAND HOLES AND/OR MAINTENANCE HOLES SHOWN ARE

APPROXIMATE LOCATIONS. FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIVATE AND/OR

PUBLIC PRIOR TO THE INSTALLATION OF THE COMPONENT. FIELD COORDINATE THE FINAL

LOCATION WITH THE OWNER AND ENGINEER PRIOR TO INSTALLATION.

2. POTHOLING TO LOCATE EXISTING UNDERGROUND UTILITIES, IF APPLICABLE, SHALL BE

INCLUDED IN THE CONTRACTOR'S BID. CONTRACTOR IS RESPONSIBLE FOR FINAL

PLACEMENT OF HAND HOLES AND/OR MAINTENANCE HOLES AND SHALL NOTIFY THE

ENGINEER OF FINAL LOCATIONS PRIOR TO INSTALLATION.

3. HAND HOLES AND/OR MAINTENANCE HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF

THE FRAME WILL BE FLUSH WITH THE GROUND LINE.

4. REMOVAL AND REPLACEMENT OF THE EXISTING UNDERGROUND UTILITIES THAT ARE

REQUIRED TO COMPLETE THE INSTALLATION SHALL BE INCLUDED IN THE CONTRACTOR'S

BID

5. CONTRACTOR SHALL INCLUDE IN THEIR BID ANY REMOVAL AND REPLACEMENT OF EXISTING

SIDEWALK, PAVEMENT, GRASS, SHRUBS, TREES, ETC. THAT WILL BE IMPACTED BY THE

INSTALLATION OF THE NEW CONDUITS SHOWN ON THE DRAWINGS. IF TREES ARE

REQUIRED TO BE REMOVED THE CONTRACTOR SHALL CONTACT THE OWNER AND DISCUSS

OPTIONS PRIOR TO CUTTING DOWN ANY TREE OR SHRUB OVER 5' IN HEIGHT.

6. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN

REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND UTILITIES.

7. PROVIDE A MINIMUM OF 25'-0" SLACK LOOP WITHIN EACH HAND HOLES AND/OR

MAINTENANCE HOLES. SLACK LOOP SHALL BE SECURE SO COPPER OR FIBER IS NOT

RESTING ON EARTH AFTER FINAL INSTALLATION.

TECHNOLOGY OUTSIDE PLANT NOTES

ELECTRICAL SHEET INDEX

E000 ELECTRICAL AND TECHNOLOGY COVERSHEET

E001 OVERALL ELECTRICAL SITE PLAN

E002 PARTIAL ELECTRICAL SITE PLAN

E003 PARTIAL ELECTRICAL SITE PLAN

E004 PARTIAL ELECTRICAL SITE PLAN

E005 TECHNOLOGY SITE PLAN

E006 TECHNOLOGY SITE PLAN

E111 FLOOR PLANS - ELECTRICAL AND TECHNOLOGY

E400 ELECTRICAL ONE-LINE DIAGRAM

E500 ELECTRICAL AND TECHNOLOGY DETAILS

GRAND TOTAL: 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:2

P

M

E000

ELECTRICAL AND TECHNOLOGY

COVERSHEET

GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

REFER TO SPECIFICATION SECTIONS LIGHTING 26 51 00 FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

INTERIOR CORRELATED COLOR TEMPERATURE 3500K, COLOR RENDERING INDEX (CRI) AT OR ABOVE 80, UNLESS NOTED OTHERWISE.

EXTERIOR CORRELATED COLOR TEMPERATURE 4000/4100K, COLOR RENDERING INDEX (CRI) AT OR ABOVE 80, UNLESS NOTED OTHERWISE.

CATALOG NUMBER SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND CATALOG NUMBER ONLY. THE COMPLETE DESCRIPTION AND THE SPECIFICATION SHALL BE COORDINATED WITH THE CATALOG NUMBER TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE FIRST MANUFACTURER LISTED IS THE BASIS OF

DESIGN.

VERIFY AND COORDINATE ALL CEILING TYPES WITH LUMINAIRE MOUNTING AND TRIM REQUIREMENTS PRIOR TO THE RELEASE OF THE LUMINAIRE ORDER.

CONFIRM ALL COLORS AND FINISHES OF ALL LUMINAIRE COMPONENTS WITH ARCHITECT AND INTERIOR DESIGNER PRIOR TO THE RELEASE OF THE LUMINAIRE ORDER.

UNLESS INDICATED ON LIGHTING PLANS OR BELOW, REFER TO ARCHITECTURAL AND INTERIOR DESIGN ELEVATIONS, SECTIONS AND DETAILS FOR ALL SUSPENDED AND WALL MOUNTED LUMINAIRE

MOUNTING HEIGHTS.

DMX - DIGITAL MULTIPLEX EM - EMERGENCY BATTERY ML - MULTI-LEVEL SWITCHING O - OTHER (SEE DESCRIPTION)

DALI - DIGITAL ADDRESSABLE ELV - ELECTRONIC LOW VOLTAGE LINE - LINE VOLTAGE DIMMING REM - REMOTE

0-10V - 0-10V DIMMING EB - ELECTRONIC HL - HIGH/LOW (100%/50%) STEP DIM MV - MULTI-VOLTAGE ELECTRONIC

(TYPE) DRIVER:

PL - POLE O - OTHER (SEE DESCRIPTION) DLED - DYNAMIC TUNABLE LED WLED - WARM DIM LED

P - PERIMETER WL - WALL OLED - ORGANIC LED RLED - RETROFIT LED

FR - FLANGED RECESSED UC - UNDER CABINET TLED - TUBULAR LED LAMP RGBA - COLOR CHANGING + AMBER

CV - COVE SU - SURFACE LED - LIGHT EMITTING DIODE RGBW - COLOR CHANGING + WHITE

CL - CEILING SURFACE SP - SUSPENDED (TYPE) LED RGB - COLOR CHANGING LED

(MTG) MOUNTING: RE - RECESSED (WATT) PER: FIX - FIXTURE, FT - FOOT, LAMP

CFSA - COLOR-FINISH SELECTION BY ARCHITECT [DESIGN SPECIFIC BLANKS]

PAF - PAINT AFTER FABRICATION WW - WALL WASH K - KSH12 .125" ACRYLIC O - OTHER (SEE DESCRIPTION)

FINISH: VWD - VERY WIDE G - TEMPERED GLASS SS - SEMI-SPECULAR CLEAR

RS - REGRESSED STEEL V - ANSI/IES TYPE 5 DISTRIBUTION WD - WIDE F - FROSTED ACRYLIC R - HIGH IMPACT DR ACRYLIC

RA - REGRESSED ALUMINUM IV - ANSI/IES TYPE 4 DISTRIBUTION MD - MEDIUM C - CLEAR ALZAK P - POLYCARBONATE

FS - FLAT STEEL III - ANSI/IES TYPE 3 DISTRIBUTION SP - SPOT B - BAFFLE/LOUVER N - NONE

FA - FLAT ALUMINUM II - ANSI/IES TYPE 2 DISTRIBUTION NSP - VERY NARROW SPOT A - .125" ACRYLIC M - MATTE DIFFUSE CLEAR

(DESC) DOOR: DISTRIBUTION: BEAMWIDTH: (L/L) LENS/LOUVER: K19 - KSH19 .156" ACRYLIC

LED LUMINAIRE SCHEDULE

ITEM DESCRIPTION L/L MTG

DIMENSIONS WATT LED DRIVER

APPROVED MANUFACTURERL W H DIA.

ANSI

WATT

S PER TYPE QTY

ABSOLUTE

LUMENS

(MIN) VOLTS TYPE

F1 48" LINEAR LED, COLD-ROLLED STEEL

HOUSING, FLAT DIFFUSE LENS, FINISH

SELECTION BY ARCHITECT.

O CL 4'-0" 3 7/16" 2

23/32"

35 W FIX LED 1 5000 120 V LITHONIA

CLXL485000LMSEFFDLMVOLT35K8

0CRI

METALUX 4SNLED

WILLIAMS 75S4

F2 OPEN RECESSED DOWNLIGHT, GALVANIZED

STEEL HOUSING, POLYCARBONATE LENS,

WIDE DISTRIBUTION, FINISH SELECTION BY

ARCHITECT.

O RE 7 9/16" 4" 20 W FIX LED 1 2000 120 V GOTHAM

EVO435/20ARWDLSSMVOLT

HALO HC4

LITHONIA LDN4

F2A SAME AS F2 EXCEPT WITH 1000 LUMENS

PACKAGE.

O RE 7 9/16" 4" 9 W FIX LED 1 1000 120 V GOTHAM

EVO435/10ARWDLSSMVOLT

HALO HC4

LITHONIA LDN4

F2AE SAME AS F2A EXCEPT WITH MINIMUM 300

LUMENS EMERGENCY BATTERY PACK.

O RE 7 9/16" 4" 9 W FIX LED 1 1000 120 V GOTHAM

EVO435/10ARWDLSSMVOLTEL

HALO HC4

LITHONIA LDN4

F2E SAME AS F2 EXCEPT WITH MINIMUM 600

LUMENS EMERGENCY BATTERY PACK.

O RE 7 9/16" 4" 20 W FIX LED 1 2000 120 V GOTHAM

EVO435/20ARWDLSSMVOLTEL

HALO HC4

LITHONIA LDN4

F3 3' VANITY LIGHT, ACRYLIC DIFFUSER, FINISH

SELECTION BY ARCHITECT. MOUNT AT 7' 0"

AFF.

O WL 3'-0" 2

13/16"

4 7/16" 34 W FIX LED 1 2050

3000K

120 V LITHONIA

FMVCCL36INMVOLT30K90CRI

OXYGEN FUGIT VANITY 3-5013-XX

VISA VOILA CV4146

LIGHTING SEQUENCE OF OPERATION

NOTES:

1.{L##} DENOTES THE LIGHTING SEQUENCE OF OPERATIONS FOR THIS SPACE.

2.a = SWITCH DESIGNATION FOR LIGHTING CONTROL.

PLAN ID LIGHTING SWITCHED

{LS1} Sequence: Switched lights are controlled in this space.

ON: The lights turn on using switches.

OFF: The lights turn off using switches.

{LS2} Sequence: Switched lights are controlled in this space.

ON: The lights turn on using switches or upon occupancy.

OFF: The lights turn off using switches or after the space has been vacant for 15 minutes, the lights will automatically turn off via an occupancy sensor.

Emergency Sequence: If normal power fails life safety (SE) lights will remain on via an integral emergency battery pack.

{LS3} Sequence: Switched lights are controlled in the space.

ON: The lights turn on automatically via outdoor photocell when insufficient daylight is available.

OFF:The lights will turn off via outdoor photocell when sufficient daylight is available.

Emergency Sequence: If normal power fails life safety (SE) lights will remain on via an integral emergency battery pack.

CIRCUIT KEY NOTES: H=LOCK ON

TOTAL ESTIMATED DEMAND CURRENT: 17.42 A

TOTAL CONNECTED CURENT: 17.42 A

Lighting 350 VA TOTAL ESTIMATE DEMAND LOAD: 4.18 kVA

Power 1600 VA TOTAL CONNECTED LOAD: 4.18 kVA

HVAC 791 VA

LOAD CLASSIFICATION CONNECTED LOAD

TOTALS

LOAD SUMMARY

Total Amps: 16.66 19.84

Total Load: 2.00 kVA 2.38 kVA

-- MPC-1-17 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE MPC-1-18 --

-- MPC-1-15 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE MPC-1-16 --

-- MPC-1-13 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE MPC-1-14 --

-- MPC-1-11 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE MPC-1-12 --

-- MPC-1-9 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE MPC-1-10 --

MPC-1-7 HVAC - EF-2 20 A 1 12 12 12 0.12 0.2 12 12 12 1 20 A Other - FAP-1 MPC-1-8 *H

MPC-1-5 Recept. - GRAVESITE LOCATOR 20 A 1 12 12 12 0.18 0.67 12 12 12 1 20 A HVAC - EF-1 MPC-1-6

MPC-1-3 Power - AUTODOOR 20 A 1 12 12 12 0.8 1.26 12 12 12 1 20 A Receptacles MPC-1-4

MPC-1-1 Lighting 20 A 1 12 12 12 0.35 0.8 12 12 12 1 20 A Power - AUTODOOR MPC-1-2

K E

Y CKT NO. LOAD DESCRIPTION

OCPD

AMPS P

WIRE

SIZE

H N G

A B

WIRE

SIZE

H N G

OCPD

P AMPS LOAD DESCRIPTION CKT NO.

K E Y

NOTES:

METER: N/A

SPD: N/A SCCR: 18,000

LOCATION: EQUIP 3 WIRE: 3

FED FROM: EXISTING 75KVA TRANSFORMER GROUND BUS PHASE: 1

ENCLOSURE: BOLT-ON SOLID NEUTRAL VOLTS: 120/240 Single

MOUNTING: SURFACE MAIN: 125 A MCB

MPC-1

Revisions: Date: 109 137

4"

2X3"

4"

2"

4X3"

4"

2"

4X3"

2"

18"

20"

18"

28"

18"

16"

18"

18"

14"

20"

12"

16"

20"

20"

24"

24"

18"

14"

8"

8"

8"

8"

8"

8" 42"

90"

46"

42"

24"

24"

36"

36"

42"

34"

32"

72"

32"

24"

44"

32"

32"

36"

52"

48"

36"

32"

26"

26"

46"

24"

66"

16"

22"

18"

60"

22"

18"

20"

10"

12"

28"

14" 24"

14"

14"

16"

16" 12"

12" 18"

18"

12"

D

D

D

D

BUILDING

CARPORT

TA

N K

CMU

WALL

3-ICV

BOXES

D

D 6

D 6

D6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D

D 6

D 6

D6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D.I.

D.I.

TR

E N C H

D R

AI

N

ICV

2-ICV

BOXES

3-ICV

SMH

SDMH

SDMH

DRAIN

BOX

ICV

ICV

ICV BOX

ICV

ICV BOX

2-ICV

SDMH

2-ICV BOXES

ICV BOX

2-ICV

2-ICV

DRAIN

BOX

DRAIN

BOX

BUILDING

C M U

W A L L

C M U

W A L L

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

D 4D 4

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

4" R

CP

18" RCP

18" RCP

18" RCP

18" RCP

18" R CP

18" R

CP

12" RCP

12" RCP

12" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

18" RCP

24" RCP

24" RCP

24" RCP

36" RCP

36" RCP

24" RCP

48" RCP

48" RCP

18" RCP

3 6" R

CP

2" R

CP

8" R CP

8" R

CP

18" RCP

12" RCP

12" R

CP

18" RCPEN D NO

TFO UN

D

24" RCP

24" RCP

24" RCP

24" RCP

18" R

CP

8" R

CP

24" RCP

12" RCP

18" RCP

18" RCP

48"

12"

12"

14"

24"

18"

14"

14"

18"

24"

20"

12"

12"

20"

5 -t o p

0 -b ott om

1 2 3 4 0

B O

T T

O M

T O

P

T O

P

B

O T

T O

M 1234567891 to p b ot to m

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

FR

ONT

B A

CK

FRONT

BA

CK

FR

ON

T

B A

CK

FR

ON

T B A

CK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

FRONT

BACK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

FRON

T

BA

CK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

FRONT

BACK

FR

ON

T

B A

CK

F

RO

NT

B

ACK

F

RO

NT

B

ACK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

FR

ONT

B A

CK

FR

ONT

B A

CK

FR

ON

T B A

CK

FR

ON

T

B A

CK

FRON

T

BA

CK

FR

ON

T

B A

CK

FR

ON

T

B A

CK

FR

ONTB

A

CK

FR

ONT

B A

CK

FR

ON

T

B A

CK

REFER TO 1/E004 FOR

WORK IN THIS AREA

REFER TO 1/E002 FOR

WORK IN THIS AREA

REFER TO 1/E003 FOR

WORK IN THIS AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:2

P

M

E001

OVERALL ELECTRICAL SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

N O R

HT

1" = 100'-0"

OVERALL ELECTRICAL SITE PLAN

SHEET NOTES:

1. REFER TO E000 FOR GENERAL ELECTRICAL

NOTES, ELECTRICAL INSTALLATION NOTES,

GENERAL ELECTRICAL EQUIPMENT SCHEDULE

AND VIEW KEY.

Revisions: Date: 110 137

18"

20"

18"

28"

18"

16"

18"

18"

14"

20"

12"

16"

20"

20"

24"

24"

18"

14"

66"

16"

22"

18"

60"

22"

8" RCP

8"

RCP

8"

R

CP

EXISTING ELECTRICAL

MANHOLE #1

EXISTING PUMP HOUSE

TRANSFORMER

112.5KVA, 12.47KV:480V

S H

E E

T E

S H

E E

T E

EXISTING HECO UTILITY POLE

EXISTING ELECTRICAL

MANHOLE #2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:2

P

M

E002

PARTIAL ELECTRICAL SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

N O R

HT

1" = 50'-0"

PARTIAL ELECTRICAL SITE PLAN

KEYNOTES:

1. CONTRACTOR TO PROVIDE TESTING OF

EXISTING CEMETERY OWNED MEDIUM

VOLTAGE CONDUCTORS FROM POINT OF

CONNECTION AT HECO POLE THROUGH

DUCTBANKS/MANHOLES TO EXISTING 75KVA

TRANSFORMER LOCATED NEAR

COLUMBARIUM COURT #13. REFER TO 26 05 15

FOR TESTING REQUIREMENTS.

#SHEET NOTES:

1. REFER TO E000 FOR GENERAL ELECTRICAL

NOTES, ELECTRICAL INSTALLATION NOTES,

GENERAL ELECTRICAL EQUIPMENT SCHEDULE

AND VIEW KEY.

2. CONTRACTOR TO REPLACE IN-KIND ALL

DISTURBED AREAS DUE TO TRENCHING AND

INSTALLATION OF NEW ELECTRICAL AND

COMMUNICATION UPGRADES UNLESS NOTED

OTHERWISE.

Revisions: Date: 111 137

4"

2X3"

4"

2"

4X3"

4"

2"

4X3"

2"

24"

8"

8"

8"

8"

8"

8" 42"

90"

46"

42"

24"

24"

36"

36"

42"

34"

32"

72"

32"

24"

48"

36"

32"

26"

26"

46"

24"

CARPORT

TA

N K

CMU

WALL

C M U

W A L L

8" RCP

8" RCP

8" RCP

8" RCP

8" RCP

8" RCP

8" RCP

4"

RCP

4"

RCP

4"

RCP

6"

RCP

6"

RCP

4"

RCP

8"

RCP

8"

RCP

8"

RCP

3 6" R

CP

2"

R

CP

8" R

CP

4"

RCP

4"

RCP

8"

R

CP

4"

RCP

2"

RCP

8" RCP

8" RCP

48"

12"

12"

14"

24"

18"

14"

14"

18"

24"

20"

12"

12"

20"

T

O P

B O

T T

O M

1234567891

- t op

- b otto m

FR

O

N T

BA

C

K

FR

O

NT

BA

C

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FR

O

N T

BA

C

K

F R

O N

T

B A

C K

F R

O N

T B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T B A

C K

F R

O N

T

B A

C K

8"

8"

8"

8"

" R C

P

R

C P

" R

C P

R

C P

R

C P

" R C

P

2 "

R C

P

SHEET E003

SHEET E004

SHEET E003

SHEET E004

S H

E E

T E

S H

E E

T E

E003

E1

EXISTING COLUMBARIUM

COURT 13 TRANSFORMER

75KVA, 12.47KV:480V, 3PH, 3W

NEW RESTROOM BUILDING

EXISTING ELECTRICAL MANHOLE

#3

E1

E4

NEW HANDHOLE

HH-1

NEW HANDHOLE

HH-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:3

P

M

E003

PARTIAL ELECTRICAL SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

N O R

HT

1" = 50'-0"

PARTIAL ELECTRICAL SITE PLAN

KEYNOTES:

1. CONTRACTOR TO PROVIDE TESTING OF

EXISTING CEMETERY OWNED MEDIUM

VOLTAGE CONDUCTORS FROM POINT OF

CONNECTION AT HECO POLE THROUGH

DUCTBANKS/MANHOLES TO EXISTING 75KVA

TRANSFORMER LOCATED NEAR

COLUMBARIUM COURT #13. REFER TO 26 05 15

FOR TESTING REQUIREMENTS.

2. CONCRETE ENCASED DUCTBANK. REFER TO

5/E500 FOR DUCTBANK DETAIL. REFER TO ONE-

LINE DIAGRAM 1/E400 FOR ELECTRICAL

CONDUIT AND CONDUCTOR SIZE.

3. REMOVE EXISTING HANDHOLE AND REROUTE

POWER WIRING AROUND NEW RESTROOM

BUILDING SITE. PROVIDE THREE 2” C. WITH

NEW WIRING BETWEEN TWO NEW

HANDHOLES. WIRING TO MATCH EXISTING

WIRING AND BE EXTENDED AS REQUIRED.

BASED ON FIELD OBSERVATIONS THE

EXISTING CONDUITS INCLUDE AT LEAST TWO

SETS OF 4#2’S AND 8#8 WIRING. CONTRACTOR

TO FIELD VERIFY. REFER TO 7/E500 FOR

COCRETE HANDHOLE DETAIL.

4. REFER TO 2/E111 FOR CIRCUIT LINE

CONTINUATION TO MATCHING MARKER TO

'MPC-1'.

5. REFER TO 1/E003 FOR CIRCUIT LINE

CONTINUATION TO MATCHING MARKER.

6. REFER TO 2/E003 FOR CIRCUIT LINE

CONTINUATION FROM MATCHING MARKER.

#SHEET NOTES:

1. REFER TO E000 FOR GENERAL ELECTRICAL

NOTES, ELECTRICAL INSTALLATION NOTES,

GENERAL ELECTRICAL EQUIPMENT SCHEDULE

AND VIEW KEY.

2. CONTRACTOR TO REPLACE IN-KIND ALL

DISTURBED AREAS DUE TO TRENCHING AND

INSTALLATION OF NEW ELECTRICAL AND

COMMUNICATION UPGRADES UNLESS NOTED

OTHERWISE.

N O R

HT

1" = 30'-0"

PARTIAL ELECTRICAL SITE PLAN - ENLARGED PLAN

Revisions: Date: 112 137

24"

44"

32"

32"

36"

52"

18"

20"

10"

12"

28"

14" 24"

14"

14"

16"

16" 12"

12" 18"

18"

12"

D

D

D

D

3-ICV

BOXES

D

D 6

D 6

D 6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D

D 6

D 6

D 6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D.I.

D.I.

TR

EN

C H

D R

AI

N

ICV

2-ICV

BOXES

3-ICV

SMH

SDMH

SDMH

DRAIN

BOX

ICV

ICV

ICV BOX

ICV

ICV BOX

2-ICV

SDMH

2-ICV BOXES

ICV BOX

2-ICV

2-ICV

DRAIN

BOX

DRAIN

BOX

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

8" RCP

8" RCP

4"

R

CP

8" RCP

8" RCP

8" RCP

8"

RCP

1 8" R

CP

8" R

CP

2"

RCP

2"

RCP

2"

RCP

8" RCP

8" RCP

8"

RCP

2"

RCP

2" R

CP

1 8"

RCPE N

D NO TF O

UN D

4"

RCP

4"

RCP

8" R

CP

- t op

- b ot to m

1 2 3 4 0

B O

T T

O M

T O

P

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

FR

O

NT

F R

O N

T B A

C K

F R

O N

T B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FRONT

BACK

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FR

O

N T

BA

C

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FRONT

BACK

FR

O

N T

BA

C

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

E

SHEET E004

SHEET E003

SHEET E004

SHEET E003

NEW ELECTRICAL

MANHOLE

MH-1

3MH-1

NEW ELECTRICAL

MANHOLE

HH-1

MPC-2

NEW ELECTRICAL

HANDHOLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:3

P

M

E004

PARTIAL ELECTRICAL SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

N O R

HT

1" = 50'-0"

PARTIAL ELECTRICAL SITE PLAN

KEYNOTES:

1. INTERCEPT AND EXTEND THE EXISTING

ELECTRICAL 480V SERVICE FROM THE

EXISTING MEMORIAL BUILDING THAT

CURRENTLY SERVES THE RESTROOMS (TO BE

DEMOLISHED) TO FEED THE NEW MPC-2

THROUGH THE HH-1. PROVIDE TWO NEW

120V/1P ELECTRICAL SERVICE FROM THE NEW

MPC-2 TO FEED THE NEW IRRIGATION

CONTROLLER AND WEATHER STATION.

EXTEND 20A/1P CIRCUIT FROM BREAKERS IN

THE MPC-2. USE 2#4 & 1#4 GND IN 3/4" C. FOR

THE CIRCUIT EXTENSION.

2. CONCRETE ENCASED DUCTBANK. REFER TO

1/E500 FOR DUCTBANK DETAIL. REFER TO ONE-

LINE DIAGRAM 1/E400 FOR ELECTRICAL

CONDUIT SIZE.

3. REFER TO 6/E500 FOR ELECTRICAL MANHOLE

DETAIL.

4. REFER TO 7/E500 FOR COCRETE HANDHOLE

DETAIL.

#SHEET NOTES:

1. REFER TO E000 FOR GENERAL ELECTRICAL

NOTES, ELECTRICAL INSTALLATION NOTES,

GENERAL ELECTRICAL EQUIPMENT SCHEDULE

AND VIEW KEY.

2. CONTRACTOR TO REPLACE IN-KIND ALL

DISTURBED AREAS DUE TO TRENCHING AND

INSTALLATION OF NEW ELECTRICAL AND

COMMUNICATION UPGRADES UNLESS NOTED

OTHERWISE.

113Revisions: Date:

2"

18"

20"

24"

24"

18"

14"

8"

8" 8"

8" 8"8"

42"

90"

46"

42"

24" 24" 36"

36"

42"

34"

32"

72"

32"

24"44"

32" 32"

36" 52"

48" 36" 32"

26" 26" 46"

24"

D 6

D

D 6

D

B U

IL

DI

NG

C

AR

PO

RT

T A N K

C M U

W

AL

L

D

D

D 6

D

D 1

D

D 6

D 1

D

D

D

D 6

D

D 1

D

D 6

D 1

D

SD

M H

SD

M H

DR

AI

N

B

OX

IC

V

IC

V

IC

V B

OX

IC

V

IC

V B

OX

2-

IC

V

SD

M H

2-

IC

V B

OX

ES

IC

V B

OX

2-

IC

V

BU

ILD

IN

G

C M

U WALL

C M

U WALL

S

S

S

S

S

SS S

8"

R

CP

8"

R

CP

8"

R

CP

8"

R

CP

8"

R

CP

8"

R

CP

8"

R

CP

2 4" R CP

8"

R

CP

8"

R

CP

8"

R

CP

1 8"

RCP

8" RCP

8"

RCP

1 2" R CP

8"

R

CP

8"

R

CP

8"

R

CP

2 4" R CP

2 4" R

CP

4"

RCP

3 6" RCP

3 6" R CP

4"

RCP

4 8" R

CP

4 8" R

CP

8"

R

CP

3 6" R

CP

1 2" R

CP

8"

R

CP

1 8" R CP

8"

R

CP

2 4" R CP

2 4" R CP

2 4" R CP

2 4" R CP

8"

RCP

8"

RCP

4"

RCP

2" R

CP

8"

R

CP

8"

R

CP

48"

12"

12"

BAC

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

NEW RESTROOMS(1) 2" CONDUIT TO THE NEW

FIBER CABINET IN THE NEW

RESTROOM. REFER TO 4/E111

FOR CONTINUATION.

PW-HH-1(2) 4" UNDERGROUND CONDUITS

1-CONDUIT RESERVED FOR NCA FIBER

1-CONDUIT RESERVED FOR FUTURE

EXISTING HANDHOLE

MAINTENANCE BUILDING

(3) 4" UNDERGROUND LOW VOLTAGE CONDUITS

1-CONDUIT RESERVED FOR NCA FIBER

1-CONDUIT RESERVED FOR FUTURE

1-CONDUIT RESERVED FOR OTHERS

CONDUITS ROUTE UP THE BUILDING AND EXTEND

TO THE SERVING IT ROOM. COORDINATE WITH THE

RESIDENT ENGINEER (RE) AND PROVIDE ALL

PATHWAY REQUIREMENTS FOR A SEEMLESS

TRANSITION FROM THE EXTERIOR TO THE IT ROOM.

CONTRACTOR SHALL ESTIMATE 200' IN THE

BUILDING FOR BIDDING PURPOSES. REFER TO THE

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

(1) 2" UNDERGROUND LOW VOLTAGE CONDUIT

1-CONDUIT RESERVED FOR NCA FIBER

PW-HH-1(C)

(A)4

1 4

PW-HH-1 (B) 4

2 4

1 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:3

P

M

E005

TECHNOLOGY SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 MDS SAC

15785

NMCP

N O R

HT

1" = 50'-0"

TECHNOLOGY SITE PLAN

NOTES:

1. REFER TO 4/E500 FOR FIBER OPTIC AND

NETWORK CABLING REQUIREMENTS.

KEYNOTES:

1. NEW CONCRETE ENCASED DUCTBANK. REFER

TO SHEET C-501 FOR DUCTBANK LOCATION

AND 1/E500 FOR DUCTBANK INSTALLATION

REQUIREMENTS.

2. A MINIMUM OF 12" AWAY FROM THE

ELECTRICAL SERVICE CONDUITS. REFER TO

5/E500 FOR DUCTBANK DETAIL.

3. EXISTING HANDHOLE TO REMAIN IN PLACE.

CONTRACTOR SHALL MAINTAIN ALL SERVICES

FOR THIS HANDHOLE SEPARATE FROM THE

NEW HANDHOLE.

4. ALL PATHWAY INCLUDING CONDUIT,

CONCRETE, HANDHOLES, ETC. IS PART OF AN

ALTERNATE BID. REFER TO THE BID SCOPE

DOCUMENT FOR ADDITIONAL INFORMATION.

Revisions: Date: 114 137

24"

44"

32"

32"

36"

52"

18"

20"

10"

12"

28"

14" 24"

14"

14"

16"

16" 12"

12" 18"

18"

12"

D

D

D

D

3-ICV

BOXES

D

D 6

D 6

D 6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D

D 6

D 6

D 6

D

D

S

S

D 6

D

D 1

D 6

D 1

D

D 6

D

D 6

D

D

D

D.I.

D.I.

TR

EN

C H

D R

AI

N

ICV

2-ICV

BOXES

3-ICV

SMH

SDMH

SDMH

DRAIN

BOX

ICV

ICV

ICV BOX

ICV

ICV BOX

2-ICV

SDMH

2-ICV BOXES

ICV BOX

2-ICV

2-ICV

DRAIN

BOX

DRAIN

BOX

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

8" RCP

8" RCP

4" R

CP

8" RCP

8" RCP

8" RCP

8"

RCP

1 8" R

CP

8" R

CP

2"

RCP

2"

RCP

2"

RCP

8" RCP

8" RCP

8"

RCP

2"

RCP

2" R

CP

1 8"

RCPE N

D NO TF O

UN D

4"

RCP

4"

RCP

8" R

CP

- t op

- b ot to m

1 2 3 4 0

B O

T T

O M

T O

P

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

FR

O

NT

F R

O N

T B A

C K

F R

O N

T B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FRONT

BACK

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FR

O

N T

BA

C

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

FRONT

BACK

FR

O

N T

BA

C

K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

F R

O N

T

B A

C K

BASE BID

PW-HH-1

(2) 4" UNDERGROUND LOW VOLTAGE CONDUITS

1-CONDUIT RESERVED FOR FUTURE

1-CONDUIT RESERVED FOR OTHERS

PW-HH-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:3

P

M

E006

TECHNOLOGY SITE PLAN GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 Checker Author 15785

NMCP

N O R

HT

1" = 50'-0"

TECHNOLOGY SITE PLAN

KEYNOTES:

1. NEW CONCRETE ENCASED DUCTBANK. REFER TO SHEET C-501 FOR

DUCTBANK LOCATION AND 1/E500 FOR DUCTBANK INSTALLATION

REQUIREMENTS.

Revisions: Date: 115 137

OC

OC

{LS1}

{LS2}

{LS2}

{LS3}

{LS3}

E

E

E

E

PP

P P

P P

P P

SD

SD

SD

A1

A1

A1

PC

1'

J

H

G

-1

F1 /MPC-1-1 /a

F2

MPC-1-1

a

K/a

K/a

D

D

F3 /MPC-1-1 /a

F2AE /MPC-1-1 /a/SE

F2A /MPC-1-1 /a

F3 /MPC-1-1 /a

F2E

MPC-1-1

SE

F2

MPC-1-1

F2E

MPC-1-1

SE

F2A

MPC-1-1

F2E

MPC-1-1

SE

F2A /MPC-1-1 /a

MPC-1

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

F2AE /MPC-1-1 /a/SE

F2A /MPC-1-1 /a

F2A /MPC-1-1 /a

WOMENS

MENS

EQUIP

1'

J

H

G

-1

A/MPC-1-4

A/MPC-1-4

GROUND ROD. REFER TO 1/E400 FOR

MORE INFORMATION (TYP. OF 2). REFER

TO 2/E500 FOR GROUND GRID DETAIL.

EF-1

MPC-1-6

EF-2/MPC-1-7

GRAVESITE LOCATOR

MPC-1-5

W/MPC-1-4

W

MPC-1-4

AUTODOOR

MPC-1-2

AUTODOOR

MPC-1-3

MPC-1

MPC-1-4

MPC-1-4

MPC-1-4

FAP-1

MPC-1-8

E4

1'

J

H

G

-1

1'

J

H

G

-1

2" CONDUIT FROM NEW FIBER

CABINET. REFER TO SITE PLAN

1/E005 FOR CONTINUATION.

WOMENS

MENS

EQUIP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P

A C

IF

IC

N A

T

IO

N A

L C

E M

E T

E R

Y

C e s lim

.c h a v e z g a rc ia

.r v t

/1

/2

:0

:4

P

M

E111

FLOOR PLANS - ELECTRICAL AND

TECHNOLOGY

GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

N O R

HT

1/4" = 1'-0"

FIRST FLOOR PLAN - LIGHTING

N O R

HT

1/4" = 1'-0"

FIRST FLOOR PLAN - POWER

N O R

HT

1/4" = 1'-0"

ROOF PLAN - ELECTRICAL

N O R

HT

1/4" = 1'-0"

FIRST FLOOR PLAN - TECHNOLOGY

SHEET NOTES:

1. REFER TO E000 FOR GENERAL ELECTRICAL

NOTES, ELECTRICAL INSTALLATION NOTES,

GENERAL ELECTRICAL EQUIPMENT SCHEDULE

AND VIEW KEY.

2. REFER TO E000 FOR LUMAINIRE SCHEDULE

AND PANEL SCHEDULES.

3. {L##} INDICATES THE SEQUENCE OF

OPERATION FOR SPACE. REFER TO SHEET

E000 FOR LIGHTING SEQUENCE OF

OPERATION.

KEYNOTES:

1. MOUNT EXTERIOR PHOTOCELL AT ROOF

LEVEL. REFER TO 3/E500 FOR PHOTOCELL

MOUNTING DETAIL.

2. INSTALL AND WIRE TWO PUSH PADS

(PROVIDED BY G.C.) FOR EACH OPENER.

COORDINATE PUSH PAD LOCATIONS WITH

ARCHITECTURAL DRAWINGS.

3. THE OUTLET NEEDS TO BE MOUNTED WITHIN

4'-0" OF THE LOCATOR OPENING.

4. REFER TO 4/E500 FOR ADDITIONAL

CONNECTIVITY REQUIREMENTS. COORDINATE

WITH THE RESIDENT ENGINEER (RE),

ARCHITECT, AND ENGINEER ON THE LAYOUT

OF THE ROOM AND THE PLACEMENT OF THE

EQUIPMENT FOR REVIEW PRIOR TO

INSTALLATION.

5. REFER TO 2/E003 FOR CIRCUIT LINE

CONTINUATION FROM MATCHING MARKER

FROM COLUMBARIUM COURT 13 EXISTING

TRANSFORMER.

6. EXHAUST FAN EF-1 IS GOING TO BE CONTROL

VIA WALL SWITCH OF THE EQUIP 103. REFER

TO 1/E111 FOR WALL SWITCH LOCATION.

7. EXHAUST FAN EF-2 IS GOING TO BE CONTROL

VIA WALL SWITCH OF THE MENS 102. REFER

TO 1/E111 FOR WALL SWITCH LOCATION.

NO SPRINKLERS

Revisions: Date: 116 137

N E

U T

R A

L

GROUND

3#1/0 IN 2" C. IN CONCRETE

ENCASED DUCTBANK

125A MCB SEC.

120/240V, 1-PHASE, 3W

18,000 SCCR

4.18KVA

#6 GROUNDING ELECTRODE

CONDUCTOR

EFFECTIVELY GROUNDED

BUILDING STEEL

CONNECT TO METALLIC

WATER MAIN, WITHIN 5'-0" OF

WATER SERVICE ENTRANCE.

WM

PROVIDE JUMPER ACROSS

WATER METER

REMOVABLE LINK

#6 GROUNDING

ELECTRODE CONDUCTOR

CONCRETE ENCASED

ELECTRODE. NEC 250.52

BOND TO MINIMUM OF 20'

OF 1/2" REINFORCING

BAR.

3/4" DIA. x 10'-0" COPPER

GROUND ROD. TOP OF

ROD SHALL BE 12" BELOW

GRADE. (TYP.)

20'-0"

'MPC-1'

100A MCB PRI.

480V, 1-PHASE, 3W

18,000 SCCR

EXISTING UTILITY

PRIMARY SERVICE

EXISTING PRIMARY

METERING

EXISTING MAINTENANCE

FACILITY BUILDING

EXISTING

COLUMBARIUM

COURT 13 PANEL

EXISTING 75KVA

TRANSFORMER

12.47KV:480V

480V, 3P, 3W240V, 1P, 3W

MH

EXISTING 1002

ADMIN BUILDING

EXISTING 150KVA

TRANSFORMER

MH

EXISTING ELECTRICAL MANHOLE #1

'MPC-1'

'MPC-1'

25KVA

480/277:120/240V

EXISTING PUMP

HOUSE PANEL

EXISTING 112.5KVA

TRANSFORMER

MH

EXISTING ELECTRICAL MANHOLE #2

MH

EXISTING ELECTRICAL MANHOLE #3

MH

EXISTING 15KVA

TRANSFORMER

12.47KV:240V

EXISTING ELECTRICAL MANHOLE #4

MH

MH-1

NEW ELECTRICAL MANHOLE

(2) 5" EMPTY CONDUITS IN DUCTBANK

REFER TO E002 AND E003

FOR REQUIRED TESTING

MH-1

NEW ELECTRICAL MANHOLE

1 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BIDDING DOCUMENTS

Office of Design and Construction

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical, Technology & Structural

Engineering:

IMEG, Inc.

623 26th Avenue

Rock Island, IL 61201

(309) 788-0673

Wade Ross

Irrigation Engineering:

EC Design Group, Ltd

400 5th St.

West Des Moines, IA 50265

(515)225-6365

Erik Christiansen

Cost Estimating, Scheduling, Value Engineering:

Leland Saylor Associates

1777 Oakland Blvd #103

Walnut Creek, CA 94596

(310)207-6900

Tommy Vest

Geotechnical Engineering:

Geolabs, Inc.

2006 Kalihi St

Honolulu, HI 96819

(808)913-5150

Robin Kim

BIDDING DOCUMENTS

Services

OF 138

Project Director

BASE BID

C R e v it L o c a l F ile s \M

E P

.1

P A

C

IF

IC

N

A T

IO

N

A L C

E M

E T

E R

Y

C

S e ja l.

A

.C h it a ra

.r v t

/1

/2

:3

:3

P

M

E400

ELECTRICAL ONE-LINE DIAGRAM GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

HONOLULU. HAWAII

899CM3030

JULY 15, 2021 JRV SAC

15785

NMCP

NO SCALE

ONE-LINE DIAGRAM

Revisions: Date: 117

KEYNOTES:

1. REFER TO 1/E004 FOR MANHOLE LOCATION

MH-1 NEAR THE EXISTING MEMORIAL

BUILDING.

2. REFER TO 1/E004 FOR MANHOLE MH-1

LOCATION AT COLUMBARIA COURT 14.

GRAVE SITE

LOCATER

SC-MEDIA-1

SC-FDC-1

GRAVE SITE

LOCATER

SC-MEDIA-1

SC-FDC-1

SC-FSC-1

GROUNDING ELECTRODE

CONDUCTOR FROM SYSTEM

GROUND CONNECTION

EXOTHERMIC WELD OR HYDRAULIC

ONE SHOT CRIMP CONNECTION. (TYP.

ALL GROUND WIRE CONNECTIONS).

BARE COPPER GROUNDING

CONDUCTOR. (TYP.)

3/4"x10'-0" COPPER OR COPPER CLAD

STEEL GROUND ROD. TOP OF GROUND

ROD SHALL BE 12" BELOW GRADE. (TYP.)

20' M

INIMUM

3'-0"

3/4" RIGID METAL CONDUIT

1-1/2" TO 3/4" REDUCING FITTING

EPDM RUBBER CAP WITH

STAINLESS STEEL CLAMP

SPUN ALUM. BASE FLANGE

ROOFING/FLASHING

3-1/2" x 3-1/2" x 1/4" L (TYP.2)

1-1/2" U-BOLT (TYP.2)

1-1/2" TO 3/4" REDUCING FITTING

3/4" RMC NIPPLE, NUT WASHER

AND COMPRESSION CONNECTOR

4" x 4" J-BOX WITH BLANK COVER

3/4" EMT BOX COMPRESSION CONNECTOR

3/4" EMT CONDUIT

1 27/32"

/1

PHOTOCELL FACING NORTH

NOTES :

1. STRUCTURAL DETAIL SHOWN IS TO BE REPRESENTATIVE ONLY. REFER TO ARCHITECTURAL

DRAWINGS AND STRUCTURAL DRAWINGS FOR ACTUAL CONDITIONS ON THIS PROJECT.

NOTES:

1. THIS RISER IS DIAGRAMMATIC AND INTENDED TO IDENTIFY THE SCOPE AND TERMINATION POINTS. THE

DIAGRAM IS TO IDENTIFY CABLE TYPE, EQUIPMENT LOCATIONS, AND RECOMMENDED ROUTING

REQUIREMENTS BUT DOES NOT IDENTIFY THE FINAL ROUTING REQUIREMENTS. THE CONTRACTOR

SHALL FIELD VERIFY DISTANCES AND LENGTHS PRIOR TO THE PURCHASE AND INSTALLATION.

2. REFER TO THE SITE PLAN ON 1/E002 FOR ADDITIONAL ROUTING INFORMATION. THE CONTRACTOR SHALL COORDINATE WITH THE RESISTANT ENGINEER (RE) PRIOR TO THE INSTALLATION OF ANY

DEVICE TO VERIFY CONNECTION AND CABLE TYPES.

KEYNOTES:

1. EQUIPMENT INSTALLED ON THE WALL IN EQUIPMENT 3 LOCATED IN THE RESTROOMS. REFER TO 4/E111

FOR THE LOCATION OF THE EQUIPMENT.

2. COORDINATE WITH THE RESIDENT ENGINEER (RE) ON THE LOCATION OF THE CONNECTION IN THE MAINTENANCE BUILDING. FOR BIDDING PURPOSES ESTIMATE APPROXIMATELY 200 FEET OF FIBER

CABLE WITHIN THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .