Attachment C2 - Conceptual Phasing - Phasing Option 2 Summary - 4 pgs.pdf
PDF 2 MB Posted
- Attached to
- 751/20015. TAP; Newberry Customer Service Center
- Solicitation number
- RFP - 171 - 230000001121
- Issued by
- Luce County, Michigan
About this file
This document is a Conceptual Phasing summary related to the Newberry Customer Service Center project in Luce County, Michigan. The first phase of the project includes a 13,900 sq. ft. customer service center with office, public, and storage areas constructed using a hybrid approach of exposed mass timber in public spaces and conventional framing in office/storage areas. The future phase includes a 16,000 sq. ft. storage building with both heated and cold storage spaces. The opinion of probable construction cost for Phase 1 is $4,114,688, and the future storage building is estimated at $4,998,010. Additional project costs include design contingency, contractor fees, construction contingency, professional services, and other allowances. The total opinion of probable project cost is redacted in the provided document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 1
CUSTOMER SERVICE CENTER
13,900 S.F.
Office Areas 9,400 S.F.
- Conventional stud framing
- Pre-fab roof trusses
- Standard office finishes
Public Areas 2,100 S.F.
- Glulam beams & columns
- CLT roof panels
- Conventional stud framing
- Exposed timbers & wood
Covered Drop-off 900 S.F.
- Glulam timbers
- CLT roof panels
- Exposed timbers & wood
Heated Garage 7,000 S.F. Cold Storage
9,000 S.F.
Approach: MAINTAIN ARCHITECTURAL CHARACTER
Key Elements:
- Maintain overall architectural character with minor adjustments for economy
- Office and support areas conventional construction and office finishes
- Public spaces mass timber structure with exposed wood finishes
- Packaged HVAC equipment ground mounted adjacent to building
FUTURE PHASE
STORAGE BUILDING
16,000 S.F.
HVAC Units (ground mounted)
Community Space 1,500 S.F.
- Exposed timber beams/trusses
- CLT roof panels
- Conventional stud framing w w w r o w e p s c c o m
S
M a i n
S t r e e t
M t
P l e a s a n t
M
I
O
F
S C
H E
M A
T I C
S
I T
E
P
L A
N
1 1
PHASE 1
BUILDING
FUTURE
ADDITION
PHASE 1
AGGREGATE
PARKING
SITE PHASING DIAGRAM
NEWBERRY CSC STORAGE BUILDING
Newberry, Michigan
File No. 751/20015.TAP REV: July 26, 2021
A. FOUNDATIONS & CONCRETE
B. EXTERIOR BUILDING SHELL
$XXX,XXX Standard shallow foundations, 4-inch conc slab
$XXX,XXX
B.1 Structure & Thermal Envelope Hybrid: Exposed mass timber in public areas, conventional framing in office/storage areas, thermal insulation
B.2 Exterior Cladding Stone cladding, cement board siding, wood coatings, asphalt shingle roofing, fascia, gutters
B.3 Exterior Openings Aluminum entrances, Alum storefront w/ low-e insulated glazing, sunshades
C. INTERIOR BUILDOUT $XXX,XXX
C.1 Interior Partitions & Openings Stud framed partitions, drywall, acoustical insulation, commercial doors/frames/hardware
C.2 Interior Finishes Polished concrete & carpet flooring, acoustical & exposed ceilings, wall paint w/ wood accent
C.3 Interior Fittings Toilet partitions & accessories, architectural casework, lockers, benches, etc.
D. MECHANICAL / ELECTRICAL / FIRE PROTECTION $X,XXX,XXX
D.1 Plumbing Systems Low-flow fixtures, domestic water heating
D.2 HVAC Systems Packaged HVAC units w/multizone controls, ground mounted
D.3 Fire Protection Systems Sprinkler piping & riser
D.4 Electrical Systems 600 amp service, distribution & panels, LED light fixtures & controls, fire alarm, data rough-in
D.5 Generator 150kW emergency generator
D.6 EV Charging Stations (1) public station + (1) MDNR station
D.7 Solar Array 20kW ground mounted system
E. SITEWORK $XXX,XXX
E.1 Site Development Earthwork, Concrete & Asphalt paving, gravel surface, dumpster enclosure
E.2 Site Utilities 2-inch dom water, 6-inch fire, tank-fill well, septic system, storm drainage, electrical transformer
E.3 Landscaping Allowance for plantings & irrigation
Construction Trade Subtotal $X,XXX,XXX $205.04
F. Design Contingency 5% $XXX,XXX 5% Construction Trade Subtotal
G. Contractor Fees 25% $XXX,XXX 10% General Conditions, 5% Overhead, 10% Profit
Construction Cost Subtotal $X,XXX,XXX $269.11
H. Construction Contingency 10.0% $XXX,XXX 10% Construction Cost Subtotal
Total Opinion of Probable Construction Cost $4,114,688 $296.02
J. PSC Fee Allowance 9% $XXX,XXX Architectural, Structural, MPE Engineering, Civil Engineering & Landscape Design
K. Geotechnical Allowance $XX,XXX Soil Borings & Foundation recommendations
L. Construction Materials Testing Allowance $XX,XXX M. Furnishings/Fixtures/Equipment Allowance $XXX,XXX Office furniture, tables & chairs, lab equipment
N. Exhibits & Displays Allowance $XX,XXX Design, construction, installation of custom exhibit displays
P. Security/Data/Communications Allowance $XX,XXX Data & network cabling
R. DTMB Fee Allowance 5% $XXX,XXX
Subtotal $XXX,XXX Total Opinion of Probable Project Cost
S. Future Storage Building (Construction Cost)
$4,998,010
$X,XXX,XXX 16,000sf PEMB structure, 7000sf heated, 9,000sf cold storage, MEP systems, sitework
Contingency, PSC, & DTMB Fees $XXX,XXX 10% Construction Contingency, 8% PSC Fees, 5% DTMB Fees
Professional Fees & Other Project Costs
$XX,XXX
$XXX,XXX
$XXX,XXX
$XX,XXX
$XXX,XXX
$XX,XXX
$XX,XXX
$XX,XXX
$XXX,XXX
$XXX,XXX
$XX,XXX
$XXX,XXX
OPINION OF PROBABLE CONSTRUCTION COST - PHASING OPTION 2-B
$XXX,XXX
$XXX,XXX
$XXX,XXX
$XXX,XXX
100 S. JEFFERSON AVENUE-SUITE 601, SAGINAW, MI 48607
Cost information except totals redacted by DTMB for RFP - 10-22-2021