Addendum 1 Attachment 4a - ArchitecturalPlanSet 2of2.pdf
PDF 4 MB Posted
- Attached to
- 751/20015. TAP; Newberry Customer Service Center
- Solicitation number
- RFP - 171 - 230000001121
- Issued by
- Luce County, Michigan
About this file
This document appears to be Addendum 1 Attachment 4a - Architectural Plan Set related to a state and local contract opportunity for the Newberry Customer Service Center in Luce County, Michigan. The document includes detailed architectural plans for the new 25,000 sq ft facility, including floor plans, elevations, sections, and details. The plans show the layout and design of the various spaces within the building, including offices, conference rooms, storage areas, a multi-purpose room, and support spaces. The contract is being managed by the Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division.
The key details regarding the state and local contract opportunity include the location (Luce County, Michigan), the project name (Newberry Customer Service Center), and the issuing agency (Michigan Department of Technology, Management and Budget). The architectural plans provided in the document appear to be part of the final design package for the construction of the new facility.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
M
DPT
M
B B
C C
D D
E E
A2 A2
Mechanical Room
Resource Room
IT
Supply
Lobby
Reception
Break Room
Field Office Storage
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
B B B B
B B
B
B B
A
B
Div. Stor.
Electrical Room
Private Office
Multi-Purpose Room
Toilet - F
Toilet - M
Janitor
Customer Center Offices (4)
Hoteling (3)
Field Offices (8)
120 Customer Center Offices (3)
Meeting Room
Law Evidence Room
Field Offices (4)
Meeting Room
Conference Room
Customer Center Offices (6)
Secure Storage
9' - 0"
9' - 0"
9' - 0"
EXPOSED
9' - 0"
EXPOSED
B
B
EXPOSEDEXPOSED
EXPOSED
9' - 0"9' - 0"
9' - 0"
AA
9' - 0"
A A
Vestibule
Display
9' - 0"
Closet
9' - 0"
Corridor
17' - 0"17' - 0"17' - 0"9' - 9 1/2"
3' - 0 1/4"
5' - 11 3/4"9' - 0"1' - 10 1/4"
/2
8' - 0"3' - 2"
/2
17' - 0"8' - 4"
3' - 5 3/4"
3' - 6 1/4"
2' - 10 5/8"
"2
/2
EQEQ
/8
/8
/8
ALIGN
ALIGN
6' - 7 1/4" 15' - 0 3/4" 16' - 2 3/8"
/4
ALIGN
2' - 4"
3' - 6"
/4
A TYP. A TYP.
TYP.
/8
4' - 2 3/4"
3' - 6"3' - 6"
2' - 3 3/8"
/8
B
D
D
TYP. TYP. A TYP. A TYP.
2' - 6 1/8"
6' - 0"
/8
6' - 0"
2' - 2 5/8"
/8
5' - 6 1/8"
/8
C
EQEQ
/8
C
C
4' - 3 7/8"3' - 4"
/4
C
C
C
C
D
/8
/8
3' - 6 3/4"
5' - 10 1/8" 8' - 0"
EQEQ
E
QE
Q
C
12' - 6 7/8"
3' - 11 1/4"
B
WALL
MOUNTED
T T
/2
ALIGN
7' - 3 5/8"8' - 0"
B WALL
MOUNTED
B
WALL
MOUNTED
B
WALL
MOUNTED
PENDANT LIGHT
4' - 10 1/2"
/8
A TYP.
7' - 0"3' - 8 7/8"
B
WALL
MOUNTED
B WALL
MOUNTED
14' - 2 1/2"
A TYP.
A TYP.
/8 " 7' - 0"
3' - 8 7/8"
7' - 5 5/8"7' - 0 1/8"
/8
3' - 4 3/8"
/2
B
3' - 1 1/4"
/8
5' - 0"
2' - 4 7/8"
E Q
E Q
12' - 0"
2' - 11 1/4"
Fish/Wildlife
Corridor
10' - 0"
3' - 11 3/4"
/4
/4
B
WALL
MOUNTED
EXPOSED
4' - 0" 2' - 3 1/4"
/8
9' - 0"
A. AT AREAS WITH NO-CEILING (N/C) PAINT CONCRETE SLAB,
AND PIPING/CONDUITS, EXCEPT SPRINKLER PIPING AND HEAD
WITH DRY-FALL PAINT. SEE FINISH SCHEDULE FOR FINISH
COLOR.
B. ALL SPRINKLER HEADS MOUNTED IN LAY-IN CEILING PANELS
ARE TO BE LOCATED IN THE CENTER OF THE PANEL UNLESS
DIMENSIONED OTHERWISE.
C. AT LOCATIONS WHERE LIGHTING CANNOT BE HUNG FROM
STRUCTURE ABOVE, HANG FIXTURES FROM DUCTWORK
TRAPEZE FRAMING.
D. WORK OF ENGINEERING DISCIPLINE ARE SHOWN FOR
COORDINATION AND CONVENIENCE PURPOSE ONLY. REFER
TO APPROPRIATE DISCIPLINE DRAWINGS FOR COMPLETE
AND GOVERNING INFORMATION REGARDING THEIR WORK.
CAN LIGHT
OFFICE LINEAR LIGHT
INDUSTRIAL LINEAR LIGHT
LINEAR LIGHT
TRACK LIGHTINGT
D
C
B
A
GYPSUM BOARD 09 21 16
EXPOSED - OPEN TO
STRUCTURE
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E E
IT
L E
S C
A L
(U
.N .O
J O
B
N A
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
IG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES SHEET SPECIFIC NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:0
:3
A
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
N E
W B
E R
R Y
C
S C
02/28/2023
11793-00
A401
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
CEILING MATERIAL LEGEND REFLECTED CEILING PLAN LEGEND
N
F
/2
V E
N T
IL
A
T
IO
N S
P A
C E
M
IN
07 42 43.C
07 42 43.VS
07 21 00.CB
07 25 20.WRM
07 42 43.MZ
03 30 00.C
1' - 3 1/2"
1/2"
1"
VENTILATION SPACE
1" FREE
4" 9"
03 30 00.C
07 25 20.WRM
07 21 00.CB
07 42 43.MZ
07 42 43.VS
07 42 43.VS
07 42 43.C
1' - 3"
4 5/8" 10 3/8" 1/2"
4 1/8"4" 3/4"
3/4"
LINE OF CONCRETE
WALL BELOW
07 46 23.C
07 46 23.FS
07 25 20.WRM
07 21 00.CB
06 17 19.WP
07 46 23.C
08 44 13.F
06 17 19.WP
07 25 20.WRM
07 25 20.FS
07 46 23.FS
07 61 00.F
07 21 00.CB
07 92 00.JS
08 44 13.BT
07 92 00.JS
10 3/8"4 5/8"
08 11 13.SF
07 46 23.C
07 46 23.FS
07 25 20.FS
07 21 00.CB
07 46 23.C
07 25 20.WRM
07 92 00.JS
07 46 23.C
07 46 23.FS
07 25 20.FS
07 25 20.WRM
06 17 19.WP
07 21 00.CB
07 25 20.FS
08 51 13.AW
/2
/8
/8
LINE OF CONCRETE
WALL BELOW
07 92 00.JS
/8
/8
/2
/4
/4
/8
06 17 19.WP
07 25 20.WRM
07 21 00.CB
07 46 23.FS
07 46 23.C
LINE OF CONCRETE
WALL BELOW
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
E X
T E
R
IO
R P
L A
N D
E T
A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A501
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
IN
D7
PLAN DETAIL
D11
PLAN DETAIL
G11
PLAN DETAIL
A1
PLAN DETAIL
D1
PLAN DETAIL
G1
PLAN DETAIL
G7
PLAN DETAIL
03 30 00.C CONCRETE
06 17 19.WP CLT WALL PANEL
07 21 00.CB ROCKWOOL COMFORTBOARD
INSULATION
07 25 20.FS SELF-ADHESIVE FLASHING
07 25 20.WRM WEATHER-RESISTANT MEMBRANE
07 42 43.C RIEDER EXTERIOR WALL PANELS
07 42 43.MZ METAL Z FURRING
07 42 43.VS VERTICAL SUPPORT 1" MIN
07 46 23.C THERMORY ASH CLADDING
07 46 23.FS FURRING STRIP
07 61 00.F FLASHING
07 92 00.JS JOINT SEALANT
08 11 13.SF STEEL FRAME
08 44 13.BT BREAK METAL TRIM
08 44 13.F CURTAIN WALL FRAME
08 51 13.AW ALUMINUM WINDOW
26' - 5 7/8"
07 25 20.WRM
07 10 00.IW
07 61 00.F
07 21 00.TR
07 61 00.C
06 17 19.RP
06 10 00.LD4
06 10 00.WB
06 10 00.P38S
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
A
VARIES, SEE PLAN
1' - 5 1/2" 10 3/8"
HIGH POINT
6"
07 61 00.C
07 61 00.RP
07 10 00.IW
06 10 00.P38S
06 10 00.LD407 21 00.TR
07 25 20.WRM
06 17 19.RP
06 18 00.B
05 12 00.BP
06 17 19.WP
07 25 20.WRM
07 21 00.CB
07 46 23.FS
07 46 23.C
A
VARIES, SEE PLAN
1' - 5 1/2" 10 3/8"
06 17 19.WP
07 25 20.WRM
07 46 23.C
07 46 23.FS
05 12 00.A
05 12 00.P
07 25 20.FS
07 42 43.C
07 42 43.HC
07 61 00.F
1/2"
05 12 00.A
07 21 00.CB
07 25 20.WRM
07 42 43.VS
07 42 43.SF
07 42 43.VC
First Floor
0' - 0"
A
1' - 5" 1' - 3 1/2"
07 25 20.WRM
07 21 00.CB
07 42 43.VS
07 42 43.C
07 42 43.HC
07 61 00.F
07 10 00.W
07 61 00.F
03 30 00.EJS
07 26 16.VR
07 21 00.CB
03 30 00.CS
03 30 00.C
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
E X
T E
R
IO
R S
E C
T
IO
N D
E T
A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A511
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
IN
F10
SECTION DETAIL
F1
SECTION DETAIL
F5
SECTION DETAIL
A5
SECTION DETAIL
03 30 00.C CONCRETE
03 30 00.CS CONCRETE SLAB
03 30 00.EJS EXPANSION JOINT FILLER WITH
JOINT SEALANT
05 12 00.A STEEL ANGLE
05 12 00.BP BENT PLATE
05 12 00.P STEEL PLATE
06 10 00.LD4 2 X 4 DIMENSION LUMBER
06 10 00.P38S 3/8" NOM. APA SHEATHING
06 10 00.WB WOOD BLOCKING
06 17 19.RP CLT ROOF PANEL
06 17 19.WP CLT WALL PANEL
06 18 00.B GLUE LAM BEAM
07 10 00.IW ICE AND WATER SHIELD
07 10 00.W WATERPROOFING MEMBRANE
07 21 00.CB ROCKWOOL COMFORTBOARD
INSULATION
07 21 00.TR ROCKWOOL TOPROCK DD
INSULATION
07 25 20.FS SELF-ADHESIVE FLASHING
07 25 20.WRM WEATHER-RESISTANT MEMBRANE
07 26 16.VR UNDERSLAB VAPOR RETARDER
07 42 43.C RIEDER EXTERIOR WALL PANELS
07 42 43.HC HANGER CLIP
07 42 43.SF SILL FLASHING
07 42 43.VC VENT CLEAT
07 42 43.VS VERTICAL SUPPORT 1" MIN
07 46 23.C THERMORY ASH CLADDING
07 46 23.FS FURRING STRIP
07 61 00.C CLEAT
07 61 00.F FLASHING
07 61 00.RP STANDING SEAM METAL ROOFING
PANEL
1' - 5"
08 80 00.AE
08 44 13.F
12 48 13.FM
06 10 00.WB
07 92 00.JS
07 26 16.VR
07 21 00.CB
03 30 00.CS
Vestibule
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
07 61 00.C
07 61 00.RP
07 10 00.IW
06 10 00.P38S
07 21 00.TR
07 25 20.WRM
06 17 19.WP
08 44 13.AS
08 44 13.F
08 80 00.AE
A2
VARIES, SEE PLAN
1' - 5"
1' - 5" 1' - 3 1/2"
08 80 00.AE
08 44 13.F
07 92 00.JS
06 10 00.WB
07 25 20.WRM
07 21 00.CB
07 42 43.VS
07 42 43.C
07 42 43.HC
07 42 43.VC
07 42 43.SF
03 30 00.C
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
E X
T E
R
IO
R S
E C
T
IO
N D
E T
A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A512
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
A7
SECTION DETAIL
F7
SECTION DETAIL
A1
SECTION DETAIL
03 30 00.C CONCRETE
03 30 00.CS CONCRETE SLAB
06 10 00.P38S 3/8" NOM. APA SHEATHING
06 10 00.WB WOOD BLOCKING
06 17 19.WP CLT WALL PANEL
07 10 00.IW ICE AND WATER SHIELD
07 21 00.CB ROCKWOOL COMFORTBOARD
INSULATION
07 21 00.TR ROCKWOOL TOPROCK DD
INSULATION
07 25 20.WRM WEATHER-RESISTANT MEMBRANE
07 26 16.VR UNDERSLAB VAPOR RETARDER
07 42 43.C RIEDER EXTERIOR WALL PANELS
07 42 43.HC HANGER CLIP
07 42 43.SF SILL FLASHING
07 42 43.VC VENT CLEAT
07 42 43.VS VERTICAL SUPPORT 1" MIN
07 61 00.C CLEAT
07 61 00.RP STANDING SEAM METAL ROOFING
PANEL
07 92 00.JS JOINT SEALANT
08 44 13.AS AIR SEAL
08 44 13.F CURTAIN WALL FRAME
08 80 00.AE ACID ETCHED GLASS
12 48 13.FM RECESSED WALK-OFF MAT
T.O. BEAM -
LOW POINT
18' - 0"
8' - 2"
10 3/8" 1' - 3"
LOW POINT
6"
' - 6
6' - 7 1/2"
06 17 19.RP
07 25 20.WRM
07 21 00.TR
07 10 00.IW
06 10 00.P38S
06 18 00.B
07 61 00.RP
07 61 00.C 07 72 10.02.SG
06 18 00.B06 17 19.WP
07 25 20.WRM
07 21 00.CB
07 46 23.FS
07 46 23.C
05 12 00.BP
07 25 20.FF
08 51 13.AW
07 42 43.SF
07 42 43.VC
07 42 43.HC
07 42 43.C
07 42 43.VS
07 21 00.CB
07 25 20.WRM
03 30 00.C
07 92 00.JS
07 25 20.FS
08 51 13.T
06 10 00.WB
07 25 20.WRM
07 61 00.F
07 21 00.CB
07 46 23.FS
07 46 23.C
06 17 19.WP
07 92 00.JS
08 51 13.AW
07 61 00.F
08 51 13.T
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
E X
T E
R
IO
R S
E C
T
IO
N D
E T
A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A513
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
IN
E5
SECTION DETAIL
A1
SECTION DETAIL
E1
SECTION DETAIL
03 30 00.C CONCRETE
05 12 00.BP BENT PLATE
06 10 00.P38S 3/8" NOM. APA SHEATHING
06 10 00.WB WOOD BLOCKING
06 17 19.RP CLT ROOF PANEL
06 17 19.WP CLT WALL PANEL
06 18 00.B GLUE LAM BEAM
07 10 00.IW ICE AND WATER SHIELD
07 21 00.CB ROCKWOOL COMFORTBOARD
INSULATION
07 21 00.TR ROCKWOOL TOPROCK DD
INSULATION
07 25 20.FF SELF-ADHESIVE FLASHING,
FLEXIBLE TYPE
07 25 20.FS SELF-ADHESIVE FLASHING
07 25 20.WRM WEATHER-RESISTANT MEMBRANE
07 42 43.C RIEDER EXTERIOR WALL PANELS
07 42 43.HC HANGER CLIP
07 42 43.SF SILL FLASHING
07 42 43.VC VENT CLEAT
07 42 43.VS VERTICAL SUPPORT 1" MIN
07 46 23.C THERMORY ASH CLADDING
07 46 23.FS FURRING STRIP
07 61 00.C CLEAT
07 61 00.F FLASHING
07 61 00.RP STANDING SEAM METAL ROOFING
PANEL
07 72 10.02.SG SNOW GUARDS
07 92 00.JS JOINT SEALANT
08 51 13.AW ALUMINUM WINDOW
08 51 13.T TRIM
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
5' - 5"
1' - 5"
07 61 00.RP
07 61 00.C
07 10 00.IW
06 10 00.P58S
06 10 00.LD4
06 10 00.WB
07 21 00.TR
07 25 20.WRM
06 17 19.WP
07 92 00.JS
08 44 13.F
08 80 00.AE
07 61 00.F
07 61 00.RP
5' - 5"
1' - 5 1/2" 10 3/8"
07 61 00.RP
07 10 00.IW
06 10 00.P58S
06 10 00.LD4
07 21 00.TR
07 25 20.WRM
07 25 20.FS
07 92 00.JS
07 46 23.FS
07 46 23.C
07 21 00.CB
07 25 20.WRM
06 17 19.WP
05 12 00.BP
06 17 19.RP
07 61 00.F
07 61 00.RP
06 10 00.P58S
07 61 00.F
07 61 00.C
06 10 00.WB
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
E X
T E
R
IO
R S
E C
T
IO
N D
E T
A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A514
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
A3
SECTION DETAIL
E3
SECTION DETAIL
05 12 00.BP BENT PLATE
06 10 00.LD4 2 X 4 DIMENSION LUMBER
06 10 00.P58S 5/8" NOM. APA SHEATHING
06 10 00.WB WOOD BLOCKING
06 17 19.RP CLT ROOF PANEL
06 17 19.WP CLT WALL PANEL
07 10 00.IW ICE AND WATER SHIELD
07 21 00.CB ROCKWOOL COMFORTBOARD
INSULATION
07 21 00.TR ROCKWOOL TOPROCK DD
INSULATION
07 25 20.FS SELF-ADHESIVE FLASHING
07 25 20.WRM WEATHER-RESISTANT MEMBRANE
07 46 23.C THERMORY ASH CLADDING
07 46 23.FS FURRING STRIP
07 61 00.C CLEAT
07 61 00.F FLASHING
07 61 00.RP STANDING SEAM METAL ROOFING
PANEL
07 92 00.JS JOINT SEALANT
08 44 13.F CURTAIN WALL FRAME
08 80 00.AE ACID ETCHED GLASS
NOTE 3
NOTE 1
09 21 16.G
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
IN
T
E R
IO
R
D E
T A
IL
S
N E
W B
E R
C
02/28/2023
11793-00
A521
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
09 21 16.G
A11
CEILING @ WALL
1. WALL TYPE - REFER TO FLOOR PLAN
2. GYPSUM WALL RETURN
3. BACKER ROD WITH SEALANT
4. REFERE TO MEP SCHEDULE
F T
60 12 IN
V A
R
IE
S
/8
5/8"2"
HEAD/JAMB @ GWB PARTITION
08 11 13.SF
2" NOTE 1
W A
L L
W
ID
T H
S E
E P
L A
N F
O R
2"
A1 C1
6" 6"
S1Q1
6" 6"
SEE TRIM HW IN SCHEDULE
SEE TRIM HW IN SCHEDULE
2" TYP U.N.O. 2" TYP U.N.O.
1' - 6"
1A 3A SF
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
D O
O R
E L E
V A
T
IO
N S
D
E T
A
IL
S
S
C H
E D
U L E
N E
W B
E R
C
02/28/2023
11793-00
A601
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
DOOR SCHEDULE
DOOR NO.
DOOR FRAME
RATING
(MIN.)
GLASS DETAILS
REMARKS HARDWAREPR
DOOR 1 DOOR 2
HEIGHT T MAT FIN TYPE
TRIM
HW MAT DOOR SIDELIGHT JAMB HEAD SILLTYPE WIDTH TYPE WIDTH
102A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM SECURITY H-3
105A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
105B A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
105C A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" HM 1 : A 2" HM INSULATED H-5
106A Q : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3
106B Q : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3
107A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-6
108A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-6
109A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM SECURITY H-3
110A A : 1 4' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3
111A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3
112A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-4
113A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3A
114A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
115A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-8
116A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
117A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM SECURITY H-4
119A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
123A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-4
124A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-8
126A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-3
127A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM H-4
127B A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 3 : A 2" HM SECURITY H-4
130A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-3
131B C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM SECURITY H-4
132A C : 1 3' - 0" -- 0" 7' - 0" 1 3/4" WD 1 : A 2" HM H-8
133A A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" HM 1 : A 2" HM INSULATED H-5
133B A : 1 3' - 0" -- 0" 7' - 0" 1 3/4" HM 1 : A 2" HM INSULATED H-5
SPECIALTY DOOR SCHEDULE
DOOR
NO. PR TYPE WIDTH HEIGHT
RATING
(MIN.) REMARKS HARDWARE
101A PR MEDIUM STILE 2' - 10" 7' - 6 3/4" H-10
101B PR MEDIUM STILE 2' - 10" 7' - 6 3/4" H-9
131A MEDIUM STILE 2' - 11" 7' - 6 3/4" H-5
A1
TYP DOOR FRAME PROFILE
A3
TYP DOOR HEAD/JAMB DETAILS
F1
DOOR ELEVATION TYPES
C1
DOOR FRAME TYPES
60 12 IN30 6 IN
2 4 FT0
2 4 FT0
1. DISTANCE FROM FRAME TO INTERSECTING PARTITION
U.N.O. ON PLANS OR DETAILS.
ABBREVIATIONS
PR: PAIR OF DOORS
UPR: UNEVEN PAIR OF DOORS
T: THICKNESS
MAT: MATERIAL
WD: WOOD (08 1416.FWD)
AL: ALUMINUM (08 1116.AD)
GL: GLASS
ST: STEEL (08 1100.SD OR 08 1100.SF)
FIN: FINISH
PT: PAINTED
STN: STAINED
HW: HEAD WIDTH
DOOR REMARKS
A.
08 11 13.SF STEEL FRAME
DOOR SCHEDULE NOTES:
A. PR: ALL DOORS ARE SINGLE DOORS U.N.O.
B. DOOR MAT: ALL DOORS ARE 08 11 00.SD U.N.O.
C. DOOR FIN: ALL DOORS ARE PAINTED U.N.O.
D. FRAME MAT: ALL FRAMES ARE 08 1100.SF U.N.O.
E. RATING: ALL DOORS ARE NON-RATED U.N.O.
F. GLASS: ALL GLAZING IS SAFETY GLAZING U.N.O.; ALL
GLAZING IN FIRE-RATED CONSTRUCTION IS
FIRE-RATED GLAZING.
G. DETAILS: SEE A3 / A601 FOR ALL DETAILS U.N.O.
SPECIALTY DOOR SCHEDULE NOTES:
A. PR: ALL DOORS ARE SINGLE DOORS U.N.O.
METAL FRAME
METAL FRAME
SEE STORE FRONT ELEVATION
FOR STORE FRONT FRAME
HARDWARE LEGEND
H-1: NOT USED
H-2: ALUMINUM PUSH/ PULLS, CLOSER, HINGES, FLOOR BUMPERS
H-3: MORTISE PASSAGE SET, HINGES, WALL BUMPER
H-3A: H-3 AND PANIC HARDWARE FOR ELECTRICAL ROOM
H-4: MORTISE LOCK SET, HINGES, WALL BUMPER, COAT HOOK IN OFFICES
H-5: MORTISE LOCK SET, HINGES, CLOSER, WALL BUMPER, WEATHERSTRIP, COMMERCIAL QUALITY ADAAG ALUMINUM THRESHOLD, CARD KEY ACTIVATED LOCKS WITH ELECTRIC STRIKES
H-6: PUSH/ PULLS, CLOSER, HINGES, WALL BUMPER
H-7: NOT USED
H-8: MORTISE LOCK SET, HINGES, WALL BUMPER, CARD KEY ACTIVATED LOCKS WITH ELECTRIC STRIKES
H-9: MORTISE PASSAGE SET, HINGES, CLOSER, COMMERCIAL QUALITY ADAAG ALUMINUM THRESHOLD, AUTOMATIC SENSOR OPERATION
H-10: MORTISE LOCK SET, HINGES, CLOSER, WEATHERSTRIP, COMMERCIAL QUALITY ADAAG ALUMINUM THRESHOLD, CARD KEY ACTIVATED LOCKS WITH ELECTRIC STRIKES, AUTOMATIC SENSOR
OPERATION, CARD KEY ACTIVATED LOCKS WITH ELECTRIC STRIKES
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"
/2
/4
31' - 6"
5' - 3" 5' - 3" 5' - 3" 5' - 3" 5' - 3" 5' - 3"
08 80 00.AE
08 80 00.AE
/4
/2
/4
/8
1 1/4" / 12"
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"
42' - 0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
/4
/2
/2
/4
/4
1 1/4" / 12"
/2
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES SHEET SPECIFIC NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
/4
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:0
A
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
W
IN
D O
W A
N D
C U
R T
A
IN
W A
L L S
N E
W B
E R
C
02/28/2023
11793-00
A602
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
A1
CURTAIN WALL 08
F9
CURTAIN WALL 01
F
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"
/2
/2
13' - 0"
3' - 3" 3' - 3" 3' - 3" 3' - 3"
08 80 00.AE
08 44 13
/4
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"
/2
/2
3' - 7"
08 80 00.AE
08 44 13.F
/4
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"
08 80 00.AE
/2
13' - 2 5/8"
3' - 6 1/16" 3' - 1 1/4" 3' - 1 1/4" 3' - 6 1/16"
/2
08 44 13.F
/4
First Floor
0' - 0"
T.O. BEAM-
HIGH POINT
25' - 9 3/4"
T.O. BEAM -
LOW POINT
18' - 0"08 80 00.AE
/2
18' - 2 3/4"
2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7"
11 1/4"
1' - 9 1/2"
/2
/2
BEAM PASSING THROUGH
CURTAIN WALL
08 44 13.F
/4
First Floor
0' - 0"
T.O. BEAM -
LOW POINT
18' - 0"
3' - 6 1/8" 3' - 1 1/4" 3' - 1 1/4" 3' - 6 1/8"
/8
/2
/8
08 80 00.AE
08 44 13
13' - 2 5/8"
First Floor
0' - 0"
6' - 2"
EQEQ
/2
1 1/4" / 12"
3' - 0"
FIRST FLOOR
0'-0"
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES SHEET SPECIFIC NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:2
:5
A
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
W
IN
D O
W A
N D
C U
R T
A
IN
W A
L L S
N E
W B
E R
C
02/28/2023
11793-00
A603
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
F1
CURTAIN WALL 07
F4
CURTAIN WALL 06
F8
CURTAIN WALL 03
F12
CURTAIN WALL 02
F T
B8
CURTAIN WALL 05
B12
CURTAIN WALL 04WINDOW ELEVATIONS
119A
117A 116A 115A 114A 113A 112A 111A
109A 123A
OPEN
OPEN
OPEN OPEN
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES SHEET SPECIFIC NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
/4
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:1
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
IN
T
E R
IO
R
E L E
V A
T
IO
N S
N E
W B
E R
C
02/28/2023
11793-00
A610
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
G1
ENLARGED ELEV - CORRIDOR 133, EAST
B2
ENLARGED ELEV - CORRIDOR 133, WEST
B3
ENLARGED ELEV - CUSTOMER CENTER OFFICES 121 & 125,
SOUTH
F
11' - 3 5/8"
EQ.
2' - 0"3' - 0"3' - 0"3' - 0"EQ.
06 41 00.BC
06 41 00.PLF
9' - 10 1/4"
EQ.
3' - 0" 3' - 0" 3' - 0"
EQ.
06 41 00.BC
06 41 00.PLF
10' - 6" 2' - 10" 3' - 0" 3' - 0" 1' - 6" 2"
131B
06 41 00.BC
06 41 00.PLF
22 40 00.S
9' - 4"
2" 3' - 0" 3' - 0" 3' - 0" 2"
06 41 00.BC
06 41 00.PLF
22 40 00.S
3' - 0" 9' - 4" 2"
3' - 0" 3' - 0" 3' - 0"
2"
06 41 00.WC
06 41 00.PLF
06 41 00.BC
22 40 00.S
3' - 0" 3' - 0" 3' - 0" 3' - 0" 1' - 6" 1' - 3" 4"
15' - 3" 2"
06 41 00.BC
06 41 00.PLF
W-1
NFT-1
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:5
A
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
IN
T
E R
IO
R
E L E
V A
T
IO
N S
N E
W B
E R
C
02/28/2023
11793-00
A611
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
06 41 00.BC BASE CABINET
06 41 00.PLF PLASTIC
LAMINATE
06 41 00.WC WALL CABINET
22 40 00.S SINK
1. OF/CI
2. FURNITURE INSTALLATION BY OTHER
G1
ENLARGED ELEV - RESOURCE ROOM 123, NORTH
G8
ENLARGED ELEV - MAIL 130, EAST
A5
ENLARGED ELEV - FISH/WILDLIFE 131, EAST
A9
ENLARGED ELEV - MULTI-PURPOSE ROOM 105, WEST
F
T
G5
ENLARGED ELEV - BREAK ROOM 126, EAST
A1
ENLARGED ELEV - LAW EVIDENCE ROOM, 115, WEST
FINISH MATERIAL LEGEND
1. EXISTING SURFACES: THE CONTRACTOR SHALL RETOUCH OR REFINISH SURFACES DAMAGED BY SUBSEQUENT WORK. CONTRACTOR SHALL EXAMINE ALL SURFACES TO BE FINISHED UNDER THIS CONTRACT AND SEE THAT THE WORK OF THEIR TRADES HAS BEEN INSTALLED IN SATISFACTORY CONDITION TO RECEIVE PAINT, STAIN OR SPECIFIED FINISH. THE APPLICATION OF THE FIRST COAT OF ANY FINISH PROCESS SHALL CONSTITUTE ACCEPTANCE OF THE SURFACE.
2. EXISTING FINISHES: WHERE CONTRACTOR IS TO INSTALL NEW FINISHES ADJACENT TO EXISTING FINISHES; MATERIALS ARE TO BE INSTALLED TO OBSCURE
DEFINITIVE TRANSITIONS BETWEEN EXISTING AND NEW FINISHES.
3. MATERIAL QUANTITIES: CONTRACTOR AND ALL VENDORS/SUBCONTRACTORS SHALL REVIEW THE DOCUMENTS AND FIELD CONDITIONS AND DETERMINE ALL
DIMENSION, QUANTITIES, ETC., FOR THEIR RESPECTIVE WORK.
4. MATERIAL PACKAGING: THE MANUFACTURER SHALL DELIVER MATERIALS IN THEIR ORIGINAL CARTONS OR CONTAINERS AS PACKAGED BEARING THE ORIGINAL MANUFACTURER’S LABELS. CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING AND STORING SUCH GOODS.
5. MATERIAL STORAGE: MATERIALS STORED ON THE SITE SHALL BE PROTECTED FROM DAMAGE BY MOISTURE, WIND, SUN, ABUSE OR ANY OTHER HARMFUL AFFECTS ACCORDING TO THE MANUFACTURER’S WRITTEN INSTRUCTIONS. DAMAGED MATERIALS SHALL BE REJECTED AND SHALL BE REPLACED.
6. PAINT: AFTER ACCEPTANCE OF PAINT SAMPLES, CONTRACTOR SHALL INSTALL AN ON-SITE MOCK-UP OF EACH COLOR AND SHEEN TYPE IN THE LOCATION WHERE THAT TYPE IS SCHEDULED AND UNDER THE FINAL LIGHTING CONDITIONS FOR REVIEW AND APPROVAL BY THE ARCHITECT. ONCE APPROVED, THE MOCK-UP MAY BE INCORPORATED INTO THE FINAL WORK. CONTRACTOR SHALL LEAVE REMAINING PAINT (1 GALLON MINIMUM) OF EACH COLOR AND SHEEN AND COLOR MATCH FORMULA
WITH TENANT/OWNER FOR FUTURE TOUCH-UP NEEDS.
7. PAINT AND SUBSTRATES: ALL VISIBLE MISCELLANEOUS GRILLES, PLATES, ETC., OCCURRING IN WALLS AND CEILINGS SHALL BE PAINTED TO MATCH THE ADJACENT SURFACES, UNLESS OTHERWISE NOTED. ALL VISIBLE ITEMS IN PLENUM ABOVE GRILLS AND OPEN CEILINGS SHALL BE PAINTED BLACK SO THAT THEY ARE NOT VISIBLE.
ALL PAINTS, PRIMERS, AND ADHESIVES SHALL BE LOW-VOC EMITTING TYPE.
8. WALL COVERING: CONTRACTOR SHALL USE ROLLS IN CONSECUTIVE ORDER. PANELS SHALL BE HUNG BY REVERSING ALTERNATE STRIPS, EXCEPT WHEN MATCHING PATTERNS. TRIM SELVAGE BEFORE APPLYING. MAKE ALL IN-PLACE CUTS ON METAL CUTTING PLATES. DO NOT CUT INTO SUBSTRATE.
9. HARDWARE, FACEPLATES, ETC. COORDINATION WITH FINISHES: CONTRACTOR SHALL ENSURE THAT NO ELECTRICAL RECEPTACLE OR TELECOMMUNICATIONS OUTLET FACEPLATES HAVE BEEN INSTALLED PRIOR TO COMPLETION OF APPLICATION OF ANY FINISH MATERIALS. ANY SUCH FACEPLATE OR HARDWARE, ETC., SHALL
BE REMOVED PRIOR TO WALL FINISH APPLICATION.
10. PLENUM FINISH: BEFORE ANY CEILINGS ARE INSTALLED AND AFTER ALL DUCTWORK, CONDUIT, CABLING, SPRINKLER LINES OR OTHER PLENUM ITEMS ARE INSTALLED, ALL ABOVE-CEILING ELEMENTS AND STRUCTURE THAT WILL BE VISIBLE ONCE CEILING HAS BEEN INSTALLED ARE TO BE PAINTED COLOR SPECIFIED.
DURING THE COURSE OF CONSTRUCTION, CONTRACTOR SHALL MONITOR CONSTRUCTION ACTIVITIES AND ASSURE THAT AT THE END OF THE PROJECT, ALL VISIBLE ABOVE-CEILING COMPONENTS REMAIN CONSISTENTLY PAINTED SPECIFIED COLOR. THIS INCLUDES ALL CEILING COMPONENTS AND HANGER WIRES.
11. CLARITY OF DOCUMENTS: WHERE NOT CONVENIENT OR CLEAR TO SHOW FINISHES FOR SOFFITS AND CEILINGS ON THE FINISH PLANS, REFER TO REFLECTED CEILING, ELEVATIONS AND SECTIONS/DETAILS. WHERE STILL UNCLEAR, CONSULT WITH THE ARCHITECT FOR DIRECTION.
12. HARD SURFACE FLOORING: VINYL COMPOSITION, RUBBER OR LINOLEUM TILE PRODUCTS SHALL BE INSTALLED WITH TIGHT/INVISIBLE SEAMS FOLLOWING MANUFACTURERS’ RECOMMENDATION. LINOLEUM SHEET PRODUCTS SHALL BE INSTALLED WITH A WELDED SEAM AT ALL JOINTS.
13. PROTECTION, FINAL CLEANING AND ACCEPTANCE: CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL NEWLY INSTALLED FINISHES FOR THE DURATION OF CONSTRUCTION. AT THE COMPLETION OF EACH PHASE OF THE WORK, CONTRACTOR SHALL REMOVE ALL PAINT, WALL COVERING PASTE, STAINS, ETC., FROM WHERE IT HAS SPILLED, SPLASHED OR SPLATTERED ONTO ADJACENT SURFACES ONLY BY METHODS RECOMMENDED BY MATERIAL MANUFACTURER. AT THE COMPLETION OF CONSTRUCTION AND IMMEDIATELY PRIOR TO ACCEPTANCE BY OWNER, CONTACTOR SHALL REMOVE PROTECTIVE COVERINGS AND PROVIDE APPROPRIATE AND NECESSARY CLEANING PER MANUFACTURER’S RECOMMENDATIONS. CONTRACTOR SHALL THOROUGHLY CLEAN TILE FLOORS OF ALL ADHESIVE/CONSTRUCTION STAINS AND FINISH FLOOR ACCORDING TO MANUFACTURERS’ RECOMMENDATIONS WHICH MAY INCLUDE APPLYING AN APPROPRIATE TWO (2) COAT NON-SLIP WAX APPLICATION WHICH IS TO BE THOROUGHLY MACHINE BUFFED.
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SHEET SPECIFIC NOTES
GENERAL NOTES
MATERIAL KEYNOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
/2
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:1
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
F
IN
IS
H
S C
H E
D U
L E
N E
W B
E R
C
02/28/2023
11793-00
A700
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
ROOM FINISH SCHEDULE FIRST FLOOR
Number Name Floor Finish Base Finish Wall Finish Ceiling Finish Comments
101 Vestibule C-2 - WALK OFF MAT B1 EXPOSED
102 Lobby CONC-1 - POLISHED CONC. B1 PT-1 EXPOSED
103 Display CONC-1 - POLISHED CONC. B1 PT-1 EXPOSED
104 Reception CONC-1 - POLISHED CONC. B1 PT-1 EXPOSED
105 Multi-Purpose Room C-1 - CARPET B1 PT-2 EXPOSED
106 Closet C-1 - CARPET B1 PT-2 GWB 9'-0" AFF
107 Toilet - F CT-1 - CERAMIC TILE B2 PT-1 GWB 9'-0" AFF
108 Toilet - M CT-1 - CERAMIC TILE B2 PT-1 GWB 9'-0" AFF
109 Corridor CONC-1 - POLISHED CONC. B1 PT-1 EXPOSED SEE FLOOR PLAN FOR PT-3 ACCENT WALL LOCATION
110 Mechanical Room CONC-2 - DUST SEAL ONLY B1 PT-1 EXPOSED
111 Janitor CONC-2 - DUST SEAL ONLY B1 PT-1 EXPOSED
112 Div. Stor. CONC-2 - DUST SEAL ONLY B1 PT-1 EXPOSED
113 Electrical Room CONC-2 - DUST SEAL ONLY B1 PT-1 EXPOSED
114 Private Office C-1 - CARPET B1 PT-2 GWB 9'-0" AFF
115 Law Evidence Room CONC-2 - DUST SEAL ONLY B1 PT-1 GWB 9'-0" AFF
116 Meeting Room C-1 - CARPET B1 PT-2 GWB 9'-0" AFF
117 Field Office Storage CONC-2 - DUST SEAL ONLY B1 PT-1 GWB 9'-0" AFF
118 Field Offices (4) C-1 - CARPET B1 PT-1 EXPOSED
119 Meeting Room C-1 - CARPET B3 PT-2 GWB 9'-0" AFF
120 Field Offices (8) C-1 - CARPET B1 PT-1 EXPOSED
121 Customer Center Offices (3) C-1 - CARPET B1 N/A EXPOSED
122 Hoteling (3) C-1 - CARPET B1 PT-1 GWB 9'-0" AFF
123 Resource Room C-1 - CARPET B1 PT-1 GWB 9'-0" AFF
124 IT VT-1 - VINYL TILE B1 PT-1 EXPOSED
125 Customer Center Offices (4) C-1 - CARPET B1 N/A EXPOSED
126 Break Room VT-1 - VINYL TILE B1 PT-2 GWB 9'-0" AFF
127 Conference Room C-1 - CARPET B1 PT-2 GWB 9'-0" AFF
128 Customer Center Offices (6) C-1 - CARPET B1 N/A EXPOSED
129 Supply C-1 - CARPET B1 PT-1 GWB 9'-0" AFF
130 Mail CONC-1 - POLISHED CONC. B1 PT-1 GWB 9'-0" AFF
131 Fish/Wildlife EP-1 - EPOXY PAINT B3 PT-1 EXPOSED
132 Secure Storage EP-1 - EPOXY PAINT B3 PT-1 GWB 9'-0" AFF
133 Corridor C-1 - CARPET B1 PT-1 GWB 9'-0" AFF
134 Open Office C-1 - CARPET B1 PT-1 EXPOSED
135 Corridor CONC-1 - POLISHED CONC. B1 PT-1 GWB 9'-0" AFF
FINISH PLAN NOTES
FINISH SCHEDULE
MARK FINISH TYPE DESCRIPTION COLOR STYLE SIZE MFG Comments
FLOORING
C-1 FLOORING CARPET TILE FUSE 52515 CORRESPOND TILE 5T353 24" X 24" SHAW CONTRACT USE VB-1 AT ADJACENT WALLS
C-2 FLOORING WALK OFF MAT PEWTER TREAD INSERTS, CLEAR ANODIZED
FRAME
PEDIMAT - HEAVY DUTY
CARPET
CONSTRUCTION SPECIALTIES
CONC-1 FLOORING POLISHED CONCRETE
CONC-2 FLOORING DUST SEAL ONLY
CT-1 FLOORING CERAMIC TILE TAUPE UW13 UNIFORM WOOD 8" X 48" DALTILE RESTROOMS ONLY, USE CB-1
EP-1 FLOORING EPOXY FLOORING
VT-1 FLOORING VINYL TILE GESSO 27520 COVE 0927V 9" X 48" SHAW CONTRACT USE VB-1 AT ADJACENT WALLS
LAMINATE
PL-1 LAMINATE MILLWORK CABINETS GLISTENING TRAIL, WH1000 WOOD ESSENCE NEVAMAR MILLWORK CABINETS
PL-2 LAMINATE MILLWORK
COUNTERTOPS
STUDIO GRAY, S6037 ARP NEVAMAR
PAINT
PT-1 PAINT SW LATEX FLAT AT CEILINGS,
SEMI-GLOSS WALLS
SHERWIN WILLIAMS ALL GYP CEILINGS
PT-2 PAINT SW 6099 SAND DOLLAR SEMI-GLOSS SHERWIN WILLIAMS
PT-3 PAINT SW2851 SAGE GREEN LIGHT SEMI-GLOSS SHERWIN WILLIAMS ACCENT WALL ONLY
RESTROOM PARTITIONS
RESTROOM
PARTITIONS
GREY DAWN P-700 METPAR CORP
WALL BASE
CB-1 WALL BASE CERAMIC WALL BASE CHRONOS MY93 COVE BASE TRIM 4" DALTILE USE WITH CERAMIC TILE ONLY
VB-1 WALL BASE VINYL WALL BASE METAL COVE VINYL BASE 4" SHAW CONTRACT TYPICAL, USE AT CONCRETE, VINYL AND CARPETED
FLOORING
WALL TILE
WT-1 WALL TILE CERAMIC WALL TILE CHRONOS MY93 MYTHOLOGY PICKET MOSAIC
UNDULATED
DALTILE RESTROOMS ONLY, TOP WITH JOLLY STRIPS TO MATCH
F Z
R F
Z R
B R
O C
H U
R E
S
W A
T
F
IL
L
COUGAR
DISPLAY
FUR
DISPLAY
DUCK
DISPLAY
M A
S S
T
IM
B E
R D
IS
P
L A
Y
D
IG
IT
A
L M
A P
SEASONAL
BROCHURES
N O
T H
IN
G
G O
E S
T O
W A
S T
E
T W
A L L
P A
N E
L
G R
ID
D
IS
P
L A
Y
SEASONAL
TABLE
F O
R E
S T
R Y
HIKING TRAILS
6' - 1" 4' - 3"
8' - 7"
Conference Room
FF:C-1 - CARPET
BF:B1
WF:PT-2
CF:GWB 9'-0" AFF
Field Offices (8)
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:EXPOSED
Field Offices (4)
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:EXPOSED
Meeting Room
FF:C-1 - CARPET
BF:B3
WF:PT-2
CF:GWB 9'-0" AFF
Corridor
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Field Office Storage
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Meeting Room
FF:C-1 - CARPET
BF:B1
WF:PT-2
CF:GWB 9'-0" AFF
Law Evidence Room
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Private Office
FF:C-1 - CARPET
BF:B1
WF:PT-2
CF:GWB 9'-0" AFF
Electrical Room
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:EXPOSED
Div. Stor.
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:EXPOSED
Janitor
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:EXPOSED
Mechanical Room
FF:CONC-2 - DUST SEAL ONLY
BF:B1
WF:PT-1
CF:EXPOSED
Display
FF:CONC-1 - POLISHED CONC.
BF:B1
WF:PT-1
CF:EXPOSED
Vestibule
FF:C-2 - WALK OFF MAT
BF:B1
CF:EXPOSED
Lobby
FF:CONC-1 - POLISHED CONC.
BF:B1
WF:PT-1
CF:EXPOSED
Customer Center Offices (3)
FF:C-1 - CARPET
BF:B1
WF:N/A
CF:EXPOSED
Break Room
FF:VT-1 - VINYL TILE
BF:B1
WF:PT-2
CF:GWB 9'-0" AFF
Secure Storage
FF:EP-1 - EPOXY PAINT
BF:B3
WF:PT-1
CF:GWB 9'-0" AFF
Customer Center Offices (6)
FF:C-1 - CARPET
BF:B1
WF:N/A
CF:EXPOSED
Toilet - M
FF:CT-1 - CERAMIC TILE
BF:B2
WF:PT-1
CF:GWB 9'-0" AFF
Toilet - F
FF:CT-1 - CERAMIC TILE
BF:B2
WF:PT-1
CF:GWB 9'-0" AFF
Reception
FF:CONC-1 - POLISHED CONC.
BF:B1
WF:PT-1
CF:EXPOSED
Corridor
FF:CONC-1 - POLISHED CONC.
BF:B1
WF:PT-1
CF:EXPOSED
Resource Room
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
IT
FF:VT-1 - VINYL TILE
BF:B1
WF:PT-1
CF:EXPOSED
FF:CONC-1 - POLISHED CONC.
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Supply
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Fish/Wildlife
FF:EP-1 - EPOXY PAINT
BF:B3
WF:PT-1
CF:EXPOSED
Multi-Purpose Room
FF:C-1 - CARPET
BF:B1
WF:PT-2
CF:EXPOSED
Customer Center Offices (4)
FF:C-1 - CARPET
BF:B1
WF:N/A
CF:EXPOSED
Hoteling (3)
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:GWB 9'-0" AFF
Open Office
FF:C-1 - CARPET
BF:B1
WF:PT-1
CF:EXPOSED
PT-3
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
10 26 00.CG
C-1 - CARPET
CT-1 - CERAMIC TILE
CONC-2 - DUST SEAL ONLY
CONC-1 - POLISHED CONC.
C-2 - WALK-OFF MAT
EP-1 - EPOXY PAINT
VT-1 - VINYL TILE
FINISH LEGEND
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:1
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
IN
T
E R
IO
R
F
IN
IS
H
P L A
N
N E
W B
E R
C
02/28/2023
11793-00
A701
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
N
A. SEE A700 FOR FINISH SCHEDULE AND GENERAL FINISH PLAN NOTES
B. ALL GWB CEILINGS TO RECEIVE PT-1
C. PROVIDE POLY CORNER GUARDS UP TO 60" ABOVE FINISH FLOOR ON ALL OUTSIDE
CORNERS TO PROTECT PAINTED WALL
10 26 00.CG CORNER GUARDS
F
S T
B F
P W
M
B F
P
T
A T
S
FACP
F A
A
F
F
F
F
F
F Z
R F
Z R
3'-2"
A. FURNITURE BY OWNER; DRAWING INCLUDED FOR
REFERENCE ONLY.
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M O E
N A
M
S H
E
L E
S C
A
.O
J
M E
L O
C A
T
IO
N
SEAL ISSUE DATE
JOB. NO.
DWG. NO.
REVISION:
P H
A S
E
F
IN
A L D
E S
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MATERIAL KEYNOTES GENERAL NOTES SHEET SPECIFIC NOTES
© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent
A s i n d ic a te d
B
IM
/1
-0
N e w b e ry C
S C a n d S to ra g e
/C e n tr a l_
-0
A R
C H v
.r v t
/2
/2
:4
:1
P
M
N e w b e rr y A v e
M -1
N e w b e rr y M
I
F U
R N
IT
U
R E
P L A
N
N E
W B
E R
C
02/28/2023
11793-00
A702
D e p a rt m e n t o f
N a tu ra l R e s o u rc e s
F
| Sheets |
| G003 - KEYNOTE LIST / SYMBOLS / LEGEND / GENERAL NOTES |
| G004 - BUILDING CODE |
| G101 - LIFE SAFETY PLAN - OFFICE |
| G200 - INTERIOR PARTITION TYPES |
| A011 - OVERALL PLAN |
| A101 - FLOOR PLAN |
| A121 - ENLARGED PLANS/ELEVATIONS |
| A201 - EXTERIOR ELEVATIONS |
| A202 - EXTERIOR ELEVATIONS |
| A211 - BUILDING SECTIONS |
| A212 - BUILDING SECTIONS |
| A221 - WALL SECTIONS |
| A222 - WALL SECTIONS |
| A223 - WALL SECTIONS |
| A501 - EXTERIOR PLAN DETAILS |
| A511 - EXTERIOR SECTION DETAILS |
| A512 - EXTERIOR SECTION DETAILS |
| A513 - EXTERIOR SECTION DETAILS |
| A514 - EXTERIOR SECTION DETAILS |
| A521 - INTERIOR DETAILS |
| A601 - DOOR ELEVATIONS, DETAILS, & SCHEDULE |
| A610 - INTERIOR ELEVATIONS |
| A700 - FINISH SCHEDULE |
| A701 - INTERIOR FINISH PLAN |
| A702 - FURNITURE PLAN |
| G201 - ADA STANDARDS AND CASEWORK SECTIONS |
File details come from the government source that posted it. Updated .