Attachment A - CM-RFP Part 2 - Cost Details - 4 pgs.xlsx

XLSX spreadsheet 197 KB Posted

Attached to
751/20015. TAP; Newberry Customer Service Center
Solicitation number
RFP - 171 - 230000001121
Issued by
Luce County, Michigan

About this file

The document provided is an attachment titled "Attachment A - CM-RFP Part 2 - Cost Details" related to a state and local contract opportunity for the Newberry Customer Service Center project in Luce County, Michigan.

The project involves the construction management services for the Newberry Customer Service Center. The contract opportunity includes a scope of work, project details, and pricing information. The contract is being offered by the State of Michigan and Luce County. The response is due on a specific date, and a bidder's conference may be held. The contract term and any renewal options are not provided in the attachment.

The attachment includes detailed cost information and pricing requirements for the construction management services. It does not provide any information about set-asides, incumbents, funding sources, or other salient details.

View the file

Other files

File Type Posted
Attachment C3d - A dwgs 13-24 12 sheets.pdf PDF
Attachment C3d - A dwgs 1-12 12 sheets.pdf PDF
Attachment C4 - LAS Schedule_r7_230125 - 1 pg.pdf PDF
Attachment C5 - DTMB465_ —
Attachment C3b - C dwgs 10 sheets.pdf PDF
Attachment E - Scope of Work Outline - estim with qtys only - 31pgs.pdf PDF
Attachment C1 - Phase 200 Program Analysis Report with Conceptual Design - 86 pgs.pdf PDF
Addendum 1 Attachment 5 - 09 93 00 - Staining and Transparent Finishing.pdf PDF
Attachment C3f - E dwgs 8 sheets.pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 2of2.pdf PDF
Newberry CSC PreProposal Attendance 2-16-23.pdf PDF
Attachment C3c - S dwgs 11 sheets.pdf PDF
Attachment C3a - G dwgs 5 sheets.pdf PDF
Attachment C3e - M dwgs 15-27 13 sheets.pdf PDF
Addendum 1 Attachment 2 - 07 42 43 - Composite Wall Panels.pdf PDF
CM RFP 20015 .pdf PDF
Addendum 1 Attachment 4b - Structural Framing Plan.pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 1of2.pdf PDF
Attachment F - CM RFQ Part 1 - 3 pgs.docx DOCX document
Project Statement 20015.pdf PDF
Attachment C2 - Conceptual Phasing - Phasing Option 2 Summary - 4 pgs.pdf PDF
Attachment C6 - Appendix 7 Cap Outlay Allowable Charges - 1 pg.pdf PDF
Attachment D - Ack of Add 20015 - 1pg.pdf PDF
Addendum 1 Attachment 3 - 10 71 13 - Fixed Sun Screens.pdf PDF
Addendum 1 Attachment 1 - 07 46 23 - Wood Siding.pdf PDF
Attachment C3e - M dwgs 1-14 14 sheets.pdf PDF
Attachment B - CM Contract SAMPLE Rev 03-22 - 172 pgs.pdf PDF
Addendum 1 20015.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Conditions

ERROR:#REF!

Field Office Costs & Reimbursables and General Conditions duration: 11 months

NUMQuantityUnitRateTotal
CostComments
Field Offices
31IT Equipment(Computers,printers,etc.)0devices$3,000Not Included
312.90%IT Support / Assistance0months$150Not Included
31Proj. Mgmt. Internet Based Software0months$500Not Included
31Proj. Mgmt. Internet Teamsite0lump sum$1,500Not Included
31Internet Connectivity - Setup / Activation/Deactivation1lump sum$500$500
31Internet Connectivity - Access11months$450$4,950
31Project Office Trailer11months$500$5,500
32East Side Superintendent Trailer0months$1,250Not Included
32Set-up/Teardown Site Office1allow$2,000$2,000
32Temporary Toilets11months$250$2,750
Drinking Water11months$150$1,650
Gas, Water, Electric Hook up for Trailers1lump sum$2,000$2,000
32Temporary Water Connection for Trailers11lump sum$30$330
33Wireless Communications11months$900$9,900
33Copy/FAX/Office Equipment11months$500$5,500
33Telephone (including monthly bills)11months$400$4,400
Travel11months$1,200$13,200
33Office Furnishings1lump sum$1,500$1,500
34Office Supplies11months$500$5,500
34Postage & Express11months$300$3,300
34Printing (Internal)1lump sum$7,500$7,500
34Office Electrical Power11allow$500$5,500

Total Field Offices & Reimbursables: $75,980

&F&A Page &P of &N &D

GC's

INSTRUCTIONS: ATTACHMENT A

The following tables are provided to assist you in determining the projected total cost for the Construction Manager to perform their Management Services as described in the proposed CM Agreement (Attachment B).

It is not a requirement for you to complete all of the line items in the table for your proposal to be considered. However, all of the items listed on the table must be included in your projected total costs and costs for each category must be completed. The CM shall be limited to reimbursement for only those items priced below, If the CM requires items not listed in order to perform the CM services for the project please identify those additional items where indicated "Other - list as applicable" below. If an item listed below does not apply please mark it N/A.

PRE CONSTRUCTION PHASE COSTS
NAMEITEMQUANTITYUNITRATETOTAL
Project Executive$0
Sr. Project Manager$0
Project Manager$0
Project Engineer$0
Project Superintendent$0
Assistant Superintendent$0
Field Engineer$0
Layout Engineer$0
Safety Officer$0
Lead Estimator$0
Estimator$0
Civil Estimator$0
Mechanical Estimator$0
Electrical Estimator$0
Secretarial & Clerical$0
Accounting$0
Other - list as applicable:$0
$0
$0
$0
CM Pre-Construction Phase Reimbursable Expenses$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
Electronic Plan Room$0
Document Reproductions$0
Postage & Expressage$0
Other - list as applicable:$0
$0
$0
$0
TOTAL PRE CONSTRUCTION PHASE COSTS$0
CONSTRUCTION/CLOSEOUT PHASE STAFF COSTS
NAMEITEMQUANTITYUNITRATETOTAL
Project Executive$0
Sr. Project Manager$0
Project Manager$0
Project Engineer$0
Project Superintendent$0
Assistant Superintendent$0
Field Engineer$0
Layout Engineer$0
Safety Officer$0
Lead Estimator$0
Estimator$0
Civil Estimator$0
Mechanical Estimator$0
Electrical Estimator$0
Secretarial & Clerical$0
Accounting$0
Other - list as applicable:$0
$0
$0
$0
$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
$0
TOTAL CONSTRUCTION/CLOSEOUT PHASE STAFF COSTS$0
CONSTRUCTION/CLOSEOUT PHASE REIMBURSABLE CM GENERAL CONDITION EXPENSES
ITEMQUANTITYRATEUNITTOTAL
CONSTRUCTION MANAGER GENERAL CONDITIONS - only those costs required for the CM to perform its management services
Temp Office Trailer Rental$0
Temp Office Trailer Set Up$0
Temp Office Trailer Furnishings$0
Temp Office Trailer HVAC$0
Temp Office Trailer Electric$0
Temporary water to trailer(s)$0
Temp Office Trailer toilets$0
Site Office Supplies$0
Site Office Water Cooler$0
Postage$0
Express Mail$0
Digital Photography & Video$0
Copy/Scan Machine$0
Printers$0
Computers$0
Temp Office Equipment$0
Printing$0
Internet Set Up and Service Fee$0
Software & Support$0
Mobile Phone Expense$0
Field Office Phone service$0
Field Office Phone Equipment$0
Site Two Way Radio$0
On site Vehicle & Fuel Expenses$0
Site Office Debris Removal$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
$0
Other - list as applicable:$0
$0
$0
$0
$0
$0
Performance/Payment Bonds (COST PER PROPOSAL SUMMARY PAGE)
CM CGL Insurance (COST PER PROPOSAL SUMMARY PAGE)
Builder's Risk Insurance (COST PER PROPOSAL SUMMARY PAGE)
$0
TOTAL CM GENERAL CONDITIONS EXPENSES$0
Construction Support General Conditions shall be defined and estimated by the CM in conjunction with the Project Team as design develops. CM shall manage all construction support general conditions either as a reimbursable expense, at cost (no mark up), or assigned to a trade contract as recommended by the CM and mutually accepted by the Project Team.
Construction Support General Conditions may include, but not limited to, items such as the following with preliminary recommended assignment identified by CM:
Construction Support General Conditions
Trade ContCM Reimb
Quality Control & Testing
Construction Quality Control Testing Bldg/Site
Permits & Special Fees (if applicable)
Driveway/Roadway Improvement Permits, Bond & Fees
Building Permits
Specialty Permits
Water Connection Fees
Sanitary Connection Fees
Storm Connection Fees
Gas Service Charges
Electric Power Service Charges
Soil Erosion & Sedimentation Control (from DTMB)
Other permits/fees
Barricades, Enclosure & Control Signs
Project Sign
Safety Signage
Opening Protection
Weather Enclosure
Control Signs
Temporary Fencing
Covered Walkways
Site Barricades / Fences
On-Site Utilities
Temporary Electric
Temporary Water
Winter Heat
Temporary Building HVAC
Temporary Building HVAC Energy/Costs
Other On-Site Services
Layout Engineering/Surveying
Site Security
Site Webcam
Project Wide Hoisting (if applicable)
Safety and First Aid
Trade Contract & storage Trailers
Small Tools & Supplies
Temporary Toilets
Temporary Fire Protection
Weekly Clean-up
Final Clean-up
Dump Permits & Fees (RECYCLING preferred)
Debris Hauling/Removal (RECYCLING preferred)
Temporary Road Installation/Maint.
Temp Stair/lift
Roadway Maintenance
Storage Trailers
Dust Control
Snow Removal

Other (Specify)

Page &P