Addendum 1 20015.pdf

PDF 155 KB Posted

Attached to
751/20015. TAP; Newberry Customer Service Center
Solicitation number
RFP - 171 - 230000001121
Issued by
Luce County, Michigan

About this file

This document is an Addendum to a Request for Proposal (RFP) for Construction Management Services issued by the Michigan Department of Technology, Management and Budget (DTMB) for the Newberry Customer Service Center project, File Number 751/20015.TAP. The addendum provides clarification on attachments referenced in the RFP, such as staffing and general conditions tables, as well as responses to various questions raised by proposers regarding the design and construction details of the project. The proposal due date is March 9, 2023.

The addendum covers topics such as the availability of a Revit or IFC model, specifications for various building materials, the coordination between the reflected ceiling plan and interior framing plans, and the expected finishes for the exposed timber framing and cross-laminated timber (CLT) roof and wall panels. The project is located in Luce County, Michigan, and the selected Construction Manager will be awarded the contract.

View the file

Other files

File Type Posted
Attachment C3d - A dwgs 13-24 12 sheets.pdf PDF
Attachment C3d - A dwgs 1-12 12 sheets.pdf PDF
Attachment C4 - LAS Schedule_r7_230125 - 1 pg.pdf PDF
Attachment C5 - DTMB465_ —
Attachment C3b - C dwgs 10 sheets.pdf PDF
Attachment E - Scope of Work Outline - estim with qtys only - 31pgs.pdf PDF
Attachment C1 - Phase 200 Program Analysis Report with Conceptual Design - 86 pgs.pdf PDF
Addendum 1 Attachment 5 - 09 93 00 - Staining and Transparent Finishing.pdf PDF
Attachment C3f - E dwgs 8 sheets.pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 2of2.pdf PDF
Newberry CSC PreProposal Attendance 2-16-23.pdf PDF
Attachment C3c - S dwgs 11 sheets.pdf PDF
Attachment C3a - G dwgs 5 sheets.pdf PDF
Attachment C3e - M dwgs 15-27 13 sheets.pdf PDF
Addendum 1 Attachment 2 - 07 42 43 - Composite Wall Panels.pdf PDF
CM RFP 20015 .pdf PDF
Addendum 1 Attachment 4b - Structural Framing Plan.pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 1of2.pdf PDF
Attachment F - CM RFQ Part 1 - 3 pgs.docx DOCX document
Project Statement 20015.pdf PDF
Attachment C2 - Conceptual Phasing - Phasing Option 2 Summary - 4 pgs.pdf PDF
Attachment C6 - Appendix 7 Cap Outlay Allowable Charges - 1 pg.pdf PDF
Attachment A - CM-RFP Part 2 - Cost Details - 4 pgs.xlsx XLSX spreadsheet
Attachment D - Ack of Add 20015 - 1pg.pdf PDF
Addendum 1 Attachment 3 - 10 71 13 - Fixed Sun Screens.pdf PDF
Addendum 1 Attachment 1 - 07 46 23 - Wood Siding.pdf PDF
Attachment C3e - M dwgs 1-14 14 sheets.pdf PDF
Attachment B - CM Contract SAMPLE Rev 03-22 - 172 pgs.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL – CM SERVICES

PREPROPOSAL ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

March 2, 2023

PROJECT NAME

Newberry Customer Service Center

FILE NUMBER

751/20015.TAP

PROJECT DIRECTOR

Tom Pawlowski

PROPOSAL DUE DATE

March 9, 2023

ADDENDUM ITEMS: Questions received are repeated below and responses provided.

1) Attachments not provided as referenced in the RFP, specifically Attachment A Staffing and General Conditions table, and Attachment C which is referenced in regards to providing a Prelim Cost Estimate with the RFP.

Response: The “Attachment A: Staffing and General Conditions Tables” referenced in the RFP in Section IV – Attachments on page 15-17, refers to the attachment provided in SIGMA labelled “Attachment A – CM-RFP Part 2 – Cost Details – 4 pgs.xlsx”.

The Attachment C referred to in the RFP in Section III-13 Cost Estimating and Control on page 14- 17 refers to Attachment C: Existing Plans, Pictures, Schedule, Study Plans, Study Report shown in Section IV on page 15-17. SIGMA attachments include Attachments C1, C2, C3a-f, C4, C5 & C6, representing the compilation of the items listed in the RFP relative to Attachment C.

2) Can we get an updated structural Revit or .ifc model from the Architect or Engineer for review with MT suppliers/fabricators for pricing validation?

Response: Supplier to provide pricing from drawings. Revit Model will be issued to the selected CM awarded the Contract.

3) Provide Details, Spec or Product Information on the following items – Basis of Design:

a. Thermory Wood Siding

b. Concrete Wall Panels

c. Sun Shades @ Curtain Wall

d. Canopy at Entrance

Response: For items a-c see attached specifications. For item d Canopy, match window mullions color and material, the structural detail is being developed.

4) Reflected Ceiling & Interior Framing Plans do not align. Also do not align with Elevations provided.

a. Rooms show Interior Framing including Ceiling and Reflected Ceiling Plan does not - which takes precedence?

i. Rms 104, 111, 112, 113, 124 & 131 http://www.buy4michigan.com/

b. Full Height Walls noted on Int Framing Plan do not align with Elevations - some walls appear to be full height not indicated on the floor plans

i. Appears walls need to be adjusted – should they be coordinated with the ceiling plans

– possibly affect same rooms listed above?

Response: See attached Drawings A101-Floor Plan, A401-Reflected Ceiling Plan, and S1.11P-Structural Framing Plan

5) Roofing - please confirm 3/4" wood roof sheathing is to be installed over "2x4 Nom. Wood Blocking" per detail B5/B11 on sheet A221. Appears to be shown on section but not noted. Also concern with design not allowing proper ventilation?

Response: ¾” roof sheathing over 2x4 wood blocking. See attached Drawings A221 and A511. The design provides proper spacing for sufficient air space.

6) Flooring @ Fish/Wildlife - Epoxy?

Response: Install epoxy floor finish in Fish/Wildlife – Epoxy. See attached Drawing A701 – Interior Finish Plan.

7) Exposed Timber Framing and CLT Roof & Wall Panels – what finish is expected, Paint, Stain or

Sealer? Factory finish or field applied?

Response: See attached specification. Sealer at interior – factory finish. Stain at exterior – field applied.

This ends Addendum No. 1.

APPROVED BY:

PROJECT DIRECTOR Tom Pawlowski DATE 3-2-23