This document is an Addendum to the Structural Framing Plan for the Newberry Customer Service Center project in Newberry, Michigan. The project is being managed by the Department of Technology, Management and Budget, State of Michigan.

The Addendum provides detailed specifications for the interior framing, including requirements for joists, studs, wall plates, blocking, headers, and wall schedules. It specifies the use of SPF No 1/2 lumber, with minimum nailing requirements and details on ceiling framing, wall anchoring, and drywall attachment. The Addendum also includes a wall schedule that defines the types of wall framing to be used throughout the project.

View the file

Other files

File Type Posted
Attachment C3d - A dwgs 13-24 12 sheets.pdf PDF
Attachment C3d - A dwgs 1-12 12 sheets.pdf PDF
Attachment C4 - LAS Schedule_r7_230125 - 1 pg.pdf PDF
Attachment C5 - DTMB465_ —
Attachment C3b - C dwgs 10 sheets.pdf PDF
Attachment E - Scope of Work Outline - estim with qtys only - 31pgs.pdf PDF
Attachment C1 - Phase 200 Program Analysis Report with Conceptual Design - 86 pgs.pdf PDF
Addendum 1 Attachment 5 - 09 93 00 - Staining and Transparent Finishing.pdf PDF
Attachment C3f - E dwgs 8 sheets.pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 2of2.pdf PDF
Newberry CSC PreProposal Attendance 2-16-23.pdf PDF
Attachment C3c - S dwgs 11 sheets.pdf PDF
Attachment C3a - G dwgs 5 sheets.pdf PDF
Attachment C3e - M dwgs 15-27 13 sheets.pdf PDF
Addendum 1 Attachment 2 - 07 42 43 - Composite Wall Panels.pdf PDF
CM RFP 20015 .pdf PDF
Addendum 1 Attachment 4a - ArchitecturalPlanSet 1of2.pdf PDF
Attachment F - CM RFQ Part 1 - 3 pgs.docx DOCX document
Project Statement 20015.pdf PDF
Attachment C2 - Conceptual Phasing - Phasing Option 2 Summary - 4 pgs.pdf PDF
Attachment C6 - Appendix 7 Cap Outlay Allowable Charges - 1 pg.pdf PDF
Attachment A - CM-RFP Part 2 - Cost Details - 4 pgs.xlsx XLSX spreadsheet
Attachment D - Ack of Add 20015 - 1pg.pdf PDF
Addendum 1 Attachment 3 - 10 71 13 - Fixed Sun Screens.pdf PDF
Addendum 1 Attachment 1 - 07 46 23 - Wood Siding.pdf PDF
Attachment C3e - M dwgs 1-14 14 sheets.pdf PDF
Attachment B - CM Contract SAMPLE Rev 03-22 - 172 pgs.pdf PDF
Addendum 1 20015.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Interior Framing Notes

All joists, studs, wall plates, and blocking to be SPF No 1/2 uno

All LVL wall studs shall be Fb = 2,400 psi, 1.8E

Reference 5/S5.1 for requirement minimum nailing of all interior framing unless noted otherwise

See typical wood details on S0.2 for requirements not shown

Ceiling Framing

All ceilings areas to include 7/16" APA rated sheating applied to top of joists glued and nailed with 10d nails at 6" oc max

Coordinate bottom of ceiling framing with architectural drawings

Adjust ceiling framing to coordinate with ceiling lights

Design Loading: all ceiling framing has been designed for DL = 10psf LL = 40 psf

Walls

HDR indicates wood header over opening, see notes below

HD indicates hold down at base of wall bolted into slab on grade per WD-41

Unless specifically noted otherwise, wall studs are either 2x4 or 2x6 studs spaced at 16" oc max uno. Coordinate wall thickness with architectural drawings

See WD-105 for typical interior wall framing detail.

LSL studs may be substituted with MSR lumber at contractor option if member lengths are available.

All sill plates at base of walls must be preservative treated. The base of all interior walls shall be anchored per WD-17

Fasten gypsum board to wall studs using No. 6 Type S or W drywall screws 1-1/4" long at 8" oc max. Drywall screws must confirm to requirements of ASTM C 1002.

All headers shall be as follows:

Openings Less than 6 ft clear:

2x4 walls: (2) 2x8 + 1/2" plywood flitch typical uno 2x6 walls: (3) 2x8 + (2) 1/2" plywood flitch plates typical uno

Openings 6 ft or greater:

2x4 walls: (2) 2x10 + 1/2" plywood flitch typical uno 2x6 walls: (3) 2x10 + (2) 1/2" plywood flitch plates typical uno

Wall Schedule

2x4 or 2x6 studs per arch drawings @ 16" oc maxW1

W2 min 2x6 studs @ 12" oc full height up to CLT roofW3

2x4 or 2x6 studs per arch drawings @ 16" oc max supporting ceiling joists, with matching studs at 16" oc max restarting above ceiling up to CLT roof.

W5 Double 1-1/2"x5-1/2" LVL wall studs at 16" oc max full height up to CLT roof

1-1/2"x5-1/2" LVL wall studs at 12" oc max full height up to CLT roof

W4

W6 Double 1-1/2"x5-1/2" LVL wall studs at 12" oc max full height up to CLT roof

W7

1-1/2"x3-1/2" LVL wall studs at 16" oc max studs per arch drawings @ 16" oc max supporting ceiling joists, with matching studs at 16" oc max restarting above ceiling up to CLT roof

W8

Double 1-1/2"x3-1/2" LVL wall studs at 16" oc max studs per arch drawings @ 16" oc max supporting ceiling joists, with matching studs at 16" oc max restarting above ceiling up to CLT roof indicates that the wall type requires a deflection gap from the CLT and non-load bearing connectors per 13/S5.1

B

C

D

E

4 5 6 7 8 91 2

A.2

A

2x12 @ 16" oc 2x10 @ 16" oc 2x10 @ 16" oc 2x10 @ 16" oc 2x10 @ 16" oc

2x8 @ 16" oc

2x8 @ 16" oc2x8 @ 16" oc

2x12 @ 16" oc

2x12 @ 16" oc

Double 2x10 @ 16" oc full depth blocking @ 1/3rd points full depth blocking @ 1/3rd points full depth blocking @ 1/3rd points full depth blocking @ 1/4 points full depth blocking @ 1/3rd points full depth block @ midspan

HDR HDR HDR HDR HDR HDR HDR HDR

H D

R

HDR

H D

R H

D R

HDR

H D

R full depth blocking @ 1/4 points

HDRHDR

HDR

x o c full depth blocking @ 1/4 points

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

H D

W1

W1 W1

W 1W

W1

W1

W

W

W

W

W

W 2 W

W

W

W3 W3 W3

W

W3

W

W4 W4

W

W5

W

W

W

W

H D

R

W7

W1

W1

W8

W

W1 W1

W1

W

W2

W

W

W

W1

W1

W

W

W1 typ

S5.1

S5.1

S5.1

S5.1

S5.1

S5.1

S5.1

S5.1

S5.1 ________________________________ 9

S5.1

S5.1 ________________________________2

S5.1 sim

S5.1

S5.1 ________________________________ 10

S5.1 ________________________________ 10

S5.1 ________________________________ 6

S5.1

S5.1 ________________________________ 11

S5.1

S5.1

H D

H D

H D

H D

W2 W2

S5.1

S5.1

S5.1 ________________________________ 8

S5.1

S5.1

S5.1

S5.1

S5.1

H D

R

S5.1

S5.1

S5.1

S5.1

S5.1

H D

H D

H D

H D

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

P L

U R

I B

U

E S

U N

U M

C I

R C

U M

S P

I C

E

S I

Q U

E R

E I

S P

E N

I N

S U

L A

M A

M O E

N A

M

S H

E E

T

T

IT

L E

S C

A L E

(U

.N .O

J O

B

N A

M E

L O

C A

T

IO

N

SEAL ISSUE DATE

JOB. NO.

DWG. NO.

REVISION:

P

H A

S E

F

IN

A L

D E

S

IG

N

N O

T

F

R

C

N

S T

R U

C T

IO

N

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

J

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

© 2021 Lord Aeck Sargent LordAeckSargent.com Unless otherwise agreed to in writing,this document is the sole property of Lord Aeck Sargent and is to be returned upon demand. The information herein is confidential and may not be used nor divulged without the written permission of Lord Aeck Sargent

A s i n d ic a te d

B

IM

/1

-0 N e w b e ry C

S C a n d S to ra g e

/N e w b e rr y S tr u c tu ra l

V

R e v is e d .r v t

/2

/2

:5

:1

P

M

N e w b e rr y A v e

M -1

N e w b e rr y M

I

IN

T

E R

IO

R

F R

A M

IN

G

P L A

N

N E

W B

E R

R Y

C S

C

02/10/2023

11793-00

S1.11P

D e p a rt m e n t o f

N a tu ra l R e s o u rc e s project north scale 1/8" = 1'-0"

Interior Framing Plan