Attachment B - Past Performance Questionnaire.docx

DOCX document 32 KB Posted

Attached to
Z1DA--FY25 VISN 21 Multiple Award Construction Contract (MACC)
Solicitation number
36C26124R0035
Issued by

About this file

This file is a Past Performance Questionnaire (PPQ) template that references solicitation 36C26124R0035 for the VISN 21 Multiple Award Construction Contract. The questionnaire is designed to be completed in two parts - first by the contractor providing basic contract information, and then by the client providing performance ratings.

The PPQ must be submitted directly to VA contracting officers Priscilla Murray and Corey Kline by the references, not by the offerors in their proposals. The evaluation uses a 5-level rating scale from Exceptional to Unsatisfactory across multiple performance categories including quality, schedule/timeliness, customer satisfaction, management/personnel, cost/financial management, safety/security, and general performance. The questionnaire captures detailed contract information including contract type, value, dates, and project description, followed by comprehensive performance ratings and narratives from the client reference.

View the file

Other files

File Type Posted
S06 - Amendment to Solicitation No. 36C26124R0035 0007.docx DOCX document
36C26124R0035 AMEND 0006.pdf PDF
36C26124R0035 Amend 0005.pdf PDF
36C26124R0035 Amend 0004.pdf PDF
PreProposal Conf Minutes.pdf PDF
36C26124R0035 Amend 0003.pdf PDF
Atch 1. Attendees.pdf PDF
Atch 2. PreProposal Conf Slide Deck.pdf PDF
36C26124R0035 Amend 0002.docx DOCX document
36C26124R0035 Amend 0001.pdf PDF
Attachment A - Construction _ Design Experience Project Data Sheet Revised.docx DOCX document
VAAR 852.219-75.docx DOCX document
WD NV20240038 20241018.pdf PDF
WD NV20240034 20240920.pdf PDF
NCO 21 Construction MACC Additional Terms and Conditions.docx DOCX document
WD CA20240018 20241018.pdf PDF
36C26124R0035_Solicitation.pdf PDF
WD N Mariana Islands 20240531.pdf PDF
WD NV20240040 20241018.pdf PDF
WD CA20240016 20240719.pdf PDF
WD GU20240002 20240105.pdf PDF
WD NV20240030 20240920.pdf PDF
WD HI20240001 20241025.pdf PDF
WD CA20240005 20240105.pdf PDF
Attachment D - Sample Client Authorization.docx DOCX document
WD NV20240029 20240920.pdf PDF
Attachment C - Consent Letter.docx DOCX document
Attachment E - Key Personnel.docx DOCX document
Attachment A - Construction _ Design Experience Project Data Sheet.docx DOCX document
WD CA20240007 20241018.pdf PDF
WD AS20240001 20240105.pdf PDF
WD NV20240031 20240920.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

1. The PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire (PPQ).

2. Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. Questionnaires must be submitted directly to the Government’s point of contact, Priscilla Murray at priscilla.murray@va.gov and Corey Kline at corey.kline3@va.gov.

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

ATTACHMENT B

PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information
Firm Name:CAGE Code:
Address:SAM UEI Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work |_| High |_| Med |_| Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: VA REQUESTS THAT THE QUESTIONNAIRES BE SUBMITTED DIRECTLY TO THE CONTRACTING OFFICE AT PRISCILLA.MURRAY@VA.GOV and COREY.KLINE3@VA.GOV. OFFERORS ARE HIGHLY ENCOURAGED TO HAVE REFERENCES SUBMIT THE QUESTIONNAIRES DIRECTLY TO THE GOVERNMENT. OFFERORS SHOULD NOT SUBMIT THE QUESTIONNAIRES WITH THEIR PROPOSALS. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant Weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant Weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant Weaknesses identified. Per policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts
E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction
E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort
E VG S M U N
c) Government Property Control
E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel
E VG S M U N
e) Utilization of Small Business concerns
E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific Strengths, Weaknesses, Deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):