Z1DA--FY25 VISN 21 Multiple Award Construction Contract (MACC)
Solicitation number
36C26124R0035
Issued by

About this file

This is a solicitation document for a Multiple Award Construction Contract (MACC) to provide design-build and design-bid-build construction services at various Veterans Integrated Service Network (VISN) 21 locations. The contract will be awarded to multiple Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) who must maintain VetCert certification throughout the contract period.

The MACC has a total ceiling value of $600 million, with individual awardee limits of $50 million and task order limits of $10 million. The period of performance includes a 2-year base period and three 1-year options, with a guaranteed minimum of $2,000 per awardee. Work will include maintenance, repair, and minor construction projects across VISN 21 facilities, encompassing renovations, HVAC, plumbing, electrical, site work, and new construction. Task orders will be issued on a firm-fixed-price basis. Primary locations include VA facilities in Palo Alto, San Francisco, Northern California, Pacific Islands, Sierra Nevada, Central California, and Southern Nevada. Proposals are due by February 28, 2025 at 3:00 PM PST, with an anticipated start date of July 1, 2025. The principal NAICS code is 236220 - Commercial and Institutional Building Construction.

View the file

Other files

File Type Posted
S06 - Amendment to Solicitation No. 36C26124R0035 0007.docx DOCX document
36C26124R0035 AMEND 0006.pdf PDF
36C26124R0035 Amend 0005.pdf PDF
36C26124R0035 Amend 0004.pdf PDF
PreProposal Conf Minutes.pdf PDF
36C26124R0035 Amend 0003.pdf PDF
Atch 1. Attendees.pdf PDF
Atch 2. PreProposal Conf Slide Deck.pdf PDF
36C26124R0035 Amend 0002.docx DOCX document
36C26124R0035 Amend 0001.pdf PDF
Attachment A - Construction _ Design Experience Project Data Sheet Revised.docx DOCX document
VAAR 852.219-75.docx DOCX document
WD NV20240038 20241018.pdf PDF
WD NV20240034 20240920.pdf PDF
NCO 21 Construction MACC Additional Terms and Conditions.docx DOCX document
WD CA20240018 20241018.pdf PDF
WD N Mariana Islands 20240531.pdf PDF
WD NV20240040 20241018.pdf PDF
WD CA20240016 20240719.pdf PDF
WD GU20240002 20240105.pdf PDF
WD NV20240030 20240920.pdf PDF
WD HI20240001 20241025.pdf PDF
WD CA20240005 20240105.pdf PDF
Attachment D - Sample Client Authorization.docx DOCX document
WD NV20240029 20240920.pdf PDF
Attachment C - Consent Letter.docx DOCX document
Attachment E - Key Personnel.docx DOCX document
Attachment A - Construction _ Design Experience Project Data Sheet.docx DOCX document
Attachment B - Past Performance Questionnaire.docx DOCX document
WD CA20240007 20241018.pdf PDF
WD AS20240001 20240105.pdf PDF
WD NV20240031 20240920.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26124R0035

X

01-27-2025

36C261-24-AP-2203

N/A

36C261

Department of Veterans Affairs Network Contracting Office 21 (NCO 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813

Department of Veterans Affairs

NETWORK CONTRACTING OFFICE (NCO21)

VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813

Priscilla A. Murray priscilla.murray@va.gov

36C26124R0035 | Design-Build/Design-Bid-Build Service Disabled Veteran Owned Small Business (SDVOSB) Multiple Award Construction Contract (DB/DBB SDVOSB MACC), Various Locations, Veterans Integrated Service Network (VISN) 21

The proposed contract is limited to Veteran Small Business Certification, (VetCert) verified SDVOSB concerns.

Vendors must be VetCert certified at the time of submission of the proposal and continuously through the award. This is a source selection procurement IAW FAR 15.101-1 requiring both Technical and Price proposals. The procurement consists of one solicitation with the intent to award multiple Indefinite Delivery/Indefinite Quantity contracts.

The aggregate value of this Multiple Award Construction Contract (MACC) acquisition shall not exceed $600,000,000.

Awardees shall not exceed $50,000,000 for the life of the contract. The period of performance (POP) for all contracts resulting from this solicitation shall consist of a two (2) year base period and three (3) one-year option periods.

The guaranteed minimum amount for each resultant award is $2,000 for the life of the contract, inclusive of options.

The MINIMUM ordering limit per task order is $2,000. The MAXIMUM ordering limit per task order is $10,000,000.

This acquisition features a "seed" project with a magnitude IAW VAAR 836.204(f)(2) Between $2,000,000 and $5,000,000.

A bid bond in the amount of 20% of the $5,000,000 magnitude limit is required. ***NOTE: SEED Project information will be released via an Amendment to Offerors who are shortlisted from Phase I.

SYSTEM FOR AWARD MANAGEMENT (SAM): Offerors shall comply with FAR 52.204-7, System for Award Management to receive an award. Offeror must be registered in SAM at the time of proposal and at the time of contract award.

Per TO Per TO

X X 52.211-10

X 14

1 3:00 PM PST

02-28-2025

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

See Box 27

Department of Veterans Affairs Network Contracting Office 21 (NCO 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813

36C261 Department of Veterans Affairs FMS VA-9(101) Financial Services Center

PO Box 149971 Austin TX 78714-9971 866-372-1141 vafscenterprisesupport@va

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

STATEMENT OF WORK

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 OTHER ATTACHMENTS

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

M.2 52.216-1 TYPE OF CONTRACT (APR 1984)

M.3 52.233-2 SERVICE OF PROTEST (SEP 2006)

M.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

M.5 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020) .66

M.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

M.7 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

M.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

M.9 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

M.10 PARTNERING

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024) ...70

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND

REPRESENTATION (JUN 2020)

GENERAL CONDITIONS

4.1 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

4.2 52.216-18 ORDERING (AUG 2020)

4.3 52.216-19 ORDER LIMITATIONS (OCT 1995)

4.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)

4.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

4.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

4.7 52.219-13 NOTICE OF SET-ASIDE OF ORDERS (MAR 2020)

4.8 52.223-21 FOAMS (MAY 2024)

4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.11 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.12 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.13 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.14 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.15 VAAR 852.211-76 LIQUIDATED DAMAGES – REIMBURSEMENT FOR DATA

BREACH COSTS (FEB 2023) ALTERNATE I (FEB 2023)

4.16 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.17 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.18 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.19 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)

4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.21 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

4.22 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.23 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.24 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

ALTERNATE I (APR 2019)

4.25 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.26 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY (FEB 2023)

4.27 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.28 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) 107

4.29 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.30 VAAR 852.246-71 REJECTED GOODS (OCT 2018)

4.31 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD

SERVICES (OCT 2018)

4.32 MANDATORY WRITTEN DISCLOSURES

4.33 IT CONTRACT SECURITY

DESIGN BUILD SPECIFICATIONS

4.34 GENDER

4.35 CONTRACTOR'S COST BREAKDOWN

4.36 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES

4.37 OWNERSHIP OF ORIGINAL DOCUMENTS

4.38 RETENTION OF REVIEW DOCUMENTS

4.39 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED

PLANNING INFORMATION

4.40 COORDINATION WITH MEDICAL CENTER

4.41 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR

ATTACHMENTS

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0.00

This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Design- Build/Design-Bid Build Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (SDVOSB MACC), Various Locations, VISN 21 for a period of 24 months. The MACC will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property within VISN 21. The work may consist of multiple disciplines of construction, and shall include but not be limited to the following categories of work:

construction, repair and alteration of facilities, interior and exterior renovations, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving, demolition of facilities, construction of new facilities, and other construction-related work.

A task order for the minimum guarantee will be issued concurrently with the award of the basic contract for the base period only. The task order will be for deliverables such as the quality assurance, safety, and environmental plans as required by the Statement of Work.

Contract Period: Base POP Begin: 07-01-2025 POP End: 06-30-2027 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries

OY1 - OPTION PERIOD

This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Design- Build/Design-Bid Build Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (SDVOSB MACC), Various Locations, VISN 21 for a period of 12 months. The MACC will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property within VISN 21. The work may consist of multiple disciplines of construction, and shall include but not be limited to the following categories of work:

construction, repair and alteration of facilities, interior and exterior renovations, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving, demolition of facilities, construction of new facilities, and other construction-related work.

Contract Period: Option 1 POP Begin: 07-01-2027 POP End: 06-30-2028 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction

OY2 - OPTION PERIOD

This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Design- Build/Design-Bid Build Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (SDVOSB MACC), Various Locations, VISN 21 for a period of 12 months. The MACC will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property within VISN 21. The work may consist of multiple disciplines of construction, and shall include but not be limited to the following categories of work:

construction, repair and alteration of facilities, interior and exterior renovations, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving, demolition of facilities, construction of new facilities, and other construction-related work.

Contract Period: Option 2 POP Begin: 07-01-2028 POP End: 06-30-2029 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction

OY3 - OPTION PERIOD

This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Design- Build/Design-Bid Build Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (SDVOSB MACC), Various Locations, VISN 21 for a period of 12 months. The MACC will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property within VISN 21. The work may consist of multiple disciplines of construction, and shall include but not be limited to the following categories of work:

construction, repair and alteration of facilities, interior and exterior renovations, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving, demolition of facilities, construction of new facilities, and other construction-related work.

Contract Period: Option 3 POP Begin: 07-01-2029 POP End: 06-30-2030 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction

GRAND TOTAL __________________

STATEMENT OF WORK

STATEMENT OF WORK

VISN 21 CONSTRUCTION MACC

December 2024

1.0 SUMMARY

1.1 The Veterans Integrated Service Network (VISN) 21 Multiple Award Construction Contract (MACC) is an indefinite delivery-indefinite quantity (IDIQ) contract whose requirements will be competed among a pool of multiple awardees. Work shall be defined in individual Task Orders and may consist of multiple disciplines in general construction categories. The MACC is for a two-year base period (24 months) and three one-year option periods consisting of 12 consecutive months.

1.2 General project descriptions and specifications shall be derived from the Statement of Work (SOW) of each individual Task Order (TO) that is issued. The contractor shall provide all personnel and equipment to perform the supervisory and administrative services and all subcontracted and self-performed labor, materials, and equipment to provide full and complete execution of work in accordance with each TO.

1.3 The MACC will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property at sites noted in the “Locations” section. The work may consist of multiple disciplines of construction, and shall include but not be limited to the following categories of work: construction, repair and alteration of facilities, interior and exterior renovations, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving, demolition of facilities, construction of new facilities, and other construction-related work.

1.4 Projects may entail alteration, renovation, repair, new construction and/or Activation/Occupancy for the following types of spaces:

Clinical and patient care units and all related areas to include general and specialized hospital spaces, including surgical areas.

General or highly specialized biomedical research laboratory spaces and all associated support areas.

Office, administrative, public and all associated support areas.

Interior and exterior utility systems including chiller and steam plants, electrical vaults, etc.

Seismic retrofits.

Parking structures.

General purpose areas such as paving, roofing, building exteriors, hardscaping, and utility efficiency upgrades to mechanical, electrical, and architectural systems.

1.5 North American Industry Classification System (NAICS) codes applicable to categories of work authorized for each MACC task order includes, but is not limited to:

236220 - Commercial and Institutional Building Construction

1.6 Task orders will be any of the following types:

1.6.1 Full Design-Build (FD-B)

1.6.1.1 Consists of a Statement of Objectives with minimal supporting documentation; the contractor shall be required to provide a Statement of Work and complete 10% design (as defined under design levels) along with their bid and, if awarded, shall complete the design in accordance with the TO and basic contract prior to commencing construction.

1.6.1.2 If required, awarded TOs shall complete the design to the 100% level. This will include participating in design reviews that shall be conducted at the construction location for each design milestone (35%, 65%, etc.) as described in the task order.

1.6.1.3 See “PG-18-15 – A/E Submission Requirements – Volume C (Minor and NRM Projects” at https://www.cfm.va.gov/til/aeDesSubReq.asp

1.6.1.4 The design documents shall comply with the requirements as specified in the VA Technical Information Library (TIL) located at https://www.cfm.va.gov/TIL/.

1.6.2 Design-Bid-Build (D-B-B)

1.6.2.1 Consists of a Statement of Work with a full A/E design package provided as part of the task order. The contractor shall be required to provide only a bid and, if awarded, shall commence construction in accordance with the TO and basic contract. An Architectural/Engineering firm (A/E) will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

2.0 DEFINITIONS / ACRONYMS

A/E: The Architectural/Engineering Design Consultants.

Contracting Officer: Refers to a person with the authority to enter into, administer, change and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the contracting officer.

Contracting Officer’s Representative (COR): The facility project manager or his/her authorized representative is designated as the COR, for the purpose of technical surveillance and evaluation of the work performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract.

Contract Clauses: Where Special Clauses or General Provisions are referred to in the specifications, reference should be to Contract Clauses.

Task Order (TO): An order placed against an established contract, which may contain the general requirements and parameters of a proposed project. Included with the TO may be a Statement of Work or Statement of Objectives that define specific technical requirements for the project. May also include information such as budget limitations, design certifications and drawings required to be prepared by the contractor.

Statement of Work (SOW): Written descriptions documenting work required by each Government TO.

May be provided by the Government or prepared by the Contractor, depending on the individual TO. The SOW includes the specific technical requirements for the project.

Statement of Objectives (SOO): The initial document, with drawings where applicable, provided to the Contractor by the Government outlining the overall performance objectives to be completed. It is used in solicitations when the Government intends to provide the maximum flexibility to each offeror to propose an innovative approach.

Warranty: Shall mean Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Government of the Contractor’s work.

Pre-Final Inspection: Pre-final inspection is the Government Project Team inspection of the project where the Substantial Completion has been achieved and verified by the Government.

Final Inspection: Final Inspection is the government inspection of the corrective work of the non-conforming items identified during the Pre-Final Inspection.

MEANING OF APPROVED, DIRECTED, AND/OR WORDS OF LIKE OR SIMILAR EFFECT

“Approved”, “Directed”, “Required”, “Applicable”, or words of like or similar effect, when used in the specifications shall be interpreted to mean “Approved By”, “Directed By”, etc., the Contracting Officer unless otherwise specifically stipulated.

3.0 LOCATIONS

3.1 The project sites are located within VISN 21. The following sites are subject to change at any time during the duration of this contract. The scope of this contract includes any sites under VISN 21’s area of responsibility. The specific project location will be indicated in the individual TOs.

3.2 VA Palo Alto Healthcare System (VAPAHCS) – consists of three main campuses: (1) Palo Alto Division (PAD) located at 3801 Miranda Avenue, Palo Alto, CA 94304; (2) Menlo Park Division (MPD) located at 795 Willow Road, Menlo Park, CA 94025; and (3) Livermore Division (LD) located at 4951 Arroyo Road, Livermore, CA 94550. The VAPAHCS is also comprised of various veteran centers and community clinics. See link at: https://www.paloalto.va.gov/ for additional information.

3.3 San Francisco VA Healthcare Center (SFVAMC) – is located at 4150 Clement Street, San Francisco, CA 94121. The SFVAMC is comprised of various veteran centers and community clinics. See link at: https://www.sanfrancisco.va.gov/ for additional information.

3.4 VA Northern California Healthcare System (VANCHCS) – consists of the Valley Division (Sacramento VA Medical Center) located at 10535 Hospital Way, Mather, CA 95655 and the East Bay Division – Martinez Outpatient Clinic located at 150 Muir Road, Martinez, CA 94553.

The VANCHCS is comprised of various veteran centers and community clinics. See link at:

https://www.northerncalifornia.va.gov/ for more information.

3.5 VA Pacific Islands Healthcare System (VAPIHCS) – the Spark M. Matsunaga VA Medical Center is located at 459 Patterson Road, Honolulu, HI 96819. The Spark M. Matsunaga VA

Medical Center is co-located on the Tripler Army Medical Center (TAMC) Department of Defense Army base. The VAPIHCS is also comprised of various veteran centers and community clinics located throughout the Hawaiian Islands, Guam, American Samoa, and Saipan. See link at: https://www.hawaii.va.gov/locations/other_facilities.asp for additional information.

3.6 VA Sierra Nevada Healthcare System (VASNHCS) – is located at 975 Kirman Avenue, Reno, NV 89502. The VASNHCS consists of veteran centers and community clinics. See link at:

https://www.reno.va.gov/ for more information.

3.7 VA Central California Healthcare System (VACCHCS) – is located at 2615 E. Clinton Avenue, Fresno, CA 93703. The VACCHCS consists of veteran centers and community clinics. See link at: https://www.fresno.va.gov/ for more information.

3.8 VA Southern Nevada Healthcare System (VASNHS) – is located at 6900 North Pecos Road, North Las Vegas, NV 89086. The VASNHS consists of veteran centers and community clinics.

See link at: https://www.lasvegas.va.gov/ for more information.

4.0 MINIMUM/MAXIMUM CONTRACT AMOUNTS

The only work authorized under the MACC is as described in individual Task Orders (TOs). The Government seeks to establish a contract ceiling for each contract of $50,000,000, with a minimum guarantee for each contract holder of $2,000. The Government will solicit for multiple awardees, geographically located, under one solicitation. Upon award of the contracts, task orders will be simultaneously awarded for the minimum guarantee. No individual task order shall exceed the task order ceiling of $10,000,000 during the life of the contract.

Total contract value for all awardees shall not exceed $600,000,000 and shall be solicited as 100% SDVOSB set aside. The projected period of performance for the new MACC is as follows:

CLIN 0001 Two (2) year Base (24 Months) CLIN 1001 Option Year 1 (12 Months) CLIN 2001 Option Year 2 (12 Months) CLIN 3001 Option Year 3 (12 Months)

5.0 CONTRACT ADMINISTRATION

5.1 The office having administrative jurisdiction over the MACC and subsequently issued task orders shall be:

Network Contracting Office 21 (NCO 21)

5.2 Only a warranted Contracting Officer, a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of the MACC and subsequently issued task orders. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of the MACC or subsequently issued task orders, contractors are hereby directed not to proceed with the change and immediately notify the Contracting Officer.

5.3 No deviations, or waivers to the MACC or subsequently issued task orders shall be affected without a modification executed by a Contracting Officer, authorizing such changes, deviations, or waivers.

5.4 Each MACC will be assigned an individual contract number. Enumeration of task orders (TO), hereafter referred to as an “order”, “task order” or “orders”, will consist of a sequential numbering system comprised of the MACC contract number and the corresponding task order number.

5.5 For accounting and appropriation data purposes, each task order shall be individually funded. All correspondence and data submitted by contractors under the MACC must reference the contract number, task order number, project title, and project number (if applicable).

5.6 At least annually, the contractor should submit to the Contracting Officer a capabilities statement that documents and highlights areas of expertise. This information may be used to satisfy fair opportunity on task orders under the Simplified Acquisition Threshold (SAT) (see SOW Section 8.7).

6.0 NOTICE OF CONSTRUCTIVE CHANGES

6.1 No order, statement or direction of the Contracting Officer, authorized representative of the

Contracting Officer, whether or not acting within the limits of his or her authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless a change is issued in writing and signed by the Contracting Officer.

7.0 ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS

7.1 Task Order Proposal Request (TOPR) projects may be non-complex performance oriented tasks requiring minimal design, may be complex construction requiring design development for design-build construction, or a combination thereof. In rare cases, the TOPR may not have traditional plans and specifications as described herein but may include sketches, and requests for catalog cuts, and other submittals. When complete plans and specifications are not provided the VA Master Specifications PG-18-1 which, can be found at Technical Information Library (TIL) - Office of Construction & Facilities Management (va.gov), will apply for elements of work not addressed by a project specific specification. For more information regarding TOPRs, see paragraph “Proposal Preparation.”

7.2 Projects may require full design-build efforts to include professional A/E services. The request will include information such as a statement of work, guide specifications, drawings, attachments, and information pertaining to a site visit; evaluation criteria, design requirements for design-build projects and any other requirements for submission (e.g. proposal requirements, price schedule, etc.). Performance and Payment bonds shall be required for Task Orders, in accordance with performance and payment bonds and alternative payment protections for construction contracts.

The basis of award will be a conforming offer, the price or cost of which may or may not be the lowest. The basis for award of each task order will be stated in the RFQ/RFP/bid invitation.

7.3 Procedures for design-build projects: An RFQ/RFP may be issued with the amount of funds available for design and construction along with, but not limited to, a Statement of Work, Design Criteria and /or project Book, or concept design. A two-step process in accordance with FAR 36.3 shall be followed. The MACC contractors may be requested to submit a concept design/proposal in Phase-one. After the first proposal submission the most highly qualified firms will be asked to submit phase-two proposals. Task Order will be issued with a firm fixed price for design and construction. It is the MACC Contractor’s responsibility to design the project so that it can be constructed within the fixed price contract value. Failure to do so is at the Contractor’s risk.

Contractors may be required to compete the design among subcontractors and submit a detailed proposal for construction (e.g. breakdowns for labor, equipment, and materials).

7.4 Cost proposals for TOPRs will include a price schedule and may require a construction cost estimate breakdown. In addition, the TOPR may include, but is not limited to, the following as applicable, based on the level of design required:

o Any available as-built drawings, specifications, or design information.

o Design calculations requirements in addition to those listed in the design level paragraphs.

o Construction drawing requirements including professional certifications.

o Timeframes for preparing the proposal, completing design work, and completing construction and closeout.

o Submittal requirements.

7.5 Contractors shall be required to furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirement specified in each TOPR.

7.6 The Contractor WILL NOT be reimbursed for proposal preparation, attendance during negotiations, site visits, walk-through or other pre-Task Order costs.

7.7 Occasionally the Government will solicit offers for projects for which funds are not certified nor readily available. Submission of proposals for these acquisitions is at the sole discretion of the respective MACC awardees and their declination to participate in any or all such solicitations will not reflect negatively upon them.

8.0 TASK ORDER (TO) COMPETITION

8.1 Fair Opportunity to compete for TOs shall be provided, in accordance with FAR 16.505.

8.2 Upon receipt of a TOPR, contractors shall be encouraged to participate in site visits and submit proposals. Failure by Offerors to propose on more than three (3) FORP through the course of the contract may result in the Government not exercising the option to extend the contract or exclusion of the Contractor from further competition.in site visits and submit proposals.

8.3 Contractors are urged to attend site visits scheduled by Contracting, as identified on TOPRs. (See Contract FAR Clauses 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work).

8.4 Failure to attend site visits may not be used as an excuse for omission or miscalculation in proposals and may be taken into consideration in determining a contractor’s eligibility to participate in future Task Orders.

8.5 Contractors are highly encouraged to inspect project job sites with Government representatives prior to proposal submissions for individual projects. Any deficiencies, conflicts, or other areas of concern existing in the scope of work and/or applicable drawings should be brought to the attention of the Contracting Officer in writing. The contractor shall also notify the Contracting Officer upon observing any features in the design that appear to be ambiguous, confusing, conflicting or erroneous.

8.6 The government shall reserve the right to issue orders non-competitively for projects involving exigent or extraordinary circumstances that threaten patient safety, or which may be necessary to mitigate damage to VA facilities or other real property. Orders may also be issued non-competitively to satisfy the minimum guarantee.

8.7 If the order does not exceed the Simplified Acquisition Threshold (SAT), the contracting officer need not contact each of the multiple awardees under the contract before selecting an order awardee. The contracting officer has the discretion to review available information when selecting an awardee for an order under the SAT and this shall constitute fair opportunity. For example, the contracting officer may review MACC awardee capability statements and choose to get quotes only from those multiple awardees that have specialized experience related to the requirement.

8.8 If the Contractor believes it was not fairly considered for a particular task order, the Contractor may present the matter to the Contracting Officer. The Contractor may appeal the explanation or Contracting Officer’s decision to the corresponding Ombudsman for the agency, or region. The Ombudsman will review the Contractor’s complaint, and in coordination with the Contracting Officer, ensure that the Contractor was afforded fair opportunity to be considered for a Task Order.

9.0 PROPOSAL PREPARATION

9.1 A TOPR issued under this contract shall, except in rare cases, be issued to all contractors and will, at a minimum, include a SOO/SOW defining the project requirements. Costs for preparation of proposals and pre-award activities shall be the sole responsibility of the contractor.

9.2 Deviations and Alternate Proposals. Offerors shall specifically identify all deviations from the minimum RFQ/RFP requirements in a cover letter in a section entitled "Alternate Proposal” or “Deviations." This requirement applies for all proposal revisions and Final Proposal Revisions.

Proposed alternates/deviations shall specifically address in detail the alternate and rationale for proposing. Alternate solutions and deviations shall include separate pricing information. If an alternate/deviation is proposed, the work as specified in the solicitation must also be priced, and all proposed alternates shall be specifically addressed and expanded upon in the proposal submissions to include separate pricing information.

10.0 PROPOSAL EVALUATION CRITERIA

10.1 Proposals received in the TOPR format will be evaluated based on compliance with the TOPR requirements and the proposed price. The TOPR shall indicate the minimum requirements that must be met for a proposal to be considered technically acceptable. Evaluations may be conducted on any basis including but not limited to pass/fail, tradeoff, comparative analysis, performance-price tradeoff, requests for bid, or price only. The type of evaluation criteria shall normally relate to the complexity of the requirement but will be at the sole discretion of the Contracting Officer.

10.2 For the purpose of initial evaluations of offers proposed for individual Task Orders, the following will be utilized in resolving arithmetic discrepancies found on the face of pricing schedule as submitted by the Offeror: (1) Obviously misplaced decimal points will be corrected; (2) Discrepancy between unit price and extended price, the unit price will govern; (3) Apparent errors in extension of unit prices will be corrected; (4) Apparent errors in addition of lump-sum and extended prices will be corrected.

10.3 For purposes of price evaluation, the Government will proceed on the assumption that the Offeror intends the proposed price to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above.

11.0 TASK ORDER (TO) AWARD DECISION

11.1 To the maximum extent practicable, award of task orders shall be made without discussions.

Contracting Officers reserve the right to limit the number of proposals received in response to an order RFQ/RFP/bid to the greatest number that will permit an efficient competition among the most highly rated proposals.

11.2 If exchanges are required, each MACC contractor will be requested to provide a final proposal revision, unless eliminated from exchanges through the establishment of a competitive range.

11.3 If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

11.4 Task Order award will be made based on the best value to the Government in accordance with the criteria described in the RFQ/RFP/bid. When price is the only factor considered, award will be based on the lowest reasonable price received. Proposals unrealistically high or low in price, when compared to the Government estimate, and market conditions evidenced by other competitive proposals received, may be indicative of an inherent lack of understanding of the solicitation requirements and may result in proposal rejection without discussion.

12.0 TASK ORDER (TO) ISSUANCE PROCEDURES

12.1 Work under the MACC contract will be ordered by written TO to the contractor by the

Contracting Officer. The individual TOs will be placed in a sequential numbering system, which relate back to the contractor’s basic MACC contract.

12.2 The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by executed TOs.

12.3 TOs will clearly define the specific services to be performed or the performance desired. Each TO is subject to the terms and conditions of the MACC contract. In the event of a conflict between the TO and the MACC contract the contract shall take precedence. The specifications may be adjusted as needed in the individual TO solicitation. Such alterations shall apply only to the individual TO in which they are contained and shall not be interpreted as replacing or removing requirements from the basic contract specifications for any prior, current, or future TO.

12.4 Task orders shall be issued using the Standard Form (SF) 1442, or other authorized VA forms where appropriate. Orders will be issued electronically via e-mail, telephone, or any other authorized electronic means.

12.5 All orders issued from the MACC basic contract shall be Firm-Fixed-Price (FFP) and individually funded.

13.0 PROTESTS

13.1 In accordance with FAR 16.505(a)(10), NO protest shall be authorized in connection with the issuance or proposed issuance of an order under task-order Contract, except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract.

13.2 FAR 33.1 defines a “Protest” as written objection by an interested party to any of the following:

(1) A solicitation or other request by an agency for offers for a contract for the procurement of property or services.

(2) The cancellation of the solicitation or other request.

(3) An award or proposed award of the contract.

(4) A termination or cancellation of an award of the contract, if the written objection contains an allegation that the termination or cancellation is based in whole or in part on improprieties concerning the award of the contract.

14.0 OMBUDSMAN

14.1 The task order contract and delivery order ombudsman for VA is the Associate Executive

Director for Procurement Policy, Systems and Oversight per VAAR 816.505—Ordering and as described in FAR 16.505 (b)(6). Interested parties may obtain the name, telephone number, facsimile number, and e-mail address of the current Associate Deputy Assistant Secretary for Procurement Policy, Systems and Oversight by contacting: The Office of Acquisitions and Logistics, 810 Vermont Ave., NW., Washington, DC 20420.

15.0 COMMENCEMENT OF WORK

15.1 No work under this contract shall commence until such a time as the Contracting Officer issues a written TO and a Notice to Proceed (NTP). The Contracting Officer reserves the right to determine the issue date of any Task Order NTP.

16.0 OPTION FOR INCREASED QUANTITY ON TASK ORDERS (TO)

16.1 The Government may elect to make certain tasks option items. In this case, the Government may increase the quantity of work awarded on individual orders by unilaterally exercising option item(s) within the period specified in the order. In the event the option is not exercised within the time period specified in the order, the parties may agree via a bi-lateral agreement to the option(s) provided that the exercising of said option(s) will not increase the contract performance period.

Any option herein shall be considered to have been exercised at the time the Government deposits written notification to the Contractor in the mail, provides by facsimile, or electronic mail.

17.0 TASK ORDER (TO) PERFORMANCE PERIOD

17.1 Specific periods of performance will be identified in each individual TO and accompanying

TOPR. FAR 52.211-10, Commencement, Prosecution, and Completion of Work shall be incorporated into each TO identifying the construction schedule. The Government reserves the right to negotiate a performance period or impose a performance period for each TO.

17.2 For design phase of task orders (as applicable): The Contracting Officer shall issue a Notice to Proceed (NTP) in order to commence the first design phase. The performance period for the design segment of work starts after the receipt of the Notice to Proceed for Design. After approval of each design level, the Contracting Officer will issue a NTP for the contractor to proceed to the next design level. The Government review time for each design level is included in the total design period of performance. When a design submission is disapproved, the contractor shall provide necessary corrections and resubmit. The resubmission time does not automatically extend the design period of performance.

17.3 For construction phase of task orders (as applicable): Prior to issuing the Notice to Proceed (NTP), the contractor shall submit bonds, safety plan, fire safety plan, infection control plan, security plan, insurance certificates, draft schedule, and any other documents specified in the TOPR. The performance period for the construction portion of a TO starts after receipt of the Notice to Proceed for Construction. This period of performance for construction includes, but is not limited to, completion of project, all punch-list items, final clean-up, review and acceptance of all deliverables (As-built drawings, O&M manuals, warranties, etc.). The Government review time for as-built drawings, manuals and warranties is included in the performance period and specific timeframes will be listed in the TO. If there is no design required, only one NTP will be issued for construction.

18.0 AMBIGUITY / CONTRACT INTERPRETATION

18.1 This written contract and any and all identified writings or documents incorporated by reference herein or physically attached hereto constitute the parties’ complete agreement and no other prior or contemporaneous agreements either written or oral shall be considered to change, modify or contradict it. Any ambiguity in the contract will not be strictly construed against the drafter of the contract language but shall be resolved by applying the most reasonable interpretation under the circumstances, giving full consideration to the intentions of the parties at the time of contracting.

18.2 It shall be the obligation of the Contractor to exercise due diligence to discover and to bring to the attention of the Contracting Officer at the earliest possible time any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein. Failure to comply with all obligations shall be deemed a waiver and release of any and all claims for extra costs or delays arising out of such ambiguities, discrepancies, inconsistencies, and conflicts.

19.0 KEY PERSONNEL REQUIREMENTS

19.1 Certain skilled experienced professional and/or technical personnel are essential for successful contractor accomplishment of the work to be performed under each task order. "Key Personnel" are those persons whose resumes may be evaluated as part of a TOPR. The contractor agrees that such personnel shall not be removed from the task order work without prior approval from the Contracting Officer. If an individual is no longer able to work on the task order for which they are designated as “key personnel”, the contractor shall promptly replace such personnel with personnel of at least substantially equal ability and qualifications. All requests for approval of substitutions must be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitutions. The request must contain a complete resume for the proposed substitute, and any other information requested by the Contracting Officer to approve the proposed substitution.

19.2 If the Contracting Officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated or have otherwise become unavailable for the contract work is not reasonably forthcoming or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the task order, the task order may be terminated by the Contracting Officer for default or for the convenience of the Government, as appropriate, or, at the discretion of the Contracting Officer if it is found the contractor to be at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

20.0 LAYING OUT WORK

20.1 Field Dimensions: Any drawings and specifications that may accompany each TO indicate generally the design and arrangement of all apparatus, fixtures, accessories, etc., necessary to complete the work required. The exact location or arrangement of equipment is subject to minor changes necessitated by field conditions and shall be made as required without additional cost to the Government. Measurements shall be verified by actual observations at the construction site, and the Contractor shall be responsible for all work fitting into place in a satisfactory and competent manner meeting the approval of the Contracting Officer.

21.0 REPORT OF ERROR AND DISCREPANCIES

21.1 Contractors shall promptly notify the Contracting Officer in writing of any discrepancies. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for…

This is the start of the file's text. The full file is on GovTribe.