This is Amendment 0003 to solicitation 36C26124R0035 for a Design-Build/Design-Bid-Build SDVOSB Multiple Award Construction Contract (MACC) issued by the VA Pacific Islands Health Care System. The amendment establishes February 21, 2025 at 3:00PM PST as the cut-off date for submitting RFIs and includes answers to nine contractor questions regarding the solicitation requirements.
Key clarifications provided include: experience must be within the last 5 years (not 7); awardees are encouraged but not required to attend site visits; contractors must propose on at least 3 task orders to avoid potential exclusion; contractors may focus on their geographic area within VISN 21; healthcare facility experience and $1.5M minimum project value requirements will remain as stated; CPARs must be submitted directly to the Contracting Officer per Amendment 0001; and the government will proceed with source selection evaluation as originally solicited regarding teaming agreements and past performance. The amendment includes attachments for Pre-Proposal Conference Minutes, Attendees list, and Conference Slide Deck.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0003 02-20-2025 N/A
36C261
Department of Veterans Affairs Network Contracting Office 21 (NCO 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813
36C261
Department of Veterans Affairs Network Contracting Office 21 (NCO 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813
To all Offerors/Bidders 36C26124R0035
01-27-2025 X
X X
X 1
The purpose of this Amendment is to answer additional RFI's as submitted, provide PreProposal Conference Meeting Minutes and establish an RFI cut off date.
A. Please note all RFI's must be submitted no later than Friday, February 21, 2025 by 3:00PM PST.
B. Please note all Amendments must be acknowledged.
C. Proposal Due Date remains unchanged.
All other Terms and Conditions remain unchanged.
Priscilla A. Murray Contracting Officer, NCO 21
36C26124R0035 Design-Build/Design-Bid-Build SDVOSB MACC, VISN 21
RFIs as of 20250219- Amend 0003
Question 1: Page 54 of 124; Factor 2: “Offerors are required to demonstrate experience under contracts that they have successfully performed (50% or greater) construction and two-phase design-build services as a prime contractor within the last five (5) calendar years (calculated from the solicitation issue date).” Would the government considering revising this requirement to allow projects performed during the last seven (7) years?
Government Response: Recency is defined as within the last five (5) calendar years as calculated from the date of the solicitation was issued. Please see page 58 of 124.
Question 2: For this MATOC, if awarded into the MATOC, is there a minimum threshold requirement in relation to site visit attendance and proposal participation? Thank you.
Government Response: Awardees are highly encouraged but not required to attend site visits. As for participation, please see page 14 of 124 para 8.2, "Failure by Offerors to propose on more than three (3) [task orders] through the course of the contract may result in the Government not exercising the option to extend the contract or exclusion of the Contractor from further competition [to participate in] site visits and submit proposals."
Question 3: If a completed Contractor Performance Assessment Report (CPAR) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. Does contractor need to pull all of their CPARs for each project used for Past Performances? Government Response: With regard to Factor 3, Past Performance, on page 60 of 124. If the project provided in Factor 2 is complete, contract shall submit the CPARs.
Question 4: Reference RFP document p. 14 of 124 para 8.2, "Failure by Offerors to propose on more than three (3) [task orders] through the course of the contract may result in the Government not exercising the option to extend the contract or exclusion of the Contractor from further competition [to participate in] site visits and submit proposals." Will offerors be able to have geographic preference locations such as VAPIHCS, VASNHS, etc.?
Not all small business contractors have operational capacity within the geographical region that encompasses VISN 21.
Government Response: Contractors may satisfy this requirement by proposing on Task Orders in any of the VISN 21 AOR. Contractors are not expected, nor required, to propose on Task Order outside of their geographical area.
Question 5: Reference RFP pp. 58 & 59 of 124, the instructions and evaluation criteria indicate that the Government will rate past performance/projects higher which involved a) providing construction services at one or more healthcare facilities and b) valued at a minimum of $1.5M. Would the Government consider replacing these two criteria with a) providing construction services at any federal facility and b) valued at $1M or greater? We are concerned that the existing criteria may unnecessarily restrict competition, as this is an SDVOSB set-aside.
Government Response: The Government intends to proceed with the source selection as solicited.
Question 6: Since this is a Design-Build effort, are offerors required to include a Designer of Record (DOR) and at least one relevant project performed by said DOR in our Technical volume?
Government Response: Please see page 48 paragraph iv for the identified Key Personnel under Factor 2.
Question 7: In lieu of a JV can we utilize a Teaming Agreement? Can we utilize the past performance of all team members? Government Response: The Government intends to proceed with the source selection evaluation as solicited.
Question 8: With CPARS and or PPQ from previous projects, you want to email directly to the CONTRACTING Team NOT to include in the Proposal Package?
Government Response: Please see Amendment 0001. All CPARs shall be emailed directly from the party completing the PPQ to the Contracting Officer.
Question 9: Can we utilize PPQ from previous project that are NOT for the Construction Project Data Sheet provided in the proposal. Some of our past performance from a healthcare environment did not provide a PPQ/CPARS as they were not obligated to provide. We can provide past project completed for the Dept of VA without a PPQ. We have requested them for this solicitation but unlikely to be provided by the client. It is difficult to receive an PPQ unless the agency is required to provide them.? Government Response:
Please see page 58 of 124 in the solicitation for instructions. Additionally see Attachments A, B,C, and D of the solicitation.
Attachments
See attached document: PreProposal Conf Minutes.
See attached document: Atch 1. Attendees.
See attached document: Atch 2. PreProposal Conf Slide Deck.