This document is an Attachment A - Description/Specifications/Work Statement for U.S. Customs and Border Protection (CBP) Indefinite Delivery Indefinite Quantity (IDIQ) construction contracts. CBP is seeking highly qualified construction contractors to provide turnkey construction services for capital projects across the United States, including Border Patrol stations, Air and Marine Facilities, and Border Patrol Checkpoints. The contracts will primarily utilize Design-Build (DB) delivery methods and cover a wide range of construction services including new construction, renovation, demolition, repair, restoration, and infrastructure improvements.
The IDIQ contracts have a combined aggregate capacity of $10 Billion with a five-year completion timeline. Contractors will compete for future task orders using the Fair Opportunity process, with work encompassing civil, structural, mechanical, electrical, fire protection, and communication systems. The projects will address CBP's aging infrastructure, which is currently insufficient for modern border security operations, by renovating, repairing, and building new facilities that meet evolving operational needs while maintaining high quality and efficiency standards. Applicable regulations include various federal acts and standards such as the Davis-Bacon Act, Miller Act, National Environmental Policy Act, and Americans with Disabilities Act.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CBP RFP 70B01C26R0000000007 - Amendment A008.pdf | ||
| CBP RFP 70B01C26R0000000007 - Amendment A007.pdf | ||
| CBP RFP 70B01C26R00000007 - Amendment A006.pdf | ||
| Attachment B - D-B Construction Recommendations SOW 2.20.26.pdf | ||
| RFP 70B01C26R00000007 A005 Summary.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A004.pdf | ||
| RFP 70B01C26R00000007 A004 Summary.docx | DOCX document | |
| RFP 70B01C26R00000007 A003 Amendment.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0002 Summarized.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A0002.pdf | ||
| CBP RFP 70B01C26R00000007 _ Amendment A0001.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0001 Summarized.docx | DOCX document | |
| CBP RPF 70B01C26R00000007 Design Build Construction IDIQ.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A – Description/Specifications/Work Statement
1. BACKGROUND
The U.S. Customs and Border Protection (CBP), Office of Acquisition, is procuring multiple Indefinite Delivery Indefinite Quantity (IDIQ) construction contracts to perform construction services. The work acquired under these contracts is for construction services of government facilities at various locations within CBP’s area of responsibility, including but not limited to, locations in any of the 50 United States and Puerto Rico.
A significant portion of the infrastructure currently utilized by CBP’s U.S. Border Patrol, Air and Marine Office, and the Office of Field Operations was constructed several decades ago. This infrastructure is now insufficient to meet the extensive scale, scope, and complexity of modern border security operations. Many facilities are in remote environments, with deteriorating structures, limited space, outdated technology, and insufficient capacity to support current staffing levels, operational tempo, or evolving security challenges.
2. SCOPE
CBP seeks highly qualified construction contractors to provide construction services for a turnkey construction of CBP capital projects to include, but not limited to, projects authorized under the One Big Beautiful Bill Act (OB3A) of 2025 (Congressional Reconciliation Bill). CBP facilities and infrastructure include but are not limited to Border Patrol stations, Air and Marine Facilities, and Border Patrol Checkpoints. This includes all utilities, environmental compliance, and site work needed to implement, operate, and maintain CBP facilities and infrastructure.
Various construction projects are necessary to support the Agency's mission by renovating, repairing, maintaining, and building new facilities. These services will play a pivotal role in renovating, repairing, maintaining, and building new facilities that address the evolving needs of CBP while maintaining the highest standards of quality and efficiency.
The IDIQs will support primarily Design-Build (DB) but may include Design-Bid-Build or performance-based construction delivery methods to provide new facilities and large capital improvement renovations to existing facilities. Design-Build is the most specialized of the three and will be the primary method utilized. General construction services include new construction, marine construction, demolition, renovation, alteration, repair, restoration, systems and infrastructure for projects and may include civil, architecture, structural, mechanical, electrical, fire protection, and communication systems. The contract shall not be used as a mechanism to achieve facility design without associated construction conducted using the design-build delivery method.
Projects may include, but are not limited to new facility construction, facility renovations and alterations, demolition, facility maintenance and repair, historical restoration, building system upgrades and installations, infrastructure systems, and site improvements. Major elements of the work may include but are not limited to civil, structural, mechanical, electrical, fire protection, and communication systems. Incidental work with specialty trades includes but not limited to Mechanical/Electrical/Plumbing (MEP) systems including Heating Ventilating and Air Conditioning (HVAC), boilers, utility distribution, high pressure steam distribution, electrical distribution, motors, generators, potable water distribution, sanitary sewer, storm water control, communications, removal and/or disposal of asbestos, lead or POL (Petroleum, Oil, Lubricant) contaminated materials.
3. Contract Structure
After award of the initial IDIQs and the "seed" project, IDIQ contractors will compete for future task orders. Only the IDIQ contractors are permitted to compete for each task order request for proposal (RFP). The RFP for each proposed task order will state the selection method for that task order utilizing the Fair Opportunity process.
The combined aggregate capacity for ALL IDIQ contracts is $10 Billion, and there will be no annual limits or limits on a “per contract basis.” The completion date for the IDIQs is five (5) years from the date of contract award.
4. Applicable Publications
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
a. FAR - Title 48, Chapter 1
b. FAR Part 36 - Construction and Architect-Engineer Contracts
c. FAR Part 16 - Types of Contracts
d. Homeland Security Acquisition Regulation
e. Davis-Bacon Act (40 U.S.C. §§ 3141-3148)
f. Miller Act (40 U.S.C. §§ 3131-3134)
Service Contract Labor Standards (41 U.S.C. chapter 67)
Contract Work Hours and Safety Standards Act (40 U.S.C. §§ 3701-3708)
National Environmental Policy Act (NEPA)
Architectural Barriers Act
Energy Independence and Security Act of 2007
Buy American Act (41 U.S.C. §§ 8301-8305)
Federal Information Security Management Act (FISMA)
Clean Air Act
Americans with Disabilities Act (ADA).
The documents listed in the text, such as the Miller Act, NEPA, ADA, and others, cover a broad range of legal and regulatory requirements. However, depending on the specifics of the project, additional documents that might be considered include:
a. Local building codes and zoning regulations specific to the location of the project
b. Industry standards, such as those from the American National Standards Institute (ANSI) or International Building Code (IBC)
c. Environmental regulations related to specific regions, such as state-level Clean Air Acts or water protection standards
d. Occupational Safety and Health Administration (OSHA) regulations for worker safety
e. FAR, if applicable to procurement processes.
These additional documents may be pertinent based on the nature of the design and construction services being performed. The Contractor shall always consult regulatory authorities and project-specific requirements to ensure compliance.