Attachment B - D-B Construction Recommendations SOW 2.20.26.pdf
PDF 160 KB Posted
- Attached to
- CBP Design-Build Construction IDIQ Federal contract opportunity
- Solicitation number
- 70B01C26R00000007
About this file
Statement of Work Summary
This is a Statement of Work for U.S. Customs and Border Protection (CBP), Office of Acquisition, soliciting design-build (DB) construction recommendations under Indefinite-Delivery, Indefinite-Quantity (IDIQ) multiple award contracts. The contracted services support construction activities at government facilities across the 50 United States and Puerto Rico within CBP's area of responsibility. The contractor must be highly qualified in design-build construction methodology and must complete three specific task deliverables within 30 calendar days from task order award.
The three required deliverables are: (1) a comprehensive MS Word report recommending processes, templates, and tools to streamline and accelerate the Task Order award process, including methods for expediting requirements development, evaluation processes, progressive pricing strategies, and templates for drafting requirement documents and review criteria while ensuring compliance with federal acquisition regulations; (2) a MS Word report defining recommendations for performance-based and cost-sharing incentive methodologies including schedule incentives, milestone incentives, innovation incentives, and value engineering savings sharing, with detailed specifications for performance metrics, payout formulas, and tracking mechanisms; and (3) a standardized MS Word value engineering study template documenting VE results with minimum requirements including design details, methodology, analysis and alternatives, costs, drawings, conflicts, recommendations, and summary of VE actions, plus additional elements such as design memoranda, cost data, site development considerations, equipment, materials, technology review, lifecycle cost analysis, construction time, and energy conservation. No government-furnished materials or information are provided, and only the Contracting Officer has authority to make contract modifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CBP RFP 70B01C26R0000000007 - Amendment A008.pdf | ||
| CBP RFP 70B01C26R0000000007 - Amendment A007.pdf | ||
| CBP RFP 70B01C26R00000007 - Amendment A006.pdf | ||
| RFP 70B01C26R00000007 A005 Summary.docx | DOCX document | |
| RFP 70B01C26R00000007 A004 Summary.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A004.pdf | ||
| RFP 70B01C26R00000007 A003 Amendment.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0002 Summarized.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A0002.pdf | ||
| CBP RFP 70B01C26R00000007 _ Amendment A0001.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0001 Summarized.docx | DOCX document | |
| CBP RPF 70B01C26R00000007 Design Build Construction IDIQ.pdf | ||
| Attachment A Statement of Work Construction IDIQ.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DESIGN-BUILD CONSTUCTION
INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ)
MULTIPLE AWARD CONTRACTS
DESIGN-BUILD CONSTRUCTION RECOMMENDATIONS REPORT
1. BACKGROUND AND SCOPE:
The U.S. Customs and Border ProtecƟon (CBP), Office of AcquisiƟon, is procuring mulƟple Indefinite-Delivery, Indefinite-QuanƟty (IDIQ) construcƟon contracts to perform construcƟon services. The work acquired under these contracts is for construcƟon services of government faciliƟes at various locaƟons within CBP’s area of responsibility, including but not limited to, locaƟons in any of the 50 United States and Puerto Rico.
This Statement of Work (SOW) requires highly qualified design-build (DB) contractors to provide a DB ConstrucƟon RecommendaƟons Report addressing the following three task areas detailed below:
• Task 1. Streamlined Task Order Award Process
• Task 2. Approaches to IncenƟvize DB ConstrucƟon Projects
• Task 3. Value Engineering Study Template
2. TASKS:
The Contractor shall complete the following tasks:
2.1 Task 1. Streamlined Task Order Award Process
The Contractor will recommend processes, templates, and tools to accelerate and streamline the Task Order award process under the DB IDIQ for all project sizes and types. RecommendaƟons will include:
• Methods to expedite Task Order requirements development and turnover
• Efficient evaluaƟon processes
• Progressive pricing strategies
• Templates for draŌing requirement documents, pricing models, and review criteria
• Appropriate evaluaƟon levels and tools to expedite technical, schedule, and price reviews.
The streamlined process must ensure compliance with federal acquisiƟon regulaƟons, minimize risk, reduce administraƟve burden, and maintain audit defensibility.
Task 1. Deliverable. The Contractor shall deliver a comprehensive report in MS Word with recommended processes, templates and tools to facilitate a streamlined and accelerated Task Order award process.
2.2 Task 2. Approaches to Incen vize DB Construc on Projects
The Contractor will recommend performance-based and cost savings sharing incenƟves to encourage DB construcƟon contractors to deliver high-quality, efficient, and innovaƟve results.
IncenƟve methodologies may include, but not be limited to:
• Schedule incenƟves
• Milestone incenƟves
• InnovaƟon incenƟves
• Value engineering savings sharing
The report will provide detailed implementaƟon consideraƟons, including:
• Performance Metrics and Measurement Methods: Specify criteria for evaluaƟng contractor performance, methods for measuring results, and standards for achieving incenƟve payouts.
• Payout Formulas: Clearly outline how incenƟve payments will be calculated and distributed based on performance outcomes.
• Tracking and Repor ng Mechanisms: Establish transparent processes and tools for tracking performance and cost savings, and for reporƟng results to all stakeholders.
All recommended incenƟves must be pracƟcal, measurable, and aligned with project goals. The implementaƟon framework must support accountability, transparency, and conƟnuous improvement.
Task 2 Deliverable. The Contractor shall deliver a report in MS Word that clearly defines recommendaƟons for incenƟve methodologies for DB construcƟon projects under the IDIQ contract.
2.3 Task 3. Value Engineering Study Template
The Contractor will develop a standardized template for documenƟng value engineering (VE) study results across all construcƟon projects. The template will ensure consistency, quality, and traceability and include, at a minimum:
• Design details
• Methodology
• Analysis and alternaƟves
• Costs
• Drawings
• Conflicts
• RecommendaƟons
• Summary of VE acƟons.
The template will also capture design memoranda, cost data, supporƟng informaƟon, alternate designs, site development, equipment, materials, technology, and review of high-cost items, including lifecycle cost, construcƟon Ɵme, and energy conservaƟon.
Task 3. Deliverable. The Contractor will deliver a VE study template in MS Word format that documents VE study results and ensures consistency, completeness, and traceability across all construcƟon projects
3. PERIOD OF PERFORMANCE:
The Contractor shall have 30 calendar days from date of task order award to complete the report as outlined in this SOW.
4. GOVERNMENT FURNISHED MATERIAL AND INFORMATION: N/A.
5. AUTHORITY OF THE CONTRACTING OFFICER:
Only a ContracƟng Officer (CO) has authority to make any changes to this contract. If the Contractor makes changes to this contract or makes changes due to the direcƟon of a non-CO the Contractor risks that the Government will not accept the changes, and/or will not provide consideraƟon for any costs incurred and becomes liable for all negaƟve repercussions, costs and/or delays, etc. ONLY THE CO CAN MAKE CHANGES TO THIS CONTRACT — NO ONE ELSE.
6. POINTS OF CONTACT:
CBP points of contact will be established and provided in the task order award.
9.. LIST OF ATTACHMENTS: N/A.