CBP RFP 70B01C26R0000000007 - Amendment A007.pdf
PDF 136 KB Posted
- Attached to
- CBP Design-Build Construction IDIQ Federal contract opportunity
- Solicitation number
- 70B01C26R00000007
About this file
This is a Questions and Answers matrix for CBP RFP 70B01C26R0000000007, a Design-Build Construction IDIQ solicitation. The document does not address specific products or services but instead provides clarifications on Phase II submission requirements and evaluation criteria.
Phase II submissions are due no later than March 9, 2026, at 3:00 PM EST and must be submitted via PDF through email with a 25MB file size limit. Offerors must submit three separate documents: Factor 5 (Senior Superintendent resume), Factor 6 (one-page technical response to the Design-Build Construction Recommendations Report seed project with three deliverables limited to one page each), and Factor 7 (pricing for completing the Design-Build Recommendations Report). The pricing format is at the vendor's discretion provided all required information is clearly stated. No bid guarantee or bond is required for Phase II; bid guarantees will only be required at the Task Order level. Technical and price factors must be submitted as separate PDFs, with SF 1442 and SF 30 Addenda Acknowledgements submitted as a separate document. For Senior Superintendent qualifications, CBP will accept 10 or more years of relevant construction management experience in lieu of a Bachelor's degree if all other requirements are met. CQM-certified professionals reporting to Senior Superintendents are acceptable as an equivalent qualification. Required licenses and permits for hazardous substance removal or disposal do not need to be held by the prime contractor and may be held by licensed subcontractors. Any FAR changes will be issued with individual Task Orders prior to proposal submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CBP RFP 70B01C26R0000000007 - Amendment A008.pdf | ||
| Attachment B - D-B Construction Recommendations SOW 2.20.26.pdf | ||
| CBP RFP 70B01C26R00000007 - Amendment A006.pdf | ||
| RFP 70B01C26R00000007 A005 Summary.docx | DOCX document | |
| RFP 70B01C26R00000007 A004 Summary.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A004.pdf | ||
| RFP 70B01C26R00000007 A003 Amendment.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0002 Summarized.docx | DOCX document | |
| CBP RFP 70B01C26R00000007 Amendment A0002.pdf | ||
| CBP RFP 70B01C26R00000007 _ Amendment A0001.pdf | ||
| Solicitation 70B01C26R00000007 Amendment 0001 Summarized.docx | DOCX document | |
| CBP RPF 70B01C26R00000007 Design Build Construction IDIQ.pdf | ||
| Attachment A Statement of Work Construction IDIQ.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CBP RFP 70B01C26R0000000007
DESIGN-BUILD CONSTRUCTION IDIQ
Phase II Vendor Questions / CBP Reponses Matrix March 2, 2026
1 | P a g e
No. Comments / Questions CBP Response
1. Document Referenced: Solicitation
Question/Comment: Will there be additional documents released for the seed project or will the Price factor be released after Factor 5 & 6?
In addition, Factor 6: DB Construction Recommendation Report asks for three separate deliverables but is limited to a 1-page technical proposal. Please advise.
No additional documents will be released for the seed project. The Statement of Work for Factor 6 (seed project), Factor 5 (Superintendent resume), and Factor 7 (Price) have all been provided. Add date the Phase II to was released
Each technical proposal for the three deliverables under Factor 6 is limited to one page per deliverable.
2. Document Referenced: Solicitation
Question/Comment: Will a seed project scope be added or are we only required to provide a PS resume and respond to questions as per attachment B?
The seed project scope was provided as the Statement of Work titled "Design-Build Construction Recommendations Report" (Attachment B). For Phase II, offerors must submit in PDF format: a resume for the Superintendent (Factor 5), a response to the seed project (Factor 6), and Price (Factor 7).
3. Document Referenced: Solicitation
Question/Comment: Senior Superintendent Credentials- The CQM accreditation appears to be a new addition for the qualifications. We have specific Quality Control professionals on our team for federal work. Our CQM certified professionals report up to our Senior Superintendents. You state "or equivalent" so we can address our Senior Superintendents
Yes, CQM-certified professionals reporting to Senior Superintendents is acceptable.
2 | P a g e experience and role with QC if that would suffice
4. Document Referenced: Solicitation
Question/Comment: Factor 7 - Attachment C for the Price Factor is not yet available for our review. Can you let us know when to expect this document?
Refer to response #1
5. Document Referenced: SF 1442
Question/Comment: Section L.12 Notice of Required Bid Guarantee - Please confirm if we only need to provide bid guarantees on Task Orders and NOT this Phase 2 submission? It does not seem appropriate to provide a bid guarantee on a $10k-$15k item.
The required bid guarantee was a pre-condition for Phase I. No bid guarantee is required for the Phase II submission. The $10k–$15k reference pertains to Factor 7 (Price), not a bid guarantee. Bid guarantees will be required at the Task Order level.
6. Document Referenced: Solicitation
Question/Comment: Factor 7 requires a price for the DB Construction Recommendations Report. Please clarify if there will be a pricing schedule issued or if there is a specific format that the price should be submitted in?
The pricing format is at the vendor’s discretion, provided all required information is clearly stated in a separate document.
7. Document Referenced: Solicitation
Question/Comment: Technical factors and price factors are usually required to be submitted in separate proposal volumes (as separate PDFs). Please confirm that
Technical and price factors must be submitted as separate PDFs: Factor 6 (Seed Project), Factor 7 (Price), and SF 1442 with SF 30 Addenda Acknowledgements is a separate document. No bond is required for Phase II.
3 | P a g e contractors are to provide all information in a single volume (single PDF file). If separate technical and price volumes are required, please indicate which volume should contain the contractor’s statement, SF 1442, SF 30 Addenda Acknowledgements, and Bond.
The technical approach should address all elements of the Statement of Work and acknowledge all amendments. A statement confirming no exceptions to the solicitation requirements may be included as a signature block on Attachment A, "Statement of Work, Construction IDIQ."
8. Document Referenced: Solicitation
Question/Comment: Please confirm the technical proposal is a one page description of how we would approach our response to the Statement of Work (in one page).
Yes, the technical proposal should be a one-page description of your approach to the Statement of Work.
9. Document Referenced: Solicitation
Question/Comment: Please confirm we are proposing a price to complete the Design Build Recommendations report.
Yes, you are to propose a price to complete the Design-Build Recommendations Report.
10. Document Referenced: Solicitation
Question/Comment: States "The Contractor shall have all licenses and permits required...to perform hazardous substance(s) removal or disposal..." Please confirm that it is acceptable to have a licensed subcontractor perform this work and it is not required to be performed by the prime contractor.
The required licenses and permits do not need to be held by the prime contractor; they may be held by a licensed subcontractor or any entity performing the work under or with the prime contractor.
11. Document Referenced: SF 1442 Yes, any FAR changes will be issued with individual Task Orders and prior to proposal
4 | P a g e
Question/Comment: Please refer to Page 54, last sentence, "CBP reserves the right to unilaterally modify..." Please confirm any changes to the FAR will be issued with the individual Task Orders and prior to submission of the proposal submission. See FAR Overhaul - FAR Part DEVIATION Guidance I Acquisition.GOV
12. Document Referenced: Solicitation
Question/Comment: In Factor 5 Key Personnel, the credentials for Senior Superintendent include a Bachelor’s degree in construction management, Civil Engineering, Architecture, or related field. This is an atypical requirement for this position. While some of our Superintendents have bachelor’s degrees, many are not in the stated fields. Please consider revising the Education requirement with the following alternative text:
Education: Bachelor’s degree in construction management, Civil Engineering, Architecture, or related field. A Bachelor’s degree is not required for a Senior Superintendent having 20+ years of construction management experience (as defined above).
This alternative text increases the ability of Offeror’s to meet the stringent requirements
Yes, the government will accept 10+ years of relevant experience in lieu of a degree for the Senior Superintendent if all other requirements are met.
5 | P a g e for this position with the person having many years of the most relevant project experience without the need for a Bachelor’s degree, which is uncommon for this role.
13. Document Referenced: Solicitation
Question/Comment: There is a discrepancy within the RFP under both Sections L and Section M between the definition of Factor 6 and Factor 7. Please confirm the Factors for Phase 2 are the following: Are these the correct factors?
a. Factor 5, Key Personnel
b. Factor 6, D-B Construction
Recommendations Report (Attachment B)
Factor 7, Price (Seed Project)
The correct Factors are as follows:
a. Factor 5, Key Personnel - Senior Superintendent
b. Factor 6, Seed Project (D-B Recommendations Report)
c. Factor 7, Price
14. Document Referenced: Solicitation
Question/Comment: Section L.12.5 states Factor 7 (Price) is required with Submission of Phase 2. Section M - Phase 2 (page 71 of
71) further references a Seed Project. Please confirm if a Seed Project will be issued with Phase 2 and when these documents will be made available to Offerors.
Refer to response #1
6 | P a g e
15. Document Referenced: SF 1442
Question/Comment: Please confirm that the correct submission date and time (am / pm) for Phase 2 is "no later than 3:00 PM ET, March 9, 2026"? The current RFP states "no later than 3:00 ET March 9, 2025".
The submission deadline is March 9, 2026, at
3:00 PM EST.
16. Document Referenced: Solicitation
Question/Comment: Phase 2 proposals are to be submitted via PDF through email. Please confirm if there are any file size restrictions that would prohibit the Government from receiving the submission?
CBP limits incoming file size to 25MB
17. Document Referenced: SF 1442
Question/Comment: Per
CBP+RFP+70B01C26R00000007+-
+Amendment+A006, Section L.12 NOTICE OF REQUIRED BID GUARANTEE (MAR 2003), “In accordance with FAR 52.228-1, "Bid Guarantee," contained in Section I of this solicitation, the bidder shall furnish a bid guarantee by the time set for bid opening. The bid guarantee amount shall be at least ____percent of the total bid price or $____, whichever is less.” Please advise what the bid guarantee percentage and the bid guarantee price should be. (Grunley 2/25 at 1:43PM)
Refer to response #5
7 | P a g e
18. Document Referenced: Solicitation
Question/Comment: The RFP issued with Amendment 6 requires that the Senior Superintendent hold a Bachelor’s degree in construction management, civil engineering, architecture or a related field. Would 30 or more years’ experience, in lieu of a degree, be acceptable if the Senior Superintendent meets all other requirements?
Refer to response #12
File details come from the government source that posted it. Updated .