Attachment 9 - Seed Project Pricing Proposal Template.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Mechanical Electrical Plumbing (MEP) MATOC Federal contract opportunity
Solicitation number
12805B24R0004
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This document appears to be a pricing proposal template for a federal contract opportunity related to a HVAC project at the Las Cruces Gin Lab. The template includes four phases of the Seed Project, with a summary sheet that captures the total pricing for all four phases.

The pricing template provides detailed worksheets for each phase, with line items for various divisions of work such as general requirements, HVAC, electrical, and other construction-related categories. The worksheets require the contractor to provide labor, equipment, material, and total man-hour costs for each division. The final total price for each phase is calculated, including labor burden, overhead, profit, performance and payment bonds, and applicable state taxes.

The related federal contract opportunity is a solicitation (Solicitation Number: 12805B24R0004) for a Mechanical Electrical Plumbing (MEP) Multiple Award Task Order Contract (MATOC) issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area. The solicitation and attachments provide further details on the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical Electrical Plumbing (MEP) MATOC, newest first.
File Type Posted
Attachment 15 Questions and Answers Amendment 0005.pdf PDF
Sol_12805B24R0004_Amd_0005.pdf PDF
Attachment 14 Questions and Answers Amendment 0004.pdf PDF
Sol_12805B24R0004_Amd_0004.pdf PDF
Sol_12805B24R0004_Amd_0003.pdf PDF
Attachment 13 Questions and Answers Amendment 0003.pdf PDF
Attachment 12 Questions and Answers Amendment 0002.pdf PDF
Sol_12805B24R0004_Amd_0002.pdf PDF
Sol_12805B24R0004_Amd_0001.pdf PDF
Sol_12805B24R0004_Amd_0001.pdf PDF
Seed Project- USDA ARS Las Cruces NM Haz Mat Final Report 08-11-20.pdf PDF
Solicitation 12805B24R0004.pdf PDF
Attachment 4 - Safety Health and Environmental Management Program.pdf PDF
Attachment 6 - SAM Reps and Certs Form.docx DOCX document
Attachment 7 - Seed Project Drawings.pdf PDF
Attachment 2 - ARS Major Facilities Construction Manual (157.0M-ARS).pdf PDF
Attachment 8 - Seed Project Specifications.pdf PDF
Attachment 10 - Seed Project Wage Determination.pdf PDF
Seed Project Site Visit Information.pdf PDF
Attachment 1 - Scope of Work.pdf PDF
Attachment 5 - ARS MAP.pdf PDF
Attachment 11 - Past Performance Questionnaire.docx DOCX document
Attachment 3 - ARS Design Standards (242.1M-ARS).pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Seed Project Summary

Attachment 9 - Seed Project Pricing Proposal Template
Summary Sheet of All Four Phases of the Seed Project

Las Cruces Gin Lab HVAC Project -MATOC Seed Project – Phase 1, Asset # 623505B048 Enter amount from sheet "Seed Project Phase 1" cell G54

Las Cruces Gin Lab HVAC Project -MATOC Seed Project – Phase 2, Asset # 623505B048 Enter amount from sheet "Seed Project Phase 2" cell G54

Las Cruces Gin Lab HVAC Project -MATOC Seed Project – Phase 3, Asset # 623505B048 Enter amount from sheet "Seed Project Phase 3" cell G54

Las Cruces Gin Lab HVAC Project -MATOC Seed Project – Phase 4, Asset # 623505B048 Enter amount from sheet "Seed Project Phase 4" cell G54

Total Seed Project Proposal Amount for all 4 Phases

Seed Project Phase 1

Contractor's Price Schedule WorksheetContractor:Date Prepared:
Name and Title of Person Authorized to Sign for Offeror:Sheet #:
Project:Las Cruces Bldg 48 HVAC Design, Phase 1
Location:Las Cruces, NMNo. of Sheets:
Signature:
Division SummaryLaborEquipmentMaterialTotal
Man HoursCost
00- Project Superintendent
01 - General Requirements
02 - Existing Conditions
03 - Concrete
04 - Masonry
05 - Metals
06 - Wood, Plastics, and Composites
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
10 - Specialties
11 - Equipment
12 - Furnishings
13 - Special Construction
14 - Conveying Equipment
21 - Fire Suppression
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
25 - Integration Automation
26 - Electrical
27 - Communications
28 - Electronic Safety and Security
31 - Earthwork
32 - Exterior Improvements
33 - Utilities
34 - Transportation
35 - Waterway and Marine Construction
40 - Process Interconnections
41 - Material Processing and Handling Equipment
42 - Process Heating, Cooling, and Drying Equipment
43 - Process Gas and Liquid Handlings, Purification and Storage Equipment
44 - Pollution Control Equipment
46 - Water and Wastewater Equipment
48 - Electric Power Generation
Subtotal:
Labor Burden:
Subtotal:
Overhead:
Profit:
Subtotal:
Performance and Payment Bonds:
Final Subtotal:
State Taxes (if applciable)
Final Total Price:

Seed Project Phase 2

Contractor's Price Schedule WorksheetContractor:Date Prepared:
Name and Title of Person Authorized to Sign for Offeror:Sheet #:
Project:Las Cruces Bldg 48 HVAC Design, Phase 2
Location:Las Cruces, NMNo. of Sheets:
Signature:
Division SummaryLaborEquipmentMaterialTotal
Man HoursCost
00- Project Superintendent
01 - General Requirements
02 - Existing Conditions
03 - Concrete
04 - Masonry
05 - Metals
06 - Wood, Plastics, and Composites
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
10 - Specialties
11 - Equipment
12 - Furnishings
13 - Special Construction
14 - Conveying Equipment
21 - Fire Suppression
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
25 - Integration Automation
26 - Electrical
27 - Communications
28 - Electronic Safety and Security
31 - Earthwork
32 - Exterior Improvements
33 - Utilities
34 - Transportation
35 - Waterway and Marine Construction
40 - Process Interconnections
41 - Material Processing and Handling Equipment
42 - Process Heating, Cooling, and Drying Equipment
43 - Process Gas and Liquid Handlings, Purification and Storage Equipment
44 - Pollution Control Equipment
46 - Water and Wastewater Equipment
48 - Electric Power Generation
Subtotal:
Labor Burden:
Subtotal:
Overhead:
Profit:
Subtotal:
Performance and Payment Bonds:
Final Subtotal:
State Taxes (if applciable)
Final Total Price:

Seed Project Phase 3

Contractor's Price Schedule WorksheetContractor:Date Prepared:
Name and Title of Person Authorized to Sign for Offeror:Sheet #:
Project:Las Cruces Bldg 48 HVAC Design, Phase 3
Location:Las Cruces, NMNo. of Sheets:
Signature:
Division SummaryLaborEquipmentMaterialTotal
Man HoursCost
00- Project Superintendent
01 - General Requirements
02 - Existing Conditions
03 - Concrete
04 - Masonry
05 - Metals
06 - Wood, Plastics, and Composites
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
10 - Specialties
11 - Equipment
12 - Furnishings
13 - Special Construction
14 - Conveying Equipment
21 - Fire Suppression
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
25 - Integration Automation
26 - Electrical
27 - Communications
28 - Electronic Safety and Security
31 - Earthwork
32 - Exterior Improvements
33 - Utilities
34 - Transportation
35 - Waterway and Marine Construction
40 - Process Interconnections
41 - Material Processing and Handling Equipment
42 - Process Heating, Cooling, and Drying Equipment
43 - Process Gas and Liquid Handlings, Purification and Storage Equipment
44 - Pollution Control Equipment
46 - Water and Wastewater Equipment
48 - Electric Power Generation
Subtotal:
Labor Burden:
Subtotal:
Overhead:
Profit:
Subtotal:
Performance and Payment Bonds:
Final Subtotal:
State Taxes (if applciable)
Final Total Price:

Seed Project Phase 4

Contractor's Price Schedule WorksheetContractor:Date Prepared:
Name and Title of Person Authorized to Sign for Offeror:Sheet #:
Project:Las Cruces Bldg 48 HVAC Design, Phase 4
Location:Las Cruces, NMNo. of Sheets:
Signature:
Division SummaryLaborEquipmentMaterialTotal
Man HoursCost
00- Project Superintendent
01 - General Requirements
02 - Existing Conditions
03 - Concrete
04 - Masonry
05 - Metals
06 - Wood, Plastics, and Composites
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
10 - Specialties
11 - Equipment
12 - Furnishings
13 - Special Construction
14 - Conveying Equipment
21 - Fire Suppression
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
25 - Integration Automation
26 - Electrical
27 - Communications
28 - Electronic Safety and Security
31 - Earthwork
32 - Exterior Improvements
33 - Utilities
34 - Transportation
35 - Waterway and Marine Construction
40 - Process Interconnections
41 - Material Processing and Handling Equipment
42 - Process Heating, Cooling, and Drying Equipment
43 - Process Gas and Liquid Handlings, Purification and Storage Equipment
44 - Pollution Control Equipment
46 - Water and Wastewater Equipment
48 - Electric Power Generation
Subtotal:
Labor Burden:
Subtotal:
Overhead:
Profit:
Subtotal:
Performance and Payment Bonds:
Final Subtotal:
State Taxes (if applciable)
Final Total Price: