This document is a Limited Asbestos and Lead-Based Paint Inspection Report for the USDA Southwestern Cotton Ginning Research Laboratory located in Las Cruces, New Mexico. The inspection was conducted to identify asbestos-containing materials (ACMs) and lead-based paints (LBPs) that may be impacted by a planned renovation project.
The key findings indicate that several ACMs were identified, including mastic, floor tiles and mastics, roof materials, pipe insulation, and wallboard. Numerous LBPs were also found on paints throughout the buildings, including on walls, metal surfaces, floors, and equipment. The report provides specific details on the location and quantities of the identified ACMs and LBPs, as well as recommendations for proper handling and disposal prior to the renovation work. The report states that the ACMs and LBPs must be removed by licensed contractors in accordance with federal, state, and local regulations before the renovation project can commence.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submission:
Limited Asbestos and Lead- Based Paint Inspection Final Report
Project:
U.S. Department of Agriculture Agriculture Research Service Plains Area
Buildings 48, 52, 49, 53, 50 and 51 Las Cruces, New Mexico
IDIQ Contract No.: AG-32SD-C-15-0044 GES Project No.: F20-025
Presented to:
Date:
August 11, 2020 www.THEGES.com
Engineering
Program Management
Construction Management
Healthcare CommercialScience & Technology Education
APEX COMPANIES, LLC
Limited Asbestos and Lead-Based Paint Inspection Report
USDA Southwestern Cotton Ginning Research Laboratory Buildings 48, 49, 50, 51, 52 and 53 300 E. College Drive Mesilla Park, New Mexico 88047
PREPARED FOR:
Mr. Farshad Majidian, PE Global Engineering Solutions 6700 Rockledge Drive Bethesda, MD 20817
August 10, 2020
PREPARED BY:
Apex Companies, LLC 7979 Broadway Street, Suite 105 San Antonio, TX 78209 Apex Project No. GLOBAL-001
WATER RESOURCES • ENVIRONMENTAL SERVICES • INDUSTRIAL HYGIENE • SAFETY • AIR QUALITY • SUSTAINABILITY AND CLIMATE CHANGE
Apex Companies, LLC • (800) 733-2739 • www.apexcos.com
August 10, 2020
Mr. Farshad Majidian, PE Global Engineering Solutions 6700 Rockledge Drive Bethesda, MD 20817
RE: LIMITED ASBESTOS AND LEAD-BASED PAINT INSPECTION REPORT
USDA Southwestern Cotton Ginning Research Laboratory Buildings 48, 49, 50, 51, 52 and 53 300 East College Drive Mesilla Park, New Mexico 88047
Apex Project No.: GLOBAL-001
Dear Mr. Majidian & Mr. Jones:
Apex Companies, LLC (Apex) has prepared this Limited Asbestos and Lead-Based Paint (LBP) inspection report of Buildings 48, 49, 50, 51, 52 and 53 of the USDA Southwestern Cotton Ginning Research Laboratory located at 300 East College Drive in Mesilla, New Mexico (the Site).
The survey was performed to support the proposed renovation project, which will impact suspect asbestos-containing materials (ACMs) and LBP located at the Site.
Please do not hesitate to contact Apex with any questions related to this report.
Sincerely, Apex Companies, LLC
Armando Flores Osanna Carrasco Asbestos Inspector License 602347 Senior Project Manager Lead Risk Assessor 2070889
Phillip G. Fronczek, CHMM Individual Asbestos Consultant License 105737 i
TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................................................................... ii
1.0 INTRODUCTION
1.1 Objective
1.2 Scope of Work
1.3 Survey Limitations
2.0 Site Description
3.0 Survey
3.1 Asbestos Sampling and Analysis
3.2 Lead Containing Paint Analysis
4.0 FINDINGS
4.1 Asbestos-Containing Materials
4.2 Lead-Containing Paints
5.0 CONCLUSIONS AND RECOMMENDATIONS
5.1 Asbestos-Containing Materials
5.2 Lead-Containing Paints
TABLES
Tables 1 through 6: Sample Results for Asbestos Table 7 through 12: Sample Results for Lead
FIGURES
APPENDICES
Appendix A – Asbestos and Lead Laboratory Analytical Reports, Associated Chain-of-Custody Documents &
Laboratory Certifications Appendix B – Apex Personnel Certifications Appendix C – Site Photographs ii
EXECUTIVE SUMMARY
Apex Companies, LLC (Apex) was retained by the Global Engineering Solutions to conduct a limited asbestos and lead-containing paints (LCPs) inspection of Buildings 48, 49, 50, 51, 52 and 53 at the USDA Southwestern Cotton Ginning Research Laboratory located at 300 East College Drive, Mesilla Park, New Mexico (the Site). This survey was conducted prior to the planned electrical system upgrades of the one structure which is comprised of Buildings 48, 49, 52 and 53. The survey for Buildings 50 and 51 was conducted since the they are being evaluated for potential upgrades. Apex conducted a limited non-destructive inspection of inspected buildings located at the Site. The purpose of this inspection was to identify and sample suspect asbestos-containing materials (ACMs) to sample lead-based paints (LBP) that may be impacted by the renovation project.
ASBESTOS-CONTAINING MATERIALS
During the non-destructive asbestos inspection, Apex collected a total of one hundred sixty-eight (168) bulk samples of suspect ACMs. The materials below were found to contain asbestos greater than 1% due to laboratory analytical results identified during this inspection. A list of the ACMs noted at each building are listed below:
Building 48:
Mastic associated with the 12” x 12” white pinhole ceiling tile; it should be noted that the white pinhole ceiling tile is not ACM but considered cross-contaminated due do contact with the ACM mastic.
Black/yellow mastic under carpet.
9” x 9” brown floor tile and black mastic.
Black mastic associated with the 12” x 12” tan speckled floor tile.
Black mastic associated with the 12” x 12” gray streaked floor tile.
Sealant on corrugated roof panels.
Roof corrugated cement panels.
Roof seam sealant.
Building 52:
Wall plaster.
Insulation on pipe fittings.
Building 49:
Tan sheet vinyl flooring.
White sealant on roof vents.
Building 53:
Exterior window glazing compound.
Building 50:
White mastic on roof vents.
Building 51:
Black counter tops.
iii
Wall plaster.
It should be noted that the following materials contain ≤1% asbestos via Point Count method and are not considered ACMs per Environmental Protection Agency (EPA) rules and regulations. However, several OSHA regulations apply to any materials containing reportable concentrations of asbestos.
Removal of the materials are required to be performed in accordance with OSHA.
Building 48:
Mastic on tread.
Building 52:
Window glazing.
Building 49:
Window glazing.
Window glazing.
ACMs identified at the Site that may be impacted by the intended renovation project should be removed and disposed in accordance with federal, state and local regulations, prior to disturbance. The asbestos abatement must be performed by a licensed asbestos contractor in accordance the National Emission Standard for Hazardous Air Pollutants (NESHAP) 40 CFR 61 Subpart M. Tables 1-6 provides a summary of all suspect ACM findings.
LEAD-CONTAINING PAINTS
During the survey, Apex collected one hundred-two (102) paint chip samples. The following paints are considered lead-based paint (containing greater than 0.5% of lead by weight) based on analytical results:
Building 48:
White paint on wood wall.
White paint on metal columns.
Yellow paint on metal railing.
Tan paint on metal equipment.
Maroon paint on metal frame.
Brown paint on metal grate floor.
Blue paint on metal railing.
Yellow paint on cement floor.
Tan paint on metal column.
Red paint on metal stairs.
Yellow paint on metal railings.
White paint on metal door and door/frame.
Blue paint om metal equipment.
iv
Yellow paint on metal railing.
Maroon paint on metal grate.
No paint with >0.5% lead.
Yellow paint on metal railing.
Yellow paint on cement floor.
Gray paint on wood stairs.
Green paint on metal equipment.
Necessary precautions must be taken to prevent or minimize worker exposure to lead during disturbance of lead-containing materials, as outlined in OSHA regulations. Lead-containing materials may also require disposal classification in accordance with the federal and state regulations. Tables 7- 12 provides a summary of all lead paint findings.
Confirmation Asbestos and Hazardous Materials Survey Report
1.0 INTRODUCTION
Apex Companies, LLC (Apex) was retained by Global Engineering Solutions to conduct a limited asbestos and lead paint inspection of the USDA Southwestern Cotton Ginning Research Laboratory located at 300 East College Drive in Mesilla Park, New Mexico (the Site). The purpose of this survey was to identify suspect asbestos-containing materials (ACMs) and lead-containing paints (LCPs) located in the buildings that may be impacted by the renovation project.
1.1 Objective
Apex understands that USDA Southwestern Cotton Ginning Research Laboratory is scheduled for renovation. The purpose of this survey was to identify suspect ACMs and LCPs that may be impacted by the renovation activities.
1.2 Scope of Work
The scope of services for this hazardous building materials survey included, and was limited to, the following tasks:
• Perform a non-destructive asbestos of Buildings 48, 49, 50, 51, 52 and 53 at the Site scheduled for renovation for the presence, location, and quantity of ACMs at the Site. Apex performed the sampling the United States Environmental Protection Agency (USEPA) National Emission Standards for Hazardous Air Pollutants (NESHAP). Bulk samples were analyzed for the presence of asbestos using polarized light microscopy (PLM).
• Perform a lead paint survey of representative painted components that may be disturbed during renovation. Apex collected paint chip samples. The sample were analyzed for total lead utilizing EPA Method SW846 7420/3050B.
• Prepare tables indicating sample locations, sample types, analytical results, and/or quantities of ACM and LCP.
• Prepare a report that documents the findings of this inspection and provides recommendations for handling the ACM and LCP building materials identified.
1.3 Survey Limitations
The survey was conducted from May 19 - 23, 2020 by certified Asbestos inspector Mr. Armando Flores.
Mr. Flores is also a certified Lead Risk Inspector/Assessor.
Destructive sampling was not conducted since the buildings are occupied. At the request of the on-site facility representatives, some suspect materials were not sampled, and the roofing sampling was limited to sampling of surface materials only, to not void the roof warranty. It should be noted that additional suspect materials could be present in walls, voids, attics, crawl spaces, beneath the base of walls, and in other areas not easily accessible or not visible. In some areas sampling was not conducted due to the request of the on-site facility representatives.
The findings, conclusions and recommendations discussed in this report are Apex’s professional opinions, based solely upon site conditions during the survey, visual site observations and interpretations of laboratory analyses. All applicable federal, state and local regulations should be verified by building owners and contractors, prior to initiating any work that will disturb regulated building materials.
This report should not be utilized as a bidding document or as a project specification document since it does not have all the components required to serve an as Abatement Project Design document or an Abatement Work Plan.
Limited Asbestos and Lead Inspection Report
2.0 SITE DESCRIPTION
The Site includes multiple structures and this inspection was limited to Buildings 48, 49, 50, 51, 52 and 53.
Building 48 is a three-story structure with masonry and stucco exterior walls, a gravel membrane lower roof and cement gabled higher roof. Interior finishes of Building 48 are comprised of vinyl tile, metal grate, cement, and ceramic floors, with cement, gypsum, ceramic, masonry, and wood panel walls.
Building 49 is a one-story structure with masonry, stucco, and metal exterior walls. The roof is a metal gabled style. Interior finishes in Building 49 are comprised of vinyl sheet, metal grate, and cement floors, with metal, masonry, and wood panel walls.
Building 50 is a one-story structure with metal exterior walls. The roof is a metal gabled style. Interior finishes in Building 50 are comprised of cement and wood floors; with metal and wood panel walls.
Building 51 is a one-story structure with metal exterior walls. The roof is gabled metal style. Interior finishes in Building 51 are comprised cement floors, with metal and wood panel walls.
Building 52 is a one-story structure with metal, stucco, and masonry exterior walls. The roof is a gabled metal style. Interior finishes in Building 52 are comprised of vinyl sheet, metal grate, and cement floors;
with masonry, stucco, and wood walls.
Building 53 is one-story structure with metal exterior walls. The roof is a metal gabled style. Interior finishes in Building 53 are comprised cement floors and metal grate; with metal walls.
3.0 SURVEY
Apex performed sampling to investigate the accessible interior and exterior surfaces. In order to identify suspect ACMs and LCPs, Apex performed a walk-through survey of the Site. Apex accessed each space in the buildings, including the rooftops and the exteriors to identify suspect ACMs and LCPs and estimated the appropriate sample count for these materials. Apex used non-destructive sampling to since the buildings are occupied. At the request of the on-site facility representatives, some suspect materials were not sampled, and the roofing sampling was limited to sampling of surface materials only, to not void the roof warranty.
3.1 Asbestos Sampling and Analysis
The asbestos survey was performed generally following the sampling protocols as outlined as the USEPA NESHAP. Approximate quantities of suspect materials were estimated by field measurements.
The condition (e.g., good, fair, poor) and friability (i.e., easily crumbled, pulverized, or reduced to powder by hand pressure) of suspect ACM was noted for each material. Friability of each sampled material was determined by hand-touch.
• Surfacing materials, including spray-applied or troweled-on wall/ceiling coatings;
• Thermal system insulation (TSI), including pipe insulation, duct insulation, boiler lagging; and
• Miscellaneous materials, including ceiling panels, floor tiles and mastics, gaskets (if accessible), fire doors, and wallboard/joint compound.
Suspected ACMs were grouped into homogeneous areas (i.e., a material that is uniform in texture, color, date of application, use or system, and appears identical in every other respect). Homogeneous areas were determined by the Apex certified Asbestos Inspector based upon date of installation and uniformity of color and texture. Fiberglass, foam glass, rubber, wood products, plastic products, glass and steel were not sampled since they are not considered suspect ACM.
Limited Asbestos and Lead Inspection Report
A total of one-hundred sixty-eight (168) bulk samples were collected from the interior, exterior and roofs of the on-site buildings. Bulk suspect asbestos samples were analyzed utilizing Polarized-Light Microscopy (PLM), following the USEPA PLM Method EPA-600/R-93/116. The bulk samples were analyzed by J3 Resources, Inc. (J3), in Pasadena, Texas. J3 is accredited by the National Institute of Standards and Technology National Voluntary Laboratory Accreditation Program (NVLAP No. 600120- 0). A summary of the samples collected, and analytical results are presented in Tables 1 through 6.
3.2 Lead Containing Paint Analysis
Apex conducted sampling and analysis of accessible painted building components to identify lead concentrations of painted surfaces that will be impacted during renovation-related activities. Sampling was performed generally following industry standards consistent with EPA guidelines.
A total of one-hundred seven (107) paint chip samples were collected from the on-site buildings. The samples were submitted to J3 Resources, Inc. in Pasadena, Texas. The sample were analyzed for total lead utilizing EPA Method SW846 7420/3050B. A summary of the samples collected, and analytical results are presented in the Tables 7 through 12.
4.0 FINDINGS
4.1 Asbestos-Containing Materials
Apex collected a total of one hundred sixty-eight (168) bulk samples of suspect ACMs during the limited inspection. The laboratory analytical results identified greater than 1% asbestos in the following materials in the buildings indicated.
Building 48:
Mastic associated with the 12” x 12” white pinhole ceiling tile located in 311 conference room;
it should be noted that the white pinhole ceiling tile is not ACM but considered cross-contaminated due do contact with the ACM mastic.
Table No. 1 Sample No. 04, 05, 06 Site Photographs for Building 48: Photo No. 4 Page 1
Black/yellow mastic under carpet located in 306, 307, and 308 Offices on the 3rd floor.
Table No. 1 Sample No. 76, 77, 78 Site Photographs for Building 48: Photo No. 10 on Page 2 and Photo No. 16 on Page 3
9” x 9” brown floor tile and black mastic located under carpet in the elevator lobby, office 311 and 305 storage; in 303 Office; in 309 storage; and 310 storage on 3rd floor.
Table No. 1 Sample No. 82, 83, 84 Site Photographs for Building 48: Photo No. 6 on Page 1, Photo 7, 8 and 11 on Page 2, and
Photo No.16 on Page 3 Black mastic associated with the 12” x 12” tan speckled floor tile located in 302 lab and hallway
300 on the 3rd floor.
Table No. 1 Sample No. 85, 86, 87 Site Photographs for Building 48: Photo No. 12 on Page 2
Black mastic associated with the 12” x 12” gray streaked floor tile located on all landings and on all levels of the West Stairwell.
Table No. 1 Sample No. 88, 89, 90 Site Photographs for Building 48: Photo No. 13 and 14 on Page 3
Limited Asbestos and Lead Inspection Report
Sealant on corrugated roof panels located on all of upper roof.
Table No. 1 Sample No. 101 Site Photographs for Building 48: Photo No. 2 on Page 1
Roof corrugated cement panels exists as the entirety of the upper roof.
Table No. 1 Sample No. 100 Site Photographs for Building 48: Photo No. 1 and 2 on Page 1, and Photo No. 19 on Page
4) Roof seam sealant located along east wall seam at lower roof level between Building 48 and
Building 52.
Table No. 1 Sample No. 102 Site Photographs for Building 48: Photo No. 18 on Page 3
Wall plaster exists as the interior West wall.
Table No. 5 Sample No. 01, 02, 03 Site Photographs for Building 52: Photo No. 2 on Page 1
Insulation on pipe fittings located elevated along the east, west, and south walls. ( Table No. 5 Sample No. 04, 05, 06 Site Photographs for Building 52: Photo No. 3 on Page 1
Insulation on pipe fittings, located along south wall elevated in open area.
Table No. 2 Sample No. 01, 02, 03 Site Photographs for Building 49: Photo No. 5 on Page 1
Tan sheet vinyl flooring located within the data room.
Table No. 2 Sample No. 07, 08, 09 Site Photographs for Building 49: Photo No. 4 on Page 1
White sealant on roof vents on roof.
Table No. 2 Sample No. 24
Insulation on pipe fittings located elevated along the east, south, and north walls.
Table No. 6 Sample No. 01, 02, 03 Site Photographs for Building 53: Photo No. 3 and 4 on Page 1
Exterior window glazing compound on windowpanes along north and west walls.
Table No. 6 Sample No. 07, 08, 09 Site Photographs for Building 53: Table No. 6 Photo No. 5 on Page 1
White mastic on roof vents on roof.
Table No. 3 Sample No. 5
Building 51:
Black counter tops located throughout small shop area.
Table No. 4 Sample No. 04, 05, 06 Site Photographs for Building 51: Photo No. 3, 4 and 5 on Page 1
Limited Asbestos and Lead Inspection Report
It should be noted that the following materials contain ≤1% asbestos via Point Count method.
Building 48:
Mastic on stair tread located in the west stairwell.
Table No. 1 Sample No. 73, 74, 75 Site Photographs for Building 48: Photo No. 15 on Page 3
Window glazing on windowpanes along north and south walls.
Table No. 5 Sample No.
Building 49:
Table No. 2 Sample No. 13, 14, 15
Table No. 3 Sample No. 01, 02, 03
A summary of Apex’s asbestos sampling, including analytical results, sample numbers, material descriptions, sample locations and quantities are provided in Tables 1 through 6. Supporting documentation for the sample analyses, including copies of laboratory analytical reports, chain-of-custody documents and laboratory certifications are provided in Appendix A. Asbestos Building Inspector certifications are provided in Appendix B. Site photographs are provided in Appendix C.
4.2 Lead-Containing Paints
Lead-based paint (LBP) is defined as paint containing >1.0 milligrams per square centimeter (mg/cm2) as measured by >0.5% of lead by weight as analyzed by Atomic Absorption, for the purposes of renovation and/or demolition work. Occupational Safety and Health Administration (OSHA) defines LBP as any paint containing detectable amounts of lead. A summary of the samples collected, and analytical results are presented in the Tables 7 through 12.
The laboratory results indicated that the following paints in the buildings indicated were above the >0.5% of lead by weight:
Building 48:
White paint on wood walls in 103 lab and adjacent hallway on the1st floor.
Table No. 7 Sample No. P07 Site Photographs for Building 48: Photo No. 28 and 30 on Page 5
White paint on metal columns that support building can be accessed on 1st and 2nd level of open area.
Table No. 7 Sample No. P13 Site Photographs for Building 48: Photo No. 23 on Page 4
Yellow paint on metal railing located on stairwells and safety railing on 2nd floor platform in open area.
Table No. 7 Sample No. P15 Site Photographs for Building 48: Photo No. 24 on Page 4
Limited Asbestos and Lead Inspection Report
Tan paint on metal equipment located on 1st and 2nd level of open area.
Table No. 7 Sample No. P16 Site Photographs for Building 48: Photo No. 25 on Page 5
Maroon paint on elevator metal door frame located in bay area on the 1st floor.
Table No. 7 Sample No. P18 Site Photographs for Building 48: Photo No. 26 on Page 5
Brown paint on metal grate floor exists as the metal platform floor of the 2nd level in open area.
Table No. 7 Sample No. P21 Site Photographs for Building 48: Photo No. 27 on Page 5
Blue paint on metal railing at all levels in the east stairwell. (Table No. 7 Photo No. 29) Table No. 7 Sample No. P23 Site Photographs for Building 48: Photo No. 29 on Page 5
Yellow paint on cement floor located sporadically on the 1st floor. (Table No. 11 Photo No. 4)
Table No. 11 Sample No. P03 Site Photographs for Building 52: Photo No. 4 on Page 1
Tan paint on metal column exists as structure for 2nd level platform. (Table No. 11 Photo No. 5) Table No. 11 Sample No. P06 Site Photographs for Building 52: Photo No. 5 on Page 1
Red paint on metal stairs located to 2nd and 3rd level stairwells. (Table No. 11 Photo No. 6) Table No. 11 Sample No. P07 Site Photographs for Building 52: Photo No. 6 on Page 1
Yellow paint on metal railings along stairwells rails and safety railing on 2nd and 3rd level platforms. (Table No. 11 Photo No. 7) Table No. 11 Sample No. P09 Site Photographs for Building 52: Photo No. 7 on Page 2
White paint on metal door and door/frame located on door along West wall. (Table No. 11 Photo No. 9) Table No. 11 Sample No. P11 Site Photographs for Building 52: Photo No. 9 on Page 2
Blue paint on metal equipment. (Table No. 11 Photo No. 8) Table No. 11 Sample No. P13 Site Photographs for Building 52: Photo No. 8 on Page 2
Yellow paint on metal railing located on stairwells and safety railing on 2nd floor platform in open area. (Table No. 8 Photo No. 2) Table No. 8 Sample No. P04 Site Photographs for Building 49: Photo No. 2 on Page 1
Maroon paint on metal grate exists as the metal platform floor of the 2nd level in open area.
(Table No. 8 Photo No. 2) Table No. 8 Sample No. P13 Site Photographs for Building 49: Photo No. 2 on Page 1
Limited Asbestos and Lead Inspection Report
No paint with >0.5% lead.
Yellow paint on metal railing located on 2nd floor.
Table No. 9 Sample No. P01 Site Photographs for Building 50: Photo No. 6 on Page 1
Yellow paint on cement floor located sporadically on the 1st floor.
Table No. 9 Sample No. P04 Site Photographs for Building 50: Photo No. 4 on Page 1
Gray paint on wood stairs located on stairwell to the 2nd floor.
Table No. 9 Sample No. P07 Site Photographs for Building 50: Photo No. 5 on Page 1
Green paint on metal equipment in the large shop. (Table 10 Photo No. 6)
Table No. 10 Sample No. P03 2Site Photographs for Building 51: Photo No. 6 on Page 1
Prior to performing renovation activities, the contractor should be made aware of the presence of potential lead-based paint, particularly in the areas of observed damaged paint to satisfy the hazard communication requirements set forth by OSHA regulations. Specifically, contractors should be required to comply with OSHA regulations including 29 CFR 1926.62, Lead Exposure in Construction:
Interim Final Rule and 29 CFR 1926.59, Hazard Communication for the Construction Industry.
5.0 CONCLUSIONS AND RECOMMENDATIONS
The conclusions of this report are Apex’s professional opinions, based solely upon visual Site observations and interpretations of laboratory analyses, as described in this report. The survey was performed to evaluate the potential presence of ACMs and LCPs that may be impacted during the renovation project.
5.1 Asbestos-Containing Materials
Federal, state, and local agencies regulate the condition, handling and disposal of ACM. Asbestos generally does not pose a human health threat unless the asbestos fibers are disturbed, become airborne and are inhaled. Contractors must be informed of the type and location of ACMs located within the work area.
Apex performed sampling in Buildings 48, 49, 50, 51, 52, and 53 at the Site. ACMs identified at the Site that will be impacted by the intended renovation project should be removed and disposed in accordance with federal, state and local regulations, prior to disturbance. The asbestos abatement must be performed by a licensed asbestos contractor in accordance the NESHAP 40 CFR 61 Subpart M. In addition, third party air monitoring must be performed during the abatement. Prior to initiating an asbestos abatement project, written notification must be provided to the New Mexico Environment Department. Notification must be provided no later than 10 calendar days prior to starting abatement.
Contractors should use caution during construction-related activities as concealed hazardous building materials that were not previously analyzed may be encountered. If additional materials, not previously sampled, are later identified during construction-related activities, then supplemental sampling should be performed. Materials identified to contain regulated quantities of asbestos or lead, must be removed
Limited Asbestos and Lead Inspection Report and disposed in accordance with federal, state and local regulations, prior to disturbance. Abatement of regulated building materials must be performed by a licensed abatement contractor.
It should be noted that the materials that contain ≤1% asbestos via Point Count method and are not considered ACMs per EPA rules and regulations. However, several OSHA regulations apply to any materials containing reportable concentrations of asbestos. Removal of those materials are required to be performed in accordance with OSHA.
5.2 Lead-Containing Paints
Paint chip analysis revealed that portions of the Site are coated with lead-based and/or lead-containing paints. The renovation project may impact materials identified to contain lead, as well as disturb unidentified LCPs that were inaccessible during the survey and may result in worker exposure to lead.
In the event that additional painted surface that were not previously sampled, precautions may be necessary to prevent or minimize worker exposure to lead.
Activities that may result in worker exposure to lead include:
• Manual damage to and/or demolition of structures coated with lead-containing paints
• Manual scraping and/or sanding of lead-containing paints
• Heat gun applications on surfaces coated with lead-containing paints
• Power tool cleaning of surfaces coated with lead-containing paints (with or without dust collection systems)
• Any other task that may result in the release of lead in the form of dusts, fumes or mists from lead-containing building materials into the air or onto surrounding environments
Prior to performing renovation activities, the contractor should be made aware of the presence of potential lead-based paint, particularly in any areas of observed damaged paint to satisfy the hazard communication requirements set forth by OSHA regulations. Specifically, contractors should be required to comply with OSHA regulations including 29 CFR 1926.62, Lead Exposure in Construction:
Interim Final Rule and 29 CFR 1926.59, Hazard Communication for the Construction Industry. Initial employee exposure monitoring must be conducted for each separate task involving the disturbance of building materials coated with lead-containing paints. If 8-hour time-weighted average (TWA) exposures exceed the action level of 30 micrograms of lead per cubic meter of air (µg/m3), periodic air monitoring must be continued at specified intervals, and medical surveillance and comprehensive training programs must be instituted. If the 8-hour TWA permissible exposure limit (PEL) of 50 µg/m3 for lead is exceeded, more stringent and additional requirements become effective, such as engineering controls, respiratory protection, regulated work areas and warning signs in lead work areas.
Based on the exposure assessment and previous similar work and exposure monitoring results, workers may have to be provided with any or all of the following:
• Respiratory protection
• Protective clothing
• Clean change areas
• Clean hand-washing facilities
• Biological monitoring (e.g., blood sampling and analysis for lead and zinc protoporphyrin levels)
• Hazard communication training
Limited Asbestos and Lead Inspection Report
All workers and supervisory personnel who will be at the job site must be informed of the presence of lead at the Site. These individuals should be provided additional training concerning the health effects associated with exposure to lead, proper work methods, appropriate use of personnel protective equipment, housekeeping procedures, and regulations governing work practices where lead-containing materials are present.
If any renovation, repair or demolition activity will disturb the lead-containing paint, engineering controls such as barriers and water should be used to minimize dust levels. The public should be prevented from unauthorized access to the work area. Ambient air monitoring is recommended to document engineering controls are adequate and that ambient airborne concentrations do not exceed permissible exposure levels.
All workers and supervisory personnel who will be at the Site must be informed of the presence of hazardous building materials. These individuals should be provided additional training concerning the health effects associated with exposure to lead, asbestos or other hazardous materials, such as proper work methods, appropriate use of personnel protective equipment, housekeeping procedures, and regulations governing specific work practices.
USDA Southwestern Cotton Ginning Research Limited Asbestos and Lead Inspection Report
TABLES
Sample Results for Asbestos
Tables 1 through 6
Table 1: Asbestos Sample Results Summary Southwestern Cotton Ginning Research Laboratory
Building 48 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
01, 02, 03 Sheetrock/Joint
Compound
2nd Floor Hallway 2nd Floor File Room
2nd Floor Conference Room N/A None Detected
04, 05, 06 12” x 12” White Pinhole
Ceiling Tile/Mastic 3rd Floor 311 Conference
Room 1,296 SF
CT: None Detected
M: 2% Chrysotile
07, 08, 09 2’ x 4’ White Long Fissure
Ceiling Tile
3rd Floor 311 Conference Room
2nd Floor Hallway 2nd Floor 211 Office
N/A None Detected
10, 11, 12 2’ x 4’ White Wide Long
Fissure Ceiling Tile 2nd Floor 211 Office N/A None Detected
13, 14,15 2’ x 4’ White Pockets
Ceiling Tile
2nd Floor Conference Room 2nd Floor File Room 2nd Floor Hallway
N/A None Detected
16, 17, 18 12” x 12” White Pinhole
Ceiling Tile- Nailed
2nd Floor 202 Office 2nd Floor 207 Office
2nd Floor Conference Room N/A None Detected
19, 20, 21 2’ x 4’ White Long Fissure
Sideways Ceiling Tile 2nd Floor File Room 2nd Floor 205 Office
N/A None Detected
22, 23, 24 Beige Wallpaper/Glue 3rd Floor 311 Conference
Room N/A None Detected
25, 26, 27 2’ x 2’ White Pinhole Wall
Panel - Nailed 2nd Floor Open Area N/A None Detected
28, 29, 30 12” x 12” White Pinhole
Ceiling Tile – Nailed 2nd Floor Open Area N/A None Detected
31, 32, 33 Paint/Texture on CMU
Block 2nd Floor Open Area 1st Floor Open Area
N/A None Detected
34, 35, 36 Plaster/Smooth Texture
Ceiling
3rd Floor 302 Office 3rd Floor 309 Office
3rd Floor 311 Conference Room
N/A None Detected
37, 38, 39 Plaster/Wave Texture Wall 3rd Floor Men’s Restroom
3rd Floor Women’s Restroom
N/A None Detected
40, 41, 42 Plaster/Orange Peel
Texture Wall
3rd Floor 306 Office 3rd Floor 307 Office
3rd 308 Office N/A None Detected
43, 44, 45 Mortar to CMU Block Attic Wall N/A None Detected
46, 47, 48 Mortar to Glass Block
3rd Floor 303 Office 3rd Floor 311 Conference
Room 3rd Floor Corridor
N/A None Detected
Building 48 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
49, 50, 51 Gray Moisture Barrier 2nd Floor Conference Room N/A None Detected
52, 53, 54 Gray Light Weight
Concrete/White Moisture Barrier
2nd Floor Open Area Deck N/A None Detected
55, 56, 57 Gray Window Glazing
Compound
3rd Floor Elevator Window 3rd Floor East Stairwell
Window N/A None Detected
58, 59, 60 Black Lab Countertop 3rd Floor 302 Lab Room N/A None Detected
61, 62, 63 Tan Mastic on Metal
Round Duct Attic Duct N/A None Detected
64, 65, 66 Black/Gray Vibration
Dampener Cloth 2nd Floor Open Area
Equipment N/A None Detected
67, 68, 69 White Caulking on Restroom Fixtures
3rd Floor Men’s Restroom 3rd Floor Women’s
Restroom N/A None Detected
70, 71, 72 Covebase/Mastic 3rd Floor 308 Office 2nd Floor File Room
N/A None Detected
73, 74, 75 Tread/Riser Mastic 1st Level West Stairwell 2nd Level West Stairwell 3rd Floor West Stairwell
N/A
T: None Detected
M: 0.99 Chrysotile (PC)
76, 77, 78 Black/Yellow Carpet Mastic
3rd Floor 306 Office 3rd Floor 307 Office 3rd Floor 308 Office
462 SF 2% Chrysotile
79, 80, 81 Green Carpet Mastic under Carpet Squares 3rd Floor 311 Office
3rd Floor Conference Room N/A None Detected
82, 83, 84 9” x 9” Brown Floor tile/Black Mastic
3rd Floor 310 Storage 3rd Floor 311 Office
3rd Floor 311 Conference Room
2,084 SF
T: 2% Chrysotile
M: 4% Chrysotile
85, 86, 87 12” x 12” Tan Speckled Floor tile/Black Mastic
3rd Floor Corridor 3rd Floor 302 Lab
1, 074 SF
T: None Detected
M: 2% Chrysotile
88, 89, 90 12” x 12” Gray Speckled
Floor tile/Black Mastic
1st Floor Level West Stairwell
2nd Floor Level West Stairwell
3rd Floor Level West Stairwell
600 SF
T: None Detected M: 1.09%
Chrysotile (PC)
91, 92, 93 Green Sheet Vinyl
Flooring 2nd Floor 211 Office N/A None Detected
Building 48 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
94, 95, 96 Green Sheet Vinyl
Flooring 2nd Floor 205 Office N/A None Detected
97, 98, 99 Brown Streaked Sheet
Vinyl Flooring 2nd Floor 207 Office N/A None Detected
Exterior Sealant on
Corrugated Roof Panel Attic 3,840 SF 8% Chrysotile
Roof Corrugated
Cement Panel Attic 3,840 SF 35%
Chrysotile
102 Roof Seam Sealant North Flat Roof 24 LF 8% Chrysotile
103 Roof Flashing Mastic North Flat Roof N/A None Detected
104 Roof Penetration Mastic North Flat Roof N/A None Detected
105 Roof Duct Mastic North Flat Roof N/A None Detected
106 Exterior Window Caulking Exterior 3rd Floor North
Roof Access N/A None Detected
107 Exterior Window Glazing Exterior 3rd Floor North
Roof Access N/A None Detected
SF – Square Feet LF – Linear Feet N/A – Not Applicable T – Tile M – Mastic CT – Ceiling Tile PC – Point Count
Table 2: Asbestos Sample Results Summary
Building 49 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
01, 02, 03 Pipe Insulation and Pipe
Wrap on Fittings 1st Level Open Area 2 LF
W: None Detected
I: 10% Chrysotile
04, 05, 06 Pipe Wrap and Pipe Mastic 1st Level Open Area N/A None Detected
07, 08, 09 Tan Sheet Vinyl Flooring Data Room 399 SF 12%
Chrysotile
10, 11, 12 12” x 12” White Pinhole
Ceiling Tile/Mastic Data Room N/A None Detected
13, 14,15 Window Glazing
Compound
1st Level Open Area – South Window
1st Level Open Area – North Window
1st Level Future Lab – North Window
N/A 1.0% Chrysotile
(PC)
16, 17, 18 Mortar to CMU Block 1st Level Open Area 1st Level Future Lab
N/A None Detected
19, 20, 21 Paint/Texture on CMU 1st Level Open Area 1st Level Future Lab
N/A None Detected
22 Beige Wallpaper/Glue 3rd Floor 311 Conference
Room N/A None Detected
23 White Roof Sealant South Roof N/A None Detected
White Sealant on Roof
Vent South Roof 2 SF 5% Chrysotile
SF – Square Feet LF – Linear Feet N/A – Not Applicable W – Wrap I – Insulation PC – Point Count
Table 3: Asbestos Sample Results Summary
Building 50 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
01, 02, 03 Window Glazing
Compound 2nd Level South Window N/A
0.5% Chrysotile
(PC)
04 White Roof Sealant North Roof N/A None Detected
05 White Mastic on Roof Vent
North Roof 6 SF 5% Chrysotile
SF – Square Feet LF – Linear Feet N/A – Not Applicable PC – Point Count
Table 4: Asbestos Sample Results Summary
Building 51 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity
Asbestos %
01, 02, 03 Window Glazing
Compound North Window Large Shop South Window Large Shop
N/A None Detected
04, 05, 06 Black Counter Tops Small Shop Area 77 SF 4 Counters
12% Chrysotile
07 White Roof Sealant East Roof N/A None Detected
08 White Mastic on Roof Vent East Roof N/A None Detected
SF – Square Feet LF – Linear Feet N/A – Not Applicable PC – Point Count
Table 5: Asbestos Sample Results Summary
Building 52 300 East College Drive
Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity Asbestos %
01, 02, 03 Wall Plaster 1st Level West Wall 1,217 SF 2% Chrysotile
04, 05, 06 Pipe Wrap and Pipe Mastic on Fittings 2nd Level East Wall 14 LF
W/M: None Detected
I: 10% Chrysotile
07, 08, 09 Pipe Wrap and Pipe Mastic on Fittings on Runs 2nd Level East Wall N/A 12% Chrysotile
10, 11, 12 Window Glazing
Compound 2nd Level North Window N/A
0.50% Chrysotile (PC)
13 Sealant on Roof Vent South Roof N/A None Detected
SF – Square Feet LF – Linear Feet N/A – Not Applicable W/Mastic – Wrap and Mastic I – Insulation PC – Point Count
Table 6: Asbestos Sample Results Summary
Building 53
300 East College Drive Mesilla, New Mexico 88047
Sample No. Suspect Material Sample Location Estimated Quantity Asbestos %
01, 02, 03 Pipe Wrap and Pipe Mastic on Fittings 2nd Level 15 LF
W/M: None Detected
I: 15% Chrysotile
04, 05, 06 Pipe Wrap and Pipe Mastic on Fittings on Runs 1st Level N/A None Detected
07, 08, 09 Window Glazing Compound
2nd Level West Window 150 LF 5 Windows
2% Chrysotile
10 White Roof Sealant South Roof N/A None Detected
White Sealant on Roof
Vent South Roof 3 SF 5% Chrysotile
SF – Square Feet LF – Linear Feet N/A – Not Applicable W/Mastic – Wrap and Mastic I – Insulation PC – Point Count
Sample Results for Lead Tables 7 through 12
TABLE 7 – LEAD SAMPLE RESULTS SUMMARY
Building 48 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 Tan Paint on Sheetrock Interior 2nd Floor File Room <0.005
P02 White Paint on CMU Wall Interior 2nd Floor Open Area 0.0052
P03 Beige Paint on Plaster Wall Interior 3rd Floor Conference
Room <0.005
P04 White Paint on Plaster Wall Interior 3rd Floor 308 Office 0.018
P05 Gray Paint on Plaster Wall Interior 3rd Level East
Stairwell <0.005
P06 Brown Paint on Plaster Wall Interior 3rd Level Stairwell 0.0099
P07 White Paint on Wood Wall Interior 1st Floor 103 Lab 0.8
P08 Blue Paint on Wood Wall Interior 2nd Floor 210 Office 0.099
P09 Beige Paint on Wood Door Interior 3rd Floor 308 Office 0.11
P10 Red Paint on Wood Door Interior 1st Floor 105 Bay
Area 0.031
P11 Tan Paint on Wood Wall Interior 1st Floor 101 Storage 0.38
P12 Gray Paint on Wood Plank Interior 2nd Floor Open Area INS*
P13 White Paint on Metal Column Interior 2nd Floor Open
Area 0.78
P14 White Paint on Metal
Door/Frame Interior 1st Floor 103 Lab 0.22
P15 Yellow Paint on Metal Railing Interior 2nd Floor Open
Area 9.9
P16 Tan Paint on Metal Equipment
Interior 2nd Floor Open Area
0.87
P17 Red Paint on Metal Brace Interior 2nd Floor Open Area 0.47
P18 Maroon Paint on Metal Frame Interior 1st Floor Bay Area Elevator Frame
3.3
P19 Gray Paint on Equipment Interior 2nd Floor Open Area 0.12
P20 Green Paint on Equipment Interior 2nd Floor Open Area 0.36
P21 Brown Paint on Metal Grate Floor
Interior 2nd Floor Open Area
0.55
P22 Beige Paint on Metal
Door/Frame Interior 3rd Floor 311
Conference Room 0.017
P23 Blue Paint on Metal Railing Interior 3rd Level East Stairwell
2.4
TABLE 7 – LEAD SAMPLE RESULTS SUMMARY
Building 48 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P24 Brown Paint on Metal Railing Interior 3rd Level West
Stairwell 0.057
P25 Gray Paint on Cement Floor Interior 1st Floor 100 Open
Area 0.2
P26 Yellow Paint on Cement Floor Interior 1st Floor 100 Open
Area <0.005
P27 Maroon Paint on Cement Curb Interior 1st Floor 105 Bay
Area 0.0087
P28 White Paint on Cement Wall Interior 1st Floor 105 Bay
Area 0.017
P29 Brown Paint on Cement Base Interior 3rd Level West
Stairwell 0.13
P30 Blue Paint on Cement Wall Interior 3rd Level East
Stairwell 0.013
P31 Gray Paint on Cement Tread Interior 3rd Level East
Stairwell 0.059
P32 Light Gray Paint on Concrete
Landing Interior 3rd Level East
Stairwell 0.35
P33 Red Paint on Metal Door/Frame Exterior 3rd Level North Roof <0.005
P34 Red Paint on Metal Window
Frame Exterior 3rd Level North Roof <0.005
P35 Beige Paint on Stucco Wall Exterior 3rd Level North Roof 0.0068
P36 Beige Paint on Metal Duct Exterior 3rd Level North Roof 0.13
INS* – Insufficient Sample Weight
TABLE 8 – LEAD SAMPLE RESULTS SUMMARY
Building 49 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 Tan Paint on Wood Wall Interior Data Room Wall 0.14
P02 White Paint on Wood Wall Interior Future Lab Wall 0.13
P03 Green Paint on Metal
Equipment Interior 1st Level Open Area 0.35
P04 Yellow Paint on Metal Rail Interior 2nd Level Open Area
P05 White Paint on Metal
Door/Frame Interior 1st Level Open Area 0.25
P06 Gray Paint on Metal Equipment Interior 1st Level Open Area 0.022
P07 Beige Paint on Metal
Equipment Interior 1st Level Open Area 0.17
P08 Red Paint on Metal Stairs Interior 1st Level Open Area 0.34
P09 Yellow Paint on Cement Floor Interior 1st Level Open Area 0.0098
P10 Gray Paint on Cement Floor Interior 1st Level Open Area 0.066
P11 White Paint on CMU Wall Interior 1st Level Open Area 0.073
P12 Tan Paint on Metal Equipment Interior 2nd Level Open Area <0.005
P13 Maroon Paint on Metal Grate Interior 2nd Level Open
Area 0.75
P14 Silver Paint on Metal
Equipment Interior 2nd Level Open Area 0.1
P15 Beige Paint on Metal Wall Exterior South Wall 0.098
P16 White Paint on Metal Roof Exterior South Roof 0.034
P17 Red Paint on Metal Window Exterior South Wall 0.041
P18 Beige Paint on Stucco Wall Exterior North Wall <0.005
TABLE 9 – LEAD SAMPLE RESULTS SUMMARY
Building 50 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 Yellow Paint on Metal Railing Interior 2nd Level 16
P02 Silver Paint on Metal Column Interior 2nd Level 0.41
P03 White Paint on Metal Wall Interior Paint Booth <0.005
P04 Yellow Paint on Cement Floor Interior 1st Level 7.5
P05 Gray Paint on Cement Floor Interior 1st Level 0.24
P06 Gray Paint on Wood Wall Interior 1st Level Compressor
Room 0.35
P07 Gray Paint on Wood Stairs Interior Stairwell 0.69
P08 Beige Paint on Metal
Door/Frame/Walls Interior South Door 0.092
P09 Red Paint on Metal Window
Frame Exterior South Window 0.17
P10 White Paint on Metal Roof Exterior South Roof 0.026
TABLE 10 – LEAD SAMPLE RESULTS SUMMARY
Building 51 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 Dark Gray Paint on Cement
Floor Interior Large Shop 0.3
P02 Light Gray Paint on Cement
Floor Interior Small Shop <0.005
P03 Green Paint on Metal Equipment
Interior Large Shop 1.7
P04 Red Paint on Metal Door/Frame Interior Small Shop <0.005
P05 Tan Paint on Metal Door/Frame Interior Large Shop 0.093
P06 Beige Paint on Metal Wall Interior Small Shop West
Wall <0.005
P07 Gray Paint on Metal Equipment Interior Large Shop <0.005
P08 Beige Paint on Metal
Equipment Interior Small Shop 0.18
P09 Blue Paint on Metal Equipment Interior Large Shop <0.005
P10 Tan Paint on Wood Wall Interior Large Shop 0.036
P11 White Paint on Wood
Door/Frame Interior Restroom 0.049
P12 Silver Paint on Metal Column Interior Large Shop 0.06
P13 Beige Paint on Metal Wall Interior North Wall <0.005
P14 Red Paint on Metal Door/Frame Exterior South Door 0.022
P15 Green Paint on Metal Generator Exterior South Exterior <0.005
TABLE 11 – LEAD SAMPLE RESULTS SUMMARY
Building 52 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 White Paint on Plaster Wall Interior 1st Level West Wall 0.3
P02 Gray Paint on Cement Floor Interior 1st Level 0.19
P03 Yellow Paint on Cement Floor Interior 1st Level 7.2
P04 Tan Paint on Metal Equipment Interior 2nd Level 0.4
P05 Brown Paint on Metal Grate
Floor Interior 2nd Level 0.48
P06 Tan Paint on Metal Column Interior 1st Level 0.56
P07 Red Paint on Metal Stairs Interior 1st Level 1.5
P08 Green Paint on Metal
Equipment Interior 1st Level 0.11
P09 Yellow Paint on Metal Railing Interior 1st Level 14
P10 Gray Paint on Metal
Door/Frame Interior 1st Level Roll Up
Door 0.22
P11 White Paint on Metal
Door/Frame Interior 1st Level West
Door 1.1
P12 Gray Paint on Metal Equipment Interior 1st Level 0.16
P13 Blue Paint on Metal
Equipment Interior 1st Level 2
P14 Red Paint on Metal Door/Frame Exterior South Door 0.0086
P15 Beige Paint on Metal Wall Exterior South Wall 0.11
TABLE 12 – LEAD SAMPLE RESULTS SUMMARY
Building 53 300 East College Drive
Mesilla, New Mexico 88047
Sample Nos. Color/Substrate Sample Location Lead Concentration
P01 Gray Paint on Cement Floor Interior 1st Level l 0.1
P02 Tan Paint on Metal Column Interior 1st Level <0.005
P03 White Paint on Metal
Door/Frame Interior 1st Level 0.19
P04 Yellow Paint on Metal Rail Interior 2nd Level <0.005% (INS*)
P05 Maroon Paint on Metal Grate Interior 2nd Level 0.12
P06 Beige Paint on Metal
Equipment Interior 2nd Level 0.021
P07 Beige Paint on Metal Wall Exterior South Wall 0.014
P08 Red Paint on Metal Door/Frame Exterior South Door 0.059
INS* – Insufficient Sample Weight
APPENDIX A
ASBESTOS AND LEAD LABORATORY ANALYTICAL RESULTS, ASSOCIATED CHAIN-OF-CUSTODY
DOCUMENTS & LABORATORY CERTIFICATIONS
Laboratory Results for Building 48
Date Received: 22-May-2020 29-May-2020Date Analyzed:
29-May-2020Date Reported:
JP201021595J3 Order #:
GLOBAL-001Project #:
Southwestern Cotton Ginning Research Laboratory-B48
7979 Broadway St., Ste 100 San Antonio TX 78209
Apex Companies, LLC Osanna Carrasco
Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)
Appx E Sub E 40 CFR 763 / EPA 600/R-93/116
Sample Description Asbestos
ConstituentsSample ID # Non-Asbestos Constituents
J3 Resources, Inc.
3113 Red Bluff Road, Pasadena, TX 77503
Phone: (713) 290-0223 - Fax: (713) 290-0248
J3Resources.com
LAYER 1
Painted Texture, Beige/White, Homogeneous *No Tape or Joint Compound Present
None Detected01 Non-Fibrous Material 100%
Cellulose FiberLAYER 2 Wallboard, Brown/White, Homogeneous
None Detected 10%
Non-Fibrous Material 90%
LAYER 1
Painted Texture, Beige/White, Homogeneous
None Detected02 Non-Fibrous Material 100%
Cellulose FiberLAYER 2 Tape, Beige, Homogeneous
None Detected 100%
LAYER 3
Joint Compound, White, Homogeneous *No Wallboard Present
None Detected Non-Fibrous Material 100%
LAYER 1
Painted Texture, Beige/White, Homogeneous *No Tape or Joint Compound Present
None Detected03 Non-Fibrous Material 100%
Cellulose FiberLAYER 2 Wallboard, Brown/White, Homogeneous
None Detected 10%
Non-Fibrous Material 90%
Cellulose Fiber Fibrous Glass
LAYER 1
Ceiling Tile, White/Gray, Homogeneous
None Detected04 60% 10%
Non-Fibrous Material 30%
LAYER 2
Mastic, Black, Homogeneous
Chrysotile 2% Non-Fibrous Material 98%
Kennetch Castro Analyst Lab DirectorScott Ward, Ph.D.
This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.
NVLAP Lab Code: 600120-0 AIHA Lab ID: 157714 TDSHS License: 30-0457 Page 1 of 16
29-May-2020Date Reported:
JP201021595J3 Order #:
GLOBAL-001Project #:
Southwestern Cotton Ginning Research Laboratory-B48
7979 Broadway St., Ste 100 San Antonio TX 78209
Apex Companies, LLC Osanna Carrasco
Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)
Appx E Sub E 40 CFR 763 / EPA 600/R-93/116
Sample Description Asbestos
ConstituentsSample ID # Non-Asbestos Constituents
J3 Resources, Inc.
3113 Red Bluff Road, Pasadena, TX 77503
Phone: (713) 290-0223 - Fax: (713) 290-0248
J3Resources.com
Cellulose Fiber Fibrous Glass
LAYER 1
Ceiling Tile, White/Gray, Homogeneous
None Detected05 60% 10%
Non-Fibrous Material 30%
LAYER 2
Mastic, Black, Homogeneous
Chrysotile 2% Non-Fibrous Material 98%
Cellulose Fiber Fibrous Glass
LAYER 1
Ceiling Tile, White/Gray, Homogeneous
None Detected06 60% 10%
Non-Fibrous Material 30%
LAYER 2
Mastic, Black, Homogeneous
Chrysotile 2% Non-Fibrous Material 98%
Cellulose Fiber Fibrous Glass
Ceiling Tile, White/Gray, Homogeneous None Detected07 60% 10%
Non-Fibrous Material 30%
Cellulose Fiber Fibrous Glass
Ceiling Tile, White/Gray, Homogeneous None Detected08 60% 10%
Non-Fibrous Material 30%
Cellulose Fiber Fibrous Glass
Ceiling Tile, White/Gray, Homogeneous None Detected09 60% 10%
Non-Fibrous Material 30%
Cellulose FiberCeiling Tile, White/Brown, Homogeneous None Detected10 70%
Non-Fibrous Material 30%
Cellulose FiberCeiling Tile, White/Brown, Homogeneous None Detected11 70%
Non-Fibrous Material 30%
Kennetch Castro Analyst Lab DirectorScott Ward, Ph.D.
This report relates only to the materials…