Sol_12805B24R0004_Amd_0002.pdf
PDF 140 KB Posted
- Attached to
- Mechanical Electrical Plumbing (MEP) MATOC Federal contract opportunity
- Solicitation number
- 12805B24R0004
About this file
This document is a contract amendment for Solicitation No. 12805B24R0004, a Mechanical Electrical Plumbing (MEP) Multiple Award Task Order Contract (MATOC) opportunity issued by the Department of Agriculture Agricultural Research Service.
The amendment adds Attachment 12 - Questions and Answers Amendment 0002, which provides responses to questions regarding the solicitation requirements. Key details include:
- The government may make multiple awards under this MATOC, with no minimum or maximum number of contractors specified.
- Proposals should be submitted in separate files/volumes as outlined in the solicitation, rather than a single combined file.
- Past performance questionnaires can be different from the prior experience projects submitted, but should be relevant to the MEP requirements.
- The solicitation requires a site superintendent and site safety & health officer, but they do not have to be full-time dedicated positions.
- Contractors can demonstrate concurrent multiple state experience through either single-project contracts or IDIQ task orders.
- Offerors can add additional detail lines to the seed project pricing template as needed, but cannot modify the overall format.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12805B24R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12805B
FORT COLLINS CO 80526
BLDG D, SUITE 300
2150 CENTRE AVENUE
USDA ARS PA AAO ACQ/PER PROP
05/10/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/04/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return ___1_______________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment 0002 is to add "Attachment 12 Questions and Answers Amendment
0002". Additionally, the Q&A is duplicated directly below on this SF30 Amendment 0002.
Q1: Is there a minimum and/or maximum number of contractors the agency will be selecting for a MATOC award?
A1: Please refer to solicitation paragraph M.1 ¿The Government reserves the right to make multiple awards (subject to availability of funds)¿. The intent is to make multiple awards.
Q2: Under Proposal Submission Documents, it states ¿information shall be confined to the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JOSHUA A. KEADLE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12805B24R0004/0002 appropriate file.¿ Is USDA wanting the proposal volumes to be 5 separate documents/files, or can the volumes be combined into a one overall file?
A2: Please refer to solicitation paragraph L.9
¿Proposal Submission Documents¿ Volume table matrix. Each Volume should be 5 separate document(s) for each volume as appropriate.
Please do not submit one single combined file for the overall proposal. *Note* The specifics for the submission documents, it is required to keep the original file format: for example an original submission of the excel file Attachment 9 ¿Seed
Project Proposal Template¿ which must be pulled out of the volume and submitted on its own in excel file format. Offerors however may choose
(for example) to additionally PDF their
Attachment 9 and include it in the volume, in addition to the stand-alone excel file, which is acceptable.
Q3: Under Volume 4, Factor 3 Past Performance, USDA is requesting 3 to 5 Past Performance
Questionnaires (PPQs). Do the PPQs need to be submitted for the same 3-5 projects featured in
Volume 3, Factor 2 Prior Experience, Subfactor A, Mechanical, Electrical and Plumbing Prior
Experience?
A3: No. The PPQs submitted for Volume 4, Factor
3 Past Performance, may be (but not required) the be the same project submitted for Volume 3, Factor 2 Prior Experience, Subfactor A, Mechanical, Electrical and Plumbing Prior
Experience. However, it is noted in Volume 4, Factor 3 Past Performance that ¿Offerors are cautioned to submit information specific to MEP work considered relevant to the requirements of this Request for Proposal.¿
Q4: If a CPARS evaluation is available for one or more of the projects the contractor intends on submitting under Volume 4, Factor 3 Past
Performance, can the contractor furnish a copy of the CPARS in lieu of a PPQ?
A4: No. The PPQ(s) must be submitted as required in the submission documents. Offerors are more
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12805B24R0004/0002 than welcome to include the CPARS evaluation to supplement the PPQ, but it cannot replace the PPQ.
Q5: In Volume 2, Factor 1 Technical, Subfactor A, Key Personnel Qualifications and Experience, it states the Site Safety & Health Officer (SSHO)
¿shall be independent from Project
Superintendent.¿ Please confirm USDA is requiring both a full-time Superintendent and
SSHO on all task orders issued under the MATOC, including the seed project.
A5: Please refer to C.11 for the site superintendent requirements. Notice this paragraph doesn¿t explicitly state ¿full time¿ which the USDA interprets as 40 hours a week, every week working solely superintendent duties.
The requirement is that during construction activities that a site superintendent be onsite and that the individual may also be ¿dual hat¿ with the ¿superintendent duties are the first priority of the superintendent.¿ This expectation would be the same for a Site Safety &
Health Officer. The only exception is that a
Site Superintendent cannot execute the duties of a SSHO, they need to be independent to avoid any conflicts of interest. The USDA (as the question is written) does not require a ¿full time¿ Site
Superintendent or SSHO, rather these positions shall adhere to the requirements identified in
C.11
Q6: Under Volume 3, Factor 2 Prior Experience, Subfactor C, Concurrent Multiple State Region
Prior Experience, it states: ¿Offerors shall submit contracts in which they performed prime contractor work in one state, while also performing another federally awarded contract in another state.¿ Please confirm by ¿contracts¿
USDA is looking for instances when the contractor executed individual projects (single-project contracts) or IDIQ task orders concurrently in two different states.
A6: Yes. Offerors may submit stand-alone awarded single-project contracts or task orders issued from an IDIQ to fulfil this requirement.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12805B24R0004/0002
Q7: In Attachment 9, Seed Project Pricing
Template, there is one line dedicated to Div 01
General Requirements. However, this division is comprised of numerous individual items that roll up to the total direct costs, such as a job trailer, safety supplies, waste disposal, temp power, etc. Since only one line is provided in the spreadsheet for Div 01, how does the offeror show the breakout of individual items comprising the total direct costs? Can the offeror add extra lines, as needed, beneath the Div 01 heading? (Note: To various degrees, this question applies to all divisions in the spreadsheet.)
A7: Offerors are allowed to insert additional lines to the excel document as necessary to provide detail and context to ¿Attachment 9, Seed
Project Pricing Template¿. However, offerors shall not disturb the format template subtotals, labor burden, totals etc. Additionally, offerors shall not remove any sections, for example profit, overhead, bonding, etc.
Period of Performance: 08/01/2024 to 07/31/2029
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .