Attachment 9 Preventive Maintenance Checklist 70B01C21R00000008 2-12-21.pdf
PDF 95 KB Posted
- Solicitation number
- 70B01C21R00000008
About this file
This document contains a preventative maintenance checklist and related federal contract opportunity solicitation. The preventative maintenance checklist outlines monthly, quarterly, semi-annual, and annual inspection and maintenance tasks required to maintain gate and security infrastructure at the border, including concrete, fencing, gates, lighting, drainage systems, electronics, and surrounding areas. The related federal contract opportunity is solicitation number 70B01C21R00000008 issued by the Department of Homeland Security Customs and Border Protection seeking maintenance, repair, and improvement services for tactical infrastructure assets in the Tucson Sector, including roads, bridges, fencing, gates, vegetation control, debris removal, lighting, drainage systems, and tunnel remediation. Services will be required within the specified timeframe and geographical location according to the attached statement of work.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gate: XX_XX Preventative
Maintenance Checklist
Date: Required
CID Component Inspection Maintenance Maintenance Component Notes 1 Concrete Slab and Pier Caps 1 month 1 month Clear top of concrete 2 Guide Rail 1 month 1 month Clean guide rail 3 Impact Beam 1 month 1 month Cleanout drainage holes
4 Filler Fence 1 month 1 month Remove debris 5 Gate Panels 1 month 1 month Remove debris from mesh/pickets 6 Emergency Light 1 month 3 months Clean plastic, check batteries/lamps 7 Magnetic Lock 1 month 3 months Clean magnets/steel 8 Operator 1 month 3 months Tighten hardware if loose 9 Photo-Eyes 1 month 3 months Clean lenses, check alignment
10 Flood Lights 1 month 3 months Clean plastic/reflectors, replace lamps if burned out 11 Trolley Beam 1 month 3 months Remove debris from beam 12 Cross Members 1 month 3 months Remove debris 13 Trolleys 1 month 3 months Check trolley suspension rod pins 14 Winch 1 month 3 months Exercise winch 15 Chain 1 month 6 months Remove debris, tighten if sagging, lubricate if necessary 16 Key Pads 1 month 6 months Clean keys of dirt/dust 17 Signage 1 month 6 months Clean signs of dirt/dust 18 Surrounding Area 1 month 6 months Clear area and grade terrain 19 Baseplates, Nuts, Bolts 3 months N/A (As required) 20 Columns 3 months N/A (As required) 21 Electrical Conduits 3 months N/A (As required) 22 Battery Box 3 months N/A Remove debris / replace wiring as necessary 23 Gate Operator Alarm 3 months 3 months Activate alarm through photo-eye obstruction, re-set to silence 24 System locks 3 months 6 months Exercise locks 25 Share lock 3 months 6 months Clean system /grease chain 26 Batteries 3 months 12 months Change Batteries if necessary 27 Operator Sprockets 6 months 6 months Check screws, tighten if necessary 28 Bird Spikes 6 months 6 months Remove debris 29 Inspect VegControl on Foot Print Area 1 month 1 month Clear up any tall grass or vines growing around gate.
30 TI Area for TI Work 1 month 1 month Examine surrounding area for work needed ( i.e. sink holes, breaches).
31 Rat Repellent 1 month 1 month Replace rat repellent.
32 Rodent Damage 1 month 1 month Inspect for any Rodent Damage, i.e. chewed wires, urine.
33 Inspect for Insects 1 month 1 month Inspect for insects, i.e. ants, bees etc. Eliminate in a environmentally safe manner.
34 Gate Status N/A N/A Is Gate Operational? Yes or No 35 Additional Comments N/A N/A
Frequency
Work Performed By:____________________________________ _____________________________________________________
File details come from the government source that posted it. Updated .