TCA Attachment 2 Line Item Summary 3-19-21.xlsx
XLSX spreadsheet 44 KB Posted
- Solicitation number
- 70B01C21R00000008
About this file
This document contains a template for offerors to complete for a fixed price contract to provide maintenance and repair services for tactical infrastructure assets in the Tucson Sector for U.S. Customs and Border Protection. The template includes line items for scheduled maintenance tasks such as gate, lighting and drainage inspections and repairs to be conducted through base and option years. Offerors are instructed to provide fixed unit prices for scheduled maintenance and a coefficient to be applied to management, scheduled and unscheduled maintenance costs to calculate the total evaluated price. Required services include road, fence and gate repairs, vegetation control, debris removal, border lighting maintenance, and drainage system and tunnel upkeep. The solicitation number for this opportunity is 70B01C21R00000008 and the issuing agency is the Department of Homeland Security Customs and Border Protection. Responses are due by specified dates in 2021.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 70B01C21R00000008 ATTACHMENT 2 - LINE ITEM SUMMARY |
| Instructions to Offeror: |
| The Offeror shall complete the sheets for the Base Period, Option Period 1, Option Period 2, Option Period 3, and Option Period 4 by filling the cells highlighted in YELLOW. After entering the proposed prices, the amounts will transfer automatically to the summary sheet to give the total evaluated price. Offerors shall use the fixed unit prices from Attachment 3 "Unit Bid Sheet" for its scheduled maintenance pricing. The offeror shall also propose its coefficient by completing Cell B9 in the Summary sheet. The coefficient will then be multiplied by the totals for program managment, schedule maintenance, and unscheduled maintenance to calculate the total evaluated price. Additionally, please identify the elements of the coefficient on the Summary Tab in the areas specified. |
Summary
| Requirement | Base Period: | ||||||||
| 07/01/21 - 06/30/2022 | Option Yr 1 | ||||||||
| 07/01/22 - 06/30/23 | Option Yr 2 | ||||||||
| 07/01/23 - 06/30/24 | Option Yr 3 | ||||||||
| 07/01/24 - 06/30/25 | Option Yr 4 | ||||||||
| 07/01/25 - 06/30/26 | Total | Extension Period 07/01/26 - 12/31/26 | Total with 6 month extension | ||||||
| Program Management (FFP-TCA) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scheduled Maintenance (FFP-TCA) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0 | $0.00 | $0.00 | |
| Unscheduled Maintenance (IDIQ TCA) | $8,992,335.00 | $9,262,126.00 | $9,539,989.00 | $9,826,189.00 | $10,120,975.00 | $47,741,614 | $5,060,487.50 | $52,802,101.50 | |
| Subtotal | $8,992,335.00 | $9,262,126.00 | $9,539,989.00 | $9,826,189.00 | $10,120,975.00 | $47,741,614 | $5,060,487.50 | $52,802,101.50 | |
| Co-Efficient Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0 | $0.00 | $0.00 | |
| Total Price: | $8,992,335.00 | $9,262,126.00 | $9,539,989.00 | $9,826,189.00 | $10,120,975.00 | $47,741,614 | $5,060,487.50 | $52,802,101.50 |
Coefficient (Profit+OH+Tax) %
| Coefficient Elements: |
| Profit |
| OH |
| Tax |
Base Period
| BASE PERIOD: TCA SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration | PRICE | Labor | Equipment | Material | Other | Comments/assumptions | |
| TON Vamori Wash - Normandy Vehicle Barrier | Routine: Remove barriers premonsoon / replace post monsoon | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for removing and one event for re-installing. Install T-posts and barbed wire | |
| TON Culvert inspections pre monsoon | Routine: Inspect culverts for sedimentation and debris accumulation and proper drainage | 37 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DGL Flood swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 105 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NCO Flood Lift and Swing Gate | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 161 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NGL Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 182 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| AJO Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 63 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| DGL Lighting inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 380 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NCO Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 550 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NGL Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 132 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| DGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 54 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NCO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 29 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SON Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 19 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 55 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| TUS Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 47 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| AJO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 49 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Smugglers Basin Cleanout | Routine: Remove debris/trash and sedimentation | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Program Management NA NA NA NA
OPT Period 1
| OPTION PERIOD 1: TCA SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration | PRICE | Labor | Equipment | Material | Other | Comments/assumptions | |
| TON Vamori Wash - Normandy Vehicle Barrier | Routine: Remove barriers premonsoon / replace post monsoon | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for removing and one event for re-installing. Install T-posts and barbed wire | |
| TON Culvert inspections pre monsoon | Routine: Inspect culverts for sedimentation and debris accumulation and proper drainage | 37 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DGL Flood swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 105 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NCO Flood Lift and Swing Gate | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 161 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NGL Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 182 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| AJO Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 63 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| DGL Lighting inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 380 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NCO Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 550 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NGL Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 132 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| DGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 54 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NCO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 29 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SON Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 19 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 55 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| TUS Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 47 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| AJO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 49 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Smugglers Basin Cleanout | Routine: Remove debris/trash and sedimentation | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Program Management NA NA NA NA
OPT Period 2
| OPTION PERIOD 2: TCA SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration | PRICE | Labor | Equipment | Material | Other | Comments/assumptions | |
| TON Vamori Wash - Normandy Vehicle Barrier | Routine: Remove barriers premonsoon / replace post monsoon | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for removing and one event for re-installing. Install T-posts and barbed wire | |
| TON Culvert inspections pre monsoon | Routine: Inspect culverts for sedimentation and debris accumulation and proper drainage | 37 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DGL Flood swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 105 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NCO Flood Lift and Swing Gate | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 161 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NGL Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 182 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| AJO Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 63 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| DGL Lighting inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 380 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NCO Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 550 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NGL Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 132 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| DGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 54 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NCO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 29 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SON Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 19 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 55 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| TUS Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 47 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| AJO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 49 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Smugglers Basin Cleanout | Routine: Remove debris/trash and sedimentation | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Program Management NA NA NA NA
OPT Period 3
| Option Period 3: TCA SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration | Price | Labor | Equipment | Material | Other | Comments/assumptions | |
| TON Vamori Wash - Normandy Vehicle Barrier | Routine: Remove barriers premonsoon / replace post monsoon | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for removing and one event for re-installing. Install T-posts and barbed wire | |
| TON Culvert inspections pre monsoon | Routine: Inspect culverts for sedimentation and debris accumulation and proper drainage | 37 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DGL Flood swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 105 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NCO Flood Lift and Swing Gate | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 161 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NGL Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 182 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| AJO Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 63 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| DGL Lighting inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 380 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NCO Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 550 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NGL Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 132 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| DGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 54 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NCO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 29 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SON Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 19 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 55 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| TUS Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 47 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| AJO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 49 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Smugglers Basin Cleanout | Routine: Remove debris/trash and sedimentation | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Program Management NA NA NA NA
OPT Period 4
| OPTION PERIOD 4: TCA SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration | PRICE | Labor | Equipment | Material | Other | Comments/assumptions | |
| TON Vamori Wash - Normandy Vehicle Barrier | Routine: Remove barriers premonsoon / replace post monsoon | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for removing and one event for re-installing. Install T-posts and barbed wire | |
| TON Culvert inspections pre monsoon | Routine: Inspect culverts for sedimentation and debris accumulation and proper drainage | 37 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DGL Flood swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 105 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NCO Flood Lift and Swing Gate | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 161 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| NGL Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 182 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| AJO Flood Lift and Swing Gates | Routine: Open premonsoon/Close postmonsoon/ Includes lubing and inspection for proper operation and installing barbed fencing across opening | 63 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | one event for opening and one event for closing | |
| DGL Lighting inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 380 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NCO Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 550 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| NGL Lighting Inspections | Routine: Inspect, clean, replace failed components as needed, ie ballasts, lamps, photocells | 132 fixtures | 4 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cells | |
| DGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 54 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NCO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 29 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SON Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 19 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| NGL Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 55 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| TUS Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 47 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| AJO Culvert/Cattleguard/Grates | Routine: Inspect for sedimentation and debris accumulation and proper drainage | 49 | 1 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Smugglers Basin Cleanout | Routine: Remove debris/trash and sedimentation | 1 | 2 | 0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Program Management NA NA NA NA
File details come from the government source that posted it. Updated .