Attachment 7 Work Order Form 70B01C21R00000008 2-12-21.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
CBP Tucson Sector Tactical Infrastructure Maintenance and Repair (CTIMR)
Solicitation number
70B01C21R00000008
Issued by

About this file

This document contains a work order form and statement of work for maintenance, repair, and improvement services for tactical infrastructure assets in the Tucson Sector. Customs and Border Protection is seeking contractor services to perform maintenance on roads and bridges, fences and gates including concertina wire, vegetation control, debris removal, border lighting and electrical systems, drainage and grate systems, and tunnel remediation. Contractors must fill out the attached site visit form if attending the site visit and email it to the specified Customs and Border Protection contact by February 25, 2021. The work order form includes tables for contractors to provide pricing details for labor, equipment, materials, mobilization, and other costs for the requested tactical infrastructure maintenance and repair work.

View the file

Other files

File Type Posted
Amendment_07_-_70B01C21R00000008_-_SF_30.pdf PDF
Boat Ramp Design Standards.pdf PDF
EC1Y1 RFP TI V4_.pdf PDF
TI Design Standards_v1_Chapter 3_Sept 2012.pdf PDF
TI Design Standards_v1_Chapter 1_Sept 2012.pdf PDF
Submittal 01 - Engineering Letter Shop Drawings.pdf PDF
TI Standards v2_Wall-Fence-Gates Drawing Updates_080618 (003).pdf PDF
TI Design Standards_v1_Chapter 2_Sept 2012.pdf PDF
TI Design Standards_v1_Sept 2012 - Roads Section.pdf PDF
Amendment_06_-_70B01C21R00000008_-_SF_30.pdf PDF
Boat Ramp Detail.pdf PDF
Site Visit Questions Answers 3-22-21 Responses (002).pdf PDF
Amendment_05_-_70B01C21R00000008_-_SF_30.pdf PDF
Site Visit Questions Answers 3-22-21.pdf PDF
TI Maintenance Work Plan Development Process Flowchart_3-19-21.pdf PDF
70B01C21R00000008 RFP 3-19-21.pdf PDF
ATTACHMENT 1 STATEMENT OF WORK CTIMR TUCSON 70B01C21R00000008 3-19-21 .pdf PDF
Site Visit Questions Answers 3-19-21 Responses (002).pdf PDF
TCA Attachment 2 Line Item Summary 3-19-21.xlsx XLSX spreadsheet
Amendment_04_-_70B01C21R00000008_-_SF_30.pdf PDF
Amendment_03_-_70B01C21R00000008_-_SF_30.pdf PDF
Attachment 2 Line Item Summary 70B01C21R00000008 3-3-2021.xlsx XLSX spreadsheet
Amendment_02_-_70B01C21R00000008_-_SF_30.pdf PDF
RFP 70B01C21R00000008 3-3-2021.pdf PDF
Amendment_01_-_70B01C21R00000008_-_SF_30.pdf PDF
CTIMR Contractor Site Visit.pdf PDF
SCA WAGES SANTA CRUZ.txt TXT text file
SCA WAGES COCHISE COUNTY.txt TXT text file
Attachment 9 Preventive Maintenance Checklist 70B01C21R00000008 2-12-21.pdf PDF
Attachment 2 Line Item Summary 70B01C21R00000008 2-12-21_.xlsx XLSX spreadsheet
ATTACHMENT 5 PAST PERFORMANCE INFORMATION SURVEY 70B01C21R00000008 2-12-21 .docx DOCX document
Attachments 6 SCA WAGE DETERMINATIONS PIMA COUNTY.txt TXT text file
RFP 70B01C21R00000008 2-12-21.pdf PDF
Attachment 1 Statement of Work CTIMR Tucson 70B01C21R00000008 2-12-21.pdf PDF
DBA WAGES COCHISE COUNTY.pdf PDF
Attachment 3 _Unit_Pricing_Sheet 70B01C21R00000008 2-12-21_.xlsx XLSX spreadsheet
Site Visit Sign In.xlsx XLSX spreadsheet
Attachment 4 Notional Work Plan 70B01C21R00000008 2-12-21.xlsx XLSX spreadsheet
DBA WAGES SANTA CRUZ.pdf PDF
Attachment 8 Estimate Form 70B01C21R00000008 2-12-21.xlsx XLSX spreadsheet
DBA WAGES PIMA COUNTY.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

EST. Service Delivery Summary
Work Activity (WA) Number:Date:REV:
Work Plan:Element:
Project:TSM:
WORK DESCRIPTION
Scope of Work:
Work Category:Location:
Work Classification:Sector:
Work Subdivisions:Work ElementGPS:B

E N:

G W: E N N:

D W:

Lead Contact:Name:Ph:Email:
Lead Contact:Name:Ph:Email:
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
$$
Labor Sub Total$
Travel Labor
$$
Travel Labor Sub Total$
Equipment
$$
$$
$$
$$
Equipment Sub Total$
Material
$$
Material Sub Total$
Mobilization
$ ‐
$ ‐
Mobilization Sub Total$ ‐
Other Costs
$ ‐
Other Costs Sub Total$ ‐
Representative:
Name, SignatureSub Total:
$
Representative:________________________________________ Name, SignatureFee:$
Total:$ __________
COR Approval_____________________________________________________

Name, Signature Contract #: Page 1 of 1 Revised:

File details come from the government source that posted it. Updated .