Attachment 4 Notional Work Plan 70B01C21R00000008 2-12-21.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
CBP Tucson Sector Tactical Infrastructure Maintenance and Repair (CTIMR)
Solicitation number
70B01C21R00000008
Issued by

About this file

This document includes a notional work plan and description of a federal contract opportunity for tactical infrastructure maintenance and repair services within the Tucson Sector in Arizona for Customs and Border Protection. The notional work plan outlines sample tasks across several asset categories including roads and bridges, fence and gates, vegetation control, debris removal, border lighting and electrical, and drainage systems. The related federal contract opportunity is solicitation number 70B01C21R00000008 seeking contractor services to perform maintenance, repair, and improvement of tactical infrastructure assets in these same categories within the Tucson Sector. Services will be required for assets such as roads, fences, gates, lighting, and drainage systems. The response deadline is February 25, 2021 for an optional site visit form.

View the file

Other files

File Type Posted
Amendment_07_-_70B01C21R00000008_-_SF_30.pdf PDF
Boat Ramp Design Standards.pdf PDF
EC1Y1 RFP TI V4_.pdf PDF
TI Design Standards_v1_Chapter 3_Sept 2012.pdf PDF
TI Design Standards_v1_Chapter 1_Sept 2012.pdf PDF
Submittal 01 - Engineering Letter Shop Drawings.pdf PDF
TI Standards v2_Wall-Fence-Gates Drawing Updates_080618 (003).pdf PDF
TI Design Standards_v1_Chapter 2_Sept 2012.pdf PDF
TI Design Standards_v1_Sept 2012 - Roads Section.pdf PDF
Amendment_06_-_70B01C21R00000008_-_SF_30.pdf PDF
Boat Ramp Detail.pdf PDF
Site Visit Questions Answers 3-22-21 Responses (002).pdf PDF
Amendment_05_-_70B01C21R00000008_-_SF_30.pdf PDF
Site Visit Questions Answers 3-22-21.pdf PDF
TI Maintenance Work Plan Development Process Flowchart_3-19-21.pdf PDF
70B01C21R00000008 RFP 3-19-21.pdf PDF
ATTACHMENT 1 STATEMENT OF WORK CTIMR TUCSON 70B01C21R00000008 3-19-21 .pdf PDF
Site Visit Questions Answers 3-19-21 Responses (002).pdf PDF
TCA Attachment 2 Line Item Summary 3-19-21.xlsx XLSX spreadsheet
Amendment_04_-_70B01C21R00000008_-_SF_30.pdf PDF
Amendment_03_-_70B01C21R00000008_-_SF_30.pdf PDF
Attachment 2 Line Item Summary 70B01C21R00000008 3-3-2021.xlsx XLSX spreadsheet
Amendment_02_-_70B01C21R00000008_-_SF_30.pdf PDF
RFP 70B01C21R00000008 3-3-2021.pdf PDF
Amendment_01_-_70B01C21R00000008_-_SF_30.pdf PDF
CTIMR Contractor Site Visit.pdf PDF
SCA WAGES SANTA CRUZ.txt TXT text file
SCA WAGES COCHISE COUNTY.txt TXT text file
Attachment 7 Work Order Form 70B01C21R00000008 2-12-21.xlsx XLSX spreadsheet
Attachment 9 Preventive Maintenance Checklist 70B01C21R00000008 2-12-21.pdf PDF
Attachment 2 Line Item Summary 70B01C21R00000008 2-12-21_.xlsx XLSX spreadsheet
ATTACHMENT 5 PAST PERFORMANCE INFORMATION SURVEY 70B01C21R00000008 2-12-21 .docx DOCX document
Attachments 6 SCA WAGE DETERMINATIONS PIMA COUNTY.txt TXT text file
RFP 70B01C21R00000008 2-12-21.pdf PDF
Attachment 1 Statement of Work CTIMR Tucson 70B01C21R00000008 2-12-21.pdf PDF
DBA WAGES COCHISE COUNTY.pdf PDF
Attachment 3 _Unit_Pricing_Sheet 70B01C21R00000008 2-12-21_.xlsx XLSX spreadsheet
Site Visit Sign In.xlsx XLSX spreadsheet
DBA WAGES SANTA CRUZ.pdf PDF
Attachment 8 Estimate Form 70B01C21R00000008 2-12-21.xlsx XLSX spreadsheet
DBA WAGES PIMA COUNTY.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Purpose of this effort is to evaluate vendors technical ability to determine proper equipment, materials and labor resources and amount of time to complete a task order
Steps :
1Use Your Estimate Form to complete the YELLOW highlighed sections of the Work Estimate Form (Attachment 8) for each Notional Work Plan task identified within each tab.
a) Labor resources
b) Equipment Resources
c) Material Resource Quantity
d) Mobilization
e) Other Cost: ex. NM tax
2Under Work Description just fill out TI Asset Description and Work category: ex.- R&B, V&D, etc.
3All Yellow Highlighted Columns should be completely filled out under the Estimate Forms (Attachment 8): Item, UoM, and Qty
4PDF all completed estimate forms and lock so they can only be viewed and not edited

F&G

Notional Work Plan; Use Work Order Form to complete for each task under each tab
Task #Task DescriptionAsset ObjectiveWork CategoryLocationSectorOccurrences
1Open premonsoon/close postmonsoon, perform inspection and maintenance of 511 lift and 208 swing gates. Inspections shall be twice a year. Maintenance includes cleaning out the tracks and moving parts with air, greasing, lubricating, test.Keep all gates fully operationalF&GAZTucson1

2 Replace damaged or missing 8'X18' fence panel, assume resetting 2 panels per event. Close all opennings and meet CBP standards F&G AZ Tucson 1

3 Urgent fence breach repairs; repair 6"X6" cut bollard with sleeve and fill with concrete. Assume one bollard per event Close all opennings and meet CBP standards. F&G AZ Tucson 25

R&B

Task #Task DescriptionAsset ObjectiveWork CategoryLocationSectorOccurrences
1Maintenance blading 250 miles of Border Fence Road. Contractor will complete maintenance blading (smoothing) on roadways regrading, reshaping and compaction with no added materials.Keep road surfaces free from washboarding and erosionR&BAZTucson1

2 Maintenance Blading of Border Fence Road. Contractor will complete maintenance blading (smoothing) on roadways regrading, reshaping and compaction with added materials including soil stabilizer. Assumption is 50 miles Keep road surfaces free from washboarding, erosions and potholes R&B AZ Tucson 1

3 Install Articulating Matting on steep incline border road to prevent eroding. Assumption is 1800 SQF per event. Keep road surfaces free from washboarding, erosions and potholes R&B AZ Tucson 1

L&E

Task #Task DescriptionAsset ObjectiveWork CategoryLocationSectorOccurrences
1Inspect, clean, replace failed components as needed. Components include, ballasts, lamps and photocells. Assumption is for 1,062 fixtures. Assume 10% quarterly failure rate on lamps, 5% failure rate on ballasts and 5% failure rate on photo cellsMaintain all fixtures to stay fully operationalL&EAZTucson1

2 Lighting/electrical repair. Replace one pole mounted 7200 volt primary 240 volt secondary and one 25kva transformer Maintain lighting requirements L&E AZ Tucson 1

2 Replace 5 complete 1,000 watt high pressure sodium pole mounted light fixtures with new photo cells Maintain lighting requirements L&E AZ Tucson 1

V&D

Task #Task DescriptionAsset ObjectiveWork CategoryLocationSectorOccurrences
1Vegetation removal along the International Boundary Fence (IBR). Cut/mulch all vegetation within 60 feet of the IBR, use weed eaters and chipper to mulch material and leave in place. Any accumulation or unchippable material will be loaded and hauled offsite. Assumption is 50 miles.Maintain clear site of view for BP agentsV&DAZTucson1

2 Vegetation removal along roadways. Assumption is a vertical line from the footprint of the road. Assumption is 20 miles Maintain clear site of view for BP agents V&D AZ Tucson 1

3 Remove debris build up to include all trash, tires, sedimentation and any other foreign objects in washes and low water crossings. Average of 50 ton per event Debris removal V&D AZ Tucson 5

D&G

Task #Task DescriptionAsset ObjectiveWork CategoryLocationSectorOccurrences
1Culvert/Cattleguard/Grates. Inspect for sedimentation and debris accumulation and proper drainage. Inspection done once a year for 250 locations.Keep culverts and grates free of obstructions for proper drainageR&BAZTucson1

2 Replace 3' X 25' collapsed culvert across roadway. Clear sedimentation and debris at inlet and outlet and install grouted rip rap Culvert replacement D&G AZ Tucson 1

3 Remove 20 tons of debris from 3' X 20' culvert's inlet and outlet. Sediment to be disposed of at an approved site. Flush and clear sedimentation from culvert to allow for proper drainage Maintain free flow of water through drainage structure D&G AZ Tucson 1