Attachment__9_Experience_Form.docx

DOCX document 13 KB Posted

Attached to
NGWSP NAVAJO CODE TALKERS SUBLATERAL Federal contract opportunity
Solicitation number
140R4021R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document contains an experience worksheet template for contractors to submit past project experience related to a federal solicitation. The solicitation is for the Navajo-Gallup Water Supply Project Navajo Code Talkers Sublateral Reaches 12.1 & 12.2 issued by the Department of the Interior Bureau of Reclamation with solicitation number 140R4021R0009. The experience worksheet requests details on up to two past projects including scope, complexity, budgets, schedules, roles, and performance issues. Contractors must use this template to provide their qualifications for conceptual planning, design, and construction of water infrastructure projects similar in size and scope to the Navajo Code Talkers Sublateral work.

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP NAVAJO CODE TALKERS SUBLATERAL, newest first.
File Type Posted
Attachment__21_00_00_01_-_Specifications_09012021_0010.pdf PDF
Sol_140R4021R0009_Amd_0010.pdf PDF
Attachment__22_00_00_02_-_Drawings_09012021_0010.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__5_2SEP21_0010.docx DOCX document
140R4021R0009-0010_Amendment_2SEP21_0010.pdf PDF
Sol_140R4021R0009_Amd_0009.pdf PDF
Round__4_Attachment_-_KINDER_MORGAN_STIPULATIONS_0009.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__4_18AUG21_0008.docx DOCX document
Attachment__20_00_00_02_-_Drawings_16AUG21_0008.pdf PDF
Sol_140R4021R0009_Amd_0008.pdf PDF
140R4021R0009-0008_Amendment_18AUG21_0008.pdf PDF
Attachment__19_00_00_01_-_Specifications_08162021_0008.pdf PDF
Attachment__18_04_00_00_02A_Dwgs_Geology_0007.pdf PDF
Attachment__16_00_00_01_-_Revised_Specifications_Amd_0007_08092021_0007.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__3_11AUG21_0007.docx DOCX document
Attachment__17_03_00_00_02_Drawings_Revised_0007.pdf PDF
Sol_140R4021R0009_Amd_0007.pdf PDF
140R4021R0009-0007_Amendment_11AUG21_0007.pdf PDF
Attachment__15_04_00_00_02_-_Revised_Drawings_080221_11x17_0006.pdf PDF
140R4021R0009-0006_Amendment_3AUG21_0006.pdf PDF
Sol_140R4021R0009_Amd_0006.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__2_3AUG21_0006.docx DOCX document
Attachment__14_03_00_00_01_-_Revised_Specifications_FINAL_08-02-21_0006.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__1_28JUL21_0005.docx DOCX document
Sol_140R4021R0009_Amd_0005.pdf PDF
Sol_140R4021R0009_Amd_0004.pdf PDF
140R4021R0009-0003_Amendment_19JUL21_0003.pdf PDF
Attachment__12_00_00_01_-_Revised_Specifications_07-16-21_0003.pdf PDF
Sol_140R4021R0009_Amd_0003.pdf PDF
Attachment__13_027_1695-D-60129_Rev_4_11x17_07-16-21_0003.pdf PDF
Sol_140R4021R0009_Amd_0002.pdf PDF
Sol_140R4021R0009_Amd_0001.pdf PDF
Attachment__2_Dwgs_06-16-2021_0001.pdf PDF
Attachment__1_00_00_01_-_Specification_06-16-2021.pdf PDF
Attachment__7_WD_NM20210024_(Building).pdf PDF
Sol_140R4021R0009.pdf PDF
Attachment__11_Subcontracting_Plan_Template.docx DOCX document
Attachment__6_WD_NM20210011_(Heavy).pdf PDF
Attachment__3_00_00_02A_Drawings_Geology_and_Logs_11x17_09-23-2020.pdf PDF
Attachment__2_Dwgs_06-16-2021.pdf PDF
Attachment__10_Key_Personnel_Form.docx DOCX document
Attachment__8_Past_Performance_Questionnaire.pdf PDF
Attachment__5_00_00_02_Drawings_061-132_11x17_05-17-2021.pdf PDF
Attachment__4_00_00_02_Drawings_001-060_11x17_06-16-2021.pdf PDF
140R4021R0009_RFP_Code_Talker_24JUN21.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE WORKSHEET

(MAXIMUM 2 PAGES PER PROJECT)

Project Name:

Project Location:

Contract Number:

Customer Name:

Customer Address:

Customer Contact:

Contact Phone:

Type of Contract:
Traditional Design-Build Progressive Design-Build Construction Manager at Risk

Design-Bid-Build Design Only

Role:
Principal Designer Principal Constructor Designer & Constructor
Point of Involvement:
Conceptual Planning Design Construction

Description of Project:

(Include scope, complexity, magnitude, and any other relevant information)

Original Completion Date (Mo/Yr):

Actual Completion Date (Mo/Yr)

Explain Early/Late Completion:

Original Contract Amount:

Final Contract Amount:

Explain Under/Over Budget Costs:

Describe any problems encountered in performance of the work and corrective action(s) taken:

File details come from the government source that posted it. Updated .