This document is an amendment to a federal solicitation for construction services. The solicitation is for two reaches of the Navajo-Gallup Water Supply Project Navajo Code Talkers Sublateral. Reach 12.1 and 12.2 will both be constructed on a firm-fixed price basis. The amendment updates pricing schedules, specifications and drawings, the period of performance, proposal acceptance timelines, and contract clauses. It also establishes a staggered notice to proceed schedule. The Bureau of Reclamation within the Department of the Interior is the contracting agency. Offerors must acknowledge receipt of the amendment by the stated deadline.
The amendment provides additional details for two construction line items. Line item one is for Reach 12.1 and line item two is for Reach 12.2. Both require conforming to updated specifications and drawings for a turnkey pumping plant. Full-time safety, quality control, and survey personnel are also requirements. Invoices must include quantity survey data. The amendment further modifies terms within the solicitation related to period of performance, acceptance timelines, alterations, and subcontractor specifications.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4021R0009 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
06/24/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/24/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to:
1. Update block 11 of the SF 1442 to read, "The Contractor shall begin performance 21 calendar days and complete it within 812 calendar days after receiving notice to proceed.
The performance period is mandatory."
2. Correct block 13.d. of the SF 1442 to read, "Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected."
3. Update the Section B Price Schedule.
4. Update Section F, clause 52.211.10 Commencement, Prosecution and Completion of Work
April 1984, to add a staggered Notice to Proceed (NTP) schedule for the two reaches.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Ashton Jones
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 28
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021R0009/0003
5. Update Section I, clause 52.252-4 Alterations in Contract April 1984, to add "4) PVC Pipe".
6. Update Section J to add Attachment #12 (00 00
01 - Revised Specifications 07-16-21) and
Attachment #13 (027_1695-D-60129_Rev 4
11x17_07-16-21). These specifications and drawings replace or are in addition to the specifications and drawings included in the original solicitation.
7. Update Section L, provision 1452.215-81 to add "Volume III" in paragraph (n).
Legacy Doc #: BOR
Period of Performance: 11/17/2021 to 02/28/2024
Change Item 00010 to read as follows(amount shown is the obligated amount):
00010 Code Talkers Sublateral - Reach 12.1
See Specifications (Section J Attachments 1 & 12) and Drawings (Section J Attachments 2 & 13) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (A/U)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure a turn-key pumping plant to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 28
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021R0009/0003
WATER SUPPLY FACILITIES
Change Item 00020 to read as follows(amount shown is the obligated amount):
00020 Code Talkers Sublateral - Reach 12.2
See Specifications (Section J Attachments 1 & 12) and Drawings (Section J Attachments 2 & 13) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (A/U)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure a turn-key pumping plant to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .