This document is an amendment to a federal solicitation for construction services related to the Navajo-Gallup Water Supply Project. The Bureau of Reclamation is seeking a turnkey contractor to construct two pumping plant reaches along the Navajo Code Talkers Sublateral, including all necessary items, equipment, materials, personnel and surveyors. Clarification questions are due by September 7, 2021, with responses from Reclamation. The amendment updates the price schedule, specifications and drawings. The period of performance is December 17, 2021 through March 28, 2024. Pricing will be firm-fixed price. Construction services are required under two contract line items for the two reaches.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4021R0009 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
06/24/20210010
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/24/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to:
1. Include Round #5 of clarification questions submitted by vendors, along with
Reclamation's answers.
2. Update Section B, Price Schedule.
3. Update Section J to add Attachment #21 (00 00 01 - Specifications_09012021) & Attachment
#22 (00 00 02 - Drawings 09012021). These specifications and drawings replace or are in addition to the specifications and drawings included in the original solicitation and previous amendments.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Ashton Jones
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021R0009/0010
4. Additional questions will be allowed for only the Banana Wash Crossing. They must be submitted no later than close of business on Tuesday, September 7, 2021. The questions should be submitted to amy.loveless@usbr.gov and cc ajones@usbr.gov.
Legacy Doc #: BOR
Period of Performance: 12/17/2021 to 03/28/2024
Change Item 00010 to read as follows(amount shown is the obligated amount):
00010 Code Talkers Sublateral - Reach 12.1
See Specifications (Section J Attachments 1, 12, 14, 16, 19 & 21) and Drawings (Section J
Attachments 2, 13, 15, 17, 18, 20 & 22) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (A/U)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure a turn-key pumping plant to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021R0009/0010
Change Item 00020 to read as follows(amount shown is the obligated amount):
00020 Code Talkers Sublateral - Reach 12.2
See Specifications (Section J Attachments 1, 12, 14, 16, 19 & 21) and Drawings (Section J
Attachments 2, 13, 15, 17, 18, 20 & 22) for more details.
Quantity (QTY) - One (1)
Unit of Issue - Activity Unit (A/U)
Pricing Arrangement - Firm-Fixed Price (FFP)
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure a turn-key pumping plant to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)