This solicitation document is for the Navajo-Gallup Water Supply Project Navajo Code Talkers Sublateral Reaches 12.1 and 12.2. The Bureau of Reclamation within the Department of the Interior is seeking construction services for two reaches of the sublateral pipeline. Services include clearing, excavation, installation of high density polyethylene pipe ranging in diameter from 2 to 30 inches, manholes, valves, air valves, blowoffs, electrical and control systems, access roads, fencing and seeding. Pricing is provided for over 50 contract line items. The deadline to submit offers was September 2, 2021. The document provides specifications, drawings and wage determinations for the work. The total value will depend on the offers submitted for each schedule but is estimated in the millions based on the quantities and unit prices provided for materials and construction activities across the two reaches.

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP NAVAJO CODE TALKERS SUBLATERAL, newest first.
File Type Posted
Attachment__21_00_00_01_-_Specifications_09012021_0010.pdf PDF
Sol_140R4021R0009_Amd_0010.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__5_2SEP21_0010.docx DOCX document
Attachment__22_00_00_02_-_Drawings_09012021_0010.pdf PDF
Sol_140R4021R0009_Amd_0009.pdf PDF
Round__4_Attachment_-_KINDER_MORGAN_STIPULATIONS_0009.pdf PDF
140R4021R0009-0008_Amendment_18AUG21_0008.pdf PDF
Attachment__19_00_00_01_-_Specifications_08162021_0008.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__4_18AUG21_0008.docx DOCX document
Attachment__20_00_00_02_-_Drawings_16AUG21_0008.pdf PDF
Sol_140R4021R0009_Amd_0008.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__3_11AUG21_0007.docx DOCX document
140R4021R0009-0007_Amendment_11AUG21_0007.pdf PDF
Attachment__17_03_00_00_02_Drawings_Revised_0007.pdf PDF
Sol_140R4021R0009_Amd_0007.pdf PDF
Attachment__18_04_00_00_02A_Dwgs_Geology_0007.pdf PDF
Attachment__16_00_00_01_-_Revised_Specifications_Amd_0007_08092021_0007.pdf PDF
140R4021R0009-0006_Amendment_3AUG21_0006.pdf PDF
Sol_140R4021R0009_Amd_0006.pdf PDF
Attachment__14_03_00_00_01_-_Revised_Specifications_FINAL_08-02-21_0006.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__2_3AUG21_0006.docx DOCX document
Attachment__15_04_00_00_02_-_Revised_Drawings_080221_11x17_0006.pdf PDF
Sol_140R4021R0009_Amd_0005.pdf PDF
140R4021R0009_Clarification_Questions_-_Round__1_28JUL21_0005.docx DOCX document
Sol_140R4021R0009_Amd_0004.pdf PDF
Attachment__13_027_1695-D-60129_Rev_4_11x17_07-16-21_0003.pdf PDF
Sol_140R4021R0009_Amd_0003.pdf PDF
140R4021R0009-0003_Amendment_19JUL21_0003.pdf PDF
Attachment__12_00_00_01_-_Revised_Specifications_07-16-21_0003.pdf PDF
Sol_140R4021R0009_Amd_0002.pdf PDF
Attachment__2_Dwgs_06-16-2021_0001.pdf PDF
Sol_140R4021R0009_Amd_0001.pdf PDF
Attachment__7_WD_NM20210024_(Building).pdf PDF
Sol_140R4021R0009.pdf PDF
Attachment__10_Key_Personnel_Form.docx DOCX document
Attachment__8_Past_Performance_Questionnaire.pdf PDF
Attachment__5_00_00_02_Drawings_061-132_11x17_05-17-2021.pdf PDF
Attachment__4_00_00_02_Drawings_001-060_11x17_06-16-2021.pdf PDF
140R4021R0009_RFP_Code_Talker_24JUN21.pdf PDF
Attachment__11_Subcontracting_Plan_Template.docx DOCX document
Attachment__6_WD_NM20210011_(Heavy).pdf PDF
Attachment__3_00_00_02A_Drawings_Geology_and_Logs_11x17_09-23-2020.pdf PDF
Attachment__2_Dwgs_06-16-2021.pdf PDF
Attachment__9_Experience_Form.docx DOCX document
Attachment__1_00_00_01_-_Specification_06-16-2021.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation

Document No.

140R4021R0009

Document Title NGWSP Code Talker

Navajo-Gallup Water Supply Project San Juan Lateral Navajo Code Talker Sublateral, Reaches 12.1 & 12.2

Amendment No. 140R4021R0009 0010

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

UPPER COLORADO REGION

SALT LAKE CITY, UTAH

Continuation of Section B – Supplies or Services and Price

SECTION B – Supplies or Services and Prices San Juan Lateral – Reaches 12.1 & 12.2 Navajo GallupWater Supply Project NewMexico

PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(b) Offers are subject to terms and conditions of this solicitation.

(c) Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1-1.

(e) Definitions:

(1) CLIN – Contract Line Item Number.

PRICE SCHEDULE 1 (Reach 12.1)

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

1-1 WBR

1452.232-81

Mobilization and Preparatory Work

For the lump sum of $

1-2 01 31 30 Contract Document Management System

For the lump sum of $

1-3 01 33 26 Electrical Drawings and Data For the lump sum of $

1-3a 01 55 20 Traffic Control Barriers 3,760 Lin Ft $ $

1-4 01 56 15 Protection of Existing Utilities For the lump sum of $

1-5 01 78 30 As-built and Final Drawings (All Reaches)

For the lump sum of $150,000

1-6 01 78 30 Operations and Maintenance (O&M) Manuals (All Reaches)

For the lump sum of $25,000

PRICE SCHEDULE 1 (Reach 12.1)

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

1-7 03 48 10 Precast Concrete Manhole Sections

For the lump sum of $

1-8 03 81 10 Concrete Removal 150 yd3 $ $

1-9 25 00 01 System Control and Monitoring For the lump sum of $

1-10 26 05 02 Complete Electrical System For the lump sum of $

1-11 26 05 33 2-inch HDPE Conduit 59,79058,730 lin ft

1-15 31 02 10 Water for Dust Abatement 5,600 M(1,000) gal

1-16 31 02 30 Dust Palliative 59,30058,600 lin ft

1-17 31 11 00 Clearing and Grubbing For the lump sum of $

1-18 31 14 10 Stripping, Stockpiling, and Placement

For the lump sum of $

1-19 31 23 11 Common Excavation for Structures

29,500 yd3 $ $

1-20 31 23 11 Backfill about Structures 16,600 yd3 $ $

1-21 31 23 11 Compacting Backfill about Structures

16,600 yd3 $ $

1-22 31 23 22 Mobilization of Trench Box For the lump sum of $

1-23 31 23 22 Use of Trench Box 2,580 lin ft $ $

1-24 31 31 30 Soil-Applied Herbicide 26,50045,500y d2

1-25 31 37 00 Riprap 77 yd3 $ $

1-26 32 15 10 Gravel Surfacing 2,9505,600 yd3 $ $

1-27 32 15 10 Black Hat Tank Access Road Excavation

2,100 yd3 $ $

1-28 32 31 10 Chain Link Fence 1,065 lin ft $ $

Unit

Unit Price Amount

1-29 32 92 20 Seeding and Soil Amendment 137 ac $ $

1-30 33 05 21 Bored Utility Crossing – Sta.

121048+60 to Sta. 121049+70

110 lin ft $ $

1-31 33 05 21 Bored Utility Crossing – Sta.

121068+17 to Sta. 121068+85

68 lin ft $ $

1-32 33 05 21 Bored Utility Crossing – Sta.

121502+90 to Sta. 121504+00

110 lin ft $ $

1-33 33 05 22 Horizontal Directional Drilling

– Sta. 121198+77

1,060 lin ft $ $

1-33 33 05 21 Bored Wash Crossing at Station 121198+77

212 lin ft $ $

1-34 33 05 22 Horizontal Directional Drilling

– Sta. 121452+94

940 lin ft $ $

1-35 33 05 22 Horizontal Directional Drilling

– Sta. 121573+29

1,270 lin ft $ $

1-36 33 11 10 24-Inch Line Pipe 25,392 lin ft $ $

1-37 33 11 10 30-Inch Line Pipe 33,50534,102 lin ft

1-37a 33 11 10 24DR32.5 HDPE Drain Pipe 314 lin ft $ $

1-37b 33 11 10 Steep Line Pipe 268 lin ft $ $

1-38 33 11 10 Repair Kits For the lump sum of $

1-39 33 11 10 Filling and Testing Pipe 1,900,000 gal $ $

1-40 33 12 10 3-Inch Diameter Air Valve Assemblies –Class 150

2 ea $ $

1-41 33 12 10 3-Inch Diameter Air Valve Assemblies – Class 300

18 ea $ $

1-42 33 12 10 6-Inch Diameter Blowoffs – Class 150

2 ea $ $

Unit

Unit Price Amount

1-43 33 12 10 6-Inch Diameter Blowoffs – Class 250

187 ea $ $

1-44 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 250B

3 ea $ $

1-45 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 350B

1 ea $ $

1-46 33 12 10 Line Pipe Sampling Stations 4 ea $ $

1-47 33 16 00 Black Hat Tank For the lump sum of $

1-48 33 82 23 Fiber Optic Cable 62,000 lin ft $ $

1-49 35 21 95 Steel Manifold Piping For the lump sum of $

1-50 35 22 15 Valves and Equipment For the lump sum of $

1-50a 35 42 35 Wash Crossing Sta. 121205+48 For the lump sum of $

1-51 35 42 35 Wash Crossing Sta. 121388+34 For the lump sum of $

1-52 35 42 35 Wash Crossing Sta. 121466+07 For the lump sum of $

TOTAL FOR PRICE SCHEDULE 1(Reach 12.1) $_________________

PRICE SCHEDULE 2 (Reach 12.2)

Unit

Unit Price Amount

2-1 WBR

1452.232-81

Mobilization and Preparatory Work

For the lump sum of $

2-2 01 31 30 Contract Document Management System

For the lump sum of $

2-3 01 33 26 Electrical Drawings and Data For the lump sum of $

2-3a 01 55 20 Traffic Control Barriers 1,575 lin ft $ $

2-4 01 56 15 Protection of Existing Utilities For the lump sum of $

2-5 25 00 01 System Control and Monitoring For the lump sum of $

2-6 26 05 02 Complete Electrical System For the lump sum of $

2-7 26 05 33 2-inch HDPE Conduit 22,838 lin ft $ $

2-11 31 02 10 Water for Dust Abatement 2,400 M(1,000) gal

2-12 31 02 30 Dust Palliative 23,110 lin ft $ $

2-13 31 11 00 Clearing and Grubbing For the lump sum of $

2-14 31 14 10 Stripping, Stockpiling, and Placement

For the lump sum of $

2-15 31 23 11 Common Excavation for Structures

27 yd3 $ $

2-16 31 23 11 Backfill about Structures 238 yd3 $ $

2-17 31 23 11 Compacting Backfill about Structures

238 yd3 $ $

2-18 31 23 22 Mobilization of Trench Box For the lump sum of $

2-19 31 23 22 Use of Trench Box 5,023 lin ft $ $

2-20 31 31 30 Soil-Applied Herbicide 19,530 yd2 $ $

2-21 32 15 10 Gravel Surfacing 660 yd3 $ $

2-22 32 15 10 McKinley Surge Tank Access Road Excavation

350 yd3 $ $

Unit

Unit Price Amount

2-23 32 31 10 Chain Link Fence 202 lin ft $ $

2-24 32 92 20 Seeding and Soil Amendment 47 ac $ $

2-25 33 05 22 Horizontal Directional Drilling

– Sta. 122033+73

1,279 lin ft $ $

2-26 33 05 22 Horizontal Direction Drilling – Sta. 122159+75

1,045 lin ft $ $

2-27 33 05 22 Horizontal Directional Drilling

– Sta. 122220+20

1,876 lin ft $ $

2-28 33 05 22 Horizontal Directional Drilling

– Sta. 122260+13

1,962 lin ft $ $

2-29 33 05 23 Open Cut Railroad Crossing 115 lin ft $ $

2-29a 33 05 21 Bored Road Crossing at Station 122207+14

170 lin ft $ $

2-30 33 11 10 24-Inch Line Pipe 21,323153 lin ft

2-31 33 11 10 Steep Line Pipe 1,159 lin ft $ $

2-32 33 11 10 Combined 24-Inch and 24DR32.5 HDPE Drain Pipe

100 lin ft $ $

2-33 33 11 10 Combined 24-Inch and 16DR32.5 HDPE Drain Pipe

917 lin ft $ $

2-33a 33 11 10 16DR32.5 HDPE Drain Pipe 53 lin ft $ $

2-34 33 11 10 Repair Kits For the lump sum of $

2-35 33 11 10 Filling and Testing Pipe 700,000 gal $ $

2-36 33 12 10 2-Inch Diameter Air Valve Assemblies – Class 150

11 ea $ $

2-37 33 12 10 2-Inch Diameter Air Valve Assemblies – Class 300

8 ea $ $

2-38 33 12 10 6-Inch Diameter Blowoffs – Class 150

7 ea $ $

Unit

Unit Price Amount

2-39 33 12 10 6-Inch Diameter Blowoffs – Class 250

5 ea $ $

2-40 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 250B

2 ea $ $

2-41 33 12 10 Line Pipe Sampling Stations 1 ea $ $

2-42 33 16 00 McKinley Surge Tank For the lump sum of $

2-43 33 33 19 Baffled Outlet For the lump sum of $

2-44 33 42 30 24-Inch Diameter Corrugated Metal Culverts

60 lin ft $ $

2-45 33 82 23 Fiber Optic Cable 29,000 lin ft $ $

2-46 35 21 95 Steel Manifold Piping For the lump sum of $

2-47 35 22 15 Valves and Equipment For the lump sum of $

2-47a 35 42 35 Wash Crossing Sta. 122022+84 For the lump sum of $

2-48 35 42 35 Wash Crossing Sta. 122107+01 For the lump sum of $

TOTAL FOR PRICE SCHEDULE 2 (Reach 12.2) $_________________

END OF SUPPLIES OR SERVICES AND PRICES

SECTION J – List of Attachments and Exhibits

Attachment Number Description Number of Pages

Attachment #1 00 00 01 – Specification 06-16-21 803 Attachment #2 Dwgs_06-16-2021 133 Attachment #3 00 00 02A_Drawings_Geology and

Logs_11x17_09-23-2020

Attachment #4 00 00 02_Drawings_001-060_11x17_06-16-

Attachment #5 00 00 02_Drawings_061-132_11x17_05-17-

Attachment #6 Wage Determination NM20210011(Heavy) 5 Attachment #7 Wage Determination NM20210024 (Building) 6 Attachment #8 Past Performance Questionnaire 4 Attachment #9 Project Experience 1 Attachment #10 Key Personnel 2 Attachment #11 SB Subcontracting Plan Template 10 Attachment #12 00 00 01 – Revised Specifications 07-16-21 288 Attachment #13 027_1695-D-60129_Rev 4 11x17_07-16-21 1 Attachment #14 03_00 00 01 – Revised Specification FINAL

08-02-21

Attachment #15 04_00 00 02 – Revised Drawings_080221 11 x

Attachment #16 00 00 01 – Revised_Specifications_Amd_0007_08092021

Attachment #17 03_00 00 02_Drawings_Revised 21 Attachment #18 04_00 00 02A_Dwgs_Geology 6 Attachment #19 00 00 01 – Specifications 08162021 196 Attachment #20 00 00 02 – Drawings 16AUG21 33 Attachment #21 00 00 01 – Specifications_09012021 68 Attachment #22 00 00 02 – Drawings_09012021 9

File details come from the government source that posted it. Updated .