140R4021R0009_RFP_Code_Talker_24JUN21.pdf
PDF 982 KB Posted
- Attached to
- NGWSP NAVAJO CODE TALKERS SUBLATERAL Federal contract opportunity
- Solicitation number
- 140R4021R0009
About this file
This solicitation is for the Navajo-Gallup Water Supply Project Navajo Code Talkers Sublateral Reaches 12.1 & 12.2. The Bureau of Reclamation is seeking offers for construction services including pipeline installation, manholes, valves, culverts, fencing, and related earthwork. Offerors must price out line items for materials, equipment, and construction activities according to the specifications in Sections B and C. The deadline to submit offers is June 30, 2021. The period of performance will be 784 calendar days from the notice to proceed. Liquidated damages of $9,507 per day will be assessed for delays. The contract will be a firm-fixed-price agreement governed by FAR clauses on construction, labor standards, and other requirements.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project San Juan Lateral Navajo Code Talker Sublateral, Reaches 12.1 & 12.2
Solicitation No. 140R4021R0009
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
UPPER COLORADO REGION
SALT LAKE CITY, UTAH
Solicitation
Document No.
140R4021R0009
Document Title
NGWSP Code Talker
Preface
This section is a synopsis of the items identified by Reclamation that have been problematic for some contractors. The items have been identified through previous real-world performance of construction with Reclamation. The following items are not all-encompassing of problems that may or may not be encountered and are only meant to identify general problems contractors may run into when contracting with Reclamation for construction work. The purpose of this document is to allow contractors to propose construction more accurately at contract inception and reduce contract interpretation disagreements after contract award. It is highly recommended the Contractor read and become intimately familiar with both the solicitation and contract specifications and drawings prior to construction, as that can also head off potential disagreements as the work is being completed.
NOTE: The examples given within are for reference purposes only. Reclamation does not take responsibility for the application of calculations during proposal creation. The Contractor is required to apply all calculations internally, and the items in this document are for awareness purposes only.
Quality Control:
FAR Clause 52.246-12 requires the Contractor to establish a construction inspection system to ensure quality. Accordingly, per section 01 46 00 – Quality Procedures, a Quality Control Plan is required to clearly outline the Contractors Quality Control (QC) Program to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents. The program must include a qualified, experienced Quality Control Supervisor (see part 1.04 Qualifications of the above specification section), who has authority delegated from an authorized official of the firm, to develop and manage quality control processes, including the three phase control system (preparatory phase, initial phase, and follow-up phase) for all aspects of work specified and who has authorization to stop work if necessary. A well-managed Contractor’s QC Program is essential to ensuring the work conforms to contract requirements. The effectiveness of the Contractor’s QC Program will be subject to continued review and approval by the Government’s Contracting Officer (CO).
Reclamation will conduct its own Quality Assurance (QA) program, which will include inspection and tests performed by Government staff to ensure compliance with terms of the contract. Test performed by Reclamation will be used to ensure compliance with contract requirements and are not to be a replacement for specified Contractor quality testing. Acceptance of materials shall be based on passing of both Contractor’s QC testing and Government’s QA testing. In the event of a discrepancy between Contractor’s and Government’s test results, Reclamation’s quality assurance test results will prevail unless convincing evidence is presented as to why it should not.
Quantity Surveys:
FAR Clause 52.236-16 Alt I will be included in this contract. Many contractor personnel have had issues providing adequate survey data IAW the referenced clause. This requires both preliminary and final surveys. The contract requires (specs and clause) that a surveying plan be submitted (Surveying Plan) 28 days prior to beginning surveying work. The surveying plan must be approved by Reclamation prior to the beginning of surveying work. The contract also requires submittal of all quantity survey notes and computations, as well as workday’s survey notes. This is important as the quantity for payment must be verified against the actual survey data. Quantity surveys and calculations, along with as-built drawings, are required to be submitted with each monthly progress payment for a Contractor’s invoice to be considered as proper.
The Government will have survey crews on site as part of its QA program. However, this is not to be relied on by the Contractor as meeting the survey specifications. The Contractor is expected to provide full-time survey support under the direction of a registered professional land surveyor licensed in the state where the work is being completed IAW the survey specifications (section 01 71 20 – Surveying). Historically, many contractors have missed this requirement and it has led to payment disagreements. See “Payline” below for common problem.
Payline Method of Payment Calculation:
Reclamation pays through the Payline method IAW attached drawings and specifications for Common Excavation for Structures, Backfill for Structures, Compacting Backfill about Structures, and Access Road Excavation. Regardless of actual widths, bottoms, and side slopes excavated, measurement will be made to the paylines shown on drawings or to paylines as directed by COR. For all pipeline payment under the following Specifications sections, but not limited to section 33 11 10 – Pipeline General Requirements, section 33 42 30 – Corrugated Metal Pipe Culvert, and section 35 21 95 – Steel Manifold Piping all trench earthwork costs (common excavation, rock excavation, backfill for pipe trench, bedding, embedment, and compacting backfill in pipeline) are included in the prices offered in the Price Schedule for applicable pipelines, drain pipe, manifold pipe, and culverts, etc.. See applicable specification section 31 23 22 – Pipe Trench Earthwork, section 33 42 30 – Corrugated Metal Pipe Culvert, and section 35 21 95 – Steel Manifold Piping for additional detail on how the Contract is set up for payment for those quantities. The overall contract price includes the full scope of work, ensure a full understanding of quantity calculation is had prior to submitting price proposal. This is an advisory statement only.
Submittals:
The submittals required for Reclamation projects can be very detailed. Reclamation is a very data-centric organization of engineering-minded personnel. As such, the data needs to be correct and submittals shall be thought out, in a logical format, and be thorough. A ‘shotgun-spread’ approach will not work. Meaning, if a contractor submits superfluous information and/or with no format or shown understanding of the items, it will likely lead to rejection and a required resubmittal of the items. The same is true if a contractor only submits a portion of the items required under a requirement submittal number (RSN). The Contractor is responsible for providing quality control of contractor and subcontractor submittals to ensure they contain all, but no more than, the items required by a particular RSN.
Reclamation will retain many, if not all, of the records in library retention for many years. This is for awareness purposes only.
As-Built Drawings:
Section 01 78 30 of the specifications covers this in detail. Reclamation expects full compliance with keeping drawings on site as required in the specifications. See specifications for further information.
Environmental Compliance and Permitting:
Environmental Compliance is a very strict item. In undertaking the construction of the Navajo-Gallup Water Supply Project, Reclamation has built a healthy and trusting relationship with the Navajo Nation Environmental Protection Agency (NNEPA), the U.S. Environmental Protection Agency (EPA), and the Army Corps of Engineers in complying with various environmental regulations, namely the Clean Water Act (CWA). Reclamation values these relationships and expects full compliance from the Contractor on all environmental items.
Many contractors unfamiliar with Reclamation run into initial issues because they: 1) do not have a dedicated environmental compliance member/team familiar with Clean Water Act (33 U.S.C. §1251 et seq. (1972)) permitting implementation experience, and specifically Storm Water Pollution Prevention Plan (SWPPP), 2) and rely on Reclamation to point out non-compliance reactively, rather than proactively implementing and managing this aspect of the job.
Some items of small nature may be required after contract award to comply with local Right of Way (ROW) changes/requirements.
These items will be paid on a case-by-case basis on actual costs plus any reasonable overhead or profit.
Example: encountered well water, directed safety and water preservation compliance, paid back based on quantity surveys of actual qty (not payline) for overage directed work.
Concern Example: Standing water pooled up near open manholes, Reclamation directed that the manholes be covered to prevent rainwater backfilling the pipe, per the specification requirements. Environmental personnel inspections identified multiple discrepancies with SWPPP compliance, directed fixes at no additional cost to the government. Be mindful of the requirements as they can add up if not initially planned for.
Cultural Resources Compliance and Archaeological Monitoring:
Given the density of archaeological sites and artifacts in this area of the country, some items of archaeological and cultural importance are expected to be encountered during construction, including previously unknown sites and artifacts called discoveries. The delays for any ROW restrictions needed to protect those resources shown in the bid documents shall be included in the initial proposal. The contract may be modified for time and/or cost if cultural resources discoveries are encountered and the Contractor does not have other areas where work can be shifted. Be sure to read the specifications sections. See specifications section 01 57 90 and Biological at 01 57 60 for further details. It can be expected that the construction monitors of an Archaeological or Monitoring Firm may contact the Reclamation personnel and have the Contracting Officer (CO) direct a temporary stop work until the discovery is mitigated or otherwise addressed and resolved.
Staying inside the ROW is of paramount importance as well. While a contractor may not place any significance on any local flora and fauna, these may have deep significance to the Navajo Nation or local community members as a sacred plant. Reclamation adheres to strict compliance with respectful observance of the Navajo Nation customs and expects the Contractor to be mindful of this as well.
Finally, any action of the Contractor related to carrying out the responsibilities and tasks associated with this contract, whether direct or indirect, are subject to compliance with environmental and cultural resources laws and regulations. Such indirect actions could include but are not limited to: grading of roads to improve access to job site, water source outside project ROW, etc.; subcontracts for off-site ground disturbing activities (i.e., borrow areas, disposal of excess excavated material, etc. – see Off ROW Land Use Coordination submittal requirements in section 01 31 19 – Project Management and Coordination).
Taxes:
The Contractor must rely on its internal tax experts to ensure full compliance with tax laws. Be aware that both New Mexico Gross Receipts Tax (NMGRT) and Navajo Nation (NN) tax may apply to the work, depending on where the work is performed.
Project Specific Areas of Concern, Interest, and/or Consideration:
There are several project specific areas of concern, interest, and/or consideration on this project. The Contractor shall be aware that a portion of the project right-of-way in Reach 12.2 lies within State Highway 264 ROW and are subject to New Mexico Department of Transportation Work permit requirements (see sections 01 55 00 – Vehicular Access Parking, 01 55 20 – Traffic Control, 01 56 10 – Protection of Existing Installations, and 51 00 10 – Property Owner Agreements). Reclamation is responsible for obtaining the Utility Permit for permanent permission to construct and maintain the pipeline in the highway ROW. The Contractor is responsible for obtaining the Work permits, including traffic control plan preparation and approval.
Additionally, the Contractor needs to maintain convenient access to private driveways, houses, and buildings along the line of work.
Site Visit:
Please contact the Walter Shaw (wshaw@usbr.gov, work 505-324-5032 or cell 505-258-0251) to be added to the attendee list and for any additional questions or information concerning the site visit.
IMPORTANT: The following guidelines are required to attend the site visit:
a. Social distancing is practiced.
b. Only one attendee is allowed, at the site visit, per contractor.
c. A mask is required to be worn throughout the site visit in accordance with Navajo Nation's Public Health
Order.
Subcontractors:
Subcontractors cannot submit partial proposals straight to the Government. Subcontractors shall propose directly to prime contractors.
Items will not be pre-qualified during the synopsis or solicitation period. It is the prime contractor’s responsibility to confirm item meets the specifications of this requirement.
Partnering:
After contract award, it is Reclamation’s intention to add a formal Partnering approach by contract modification on how for the Contractor to integrate into their project management plan during contract performance. This shall include Partnering with Reclamation, Project Sponsors, major sub-contractors, and major sub-consultants to help proactively identify potential problems and solutions in a collaborative environment.
Contents Solicitation No. 140R4021R0009
Preface
SECTION A – SF-1442
SECTION B – Supplies or Services and Prices San Juan Lateral – Reaches 12.1 & 12.2 Navajo-Gallup Water Supply Project - New Mexico
SECTION C – Statement / Description / Specification of Work
D – Packaging and Marking
SECTION E – Inspection and Acceptance
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
SECTION F -- Deliveries or Performance
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984
F.3 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION SEPTEMBER 2000
F.4 52.211-13 TIME EXTENSIONS SEPTEMBER 2000
SECTION G - Contract Administration Data
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM
(IPP) APRIL 2013
G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION JULY 1993
G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS BUREAU OF
RECLAMATION MAY 2018
SECTION H -- Special Contract Requirements
H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DECEMBER 2015
SECTION I - Contract Clauses
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
I.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) JUNE 2020
I.3 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
JANUARY 2017
I.4 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUGUST 2020
I.5 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS JUNE 2016
I.6 52.209-1 QUALIFICATION REQUIREMENTS FEBRUARY 1995
I.7 52.216-4 ECONOMIC PRICE ADJUSTMENT-LABOR AND MATERIAL (JAN 2017)
I.8 52.219-4 NOTICE OF PRICE PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (DEVIATION 2019-01) ALT
I MARCH 2020
I.9 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION NOVEMBER 2020
I.10 52.222-35 EQUAL OPPORTUNITY FOR VETERANS JUNE 2020
I.11 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES JUNE 2020
I.12 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS JANUARY 2021
I.13 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APRIL 1984
I.14 52.236-4 PHYSICAL DATA APRIL 1984
I.15 52.252-4 ALTERATIONS IN CONTRACT APRIL 1984
I.16 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES NOVEMBER 2020
I.17 1452.203-70 RESTRICTION ON ENDORSEMENTS DEPARTMENT OF INTERIOR JULY 1996
I.18 1452.204-70 RELEASE OF CLAIMS DEPARTMENT OF THE INTERIOR JULY 1996
I.19 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR APRIL 1984
I.20 1452.226-70 INDIAN PREFERENCE—DEPARTMENT OF THE INTERIOR APRIL 1984
I.21 1452.226-71 INDIAN PREFERENCE PROGRAM APRIL 1984
I.22 WBR 1452.223-80 ASBESTOS FREE WARRANTY BUREAU OF RECLAMATION OCTOBER 1992
I.23 WBR 1452.223-81 SAFETY AND HEALTH – BUREAU OF RECLAMATION JUNE 2015
I.24 WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE BUREAU OF RECLAMATION JULY 1998 51
I.25 WBR 1452.232-80 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) - BUREAU OF RECLAMATION SEPTEMBER
I.26 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU OF RECLAMATION
ALT II MAY 2000
I.27 WBR 1452.232-82 – OTHER INVOICE REQUIREMENTS – BUREAU OF RECLAMATION JULY 1998
I.28 WBR 1452.232-83 PAYMENT FOR TECHNICAL DATA – BUREAU OF RECLAMATION DECEMBER 1994
I.29 WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES BUREAU OF RECLAMATION FEBRUARY 2000
I.30 WBR 1452.243-80 MODIFICATION PROPOSALS – BUREAU OF RECLAMATION DECEMBER 2001
SECTION J – List of Attachments and Exhibits
SECTION K – Representations, Certifications and Other Statements of OFFERORS
K.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS MARCH 2020
K.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT OCTOBER 2020
K.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS OCTOBER 2018
K.5 52.209-12 CERTIFICATION REGARDING TAX MATTERS OCTOBER 2020
K.6 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS – CERTIFICATION FEBRUARY 2021
K.7 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION FEBRUARY 1999
K.8 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION JUNE 2020
K.9 52.230-7 PROPOSAL DISCLOSURE—COST ACCOUNTING PRACTICE CHANGES APRIL 2005
K.10 52.233-2 – SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR JUL 1996 (Deviation)
SECTION L – Instructions, Conditions and Notices to Bidders
L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
L.2 52.204-7 -- SYSTEM FOR AWARD MANAGEMENT OCTOBER 2018
L.3 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JANUARY 2017
L.4 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 AUGUST 1998
L.5 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM (ASSIST) APRIL 2014
L.6 52.216-1 – TYPE OF CONTRACT APRIL 1984
L.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK May 2014
L.8 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS May 2014
L.9 52.232-13 NOTICE OF PROGRESS PAYMENTS APRIL 1984
L.10 52.236-27 SITE VISIT CONSTRUCTION ALT I FEBRUARY 1995
L.11 52.252-3 ALTERATIONS IN SOLICITATION APRIL 1984
L.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVIVIONS NOVEMBER 2020
L.13 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION – DEPARTMENT OF THE INTERIOR APRIL 1984
L.14 WBR 1452.215-80 SOURCE EVALUATION AND SOURCE SELECTION EVALUATION PROCEDURES MAR 2021
L.15 WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021
L.16 52.228-1 BID GUARANTEE SEPT 1996
L.17 WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND PREPARATORY WORK SCHEDULE LINE ITEM -
BUREAU OF RECLAMATION MAY 2000
SECTION M -- Evaluation Factors for Award
M.1 WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION GOVERNMENT PROCUREMENT AGREEMENT
EVALUATIONS -- BUREAU OF RECLAMATION MAY 2005
M.2 WBR 1452.215-84 EVALUATION FACTORS FOR AWARD—QUALITY AND COST/PRICE APPROXIMATELY EQUAL –
BUREAU OF RECLAMATION ALT I MAR 2021
84 101
SECTION A – SF-1442
9 101
10 101 e
11 101 e
Continuation of Section B – Supplies or Services and Price
| SECTION | B | – | Supplies | or | Services | and | Prices | San | Juan | Lateral | – | Reaches | 12.1 | & | 12.2 |
| Navajo‐Gallup | Water | Supply | Project | ‐ | New | Mexico |
PRICE SCHEDULE
Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.
Offers are subject to terms and conditions of this solicitation.
Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1-1.
Definitions:
CLIN – Contract Line Item Number.
PRICE SCHEDULE 1 (Reach 12.1)
CLIN Section Supplies or Services Quantity and
Unit Unit Price
Amount
1-1 WBR
1452.23 2-81
Mobilization and Preparatory Work
For the lump sum of $
1-2 01 31 30 Contract Document Management System
For the lump sum of $
1-3 01 33 26 Electrical Drawings and Data
For the lump sum of $
1-4 01 56 15 Protection of Existing Utilities
For the lump sum of $
1-5 01 78 30 As-built and Final Drawings (All Reaches)
For the lump sum of $150,000
PRICE SCHEDULE 1 (Reach 12.1)
CLIN Section Supplies or Services Quantity and
Unit Unit Price
Amount
1-6 01 78 30 Operations and Maintenance (O&M) Manuals (All Reaches)
For the lump sum of $25,000
1-7 03 48 10 Precast Concrete Manhole Sections
For the lump sum of $
1-8 03 81 10 Concrete Removal 150 yd3 $ $
1-9 25 00 01 System Control and Monitoring
For the lump sum of $
1-10 26 05 02 Complete Electrical System For the lump sum of $
1-11 26 05 33 2-inch HDPE Conduit 58,730 lin ft $ $
1-12 26 42 10 Submerged Galvanic Anode Cathodic Protection System for Welded Steel Tanks
For the lump sum of $
1-13 26 42 11 Bolted Tank Submerged Galvanic Anode Cathodic Protection System
For the lump sum of $
1-14 26 42 12 Buried Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of $
1-15 31 02 10 Water for Dust Abatement 5,600 M(1,000) gal
1-16 31 02 30 Dust Palliative 58,600 lin ft $ $
1-17 31 11 00 Clearing and Grubbing For the lump sum of $
1-18 31 14 10 Stripping, Stockpiling, and Placement
For the lump sum of $
1-19 31 23 11 Common Excavation for Structures
29,500 yd3 $ $
1-20 31 23 11 Backfill about Structures 16,600 yd3 $ $
Quantity and
Unit Unit Price
Amount
1-21 31 23 11 Compacting Backfill about Structures
16,600 yd3 $ $
1-22 31 23 22 Mobilization of Trench Box For the lump sum of $
1-23 31 23 22 Use of Trench Box 2,580 lin ft $ $
1-24 31 31 30 Soil-Applied Herbicide 45,500 yd2 $ $
1-25 31 37 00 Riprap 77 yd3 $ $
1-26 32 15 10 Gravel Surfacing 5,600 yd3 $ $
1-27 32 15 10 Black Hat Tank Access Road Excavation
2,100 yd3 $ $
1-28 32 31 10 Chain Link Fence 1,065 lin ft $ $
1-29 32 92 20 Seeding and Soil Amendment
137 ac $ $
1-30 33 05 21 Bored Utility Crossing – Sta. 121048+60 to Sta.
121049+70
110 lin ft $ $
1-31 33 05 21 Bored Utility Crossing – Sta. 121068+17 to Sta.
121068+85
68 lin ft $ $
1-32 33 05 21 Bored Utility Crossing – Sta. 121502+90 to Sta.
121504+00
110 lin ft $ $
1-33 33 05 22 Horizontal Directional Drilling – Sta. 121198+77
1,060 lin ft $ $
1-34 33 05 22 Horizontal Directional Drilling – Sta. 121452+94
940 lin ft $ $
1-35 33 05 22 Horizontal Directional Drilling – Sta. 121573+29
1,270 lin ft $ $
1-36 33 11 10 24-Inch Line Pipe 25,392 lin ft $ $
1-37 33 11 10 30-Inch Line Pipe 33,505 lin ft $ $
Quantity and
Unit Unit Price
Amount
1-38 33 11 10 Repair Kits For the lump sum of $
1-39 33 11 10 Filling and Testing Pipe 1,900,000 gal $ $
1-40 33 12 10 3-Inch Diameter Air Valve Assemblies –Class 150
2 ea $ $
1-41 33 12 10 3-Inch Diameter Air Valve Assemblies – Class 300
18 ea $ $
1-42 33 12 10 6-Inch Diameter Blowoffs – Class 150
2 ea $ $
1-43 33 12 10 6-Inch Diameter Blowoffs – Class 250
17 ea $ $
1-44 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 250B
3 ea $ $
1-45 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 350B
1 ea $ $
1-46 33 12 10 Line Pipe Sampling Stations 4 ea $ $
1-47 33 16 00 Black Hat Tank For the lump sum of $
1-48 33 82 23 Fiber Optic Cable 62,000 lin ft $ $
1-49 35 21 95 Steel Manifold Piping For the lump sum of $
1-50 35 22 15 Valves and Equipment For the lump sum of $
1-51 35 42 35 Wash Crossing Sta.
121388+34
For the lump sum of $
1-52 35 42 35 Wash Crossing Sta.
121466+07
For the lump sum of $
TOTAL FOR PRICE SCHEDULE 1(Reach 12.1) $_________________
PRICE SCHEDULE 2 (Reach 12.2)
Quantity and
Unit Unit Price
Amount
2-1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
2-2 01 31 30 Contract Document Management System
For the lump sum of $
2-3 01 33 26 Electrical Drawings and Data
For the lump sum of $
2-4 01 56 16 Protection of Existing Utilities
For the lump sum of $
2-5 25 00 01 System Control and Monitoring
For the lump sum of $
2-6 26 05 02 Complete Electrical System For the lump sum of $
2-7 26 05 33 2-inch HDPE Conduit 22,838 lin ft $ $
2-8 26 42 10 Submerged Galvanic Anode Cathodic Protection System for Welded Steel Tanks
For the lump sum of $
2-9 26 42 11 Bolted Tank Submerged Galvanic Anode Cathodic Protection System
For the lump sum of $
2-10 26 42 12 Buried Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of $
2-11 31 02 10 Water for Dust Abatement 2,400 M(1,000) gal
2-12 31 02 30 Dust Palliative 23,110 lin ft $ $
2-13 31 11 00 Clearing and Grubbing For the lump sum of $
2-14 31 14 10 Stripping, Stockpiling, and Placement
For the lump sum of $
2-15 31 23 11 Common Excavation for Structures
27 yd3 $ $
Quantity and
Unit Unit Price
Amount
2-16 31 23 11 Backfill about Structures 238 yd3 $ $
2-17 31 23 11 Compacting Backfill about Structures
238 yd3 $ $
2-18 31 23 22 Mobilization of Trench Box For the lump sum of $
2-19 31 23 22 Use of Trench Box 5,023 lin ft $ $
2-20 31 31 30 Soil-Applied Herbicide 19,530 yd2 $ $
2-21 32 15 10 Gravel Surfacing 660 yd3 $ $
2-22 32 15 10 McKinley Surge Tank Access Road Excavation
350 yd3 $ $
2-23 32 31 10 Chain Link Fence 202 lin ft $ $
2-24 32 92 20 Seeding and Soil Amendment
47 ac $ $
2-25 33 05 22 Horizontal Directional Drilling – Sta. 122033+73
1,279 lin ft $ $
2-26 33 05 22 Horizontal Direction Drilling – Sta. 122159+75
1,045 lin ft $ $
2-27 33 05 22 Horizontal Directional Drilling – Sta. 122220+20
1,876 lin ft $ $
2-28 33 05 22 Horizontal Directional Drilling – Sta. 122260+13
1,962 lin ft $ $
2-29 33 05 23 Open Cut Railroad Crossing 115 lin ft $ $
2-30 33 11 10 24-Inch Line Pipe 21,323 lin ft $ $
2-31 33 11 10 Steep Line Pipe 1,159 lin ft $ $
2-32 33 11 10 Combined 24-Inch and 24DR32.5 HDPE Drain Pipe
100 lin ft $ $
2-33 33 11 10 Combined 24-Inch and 16DR32.5 HDPE Drain Pipe
723 lin ft $ $
Quantity and
Unit Unit Price
Amount
2-34 33 11 10 Repair Kits For the lump sum of $
2-35 33 11 10 Filling and Testing Pipe 700,000 gal $ $
2-36 33 12 10 2-Inch Diameter Air Valve Assemblies – Class 150
11 ea $ $
2-37 33 12 10 2-Inch Diameter Air Valve Assemblies – Class 300
8 ea $ $
2-38 33 12 10 6-Inch Diameter Blowoffs – Class 150
7 ea $ $
2-39 33 12 10 6-Inch Diameter Blowoffs – Class 250
5 ea $ $
2-40 33 12 10 24-Inch Sectionalizing Valve Assemblies – Class 250B
2 ea $ $
2-41 33 12 10 Line Pipe Sampling Stations 1 ea $ $
2-42 33 16 00 McKinley Surge Tank For the lump sum of $
2-43 33 33 19 Baffled Outlet For the lump sum of $
2-44 33 42 30 24-Inch Diameter Metal Culverts
40 lin ft $ $
2-45 33 82 23 Fiber Optic Cable 29,000 lin ft $ $
2-46 35 21 95 Steel Manifold Piping For the lump sum of $
2-47 35 22 15 Valves and Equipment For the lump sum of $
2-48 35 42 35 Wash Crossing Sta.
122107+01
For the lump sum of $
TOTAL FOR PRICE SCHEDULE 2 (Reach 12.2) $_________________
END OF SUPPLIES OR SERVICES AND PRICES
SECTION C – Statement / Description / Specification of Work
Please See Section J Attachment(s) 1-5 for specifications, drawings, and supporting data.
D – Packaging and Marking
There are no clauses included in this section.
SECTION E – Inspection and Acceptance
E.1 52.252‐2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/
CLAUSES INCORPORATED BY REFERENCE
Clause Title Date
52.246-12 Inspection of Construction August 1996
SECTION F ‐‐ Deliveries or Performance
F.1 52.252‐2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses: FAR Clauses - https://www.acquisition.gov/far/
52.242-14 Suspension of Work April 1984
F.2 52.211‐10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984
The Contractor shall be required to
(a) commence work under this contract within 21 calendar days after the date the Contractor receives:
1) Notice to Proceed for non-site work under this contract, which is anticipated within twenty-one (21) calendar days after contract award.
2) Notice to Proceed for site work under this contract, which is anticipated to be issued no later than January 14, 2022.
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 784 calendar days after the contractor receives the initial non-site work Notice to Proceed issued in accordance with (a)(1) above. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
F.3 52.211‐12 LIQUIDATED DAMAGES – CONSTRUCTION SEPTEMBER 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $9,507.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
F.4 52.211‐13 TIME EXTENSIONS SEPTEMBER 2000
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
SECTION G ‐ Contract Administration Data
G.1 1452.201‐70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers having been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers exceeding the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR via electronic transmission. This can be through email, mail, or fax. If by fax please request the appropriate fax number. Email is the preferred method of delivery.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
| G.2 | DOI‐AAAP | 0028 | ELECTRONIC | INVOICING | AND | PAYMENT | REQUIREMENTS | – | INVOICE | ||
| PROCESSING | PLATFORM | (IPP) | APRIL | 2013 |
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice, failure to provide the items will result in invoice rejection:
1 – Quantity Surveys 2 – Current Copy of As-Built Drawings 3 – Quantity sheets reflecting the CLIN in schedule B, percentage complete, and bold any items nearing or exceeding 100% of the CLIN amount.
Once the invoice has been submitted into the IPP system, the Contractor shall also submit an electronic copy of the invoice to the following:
Contracting Officer: (Ashton Jones – ajones@usbr.gov) Contract Specialist: (Amy Loveless – aloveless@usbr.gov) Procurement Technician: (Valerie Jiron – vjiron@usbr.gov)
Failure to transmit invoices via electronic transmission may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.3 WBR 1452.242‐80 POST AWARD CONFERENCE BUREAU OF RECLAMATION JULY 1993
(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference (if in-person) will be held at Four Corners Construction Office at 1235 La Plata Highway in Farmington, NM.
If it cannot be held in-person for any reason, it will be held virtual using Microsoft Teams. If held virtually, each attendee shall attend using a separate computer/camera.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference in its offer.
| G.4 | WBR | 1452.201‐80 | CONTRACTING | OFFICER’S | REPRESENTATIVE’S | AUTHORITIES | AND |
| LIMITATIONS | BUREAU | OF | RECLAMATION | MAY | 2018 |
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
(End of clause)
SECTION H ‐‐ Special Contract Requirements
| H.1 | DOI‐AAAP‐0050 | CONTRACTOR | PERFORMANCE | ASSESSMENT | REPORTING | SYSTEM |
| DECEMBER | 2015 |
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at: https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6)The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
SECTION I ‐ Contract Clauses
I.1 52.252‐2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/
52.202-1 Definitions June 2020 52.203-3 Gratuities April 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures June 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity May 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions June 2020
52.203-13 Contractor Code of Business Ethics and Conduct June 2020 52.203-17 Contractor Employee Whistleblower Rights and Requirement to
Inform Employees of Whistleblower Rights June 2020
52.204-4 Printed or Copied Double-Sided on Post-Consumer Fiber Content Paper
May 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
June 2020
52.204-13 System for Award Management Maintenance October 2018 52.204-14 Service Contract Reporting Requirements October 2016 52.204-19 Incorporation by Reference of Representations and
Certifications December 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Entities
July 2018
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
August 2020
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
June 2020
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
October 2018
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.210-1 Market Research June 2020 52.211-18 Variation in Estimated Quantity April 1984 52.215-2 Audit and Records – Negotiations June 2020 52.215-8 Order of Precedence – Uniform Contract Format October 1997
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data— Modifications
June 2020
52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications June 2020 52.215-17 Waiver of Facilities Capital Cost or Money October 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other
Than Certified Cost or Pricing Data – Modifications June 2020
52.219-8 Utilization of Small Business Concerns October 2018 52.219-9 Small Business Subcontracting Plan Alt II November 2016 52.219-16 Liquidated Damages-Subcontracting Plan January 1999 52.222-3 Convict Labor June 2003 52.222-4 Contract Work Hours and Safety Standards Act – Overtime
Compensation May 2018
52.222-6 Construction Wage Rate Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records August 2018 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations May 2014
52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities April 2015 52.222-26 Equal Opportunity September 2016 52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.222-37 Employment Reports on Veterans June 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act December 2010
52.222-50 Combating Trafficking in Persons October 2020 52.222-54 Employment Eligibility Verification October 2015 52.222-55 Minimum Wages Under Executed Order 13658 November 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 January 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service
And Construction Contracts September 2013
52.223-3 Alt I Hazardous Material Identification and Material Safety Data – Alternate I
July 1995
52.223-6 Drug Free Workplace May 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts August 2018
52.223-18 Encouraging Contractor Policies to Ban text Messaging While Driving
June 2020
52.225-13 Restrictions on Certain Foreign Purchases February 2021 52.227-1 Authorization and Consent June 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright
Infringement June 2020
52.227-4 Patent Indemnity – Construction Contracts December 2007 52.228-2 Additional Bond Security October 1997 52.228-11 Pledges Of Assets February 2021 52.228-12 Prospective Subcontractor Requests for Bonds May 2014
52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bonds–Construction June 2020 52.229-3 Federal, State And Local Taxes February 2013 52.230-2 Cost Accounting Standards June 2020 52.230-6 Administration of Cost Accounting Standards June 2010 52.232-5 Payments Under Fixed-Price Construction May 2014 52.232-17 Interest May 2014 52.232-18 Availability of Funds April 1984 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts January 2017 52.232-33 Payment by Electronic Funds…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .