ATTACHMENT 9 - Base Offer Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DZ--PROJECT 675-23-100, Bid-Build (BB) Renovate Lake Nona Building 2 for Emergency Department and Observation Unit
Solicitation number
36C24825R0025
Issued by

About this file

This is a base offer price breakdown template in Excel format (Attachment 9) for contractors to itemize their costs across standard construction divisions. The template includes fields for labor and material costs across 24 construction divisions (from General Requirements through Transportation), with automatic calculations for overhead, profit, and bond percentages. The spreadsheet is structured to show subtotals for each division and calculates the total base offer price incorporating the contractor's specified overhead, profit and bond percentages.

The template is designed to support price proposals for a VA renovation project at Lake Nona Building 2 for an Emergency Department and Observation Unit, with an estimated value between $5-10 million. The breakdown requires detailed cost information rather than lump sums to facilitate the government's price analysis. No pre-filled costs or percentages are included - it is a blank template for offerors to complete with their specific pricing details.

View the file

Other files

File Type Posted
ATTACHMENT - MEP.pdf PDF
ATTACHMENT - RFI 39.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-3.pdf PDF
ATTACHMENT - RFI 38.pdf PDF
ATTACHMENT - VOLUME 2C_Arch Construction Plans Updated 05.30.13-2.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13.pdf PDF
ATTACHMENT - HVAC.pdf PDF
ATTACHMENT - RFI 61.pdf PDF
ATTACHMENT - Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT - Sirca Examination Light.pdf PDF
ATTACHMENT - RFI 108_PL702 Plumbing Details and Schedule.pdf PDF
ATTACHMENT - G2022-10000717-001-001_Diamond_Pledge_NDL_Roof_Guarantee.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-2.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-3.pdf PDF
ATTACHMENT - VOLUME 12A_Power Updated 07.25.13-2.pdf PDF
ATTACHMENT - RFI 11 and 21_Sirca Exam Light Brochure.pdf PDF
ATTACHMENT - RFI 73.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-2.pdf PDF
S06 Amendment 36C24825R0025 0001.pdf PDF
ATTACHMENT - Emergency Department Lake Nona Addendum 1.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13-2.pdf PDF
ATTACHMENT - RFI 58 and 87 - 65 Percent Design Development CIH Report.pdf PDF
Solicitation 36C24825R0025.pdf PDF
ATTACHMENT 6 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 4 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 1 - Construction Specifications.pdf PDF
ATTACHMENT 2 - Construction Drawings.pdf PDF
ATTACHMENT 3 - DBA Wage Determination 01.24.2025.pdf PDF
ATTACHMENT 5 - EMR.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis