ATTACHMENT - RFI 108_PL702 Plumbing Details and Schedule.pdf

PDF 2 MB Posted

Attached to
Y1DZ--PROJECT 675-23-100, Bid-Build (BB) Renovate Lake Nona Building 2 for Emergency Department and Observation Unit
Solicitation number
36C24825R0025
Issued by

About this file

This document is a Request for Information (RFI) for plumbing details and schedule related to the VA's renovation project at Lake Nona Building 2 for the Emergency Department and Observation Unit in Orlando, Florida. The RFI provides technical specifications for plumbing components, including patient shower details, dialysis box details, lavatory/sink potable water connection details, and a plumbing fixture schedule. Specific technical notes highlight requirements for reverse osmosis loop piping (CPVC schedule 80 or polyethylene), acid waste drainage systems, and connection instructions to an existing acid neutralization tank.

The associated federal contract opportunity (Solicitation No. 36C24825R0025) is a VA construction project valued between $5-10 million, seeking Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors. Key procurement details include a site visit on February 12, 2025, proposal submission deadline, and requirements for technical approach, past performance, and pricing. Contractors must demonstrate healthcare construction experience, provide detailed project management and phasing plans, and comply with Davis-Bacon wage determinations. The evaluation will be conducted on a best-value basis, with technical factors significantly more important than price.

View the file

Other files

File Type Posted
ATTACHMENT - MEP.pdf PDF
ATTACHMENT - RFI 39.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-3.pdf PDF
ATTACHMENT - RFI 38.pdf PDF
ATTACHMENT - VOLUME 2C_Arch Construction Plans Updated 05.30.13-2.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13.pdf PDF
ATTACHMENT - HVAC.pdf PDF
ATTACHMENT - RFI 61.pdf PDF
ATTACHMENT - Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT - Sirca Examination Light.pdf PDF
ATTACHMENT - G2022-10000717-001-001_Diamond_Pledge_NDL_Roof_Guarantee.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-2.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-3.pdf PDF
ATTACHMENT - VOLUME 12A_Power Updated 07.25.13-2.pdf PDF
ATTACHMENT - RFI 11 and 21_Sirca Exam Light Brochure.pdf PDF
ATTACHMENT - RFI 73.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-2.pdf PDF
S06 Amendment 36C24825R0025 0001.pdf PDF
ATTACHMENT - Emergency Department Lake Nona Addendum 1.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13-2.pdf PDF
ATTACHMENT - RFI 58 and 87 - 65 Percent Design Development CIH Report.pdf PDF
Solicitation 36C24825R0025.pdf PDF
ATTACHMENT 6 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 4 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 1 - Construction Specifications.pdf PDF
ATTACHMENT 2 - Construction Drawings.pdf PDF
ATTACHMENT 9 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 3 - DBA Wage Determination 01.24.2025.pdf PDF
ATTACHMENT 5 - EMR.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA FORM 08 - 6231

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 10

A

B

C

D

E

F

3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437

COA: FL #29758

AKEA Project No. AD214-23

Design, Inc.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT ENGINEER - OF - RECORD FL. P.E. NO.

RENOVATE LAKE NONA BUILDING

2 FOR EMERGENCY DEPARTMENT

(ED) AND OBSERVATION UNIT

ORLANDO, FLORIDA

OF

675-23-100

FINAL CONSTRUCTION

DRAWINGS

This item has been electronically signed and sealed by the individual named at right.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

WR WR

WILLIAM RODRIGUEZ 69663

PL702

PLUMBING DETAILS AND SCHEDULE

64 94SEPTEMBER 25, 2024

SCALE: N.T.S.

TYPE "P-702" PATIENT SHOWER DETAIL

SCALE: N.T.S.

TYPE "P-809" DIALYSIS BOX DETAIL

SCALE: N.T.S.

TYPICAL LAVATORY / SINK

POTABLE WATER CONNECTION DETAIL

SCALE: N.T.S.

PLUMBING FIXTURE SCHEDULE

Revisions: Date:

William Rodriguez- Arroyo

2024.09.25 16:19:17 -04'00'

JFong Cloud+

JFong Cloud+ Reverse osmosis loop needs to be cpvc pipe - schedule 80 or polyethylene bicarbonate destroys the pipe and connections. glass pipe possible (kimax - expensive) but acid glazed is suitable as well - needs to handle acid waste.

Drain to neutralization tank - acid drain system is available on site - it needs to connect to it.

(currently under mobile MRI - Plumbing available - ED - tell drawing to connect to acid tank and let Kevin deal with the available route during construction -

Verbiage instruction for connection to acid tank and refer to attached civil drawings provided by VA send this drawing with a bubble that shows it addendum item

File details come from the government source that posted it. Updated .