ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-2.pdf

PDF 732 KB Posted

Attached to
Y1DZ--PROJECT 675-23-100, Bid-Build (BB) Renovate Lake Nona Building 2 for Emergency Department and Observation Unit
Solicitation number
36C24825R0025
Issued by

About this file

This document is a detailed plumbing plan drawing (H-PL1.1FD5-A) for a new hospital project at the VA Medical Center in Orlando, Florida. The drawing provides a comprehensive layout of plumbing fixtures, pipe routes, and connections across Level 1, Area D, including specific annotations for various rooms such as offices, medical spaces, restrooms, and utility areas. The drawing includes multiple technical notes about plumbing connections, vent systems, drain configurations, and future sink installations, with precise measurements and location references for water lines (cold water, hot water, sanitary drains) throughout the facility.

The plumbing plan is part of a larger construction project (Project 673-950) dated June 2010, with multiple revision dates through 2012, and appears to be a bid alternate for a hospital/clinic construction effort. The drawing includes a key plan, graphic scale, and detailed room-by-room plumbing infrastructure annotations, demonstrating the intricate planning required for a complex medical facility's mechanical systems. Technical details include pipe sizes, connection types, and specific routing instructions for various water and drainage systems across multiple rooms and zones.

View the file

Other files

File Type Posted
ATTACHMENT - MEP.pdf PDF
ATTACHMENT - RFI 39.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-3.pdf PDF
ATTACHMENT - RFI 38.pdf PDF
ATTACHMENT - VOLUME 2C_Arch Construction Plans Updated 05.30.13-2.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13.pdf PDF
ATTACHMENT - HVAC.pdf PDF
ATTACHMENT - RFI 61.pdf PDF
ATTACHMENT - Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT - Sirca Examination Light.pdf PDF
ATTACHMENT - RFI 108_PL702 Plumbing Details and Schedule.pdf PDF
ATTACHMENT - G2022-10000717-001-001_Diamond_Pledge_NDL_Roof_Guarantee.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-2.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-3.pdf PDF
ATTACHMENT - VOLUME 12A_Power Updated 07.25.13-2.pdf PDF
ATTACHMENT - RFI 11 and 21_Sirca Exam Light Brochure.pdf PDF
ATTACHMENT - RFI 73.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13.pdf PDF
S06 Amendment 36C24825R0025 0001.pdf PDF
ATTACHMENT - Emergency Department Lake Nona Addendum 1.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13-2.pdf PDF
ATTACHMENT - RFI 58 and 87 - 65 Percent Design Development CIH Report.pdf PDF
Solicitation 36C24825R0025.pdf PDF
ATTACHMENT 6 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 4 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 1 - Construction Specifications.pdf PDF
ATTACHMENT 2 - Construction Drawings.pdf PDF
ATTACHMENT 9 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 3 - DBA Wage Determination 01.24.2025.pdf PDF
ATTACHMENT 5 - EMR.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

3" AW UP &

DN (28 FU)

3" AV UP & DN

4" VENT UP & DN

6" SAN UP & DN

6" SAN UP &

DN (141 FU)

4" VENT

UP & DN

P-528

P-528AP-528A

P-528

P-528

P-401

P-502

P-528A

P-528A

P-528A

P-528A

P-528A

P-401

P-401 P-401

P-528

P-528

P-401

P-401

P-202P-404

P-201

P-701

P-702

P-404

P-702

P-404

P-502

P-528

P-102

P-101 P-101

P-102

P-102 P-102

P-102

P-101

P-102

P-102

P-102

FLOOR C.O.

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

3" SIDE OUTLET

AD TYPE A

P-102 P-528A

P-701

P-609

P-404

P-404

P-404

FLOOR

C.O.

2" W UP & DN

1 1/2" V UP

2" W UP & DN

FD-D

(TYP OF 3)

P-702

FLOOR C.O.

H-PL1.1FD5-A

H-PL1.1FD2-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H-PL1.1FD5-A

H-PL1.1FD2-A

CLOSET

1C106

CLOSET

1C104

RAD/FLOURO

1M710

CONTROL

1M710a

1 1/2" V UP & DN

STAIR

1ES01

ELEVATOR

1EE02

ELEVATOR

1EE01

ELEVATOR

1FE02

ELEVATOR

1FE01

WAIT

1M702

BIO MED OFFICE

1M204

WAITING

1G404

OFFICE (PVA)

1N404

OFFICE

(FDVA/STATE)

1N203

RECEP(FDVA/STATE)

1N201

OFFICE

1H202

OFFICE

1H204

PASSAGE

1HC02

CHIEF

NON-INVASIVE

1F203

VEST

1F201

OFFICE

(FDVA/STATE)

1N204

OFFICE (DAV)

1N403

OFFICE

1N405

PHYSICIAN

1F303

CHIEF OF

CARDIOLOGY

1M715

ECG CUBICLE

1F404

STRESS

LAB/ECHO

1F602

STRESS

LAB/ECHO

1F604

STORAGE

1F101

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

TLT

1F403

ELEC

1N601a

CORRIDOR

1FC04

CHIEF

1G403

PACEMAKER/HOLTER

MONITOR ROOM

1F307

CORRIDOR

1FC05

HAC

1F401

CORRIDOR

1FC03

Space

2C558

ECG/ECHO

READING

1F601

ECHO ROOM

1F605

CORRIDOR

1FC06

STRESS LAB

1F607

STRETCHER

ALCOVE

1FC04a

ECG CUBICLE

1F104

CORRIDOR

1FC01

OFFICE

(FDVA/STATE)

1N206

PASSAGE

1NC02

OFFICE

(FAVA/STATE)

1N205

CORRIDOR

1NC04

OFFICE (PVA)

1N406

LOCKERS MALE

1G302a

COMM

1N601b

CANTEEN RETAIL

1N601

POLICE TRAINING

ROOM

1H206

HAC

1G305

EVIDENCE STOR

1H206a

TLT & SHWR

FEMALE

1G303b

VESTIBULE

1G303

TRAINING ROOM

1G408

LOCKERS

FEMALE

1G303a

STORAGE

1G410

OFFICE(COUNTY)

1G101b

OFFICE(COUNTY)

1G101a

CO-ORDINATOR

1G406

OFFICE/ADMIN(DAV)

1N401

TLT & SHWR

MALE

1G302b

VESTIBULE

1G302

ENTRY

1GC04

SECRETARY

1G402

SERVICE OFFICER

1G401

PHYSICIAN

1F301 CARDIAC NUC

IMAGING

1F309

DRESS

1M704

PACS OFFICE

1M406

ADPAC OFFICE

1M404

DRESS

1M714

RAD/FLOURO

1M148

CHEST RM

1M206

CONTROL

1M206a

TLT

1M304

TLT

1M302

CORRIDOR

1MC03

WORK

1F808a

STAFF TLT

1F402

ECG ROOM

1F106

RADIOLOGY

LOCKERS AND

TOILETS

1M303

PASSAGE

1MC04

CONFERENCE

1M718

COMM

1M403

EMPLOYEE

BIO-SAFETY

1M307

ELEC

1M307a

ELEVATOR

LOBBY

1F716

CORRIDOR

1FC07

Space

2C933

TECH WORK

1M210

SOILED HOLD

1M306

RF TLT

1M706

RF TLT

1M712

PATIENT REP

1F804

ELEC

1F802

SECRETARY

1M717

OFFICE (VFW)

1N202

OFFICE/RECEP(PVA)

1N402

CORRIDOR

1GC01

PATIENT REP

1F806

PATIENT

STORAGE

1F716a

ELEV LOBBY

1GC02

WAITING/LOUNGE

1G101

COFFEE SHOP

1F808

CORRIDOR

1HC09

CORRIDOR

1MC08

ELEVATOR

1FE03

CHIEF TECH

OFFICE

1M402

PUBLIC TLT

1F808b

3/4" FW

1/2" CW

1/2" HW

3/4" 3/4"

3/4" 1/2" HW

1/2" FW

1/2"

1/2"

1"

HW & CW UP

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

CW UP

CW & HW UP

FLOOR C.O.

WALL C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

P-528A

H-PL4.001

H-PL4.001

H-PL1.1FE2-A

H-PL1.1FD5-A

H-PL1.1FE2-A

H-PL1.1FD5-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

E

-A

H -P

L

.1 F

E

P-811

1.2

C

D

E

F

G

D.9

35.2

D.7

F.4

E.4

C.7

32333435 A7

C.81

C.91

32.532.7

33.6

P-811

P-811

P-811 P-811

P-811

FD-C

FD-C

P-528

1 1/2"

2"FD-C WITH

FUNNEL

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

1. 1/2" SAN UP.

2. 1/2" HW FROM SINK TO DISHWASHER. 1 1/2" DRAIN

FROM DISHWASHER TO SINK TAILPIECE.

3. NOTE NOT USED.

4. REFER TO KITCHEN CONSULTANT HQ-F SERIES

DRAWINGS FOR DRAIN LOCATIONS.

5. 1/2" CW FROM TRAP PRIMER TO FD-C.

6. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM URINAL P-201.

7. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM WATER CLOSET P-101.

8. EXTEND 1 1/2" SANITARY DRAIN FROM RELOCATED

P-528 SINK AND CONNECT TO EXISTING 2" VERTICAL

SANITARY DRAIN THAT CONTINUES DOWN THRU FLOOR.

9. PROVIDE CW, HW, VENT AND DRAIN STUB OUT FOR

FUTURE P-528A IN-COUNTER SINK INSTALLATION.

10. 1-1/2" VENT UP IN WALL TO INTERSTITIAL SPACE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 5 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD5-A

No. Description Date

1 CPR 078 05-12-11

2 CPR 128 08/04/11

3 CPR 160 10/14/11

4 CPR 236 03/09/12

5 CPR 272 04/30/12

File details come from the government source that posted it. Updated .