About this file

This document is a Request for Information (RFI) and Solicitation for a VA project to renovate the Emergency Department and Observation Unit at Lake Nona in Orlando, Florida. The project is valued between $5-10 million and is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Key submission requirements include a technical proposal demonstrating specialized healthcare construction experience, past performance references, and a separate price proposal. Critical proposal dates include a mandatory site visit on February 12, 2025, and a question submission deadline of February 18, 2025 at 10:00 AM EST.

The solicitation requires detailed technical submissions covering project management capability, construction approach, phasing plan, and organizational structure, with specific emphasis on maintaining facility operations during renovation. Contractors must demonstrate experience in healthcare environments, provide comprehensive project schedules, and comply with specific requirements such as Davis-Bacon wage determinations, safety record submissions, and an Experience Modification Rate (EMR) at or below 1.0. The award will be made on a best-value basis, with technical factors significantly more important than price, and the contract will be awarded to a single responsible offeror through a comparative evaluation of submitted proposals.

View the file

Other files

File Type Posted
ATTACHMENT - MEP.pdf PDF
ATTACHMENT - RFI 39.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-3.pdf PDF
ATTACHMENT - VOLUME 2C_Arch Construction Plans Updated 05.30.13-2.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13.pdf PDF
ATTACHMENT - HVAC.pdf PDF
ATTACHMENT - RFI 61.pdf PDF
ATTACHMENT - Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT - Sirca Examination Light.pdf PDF
ATTACHMENT - RFI 108_PL702 Plumbing Details and Schedule.pdf PDF
ATTACHMENT - G2022-10000717-001-001_Diamond_Pledge_NDL_Roof_Guarantee.pdf PDF
ATTACHMENT - VOLUME 11C_Lighting Plans Updated 07.08.13-2.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-3.pdf PDF
ATTACHMENT - VOLUME 12A_Power Updated 07.25.13-2.pdf PDF
ATTACHMENT - RFI 11 and 21_Sirca Exam Light Brochure.pdf PDF
ATTACHMENT - RFI 73.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13.pdf PDF
ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13-2.pdf PDF
S06 Amendment 36C24825R0025 0001.pdf PDF
ATTACHMENT - Emergency Department Lake Nona Addendum 1.pdf PDF
ATTACHMENT - VOLUME 7A_Ductwork Updated 07.23.13-2.pdf PDF
ATTACHMENT - RFI 58 and 87 - 65 Percent Design Development CIH Report.pdf PDF
Solicitation 36C24825R0025.pdf PDF
ATTACHMENT 6 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 4 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 1 - Construction Specifications.pdf PDF
ATTACHMENT 2 - Construction Drawings.pdf PDF
ATTACHMENT 9 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 3 - DBA Wage Determination 01.24.2025.pdf PDF
ATTACHMENT 5 - EMR.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4.2

3.2

2.2

A.2

1.2

2.0

A.05

34.5 34.2

A.04

4.8

3.8

2.8

1.4

35.4

27.8

E.8 33.8

AD102

A301

A301

/4

" / 1

1/4" / 12"

/4

" / 1

1/4" / 12"

/4

" / 1

1/4" / 12"

/4

" / 1

22.03

22.03

7.217.21

8.23

7.497.49

7.49

7.497.49

7.49

A311

7.66

7.66

B

A

C

7.49

7.49

7.66

7.49

A102

Sim

1/4" / 12"

107B

5.21

7.25

7.54

10.63

ROOF LEVEL

14'-2"

8.23

7.29

7.59

7.21

3.01

3.11

5.10

M

IN

S

A F

E T

Y R

A

IL

(561) 270-0178 Delray Beach, FL. 33445

601 N. CONGRESS AVE. SUITE 106A

Florida P.E. 83972 Pennoni Project No. RDCJP20005

Florida Coa 7819 Jeremy M. Case, P.E.

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

R O G E

R

A. REP

S T I E N

AR0012462

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1

/2

:0

:0

A

M

Expand Emergency Department at Lake Nona

08/13/2021

ROOF PLAN

A102

NSKR

675-901

Orlando, Florida

Kevin Glover - COR

CONSTRUCTION

DOCUMENTS

20016.00

N Scale: 1/8" = 1'-0"

Roof Plan

3.01 Concrete slab on metal deck. See Structural Drawings.

3.11 Concrete curb.

5.10 Continuous steel bent plate / pour stop. See Structural

Drawings.

5.21 Pre=fabricated metal building canopy to match existing.

7.21 Roof Assembly: Built-up roofing system over 1/2" cover board over sloped tapered insulation - 3" minimum thickness over [vapor barrier if requried] over structural deck.

7.25 2-3/4" thick translucent, insulated, structural sandwich roof panel.

7.29 Built-up roofing membrane.

7.49 Prefinished metal coping.

7.54 Prefinished aluminum canopy gutter. Supplied and installed with canopy framing.

7.59 Fiber board cant.

7.66 Expansion joint system. Type E-2: Exterior roof to wall.

8.23 Roof access hatch with integral safety railing.

10.63 Internally lit aluminum panel box. Sign box to be designed by sign manufacturer and coordinated with other trades as required. Include access to interior as required for maintenance and replacement of lamps/equipment.

22.03 Roof drain and overflow drain. See Plumbing Drawings.

PLAN NOTES

Scale: 1 1/2" = 1'-0"1 Roof Hatch Detail

Revisions Date

File details come from the government source that posted it. Updated .