This document contains construction drawings related to solicitation 36C24825R0025 for renovation of Lake Nona Building 2's Emergency Department and Observation Unit at the Orlando VA Healthcare System. Since this is identified as "Construction Drawings.pdf", it appears to be a technical drawing package, though the actual drawing content is not provided in the excerpt.
The associated solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated value between $5-10 million. The project requires renovation work in a healthcare environment with key requirements including infection control measures, safety protocols, and maintaining facility operations during construction. Proposals are due to elizabeth.romero@va.gov per the SF1442 deadline, with a site visit scheduled for February 12, 2025. The contractor must self-perform at least 15% of the work excluding materials costs. Technical evaluation factors include specialized experience, technical/management approach, scheduling, and past performance, with non-price factors being significantly more important than price in the best-value award decision.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-0 2-
:1 3:
P
M
PROJECT 675-23-100
RENOVATE BUILDING 2 FOR EMERGENCY
DEPARTMENT AND OBSERVATION UNIT
3603 NW 98TH ST, SUITE B
GAINESVILLE, FLORIDA 32606
PH: (352) 474-6124
FAX. (352) 553-4437
DESIGNED BY:DESIGNED FOR:
ORLANDO VA MEDICAL CENTER
2500 LAKEMONT AVE.
ORLANDO, FL 32803
SEPTEMBER 25, 2024
PROJECT AREAS
(LEVEL 1)
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 10
RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
SEPTEMBER 25, 2024Revisions: Date:
Office of Construction and Facilities Management
ARCHITECT / ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
675-23-100FINAL CONSTRUCTION
DRAWINGS
VA MEDICAL CENTER, ORLANDO, FL
FINAL CONSTRUCTION DRAWINGS
TITLE PAGE, LOCATION MAP,
AND INDEX OF DRAWINGS
G-001 Digitally signed by Jennifer R Fong Date: 2024.10.02 16:35:36-04'00'
UP
DN
UP
B
C
D
E
363738394041
8.2
7.2
6.2
5.2
4.2
3.2 2.2
C.2
A.2
D.2
B.2
1.2
2.0
7.8
A.10
34.235.4
A.05
D.9
35.237.2
B.4
34.5
5.8
4.8
3.8
2.8
1.4
C.4
C.8 5.0
39.7
C.7
E.6
D.6
34.4
A.01
MUST MAINTAIN
ACCESS TO EXISTING
EMERGENCY DEPT
1F307
MED ROOM
77 SF 1F101
SOILED HOLD
43 SF
1F401
CLEAN UTILITY
59 SF
1F303
NURSE STATION 2
218 SF
1F301
NURSE STATION 1
218 SF
1F201
STAFF ROOM
43 SF
1F408
OBSERVATION
ROOM 4
147 SF
1F104
OBSERVATION
ROOM 5
142 SF
1F106
SHARED TOILET 1
55 SF
1F108
OBSERVATION
ROOM 6
151 SF
1F408A
PRIVATE TOILET 4
69 SF
1F406A
PRIVATE TOILET 3
69 SF
1F406
OBSERVATION
ROOM 3
135 SF
1F404
OBSERVATION
ROOM 2
137 SF
1F404A
PRIVATE TOILET 2
69 SF
1F308A
PRIVATE TOILET 1
69 SF
1F308
OBSERVATION
ROOM 1
148 SF
1F601
OBSERVATION
ROOM 10
150 SF
1F602
SHARED TOILET 2
50 SF
1F203
OFFICE
127 SF
1F605
OBSERVATION
ROOM 7
134 SF
1F604
OBSERVATION
ROOM 8
139 SF
1F605A
PRIVATE TOLIET 5
70 SF
1FC03C
CORRIDOR
268 SF
1F603
OBSERVATION
ROOM 9
150 SF
1F604A
SHOWER
81 SF
1B202
EXAM ROOM 1
109 SF
1B201C
SOILED HOLD
47 SF
1B203
EXAM ROOM 2
107 SF
1A723
ISOLATION ROOM
131 SF1A722
ISOLATION ROOM
121 SF
1A721
ANTE ROOM
32 SF
1A127
EXAM ROOM 6
106 SF
1B206
EXAM ROOM 5
106 SF
1B205
EXAM ROOM 4
106 SF
1B204
EXAM ROOM 3
106 SF
1A125A
PRIVATE TOILET
56 SF
1A502
TOILET 1
57 SF
1A504
TOILET 2
60 SF
1A128
EXAM ROOM 10
139 SF
1A724
EXAM ROOM 12
127 SF
1B201
NURSE STATION
285 SF
1A121
MED ROOM
104 SF
1A122
CLEAN UTILITY
66 SF
1A119
EXAM ROOM 9
128 SF
1A718
EXAM ROOM 11
126 SF
1A125
EXAM ROOM 8
125 SF
1FC03B
CORRIDOR
261 SF
1AC04
CORRIDOR
535 SF
1AC06
CORRIDOR
134 SF
1B201B
NOURISHMENT
13 SF
1B20A
CLEAN UTILITY
ALCOVE
25 SF
1AC04A
CORRIDOR
273 SF
1FC03A
CORRIDOR
261 SF
1FC03
CORRIDOR
548 SF
1F301A
CLEAN CARTS
29 SF
1F301B
PNEUMATIC TUBE
SYSTEM
14 SF
1F301C
NOURISHMENT
13 SF
PHASE 2
PHASE 1 & 3
PHASE 2
PHASE 1 & 3
TEMPORARY 1HR
RATED BARRIER AND
DOOR TO BOTTOM OF
INTERSTITIAL FLOOR
1EC07
CORRIDOR
592 SF
1FC05
CORRIDOR
534 SF
TEMPORARY
CONSTRUCTION
VESTIBULE
CONSTRUCTION PATH
ICRA BARRIER
TEMPORARY 1HR RATED
BARRIER AND DOOR TO
BOTTOM OF INTERSTITIAL
FLOOR
C
LEAR
4' -8"
TEMPORARY CONSTRUCTION
WALL, DOOR, AND VESTIBULE
TEMPORARY
WALL AND DOOR
PH
AS
E
TEMPORARY
WALLS
1A126
EXAM ROOM 7
106 SF
1E702
C.T. (ED)
1200 SF / 580 SF
1E602
CONTROL RM
200 SF / 79 SF
1B303a
OPERATIONS
180 SF / 273 SF
1B303c
ARMORY WORKRM
80 SF / 136 SF
1B303b
HOLDING
60 SF / 69 SF
1A721
ISOLATION
130 SF / 141 SF
1A409
MEDS
80 SF / 83 SF
1A413
NOURISH
60 SF / 87 SF
1A408
CLEAN SUPPLY
120 SF / 201 SF
1A801
OFFICE
120 SF / 132 SF
1A803
OFFICE
120 SF / 131 SF
1A105
PATIENT TLT
50 SF / 60 SF1A103
COMMUNICATION
STATION
150 SF / 153 SF
1A109
COMMUNICATION
STATION
300 SF / 1205 SF
1A112
LIFE SUPPORT UNIT
300 SF / 295 SF
1A713
EXAM/TREAT
0 SF / 122 SF1A711
EXAM/TREAT
0 SF / 122 SF1A709
EXAM/TREAT
0 SF / 122 SF1A707
EXAM/TREAT
0 SF / 122 SF1A705
EXAM/TREAT
0 SF / 123 SF
1A109d
EXAM/TREAT
0 SF / 120 SF
1A109c
EXAM/TREAT
0 SF / 114 SF
1A109b
EXAM/TREAT
0 SF / 116 SF
1A109a
EXAM/TREAT
0 SF / 117 SF
1A118
ENT
EXAM/TREATMENT
0 SF / 124 SF
1A116
EXAM/TREAT
0 SF / 114 SF
1A101
EXAM/TREAT
0 SF / 110 SF
1A110
EXAM/TREAT
0 SF / 126 SF
1A714
PATIENT TLT
50 SF / 59 SF
1A703
SECLUSION RM
0 SF / 121 SF
1A719
ANTE RM
0 SF / 48 SF
1A702c
COMM
0 SF / 103 SF
1A702d
ELEC
0 SF / 75 SF
1B201a
ELEC
0 SF / 93 SF
1B201b
COMM
0 SF / 149 SF
1B403
LOBBY
150 SF / 2389 SF
1B401a
WHEEL CHAIR
STOR
150 SF / 192 SF
1A715
EXAM/TREAT
0 SF / 122 SF
1A717
ISOLATION
0 SF / 139 SF
1A412
SOILED UTILITY
120 SF / 86 SF
1A106
EXAM/TREAT
0 SF / 125 SF
1A108
MONITORED BEDS
100 SF / 104 SF
1A610
STAFF
LKRS/LOUNGE
220 SF / 167 SF
1A104
MONITORED BEDS
100 SF / 106 SF
1F505
PHYSICIAN
120 SF / 125 SF1F503
PHYSICIAN
120 SF / 123 SF
1F501
PHYSICIAN
120 SF / 120 SF
1A609
HAC
65 SF / 59 SF
1A124
CONSULT
120 SF / 170 SF
1A120
GYN EXAM/
TREAT
0 SF / 114 SF
1A122
GYN EXAM/
TREAT
0 SF / 123 SF
1F507
PHYSICIAN
120 SF / 130 SF
1A607
ON-CALL ROOM
135 SF / 147 SF
1A102
EXAM/TREAT
0 SF / 112 SF
1A702a
DECON
0 SF / 134 SF
1A702b
SHOWER
100 SF / 104 SF
1A701
BIO-TERRORISM
STORE
90 SF / 186 SF
1A115
PATIENT TLT
50 SF / 62 SF
1A608
STAFF TLT
25 SF / 67 SF
1E203
SOILED UTILITY
160 SF / 145 SF
1BC04a
KIOSK CHECK-IN
0 SF / 54 SF
1F208
NURSE
100 SF / 102 SF
1E205
CLEAN SUPPLY
40 SF / 148 SF
1E501
MRI WAIT
180 SF / 175 SF
1E202
MRI ROOM
800 SF / 612 SF
1E601 C.T.
600 SF / 504 SF
1E605 C.T. (#2)
600 SF / 492 SF
1E603
CONTROL RM
200 SF / 339 SF
1E608
WHEELCHAIR &
STRETCHER
WAITING
300 SF / 517 SF
1K705
NURSE
PRACTIONER
25 SF / 235 SF
1E201
COMPUTER
EQUIPMENT
300 SF / 244 SF
1E204
MRI CONTROL
120 SF / 227 SF
1E304
IV PREP
150 SF / 48 SF
1E305
RECEPTION
80 SF / 134 SF
1F802
ELEC
0 SF / 89 SF
1E401
DRESS
30 SF / 41 SF
1E604
CLEAN SUPPLY
40 SF / 90 SF
1F808
COFFEE SHOP
0 SF / 755 SF
1E610
ELEC
0 SF / 150 SF
1M715
CHIEF OF
CARDIOLOGY
150 SF / 183 SF
1M717
SECRETARY
90 SF / 145 SF
1F206
NURSE
100 SF / 104 SF
1F204
NURSE
100 SF / 103 SF
1F202
NURSE
100 SF / 98 SF
1F716a
PATIENT STORAGE
104 SF / 171 SF
1E306
CRASH CART
75 SF / 27 SF
1E402
STORAGE
75 SF / 59 SF
1E404
TLT
50 SF / 54 SF
1F210
NURSE
100 SF / 95 SF
1F212
NURSE
100 SF / 104 SF
1F214
NURSE
100 SF / 104 SF
1E301
STRETCHER HOLD
60 SF / 201 SF
1E403
DRESS
0 SF / 41 SF
1A610a
CONFERENCE
0 SF / 311 SF
1B505
FIRE COMMAND
130 SF
1A411
O2 STOR
37 SF
1A733
PLUMB CLOS
0 SF / 22 SF
1B403b
WAITING
0 SF / 140 SF
1A410
AMBULANCE
ENTRANCE
VESTIBULE
85 SF
1A731
STORAGE
0 SF / 22 SF
1B303
VESTIBULE
86 SF
1AC08
CORRIDOR
143 SF
1AC06
CORRIDOR
257 SF
1AC04
CORRIDOR
360 SF
1A702
VESTIBULE
176 SF
1AC02
CORRIDOR
201 SF
1EC06
CORRIDOR
604 SF
1EC05
CORRIDOR
132 SF
1F806
PATIENT REP
114 SF
1F804
PATIENT REP
115 SF
1F808a
WORK
215 SF
1EC04
CORRIDOR
141 SF
1B403a
RECEPTION
193 SF
1B401
VESTIBULE
689 SF
1FC07
CORRIDOR
487 SF
1F716
ELEVATOR LOBBY
393 SF
1KC07
CORRIDOR
422 SF
1EC02
CORRIDOR
325 SF
1EC03
CORRIDOR
293 SF
1E302
MRI CONTROL
120 SF / 208 SF
1E206
MRI ROOM
663 SF
1E206a
MRI EQUIP
259 SF
1A607a
BATHROOM
43 SF
1EC01
CORRIDOR
275 SF
1ES04
STAIR
361 SF
1E608a
COMM
105 SF
1FC08
CORRIDOR
1224 SF
1AS01
STAIR
330 SF
1EE02
ELEVATOR
152 SF
1EE01
ELEVATOR
143 SF
1ES01
STAIR
216 SF
1AC01b
EQ. ALCOVE
38 SF
1AC01a
EQ. ALCOVE
23 SF
1AC07a
EQ. ALCOVE
30 SF
1AC07b
EQ. ALCOVE
27 SF
1AC08a
EQ. ALCOVE
37 SF
1A704
PATIENT TLT
60 SF
1AC08b
EQ. ALCOVE
39 SF
1BC05
CORRIDOR
709 SF
1AC02a
EQ. ALCOVE
21 SF
1AC02b
EQ. ALCOVE
19 SF
1AC02c
EQ. ALCOVE
18 SF
1A735
BICYCLES
80 SF
1A736
BICYCLES
81 SF
1A199
EXTERIOR MASS
CASUALTY AREA
3562 SF
1A198
EXTERIOR ARCADE
1989 SF
MEN'S TOILET
196 SF
TRIAGE
113 SF
FRONT END TRIAGE
111 SF
CHECK-IN
82 SF
ELECTRIC
44 SF
CHECK-IN
97 SF
NURSE FIRST/
RECEPTION
142 SF
WAITING
1,561 SF
TRIAGE
104 SF
TRIAGE
121 SF
WOMEN'S TOILET
158 SF
VESTIBULE
158 SF
105A
TRIAGE
SUB-WAITING
42 SF
ROOF ACCESS
44 SF
4' - 0"
PHASE 2
G-002
G-002
G-002
CLEAR
3' - 0" 5' - 0"
CLEAR
4' - 7"
G-002
AE
D F
EC
FECAED
GENERAL NOTES:
1. CONTRACTOR TO CONFIRM PHASING WITH VA
COR. VA APPROVAL REQUIRED.
2. PROVIDE TEMPORARY DUSTPROOF PARTITIONS
AS REQUIRED TO PROTECT ALL EXISTING AREAS
FROM DAMAGE DUE TO DEMOLITION OR NEW
CONSTRUCTION.
3. PROTECT ALL ITEMS NOT NOTED TO BE
REMOVED (FIELD VERIFY ALL CONDITIONS) AND
COORDINATE ALL WORK WITH OWNER TO
MINIMIZE DISRUPTION TO EXISTING FACILITIES
OPERATIONS.
4. CONTRACTOR TO VERIFY THE LOCATION OF
EXISTING UTILITIES BEFORE THE START OF
DEMOLITION. PROTECT UTILITIES TO REMAIN IN
SERVICE.
5. COORDINATE ITEMS TO BE SALVAGED TO THE
OWNER WITH THE SPECIFICATIONS AND
OWNER'S REPRESENTATIVE.
6. CONTRACTOR TO PATCH, REPAIR, AND PAINT
(REFINISH) SURFACES AND BUILDING ELEMENTS
DAMAGED BY THE ADDITION OR REMOVAL OF
MECHANICAL AND ELECTRICAL ITEMS. PATCH
AND REPAIR ALL SURFACES TO MATCH EXISTING
SURFACES. FIELD VERIFY EXTENT OF REQUIRED
REPAIRS.
7. EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNOBSTRUCTED.
8. CORRIDORS 1EC07, FC05, AND 1FC07 REQUIRE
CONSISTENT MOPPING AND CLEANING FROM
START TO FINISH OF EACH CONSTRUCTION
ACTIVITY DAY.
9. ADD KEYPAD LOCKS TO ALL THE TEMPORARY
DOORS.
PHASE 2
PHASE 1
PHASING LEGEND:
NOT IN CONTRACT
SCOPE LEGEND:
PHASE 3
CONSTRUCTION PHASING
PLAN
NOTE: CONSTRUCTION INGRESS & EGRESS THROUGH
CORRIDORS 1FC05 & 1FC07. ALL TEMPORARY WALL
CONSTRUCTION WORK TO BE PERFORMED BETWEEN 12 AM
TO 7 AM ON WEEKENDS ONLY (FRIDAY, SATURDAY, AND
SUNDAY).
PHASE 1
1. CONSTRUCT ICRA BARRIERS, VESTIBULES &
TEMPORARY FIREWALLS.
PHASE 2
1. NEW RTU UNIT: ROOF MODIFICATIONS,
LEVEL 2 WALL PENETRATION(S) AND INTERSTITIAL WORK.
2. FAST TRACK CONSTRUCTION.
3. OBSERVATION UNIT CONSTRUCTION.
PHASE 3
1. RELOCATE CONSTRUCTION CORRIDOR ICRA (INFECTION
CONTROL RISK ASSESSMENT) WALLS FOR ANTE ROOM &
CORRIDORS FINAL WORK.
2. REMOVE ICRA WALLS.
1.2
11' - 7 1/2"
4'
0" 4'
0"
3'
7"
TEMPORARY 1HR RATED
BARRIER AND DOOR TO
BOTTOM OF INTERSTITIAL
FLOOR
TEMPORARY WALLS
(FLOOR TO SLAB)
1 HR RATED DOOR
C
/2
5' - 0"
CLEAR
3' - 0"
CLEAR
4' - 7"
TEMPORARY
CONSTRUCTION
VESTIBULE
TEMPORARY WALL
AND DOOR WITH
TEMPORARY KEYPAD
LOCK.
TEMPORARY WALL
AND DOOR
TEMPORARY
OPENING, WALL,
AND DOOR WITH
KEYPAD LOCK
9' - 11 1/2"
TEMPORARY
CONSTRUCTION WALL,
DOOR, AND VESTIBULE
TEMPORARY WALL AND
DOOR
TEMPORARY 1HR RATED
BARRIER AND DOOR TO
BOTTOM OF INTERSTITIAL
FLOOR
VA FORM 08 - 6231
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 10
A
B
C
D
E
F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
OF
ARCHITECT - OF - RECORD FL. REG. NO.
675-23-100
FINAL CONSTRUCTION
DRAWINGS
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
JRF SNG
JENNIFER R. FONG AR97191
G-002
LEVEL 1, AREA E2 & D5 - EMERGENCY
DEPARTMENT PHASING & TEMPORARY
CONSTRUCTION PLAN
2 94SEPTEMBER 25, 2024
SCALE: 3/32" = 1'-0"5
LEVEL 1, AREA E2 & D5- EMERGENCY DEPARTMENT PHASING &
TEMPORARY CONSTRUCTION PLAN
E1 E2 E3
E4
C1
A3 A2
A1 B1
B2
CLINIC
HOSPITAL
D1 D2 D3
D4 D5 D6
P-W P-E
A4
W
KEY PLAN
NTS
W
FAST TRACK
OBSERVATION UNIT
EXISTING EMERGENCY
DEPARTMENT
WAITING AREA
SCALE: 1/4" = 1'-0"4
PHASE 1 & 3- OBSERVATION UNIT TEMPORARY
CONSTRUCTION VESTIBULE
SCALE: 1/4" = 1'-0"1
PHASE 1 & 3- BARRIER AND ACCESS TO
EXISTING ED
SCALE: 1/4" = 1'-0"3
PHASE 1 & 3- FAST TRACK TEMPORARY
CONSTRUCTION VESTIBULE
SCALE: 1/4" = 1'-0"2
PHASE 2- TEMPORARY
1HR RATED BARRIER
AND DOOR TO BOTTOM
OF INTERSTITIAL FLOOR
Revisions: Date:
Date: 2024.10.01 11:15:03-04'00'
DN
DN
UP
THIS PROPOSED PROJECT WILL RENOVATE FAST TRACK 4,079 SF AND
OBSERVATION UNIT 4,675 SF ON THE FLOOR NUMBER # 1 OF THE LAKE NONA
EMERGENCY DEPARTMENT TO PROVIDE SPACE FOR FAST TRACK AND
OBSERVATION UNIT INCLUDING SUPPORT SPACES.
CLASSIFICATION OF WORK - THE PROJECT IS A REMODELING OF AN EXISTING
BUILDING.
1. OCCUPANCY CLASSIFICATION - I-2 (CHAPTER 18/19 NFPA101)
THE REQUIREMENTS ESTABLISHED BY THIS CHAPTER SHALL APPLY TO ALL
EXISTING HOSPITALS, NURSING HOMES, AND LIMITED CARE
FACILITIES. THE TERM HOSPITAL, WHEREVER USED IN THIS CODE, SHALL
INCLUDE GENERAL HOSPITALS, PSYCHIATRIC HOSPITALS, AND SPECIALTY
HOSPITALS. THE HEALTHCARE FACILITIES REGULATED BY THIS CHAPTER
SHALL BE THOSE THAT PROVIDE SLEEPING ACCOMMODATIONS FOR THEIR
OCCUPANTS AND ARE OCCUPIED BY PERSONS WHO ARE MOSTLY INCAPABLE
OF SELF-PRESERVATION BECAUSE OF AGE, BECAUSE OF PHYSICAL OR
MENTAL DISABILITY, OR BECAUSE OF SECURITY MEASURES NOT UNDER THE
OCCUPANTS’ CONTROL.
THE IBC OCCUPANCY IS HEALTHCARE (IBC ALLOWS PERSONS INCAPABLE OF
SELF-PRESERVATION FOR MEDICAL CARE ON A 24-HOUR BASIS).
2. BUILDING HEIGHTS AND AREAS
HEIGHT - UNLIMITED
NUMBER OF STORIES - UNLIMITED
AREA, PER FLOOR - UNLIMITED
3. CONSTRUCTION TYPE - (NFPA TYPE II (222))
4. FIRE RESISTANCE AND PROTECTION
BUILDING ELEMENT HOURLY RATING
PRIMARY STRUCTURAL FRAME 2 (1 WHERE SUPPORTING ROOF ONLY)
BEARING EXTERIOR WALLS 2
BEARING INTERIOR WALLS 2
NONBEARING EXTERIOR WALLS 0
NONBEARING INTERIOR WALLS 0
FLOOR 2
ROOF 1
SPRINKLERED - YES TYPE - WET PIPE, TYPICAL
FIRE ALARM - YES
5. MEANS OF EGRESS
NUMBER OF EXITS PERMITTED - EXIT THROUGH A HORIZONTAL EXIT INTO
OTHER CONTIGUOUS OCCUPANCIES THAT MEET CODE (NFPA 19.2.4) NUMBER
OF EXITS (NFPA 19.2.4.3) - 2 REQUIRED / 2 PROVIDED
EXIT WIDTH (NFPA 7.3.3.1) – SEE EXIT CALCULATIONS BELOW
MINIMUM WIDTH (IBC/NFPA 20.2.3.2) - 44” MINIMUM CORRIDOR WIDTH
TRAVEL DISTANCE TO HORIZONTAL EXIT (NFPA 19.2.6) - 200’ MAX / 184' ACTUAL
FOR FAST TRACK AND 200' MAX/ 191' ACTUAL FOR OBSERVATION UNIT PER
59.2.5.3.1)
TRAVEL DISTANCE FROM ANY POINT TO REACH A DOOR IN A SMOKE BARRIER
(NFPA 20.3.7.4) - 200’ MAX / 96’ ACTUAL FOR FAST TRACK AND 147 ACTUAL FOR
OBSERVATION UNIT.
COMMON PATH LIMIT (NFPA 20.2.5.3.1) - 100’ MAX / 96'-0"’ ACTUAL
OCCUPANT CALCULATIONS
USE AREA ÷ LOAD FACTOR = OCCUPANTS
RENOVATION (FAST TRACK) 3,789 SF ÷ 240 = 16 OCCUPANTS AND
(OBSERVATION UNIT) 4,659 SF ÷ 240 = 19 OCCUPANTS
TOTAL = 8,648
EXIT CALCULATIONS
EXIT ID TYPE WIDTH ÷ FACTOR = CAPACITY
H1 HORIZONTAL 66" ÷ 0.2” 330
H2 HORIZONTAL 66" ÷ 0.2” 330
H3 HORIZONTAL 66" ÷ 0.2" 330
TOTAL = 990
THE EXIT CAPACITY PROVIDED (990) EXCEEDS THE OCCUPANT LOAD/EXIT
CAPACITY REQUIRED (35).
6. ACCESSIBILITY
100% ACCESSIBLE - YES
VERTICAL ACCESSIBILITY - N.A.
PROJECT INFORMATION
LIFE SAFETY NOTES
1. FIRE RESISTANCE-RATED PARTITIONS ARE INDICATED WITH
LINE TYPES AS DEFINED IN THE LEGEND. PROTECT FIRE
RESISTANCE-RATED PARTITION PERIMETER JOINTS AND
PENETRATIONS WITH UL-TESTED SYSTEMS TO MAINTAIN
RATING INDICATED.
3. REFER TO MEP DRAWINGS FOR FIRE-PROTECTION
SPRINKLER AND FIRE ALARM INFORMATION.
APPLICABLE CODES
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2021
FIRE CODE: NFPA 1, FIRE CODE, 2021
LIFE SAFETY CODE: NFPA 101, LIFE SAFETY CODE, 2021
PLUMBING CODE: INTERNATIONAL PLUMBING CODE, 2021
ACCESSIBILITY CODE: ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN STANDARD (PG-18-13)
REV. 11/1/2022
TIL 2008 FAST TRACK
TIL 2021 OBSERVATION UNIT
JURISDICTION
BUILDING CODE AUTHORITY: DEPARTMENT OF VETERANS
AFFAIRS
FIRE CODE AUTHORITY: DEPARTMENT OF VETERANS AFFAIRS
TD= TRAVEL DISTANCE TO EXIT
CP= COMMON PATH
B
C
D
E
33363738394041
8.2
7.2
6.2
5.2
4.2
3.2
2.2
C.2
A.2
D.2
B.2
1.2
2.0
7.8
6.8 A.10
A.05
D.9
35.237.2
B.4
5.8
4.8
3.8 2.8
1.4
C.4
C.8 5.0
39.7
C.7
E.6
D.6
A.01
N.I.C.
1F307
MED ROOM
77 SF 1F101
SOILED HOLD
43 SF
1F401
CLEAN UTILITY
59 SF
1F303
NURSE STATION 2
218 SF
1F301
NURSE STATION 1
218 SF
1F201
STAFF ROOM
43 SF
1F408
OBSERVATION
ROOM 4
147 SF
1F104
OBSERVATION
ROOM 5
142 SF
1F106
SHARED TOILET 1
55 SF
1F108
OBSERVATION
ROOM 6
151 SF
1F408A
PRIVATE TOILET 4
69 SF
1F406A
PRIVATE TOILET 3
69 SF
1F406
OBSERVATION
ROOM 3
135 SF
1F404
OBSERVATION
ROOM 2
137 SF
1F404A
PRIVATE TOILET 2
69 SF
1F308A
PRIVATE TOILET 1
69 SF
1F308
OBSERVATION
ROOM 1
148 SF
1F601
OBSERVATION
ROOM 10
150 SF 1F602
SHARED TOILET 2
50 SF
1F203
OFFICE
127 SF
1F605
OBSERVATION
ROOM 7
134 SF
1F604
OBSERVATION
ROOM 8
139 SF
1F605A
PRIVATE TOLIET 5
70 SF
1F C
C
C O
R R
ID
O
R
SF
1F603
OBSERVATION
ROOM 9
150 SF
1F604A
SHOWER
81 SF
1B202
EXAM ROOM 1
109 SF
1B201C
SOILED HOLD
47 SF
1B203
EXAM ROOM 2
107 SF
1A723
ISOLATION ROOM
131 SF
1A722
ISOLATION ROOM
121 SF
1A721
ANTE ROOM
32 SF
1A126
EXAM ROOM 7
106 SF
1A127
EXAM ROOM 6
106 SF 1B206
EXAM ROOM 5
106 SF
1B205
EXAM ROOM 4
106 SF
1B204
EXAM ROOM 3
106 SF
1A125A
PRIVATE TOILET
56 SF
1A502
TOILET 1
57 SF
1A504
TOILET 2
60 SF
1A128
EXAM ROOM 10
139 SF
1A724
EXAM ROOM 12
127 SF
1B201
NURSE STATION
285 SF
1A121
MED ROOM
104 SF
1A122
CLEAN UTILITY
66 SF
1A119
EXAM ROOM 9
128 SF
1A718
EXAM ROOM 11
126 SF
1A125
EXAM ROOM 8
125 SF
1FC03B
CORRIDOR
261 SF
1AC04
CORRIDOR
535 SF
1AC06
CORRIDOR
134 SF
1B201B
NOURISHMENT
13 SF
1B20A
CLEAN UTILITY
ALCOVE
25 SF
1C102
WAITING
0 SF / 1099 SF
1E702
C.T. (ED)
1200 SF / 580 SF
1E602
CONTROL RM
200 SF / 79 SF
1K505c
IMAGING RM
400 SF / 392 SF
1B303a
OPERATIONS
180 SF / 273 SF
1B303c
ARMORY WORKRM
80 SF / 136 SF
1B303b
HOLDING
60 SF / 69 SF
1A721
ISOLATION
130 SF / 141 SF
1A409
MEDS
80 SF / 83 SF
1A413
NOURISH
60 SF / 87 SF
1A408
CLEAN SUPPLY
120 SF / 201 SF
1A801
OFFICE
120 SF / 132 SF
1A803
OFFICE
120 SF / 131 SF
1A105
PATIENT TLT
50 SF / 60 SF
1A103
COMMUNICATION
STATION
150 SF / 153 SF
1A109
COMMUNICATION
STATION
300 SF / 1205 SF
1A112
LIFE SUPPORT UNIT
300 SF / 295 SF
1A713
EXAM/TREAT
0 SF / 122 SF1A711
EXAM/TREAT
0 SF / 122 SF1A709
EXAM/TREAT
0 SF / 122 SF1A707
EXAM/TREAT
0 SF / 122 SF
1A109d
EXAM/TREAT
0 SF / 120 SF
1A109c
EXAM/TREAT
0 SF / 114 SF
1A109b
EXAM/TREAT
0 SF / 116 SF
1A109a
EXAM/TREAT
0 SF / 117 SF
1A118
ENT
EXAM/TREATMENT
0 SF / 124 SF
1A116
EXAM/TREAT
0 SF / 114 SF
1A101
EXAM/TREAT
0 SF / 110 SF
1A110
EXAM/TREAT
0 SF / 126 SF
1A714
PATIENT TLT
50 SF / 59 SF
1A703
SECLUSION RM
0 SF / 121 SF
1A719
ANTE RM
0 SF / 48 SF
1A702c
COMM
0 SF / 103 SF
1A702d
ELEC
0 SF / 75 SF
1C102a
ELEC
0 SF / 99 SF
1B201a
ELEC
0 SF / 93 SF
1B201b
COMM
0 SF / 149 SF
1B403
LOBBY
150 SF / 2389 SF
1B401a
WHEEL CHAIR
STOR
150 SF / 192 SF
1A715
EXAM/TREAT
0 SF / 122 SF
1A717
ISOLATION
0 SF / 139 SF
1A412
SOILED UTILITY
120 SF / 86 SF
1A106
EXAM/TREAT
0 SF / 125 SF
1A108
MONITORED BEDS
100 SF / 104 SF
1A610
STAFF
LKRS/LOUNGE
220 SF / 167 SF
1A104
MONITORED BEDS
100 SF / 106 SF
1F505
PHYSICIAN
120 SF / 125 SF1F503
PHYSICIAN
120 SF / 123 SF
1F501
PHYSICIAN
120 SF / 120 SF
1A609
HAC
65 SF / 59 SF
1A124
CONSULT
120 SF / 170 SF
1A120
GYN EXAM/
TREAT
0 SF / 114 SF
1A122
GYN EXAM/
TREAT
0 SF / 123 SF
1F507
PHYSICIAN
120 SF / 130 SF
1A607
ON-CALL ROOM
135 SF / 147 SF
1A102
EXAM/TREAT
0 SF / 112 SF
1A702a
DECON
0 SF / 134 SF
1A702b
SHOWER
100 SF / 104 SF
1A701
BIO-TERRORISM
STORE
90 SF / 186 SF
1A115
PATIENT TLT
50 SF / 62 SF
1A608
STAFF TLT
25 SF / 67 SF
1E203
SOILED UTILITY
160 SF / 145 SF
1K201
SOILED HOLD
3314 SF / 82 SF
1BC04a
KIOSK CHECK-IN
0 SF / 54 SF
1F208
NURSE
100 SF / 102 SF
1E205
CLEAN SUPPLY
40 SF / 148 SF
1E501
MRI WAIT
180 SF / 175 SF
1E202
MRI ROOM
800 SF / 612 SF
1E601 C.T.
600 SF / 504 SF
1E605 C.T. (#2)
600 SF / 492 SF
1E603
CONTROL RM
200 SF / 339 SF
1E608
WHEELCHAIR &
STRETCHER
WAITING
300 SF / 517 SF
1K705
NURSE
PRACTIONER
25 SF / 235 SF
1K801
COMMON VIEWING
RM
80 SF / 788 SF
1M706
RF TLT
52 SF / 86 SF
1E201
COMPUTER
EQUIPMENT
300 SF / 244 SF
1E204
MRI CONTROL
120 SF / 227 SF
1E304
IV PREP
150 SF / 48 SF
1E305
RECEPTION
80 SF / 134 SF
1K505a
IMAGING RM
400 SF / 365 SF
1K505b
IMAGING RM
400 SF / 397 SF
1K202
NUC WASTE STOR
80 SF / 94 SF
1F802
ELEC
0 SF / 89 SF
1E401
DRESS
30 SF / 41 SF
1E604
CLEAN SUPPLY
40 SF / 90 SF
1N201
RECEP(FDVA/STATE)
120 SF / 138 SF
1N203
OFFICE
(FDVA/STATE)
120 SF / 139 SF
1N202
OFFICE (VFW)
120 SF / 126 SF
1N204
OFFICE
(FDVA/STATE)
120 SF / 132 SF
1N206
OFFICE
(FDVA/STATE)
120 SF / 135 SF
1F808
COFFEE SHOP
0 SF / 755 SF
1E610
ELEC
0 SF / 150 SF
1M715
CHIEF OF
CARDIOLOGY
150 SF / 183 SF
1M717
SECRETARY
90 SF / 145 SF
1M702
WAIT
55 SF / 137 SF
1M402
CHIEF TECH
OFFICE
100 SF / 126 SF
1F206
NURSE
100 SF / 104 SF
1F204
NURSE
100 SF / 103 SF
1F202
NURSE
100 SF / 98 SF
1F716a
PATIENT STORAGE
104 SF / 171 SF
1E306
CRASH CART
75 SF / 27 SF
1E402
STORAGE
75 SF / 59 SF
1E404
TLT
50 SF / 54 SF
1F210
NURSE
100 SF / 95 SF
1F212
NURSE
100 SF / 104 SF
1F214
NURSE
100 SF / 104 SF
1E301
STRETCHER HOLD
60 SF / 201 SF
1M718
CONFERENCE
400 SF / 436 SF
1E403
DRESS
0 SF / 41 SF
1A610a
CONFERENCE
0 SF / 311 SF
1B505
FIRE COMMAND
130 SF
1B403c
SECURITY
SCREENING
200 SF
1A411
O2 STOR
37 SF
1M712
RF TLT
52 SF / 73 SF
1A733
PLUMB CLOS
0 SF / 22 SF
1B403b
WAITING
0 SF / 140 SF
1M704
DRESS
56 SF
1M714
DRESS
58 SF
1A410
AMBULANCE
ENTRANCE
VESTIBULE
85 SF
1A731
STORAGE
0 SF / 22 SF
1B303
VESTIBULE
86 SF
1AC08
CORRIDOR
143 SF
1AC06
CORRIDOR
257 SF
1AC04
CORRIDOR
360 SF
1A702
VESTIBULE
176 SF
1AC02
CORRIDOR
201 SF
1EC07
CORRIDOR
592 SF
1FC05
CORRIDOR
534 SF
1B602
PHONE
28 SF
1HC09
CORRIDOR
1656 SF
1EC06
CORRIDOR
604 SF
1EC05
CORRIDOR
132 SF
1F806
PATIENT REP
114 SF
1F804
PATIENT REP
115 SF
1F808a
WORK
215 SF
1EC04
CORRIDOR
141 SF
1B403a
RECEPTION
193 SF
1B401
VESTIBULE
689 SF
1B405
ELEVATOR LOBBY
306 SF
1G101
WAITING/LOUNGE
868 SF
1FC07
CORRIDOR
487 SF
1F716
ELEVATOR LOBBY
393 SF
1KC07
CORRIDOR
422 SF
1EC02
CORRIDOR
325 SF
1EC03
CORRIDOR
293 SF
1E302
MRI CONTROL
120 SF / 208 SF
1E206
MRI ROOM
663 SF
1E206a
MRI EQUIP
259 SF
1F808b
PUBLIC TLT
71 SF
1N205
OFFICE
(FAVA/STATE)
120 SF / 111 SF
1A607a
BATHROOM
43 SF
1EC01
CORRIDOR
275 SF
1ES04
STAIR
361 SF
1E608a
COMM
105 SF
1FC08
CORRIDOR
1224 SF
1NC02
PASSAGE
173 SF
1GC01
CORRIDOR
579 SF
1B403d
WAITING
134 SF
1AS01
STAIR
330 SF
1BE03
ELEVATOR
90 SF1BE01
ELEVATOR
100 SF
1BE04
ELEVATOR
90 SF
1BE02
ELEVATOR
143 SF
1EE02
ELEVATOR
152 SF
1EE01
ELEVATOR
143 SF
1ES01
STAIR
216 SF
1FE01
ELEVATOR
95 SF
1FE02
ELEVATOR
108 SF
1FE03
ELEVATOR
120 SF
1AC01b
EQ. ALCOVE
38 SF
1AC01a
EQ. ALCOVE
23 SF
1AC07a
EQ. ALCOVE
30 SF
1AC07b
EQ. ALCOVE
27 SF
1AC08a
EQ. ALCOVE
37 SF
1A704
PATIENT TLT
60 SF
1AC08b
EQ. ALCOVE
39 SF
1BC05
CORRIDOR
709 SF
1AC
02a
EQ
. ALC
O
VE
21 SF
1AC
02b
EQ
. ALC
O
VE
19 SF
1AC
02c
EQ
. ALC
O
VE
18 SF
1B401b
MECH
196 SF
1A735
BICYCLES
80 SF
1A736
BICYCLES
81 SF
1A199
EXTERIOR MASS
CASUALTY AREA
3562 SF
1A198
EXTERIOR ARCADE
1989 SF
NIC
NIC
NIC
NIC
NIC
NIC
1AC04A
CORRIDOR
273 SF
1FC03A
CORRIDOR
261 SF
1FC03
CORRIDOR
548 SF
EXISTING 2 HOUR
HORIZONTAL EXIT
H1
EXISTING 2 HOUR
HORIZONTAL EXIT
1A705
EXAM/TREAT
0 SF / 123 SF
43'- 8"
68' - 0"
50'- 1"
5"
31' - 6"
31' - 0"
10' - 2"
76' - 0"
4" 7'
4"
11' - 2" 6'
45' - 2"
6"
45' - 2"
TD=183' - 11"
TD=95' -11"
TD=146' - 5"
TD=191' - 3"
MEN'S TOILET
196 SF
TRIAGE
113 SF
FRONT END TRIAGE
111 SF
CHECK-IN
82 SF
ELECTRIC
44 SF
CHECK-IN
97 SF
NURSE FIRST/
RECEPTION
142 SF
WAITING
1,561 SF
TRIAGE
104 SF
TRIAGE
121 SF
WOMEN'S TOILET
158 SF
VESTIBULE
158 SF
105A
TRIAGE
SUB-WAITING
42 SF
ROOF ACCESS
44 SF
4'
9"
H2
H3
1B200
PNEUMATIC TUBE
SYSTEM
19 SF
1F301B
PNEUMATIC TUBE
SYSTEM
14 SF
CP = 48'
CP = 52' - 5"FEC
AE
D
FE
C
AED
FE
C
FEC
1-HR FIRE/SMOKE
-STORAGE ROOMS
-CLEAN SUPPLY ROOMS
-SOIL HOLD
-LARGER THAN 100SF
2-HR FIRE/SMOKE
(TRAVEL DISTANCE 300' OR LESS)
- SMOKE BARRIER
2-HR FIRE
-STAIRS
-FLOOR TO FLOOR OPENINGS
-OCCUPANCY SEPARATION
EXIT LIGHT - SINGLE FACE
EXIT LIGHT - DIRECTIONAL (ONE WAY)
EXIT LIGHT - DIRECTIONAL (TWO
WAY)
EXIT LIGHT - DOUBLE FACE
EXIT PATH
DISTANCE TO SMOKE PARTITION OR
EXIT
FEC FIRE EXTINGUISHER CABINET
(WITHIN 75' OF ANY POINT)
EXIT
HORIZONTAL EXITH
VA FORM 08 - 6231
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 10
A
B
C
D
E
F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
OF
ARCHITECT - OF - RECORD FL. REG. NO.
675-23-100
FINAL CONSTRUCTION
DRAWINGS
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
JRF SNG
JENNIFER R. FONG AR97191
G-003
LEVEL 1, AREAS E2 & D5 - LIFE SAFETY
PLAN
3 94SEPTEMBER 25, 2024
SCALE: 3/32" = 1'-0"1 LEVEL 1, AREAS E2 & D5- LIFE SAFETY PLAN
E1 E2 E3
E4
C1
A3 A2
A1 B1
B2
CLINIC
HOSPITAL
D1 D2 D3
D4 D5 D6
P-W P-E
A4
W
KEY PLAN
NTS
W
Revisions: Date:
Date: 2024.10.01 11:27:04-04'00'
A-101 DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL REFERENCE
SIM
A
NEW GRID
IDENTIFICATION
LAYOUT GRID LINES
A102
ELEVATION NUMBER AND
DIRECTION OF VIEW
SHEET WHERE DRAWN
INTERIOR ELEVATION REFERENCE
101 ROOM NUMBER
ROOM NAME
ROOM TAG
ROOM NUMBER
ROOM FINISH
BASE FINISH
WALL FINISH
ROOM NAME
FINISH PLAN ROOM TAG
SECTION NUMBER
SHEET WHERE DRAWN
DIRECTION OF VIEW
A-101
SIM
SECTION
A-101
SIM
ELEVATION NUMBER
AND DIRECTION
SHEET WHERE DRAWN
SECTION DETAIL REFERENCE
B3B PARTITION SYMBOL
SEE SHEET A-620
PARTITION TYPE IDENTIFICATION MARK
A
EXISTING GRID
IDENTIFICATION
ELEVATION NUMBER
DIRECTION OF VIEW1
A-101
SIM
EXTERIOR ELEVATION
SHEET WHERE DRAWN
SCALE: 1/8" = 1'-0"
BASIC DRAWING
TITLE
DRAWING TITLE SYMBOLS
VIEW NAME
INDICATES HEIGHT
ABOVE PROJECT DATUM
+10'-0"
SECOND LEVEL
NAME OF LEVEL
LEVEL LINE
SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET
WHERE REFERENCE OCCURS
KEYED NOTE MARKED
REVISION NUMBER - SEE
REVISION HISTORY ON THE TITLE
BLOCK OF EACH SHEET
EXTENT OF CURRENT
REVISION
REVISION NUMBER AND EXTENT
CEILING TYPE TAG
CEILING TYPE TAG WITH
CEILING HEIGHT. HEIGHT
INDICATED IS AFF
2'X2' RECESSED LIGHT
FIXTURE
2'X4' RECESSED
LIGHT FIXTURE
FIRE PROTECTION-
SPRINKLER HEAD
F FIRE PROTECTION-
FIRE ALARM DEVICE
GYPSUM BOARD
CEILING OR SOFFIT
GWB
APC CEILING - 2X2 OR 2X4
AS INDICATED ON CEILING PLAN
APC-X
COVE LIGHT (NOT ALL
INDICATED)
RECESSED LINEAR
LIGHT FIXTURE
PENDANT/SUSPENDED
LIGHT FIXTURE
PENDANT/SUSPENDED
LIGHT FIXTURE
EXIT SIGN,
SINGLE-SIDED EXIT SIGN,
DOUBLE-SIDED
HVAC SUPPLY
GRILLE
HVAC RETURN
GRILLE
HVAC SWITCHED
EXHAUST GRILLE
HVAC SUPPLY/RETURN
LINEAR DIFFUSER
ACCESS PANEL
ARCHITECTURAL REFERENCE SYMBOLS REFLECTED CEILING PLAN SYMBOLS
FLOOR PLAN SYMBOLS ARCHITECTURAL MATERIAL INDICATIONS
EARTH RIGID INSULATION
STEEL
PLYWOOD
GYPSUM WALL BOARD
ASPHALT
SAND
GROUT
DIMENSIONAL LUMBER
CONTINUOUS WOOD
FRAMING
DIMENSIONAL LUMBER
WOOD BLOCKING
CONCRETE MASONRY
UNIT
PRECAST CONCRETE
BRICK
CONCRETE
ALUMINUM
FINISH LUMBER
GRAVEL
GRANULAR DRAINAGE
MATERIAL
STONE
BATT INSULATION
ONE HOUR FIRE
RATED PARTITION
TWO HOUR FIRE
RATED PARTITION
THREE HOUR FIRE
RATED PARTITION
DOOR OPENING
OVERHEAD
ROLLING DOOR
INTERIOR GLAZED
WINDOW
WINDOW TYPE
EQUIPMENT TYPE1i
DIM
DIMENSION SYMBOL
BASE CABINETS
BASE AND WALL
CABINETS
WALL CABINETS
TOILET PARTITION
AND DOOR
HANDRAIL
BUMPER GUARD
CORNER GUARD
CGCG
OVERHEAD ITEMS
UNDER-COUNTER ITEMS
NOT-IN-CONTRACT ITEMSNIC
FEC
FIRE EXTINGUISHER
CABINET
FE
FIRE EXTINGUISHER
(MOUNT 3'-6" AFF)
URINAL
LAVATORY -
COUNTERTOP
LAVATORY -
PEDESTAL/WALL HUNG
UTILITY SINK
FLOOR FINISH
TRANSITION SYMBOL
XXX-X
XXX-X
JANITOR'S
RECEPTOR
SHOWER
FLOOR DRAIN IN
SLOPING FLOOR
FD
FLOOR JUNCTION
BOX
ROOF SAFETY TIE-
BACK
ROOF DRAIN
RD
OVER FLOW ROOF
DRAIN
ORD
DOOR OPENING MARK
XX
X
SINGLE OPENING DOOR
DOUBLE ACTING DOOR
XX
X
XX
X
PAIR DOORS -
EQUAL SIZES
XX
X
PAIR DOORS -
UNEQUAL SIZES
XX
X
PAIR DOORS -
DOUBLE EGRESS
XXX
SLIDING DOOR -
BETWEEN JAMBS
DOOR WITH SIDE LIGHT
XX
X
PAIR - BI FOLD DOOR
XXX
@ AT
A AIR
AB AIR BARRIER
AB ANCHOR BOLT
AC AIR CONDITIONING
ACC ACCESSIBLE
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJACENT
ADMIN ADMINISTRATIVE
AESS ARCHITECTURAL EXPOSED
STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMP INTERRUPTING CAPACITY
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AMPC ACOUSTICAL METAL PAN CEILING
AOR AREA OF REFUGE
AP ACCESS PANEL
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR ARGON
ARCH ARCHITECTURAL/ARCHITECT
PCC PRECAST CONCRETE
ASPH ASPHALT
ASSY ASSEMBLY
AT AIR TERMINAL DEVICE
AUTO AUTOMATIC
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AVTR ACID VENT THROUGH ROOF
AW ACID WASTE
AWC ACOUSTIC WOOD CEILING
AWP ACOUSTICAL WALL PANEL
BD BOARD
BITUM BITUMINOUS
BL BORROWED LIGHT
BLDG BUILDING
BLKG BLOCKING/BLOCK
BLKT BLANKET
BM BENCH MARK
BOD BASIS OF DESIGN
BOS BOTTOM OF STEEL
BPL BASE PLATE
BRG BEARING
BRK BRICK
BSL BIO SAFETY LEVEL
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CHANNEL
C/C CENTER TO ROOFING
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CC CUBICAL CURTAIN
CFCI CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFMF COLD FORM METAL FRAMING
CFOI CONTRACTOR FURNISHED OWNER
INSTALLED
CH BD CHALKBOARD
CHWS/R CHILLED WATER SUPPLY/RETURN
CI CAST IRON
CIP CAST IN PLACE CONCRETE
CIRC CIRCULATE/CIRCULATING
CJ CONTROL JOINT
CK CORK FLOORING
CL CENTERLINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
CO CARBON MONOXIDE
CO CLEANOUT
CO2 CARBON DIOXIDE
COL COLUMN
COMB COMBINATION/COMBINED
COMP COMPOSITE
CONC CONCRETE
COND CONDENSATE
CONF CONFERENCE
CONN CONNECTION/CONNECT
CONSTR CONSTRUCTION
CONT CONTINUOUS/CONNECT
CONTR CONTRACT(OR)
CONV CONVECTOR
CORP CORRIDOR
CP CONTROL PANEL
CPT CARPET
CR CARD READER
CS CUP SINK
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CU CUBIC
CU FT CUBIC FEET
CU FT CUBIC FEET
CU YD CUBIC YARD(S)
CUH CABINET UNIT HEATER
CW COLD WATER
CW CURTAIN WALL
D DEPTH
DBL DOUBLE
DEPT DEPARTMENT
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFERENCE
DIFF DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DISTR PNL DISTRIBUTION PANEL
DIV DIVISION
DL DEAD LOAD
DL DIVIDED LITES
DN DOWN
DO DOOR OPERATOR
DPTN DEMOUNTABLE PARTITION
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
DWTR DUMBWAITER
ARCHITECTURAL ABBREVIATIONS
E EAST
EA EACH
EC ELECTRICAL CONTRACTOR
ED EMERGENCY DEPARTMENT
EEW EMERGENCY EYE WASH
EF EXHAUST FAN
EFG ENTRANCE FLOOR GRILL
EFM ENTRANCE FLOOR MAT
EH EXHAUST HOOD
EIFS EXTERIOR FINISH INSULATION SYSTEM
EL ELEVATION
ELEC ELECTRIC (ELECTRICAL)
ELEV ELEVATOR
EMBED EMBEDDED
EMER EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENTR ENTRANCE
EP ELECTRICAL PANEL
EPO EMERGENCY POWER OUTLET
EPT EPOXY PAINT
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ES EMERGENCY SHOWER
ESR ELASOMETRIC SHEET ROOFING
ETR EXISTING GTO REMAIN
EWC ELECTRIC WATER COOLER
EWS EMERGENCY SHOWER AND EYE WASH
EXC EXCAVATE(D)
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
F FAHRENHEIT
FA FIRE ALARM
FB FLOOR BOX
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPT CONNECTION
FDTN FOUNDATION
FDV FIRE DEPT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FIN FINISH (ED)
FIXT FIXTURE
FLEX FLEXIBLE
FLR FLOOR
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RETARDANT/RESISTANT
FRP FIBERGLASS REINFORCED
PANEL/POLYESTER/PLASTIC
FRT FIRE RESISTANT TREATED
FRZ FREEZER
FT FEET
FTG FOOTING
GA GAGE (GAUGE)
GAL GALLON(S)
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFRC GLASS FIBER REINFORMCENT
CONCRETE
GFRP GLASS FIBER REINFORCED PLASTER
GL GLASS
GPC GROUND POLISHED CONCRETE
GRT GROUT
GWB GYPSUM WALL BOARD
HB HOSE BIBB
HD HEAD
HD HUB DRAIN
HDWD HARDWOOD
HDWE HARDWARE
HE HELIUM
HEX HEXAGON
HM HOLLOW METAL
HO ELECTROMAGNETIC HOLD OPEN
HOLD HOLD DIMENSION
HORIZ HORIZONTAL
HP HIGH POINT
HP HORSEPOWER
HPC HIGH PERFORMANCE COATING
HR HOUR
HSKPG HOUSEKEEPING
HSS HOLLOW STRUCTURAL SHAPE
HT HEIGHT
HVAC HEATING, VENTILATING & AIR
CONDITIONING
HW HOT WATER
HWS HEAD WELDED STUD
HYD HYDROGEN
ID INSIDE DIAMETER/DIMENSION
IMP INSULATED METAL PANEL
IN INCH(ES)
INCL INCLUDE
INFO INFORMATION
INSUL INSULATION/INSULATED
INT INTEGRAL
INV INVERT
INV EL INVERT ELEVATION
JAN JANITOR
JAN CLO JANITOR CLOSET
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
K KIP (1000 LB)
KO KNEE SPACE OPENING
KPL KICK PLATE
KV KILOVOLT
KW KILOWATTS
KWH KILOWATT HOUR
L ANGLE
L LENGTH/LONG
LAB LABORATORY
LAN LOCAL AREA NETWORK
LAV LAVATORY
LBS POUND(S) / LBS
LEV LEVEL
LF LINEAR FOOT
LFG LAB FURNISHINGS CONTRACTOR
LH LEFT HAND
LINO LINOLEUM
LKR LOCKER
LL LIVE LOAD
LN2 LIQUID NITROGEN
LNDG LANDING
LOC LOCATION (LOCATE)
LONG LONGITUDINAL
LPT LOW POINT
LT GA LIGHT GAGE
LTG LIGHTING
LTG PNL LIGHTING PANEL
LVR LOUVER
LW LIGHTWEIGHT
M METER
MACH MACHINE
MAN MANUAL
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MC MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MECH RM MECHANICAL EQUIPMENT ROOM
MED MEDICINE/MEDICAL
MED MEDIUM
MEMB MEMBRANE
MEP MECHANICAL, ELECTRICAL, PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MGR MANAGER
MH MANHOLE
MIC MOBILE INSTRUMENT CART
MICRO MICROWAVE
MIN MINIMUM
MIN MINUTE
MIR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING/MOULDING
mm MILLIMETER
MO MASONRY OPENING
MPH MILES PER HOUR
MTD MOUNTED
MTG MOUNTING
MTL METAL
N NORTH
N2 NITROGEN, PIPED GAS
NA NOT APPLICABLE
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT IN SCALE
NW NORMAL WEIGHT
O OXYGEN, PIPED GAS
OA OUTSIDE AIR
OA OVERALL
OC ON CENTER
OCC OCCUPANCY/OCCUPATION/OCCUPY
OD DRAIN (OVERFLOW)
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFF OFFICE/OFFICER
OFOI OWNER FURNISHED,OWNER INSTALLED
OH OPPOSITE
OHSC OVER HEAD SERVICE CARRIER
OPNG OPENING
OPP OPPOSITE
OR OPERATING ROOM
OSHA OCCUPATIONAL SAFETY AND HEALTH
ASSOCIATION
OZ OUNCE
PCC PRECAST CONCRETE - STRUCTURAL
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL/PANELING
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PREP PREPARATION
PS PROJECTION SCREEN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
P-TYPE PARTITION TYPE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT / PAVING
PW POLISHED WATER
QT QUARRY TILE
QTY QUANTITY
R RADIUS
R RISER
RA RETURN AIR
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REF REFRIGERATOR
REINF REINFORCED/REINFORCEMENT
REQ REQUIRED
RET RETURN
REV REVISION
RF RESINOUS FLOORING
RH RELATIVE HUMIDITY
RH RIGHT HAND
RM ROOM
RO REVERSE OSMOSIS
RO ROUGH OPENING
RPM REVOLUTION PER MINUTE
RUB RUBBER FLOORING
RV ROOF VENT
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SEALED CONCRETE
SCF STATIC CONTROL FLOORING
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT
SGL SINGLE
SHT SHEET
SHT MTL SHEET METAL
SHWR SHOWER
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION
SPKR SPEAKER
SPP SOLID PHENOLIC PANELS
SQ IN SQUARE INCHES
SQ YD SQUARE YARD
SS STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
ST STONE
ST STREET
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL /STRUCTURE
SUSP SUSPENDED
SV SHEET VINYL
SVT SOLID VINYL TILE
SW SWITCH
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TA TOILET ACCESSORIES
TB TACKBOARD
TBB TILE BACKER BOARD
TBD TO BE DETERMINED
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE/TEMPERED
THK THICK/THICKNESS
TLT TOILET
TO TOP OF
TPO THERMOPLASTIC OLEFIN
TR TELECOM ROOM
TRDT TREATED
TS TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
UC UNDER COUNTER
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPH UPHOLSTERY
UPS UNINTERRUPTED POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
VAR VARIES
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
VOL VOLUME
VR VAPOR RETARDER
VTR VENT THRU ROOF
W WEST
W WIDTH
W/ WITH
W/O WITHOUT
WC WALL COVERING
WD WOOD
WF WIDE FLANGE STEEL BEAM
WP WALL PROTECTION
WP WORKING POINT
WT WINDOW TREATMENTS
WT WEIGHT
WTR WATER
WHEEL CHAIR
CLEARANCE
CENTERLINE
ø 5' - 0
1i CEILING TYPE
? KEYNOTE SYMBOL
101 DOOR TYPE TAG
Ref
ELEVATION NUMBER
SYMBOL
EXIT SIGN SYMBOL
ACT-?
ACT-?
NORTH ARROW
SYMBOL
X WALL TAG SYMBOL
1t
Zone Name ZONE TAG SYMBOL
BREAK LINE SYMBOL
DEMO APC CEILING - 2X2 OR 2X4
AS INDICATED ON CEILING PLAN
APC-X
FOUR HOUR FIRE
RATED PARTITION
ADA COMPLIANCE DETAILS
WOOD
SVT-1 SOLID VINYL TILE
LVT-1 LUXURY VINYL TILE
VCT-1 VINYL COMPOSITE TILE
WSF-1 WELDED SEAM FLOORING
RES-3 RESINOUS FLOORING
SC-1 SEALED CONCRETE
COMPRESSED CARPET 1/4" MAX BELOW THRESHOLD
THRESHOLD
A. TRANSITION BETWEEN FLOOR FINISHES
B. THRESHOLD
C. LEVEL CHANGES
FFL
FRONT
APPROACH
PULL SIDE
FRONT
APPROACH
PUSH SIDE
FRONT APPROACH
PUSH
SIDE DOOR PROVIDED
WITH BOTH CLOSER
AND
LATCH
HINGE
APPROACH
FULL SIDE
HINGE
APPROACH
PUSH SIDE
HINGE APPROACH
PUSH
SIDE DOOR WITH
CLOSER AND LATCH
LATCH
APPROACH
PULL SIDE
LATCH APPROACH
PULL SIDE
DOOR WITH
CLOSER
LATCH
APPROACH
PUSH SIDE DOOR
WITH CLOSER
DOORS
IN
SERIES
LATCH
APPROACH
PUSH SIDE
DOORS IN SERIES
DOORS IN SERIESHINGE
APPROACH
PULL SIDE
(b)(a) (b)(a)
OBSTRUCTED
HIGH
FORWARD REACH
OBSTRUCTED
HIGH
FORWARD REACH
UNOBSTRUCTED
FORWARD
REACH
OBSTRUCTED
HIGH
SIDE REACH
OBSTRUCTED
HIGH
SIDE REACH
UNOBSTRUCTED
HIGH SIDE
REACH
BLUE BACKGROUND W/
WHITE TEXT AND
SYMBOLS
NOTE: DO NOT PLACE ON DOORS.
PROTRUDING HAZARD
18" MIN
" M
IN 48
" M
IN
" M
IN
12" MIN
36" MIN
" M
IN
42" MIN
" M
IN
22" MIN
" M
IN
22" MIN
" M
IN
24" MIN
" M
IN
24" MIN
" M
IN
" M
IN
24" MIN
" M
IN
24" MIN
48" MIN
48" MIN
48" MIN
10" MAX.
" M
AX
24" MAX.
" M
AX
" M
AX
M
IN
20"-25"20" MAX.
" M
AX
" M
AX
" M
AX
1'-6"
3'-0"6"
2' -1
0"
1' -7
" 48 " A
.F .F
(M
AX
M
AX
1' -6
2' -5
M
IN
2' -1
0" (M
AX
3' -4
M
AX
6"
9"
" A
.F .F
" A
.F .F
(M
AX
" M
IN
12" MAX
" M
IN
36" MIN CLEAR
4" 12"
1/ 2"
M
AX
PI
LE
H
EI
G H
T
1/ 4"
M
AX
1/ 2"
M
AX
1/ 4"
1/ 4"
-1 /2
1/
4" M
AX
1' -3
2'
-6 " M
IN
IM
U M
1'-5"MIN.
1' -3
4'-0" MINIMUM6"
4' -0
1' -3
2' -6
"M
IN
IM
U
M
1' -3
4'-8"
5' -0
1' -3
2' -6
"M
IN
IM
U
M
1' -3
4'-8"
4' -0
1' -3
2' -6
"M
IN
IM
U
M
5'-6"
1' -3
5'- 6"
MINIM
UM
WHEELC
HAIR
TURNING SPACE
1 1/2 O.D. GRAB BAR -11/2"
FROM WALL-3'-6" LONG MTD.
12" FROM BACK WALL
H.C. URINAL
GRAB
BAR
SOAP
DISPENSE
R
ALIGN
MIRROR
PAPER TOWEL
DISPENSER,
MANUAL OR
TOUCHLESS
TOILET
TISSUE
DISP.
HAND DRYER
ALL MOUNTING HEIGHTS SHALL COMPLY WITH THE CURRENT A.D.A. STANDARDS AND THE ARCHITECTURAL ACCESS BOARD
1. HAND OPERATED FLUSH CONTROLS @44" A.F.F. (MAX.) TO BE ON THE WIDE SIDE OF TOILET AREA
2. TOE & KNEE SPACE SHALL COMPLY WITH A.D.A. - E.W.C. (4.15), LAVATORY (4.19)
3. SURFACE MOUNTED TOWEL DISPENSER AND SANITARY NAPKIN DISPENSER MAX. HEIGHT 53" A.F.F.
4. INSULATE HOT WATER PIPES AND DRAINS TO PROTECT AGAINST CONTACT - HANDISHIELD OR EQUAL. ALL NEW AND EXISTING SINK
LOCATIONS (AS REQUIRED).
NOTES:
1. 1/2" MAXIMUM TOTAL HEIGHT WITH 1/4" MAXIMUM VERTICAL
CHANGE AT EDGE.
2. 1 : 2 SLOPED BEVEL REQUIRED IF LEVEL CHANGE IS OVER
1/4" VERTICAL LEVEL CHANGE.
3. 1/4" MAXIMUM VERTICAL LEVEL CHANGE.
WHEELCHAIR ACCESS CLEAR SPACE
LAVATORIES
CLEAR SPACE @
WATER
CLOSET FRONT
ACCESS
CLEAR SPACE
WATER CLOSET
CLEAR SPACE @
WATER
CLOSET SIDE ACCESS
ADA WASHROOM FIXTURE - MOUNTING HEIGHTS GENERAL NOTES:
HANDICA
P
LAVATOR
Y
"C" "B" "A"
SIGN POST
CONSTRUCTION
ACCESSIBLE
ROUTE WALK
PROTRUDING OBJECT
FREESTANDING OBJECT MOUNTED ON POSTS OR PYLON MAY
OVERHANG 12"MAX FROM 27" TO 80"ABOVE FINISH FLOOR
OBJECT PROJECTION FROM WALL BETWEEO 27" TO 80" ABOVE
FINISH FLOOR SHALL PROTRUDE NO MORE THAN 4"
ACCESSIBLE ROUTE
OBJECT PROJECTION FROM WALL LESS THAN 27" ABOVE
FINISH FLOOR MAY PROTRUDE ANY AMOUNT
FLOOR SHALL BE SLIP-RESISTANT SURFACE AND LEVEL
WITH MAX 1/4" CHANGE IN LEVEL
MENWOMEN RESTROOM
DOOR APPROACHES
REACH RANGES
RESTROOMS
PROTRUDING HAZARD INTERIOR ACCESS ROUTE IMPEDIMENTS
LEVEL CHANGES
18" MIN
control wall seat wall seat wall
6" max side wall back wall 6" max side wall
6" max side wall back wall 6" max side wall
6" m ax
6" m ax
(a) vithout seat
(b) vith seat
SHOWERS
GRAB BARS FOR SHOWERS
6" m ax
AUTOMATED EXTERNAL
DEFIBRILLATOR
FIRE EXTINGUISHER
CABINET
AED
" A
.F .F
(M
AX
VA FORM 08 - 6231
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 10
A
B
C
D
E
F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
OF
ARCHITECT - OF - RECORD FL. REG. NO.
675-23-100
FINAL CONSTRUCTION
DRAWINGS
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
JRF SNG
JENNIFER R. FONG AR97191
AG-001
ARCHITECTURAL GENERAL NOTES,
ABBREVIATIONS, AND SYMBOLS
4 94SEPTEMBER 25, 2024Revisions: Date:
Date: 2024.10.01 11:26:32-04'00'
3'-6"
S
B
C
D
E
363738
4.2 3.2 2.2
C.2
D.2
B.2
1.22.0
D.9
35.237.2
3.8 2.8C.8 34.4
A.01
NIC
(TYP.)
(TYP.)
(TYP.)
(TYP.)
NIC
NIC
(TYP.)
(TYP.) 5
(TYP.)
(TYP.)
(TYP.)
1 2
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.) 8
(TYP.)
(TYP.)
(TYP.)
9 9
9 9
AE
D F
EC
FECAED
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
DEMOLITION KEYNOTES
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO COORDINATE WITH VA COR TO
REMOVE/ RELOCATE EXISTING MEDICAL EQUIPMENT
FOR BOTH EMERGENCY DEPT. AND OBSERVATION
UNIT.
2. FIELD VERIFY ACTUAL CONDITIONS & DIMENSIONS TO
EXISTING ELEMENTS. NOTIFY ARCHITECT OF
DISCREPANCIES & UNDOCUMENTED CONDITIONS
THAT CONFLICT WITH NEW WORK.
3. PATCH FINISHES & MATERIALS DISTURBED IN THE
DEMOLITION & EXECUTION OF NEW WORK TO MATCH
ADJACENT SURFACES.
4. REFER TO THE MEP AND FIRE SPRINKLER DRAWINGS
FOR THE DEMOLITION SCOPE OF WORK.
5. RETURN ALL REMOVED EXISTING SIGNAGE TO THE
VA/ OWNER.
6. RETURN ALL REMOVED EXISTING HARDWARE SETS
TO THE VA/ OWNER.
REMOVE EXISTING WALL CONSTRUCTION AND MTL
STUD/GWB PARTITION, EXISTING WALL BASE,
CORNER GUARDS, AND WALL PROTECTION WITHIN
THE PROJECT LIMITS. PATCH EXISTING PARTITIONS
TO REMAIN DAMAGED BY THE REMOVAL OF THESE
ITEMS.
DEMOLISH EXISTING DOORS AND FRAMES AND
STOREFRONT. RETURN ALL HARDWARE TO THE COR
FOR VA LOCKSMITH PROCESSING.
DEMOLISH THE EXISTING RESTROOM FIXTURES,
ACCESSORIES, COUNTERS, TOLIET CUBICLES WITH
DOORS AND SEALED OFF THE PLUMBING DRAINS.
REMOVE EXISTING COLUMN FINISHES.
REMOVE EXISTING CASEWORK WITH SINKS IF
APPLICABLE.
REMOVE DEMOUNTABLE GLASS PARTITION.
REMOVE PARTIAL OF THE WALL FOR OPENING OF
THE NEW DOOR.
REMOVE EXISTING FLOOR FINISHES WITHIN THE
PROJECT LIMITS. FILL DEPRESSIONS, RECESSED
SLAB AREAS, AND LEVEL FLOORS IN PREPARATION
FOR NEW FINISH.
REMOVE EXISTING CEILINGS AND SOFFITS WITH ANY
EXISTING ACOUSTICAL CEILING TILE, GYPSUM
BOARD CEILING, T-BAR CEILING GRID, CONDUIT,
HVAC GRILLES, ELECTRICAL DEVICES AND LIGHT
FIXTURES WITH THE SCOPE OF WORK. SALVAGE
FOR REINSTALLATION. COORDINATE DEMOLITION
WITH MECHANICAL AND ELECTRICAL DRAWINGS.
NOT IN CONTRACT (NIC)
SCOPE LEGEND:
1A721
ISOLATION
130 SF / 141 SF
1A801
OFFICE
120 SF / 132 SF
1A803
OFFICE
120 SF / 131 SF
1A109
COMMUNICATION
STATION
300 SF / 1205 SF
1A713
EXAM/TREAT
0 SF / 122 SF
1A109d
EXAM/TREAT
0 SF / 120 SF
1A109c
EXAM/TREAT
0 SF / 114 SF
1A118
ENT
EXAM/TREATMENT
0 SF / 124 SF
1A116
EXAM/TREAT
0 SF / 114 SF
1A714
PATIENT TLT
50 SF / 59 SF
1A719
ANTE RM
0 SF / 48 SF
1B201a
ELEC
0 SF / 93 SF
1B201b
COMM
0 SF / 149 SF
1A715
EXAM/TREAT
0 SF / 122 SF
1A717
ISOLATION
0 SF / 139 SF
1A610
STAFF
LKRS/LOUNGE
220 SF / 167 SF
1F505
PHYSICIAN
120 SF / 125 SF1F503
PHYSICIAN
120 SF / 123 SF
1F501
PHYSICIAN
120 SF / 120 SF
1A609
HAC
65 SF / 59 SF
1A124
CONSULT
120 SF / 170 SF
1A120
GYN EXAM/
TREAT
0 SF / 114 SF
1A122
GYN EXAM/
TREAT
0 SF / 123 SF
1F507
PHYSICIAN
120 SF / 130 SF
1A607
ON-CALL ROOM
135 SF / 147 SF
1A115
PATIENT TLT
50 SF / 62 SF
1A608
STAFF TLT
25 SF / 67 SF
1B C a
KI
O
SK
C
H
EC
K-
IN
SF
S F
1F208
NURSE
100 SF / 102 SF
1E601 C.T.
600 SF / 504 SF
1E605 C.T. (#2)
600 SF / 492 SF
1E603
CONTROL RM
200 SF / 339 SF
1K705
NURSE
PRACTIONER
25 SF / 235 SF
1F802
ELEC
0 SF / 89 SF
1F808
COFFEE SHOP
0 SF / 755 SF
1M715
CHIEF OF
CARDIOLOGY
150 SF / 183 SF
1M717
SECRETARY
90 SF / 145 SF
1F206
NURSE
100 SF / 104 SF
1F204
NURSE
100 SF / 103 SF
1F202
NURSE
100 SF / 98 SF
1F716a
PATIENT STORAGE
104 SF / 171 SF
1F210
NURSE
100 SF / 95 SF
1F212
NURSE
100 SF / 104 SF
1F214
NURSE
100 SF / 104 SF
1B505
FIRE COMMAND
130 SF
1BC03
CORRIDOR
295 SF
1AC07
CORRIDOR
1068 SF
1AC08
CORRIDOR
143 SF
1AC01
CORRIDOR
1247 SF
1AC06
CORRIDOR
257 SF
1FC05
CORRIDOR
543 SF
1F806
PATIENT REP
114 SF
1F804
PATIENT REP
115 SF
1F808a
WORK
215 SF
1FC02
CORRIDOR
598 SF
1B301
VESTIBULE
1FC07
CORRIDOR
487 SF
1F716
ELEVATOR LOBBY
393 SF
1KC07
CORRIDOR
422 SF
1EE02
ELEVATOR
152 SF
1EE01
ELEVATOR
143 SF
1AC08a
EQ. ALCOVE
37 SF
1AC08b
EQ. ALCOVE
39 SF
1A121
WAITING
1329 SF / 2006 SF
1A119
TRIAGE
0 SF / 126 SF
1A718
TRIAGE
1950 SF / 134 SF
1A121a
VENDING
0 SF / 109 SF
1B201
MAS WORKRM
0 SF / 255 SF
1B203
PROCEDURE
CHECK IN
0 SF / 144 SF
1B202
ADMISSIONS
CHECK IN
0 SF / 145 SF
1B204
ADMISSIONS
CHECK IN
0 SF / 145 SF
1B205
PROCEDURE
CHECK IN
0 SF / 139 SF
1A502
ED TLT MALE
260 SF / 209 SF
1A504
ED TLT FEMALE
205 SF / 209 SF
1F309
UNASSIGNED
400 SF / 401 SF
1F307
PACEMAKER/HOLTER
MONITOR ROOM
400 SF / 401 SF
1F303
PHYSICIAN
120 SF / 121 SF
1F301
PHYSICIAN
120 SF / 124 SF
1F203
CHIEF
NON-INVASIVE
120 SF / 127 SF
1F201
VEST
0 SF / 40 SF
1F402
STAFF TLT
100 SF / 59 SF
1FC03
CORRIDOR
1295 SF
1F601
ECG/ECHO
READING
120 SF / 189 SF
1F605
ECHO ROOM
200 SF / 174 SF
1F607
STRESS LAB
200 SF / 223 SF
1F106
ECG ROOM
180 SF / 223 SF
1F104
ECG CUBICLE
100 SF / 195 SF
1F408
ECG: CUBICLE
100 SF / 119 SF
1F406
ECG CUBICLE
100 SF / 119 SF
1F404
ECG CUBICLE
100 SF / 119 SF
1FC03
CORRIDOR
1295 SF
1FC03
CORRIDOR
1295 SF
1FC03
CORRIDOR
1295 SF
1AC05
CORRIDOR
148 SF
1BC02
CORRIDOR
131 SF
1F604
STRESS LAB/ECHO
240 SF / 235 SF
1F602
STRESS LAB/ECHO
240 SF / 240 SF
1F403
TLT
50 SF / 56 SF
1F101
STORAGE
27 SF / 35 SF
1F401
HAC
40 SF / 46 SF
1A501
PHONE
39 SF
VA FORM 08 - 6231
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 10
A
B
C
D
E
F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
OF
ARCHITECT - OF - RECORD FL. REG. NO.
675-23-100
FINAL CONSTRUCTION
DRAWINGS
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
JRF SNG
JENNIFER R. FONG AR97191
AD-101
LEVEL 1, AREAS E2 & D5 - EMERGENCY
DEPARTMENT OBSERVATION UNIT & FAST
TRACK DEMOLITION PLAN
5 94SEPTEMBER 25, 2024
1/8" = 1'-0"1 LEVEL 1, AREAS E2 & D5- EMERGENCY DEPARTMENT FAST TRACK & OBSERVATION UNIT DEMOLITION PLAN
EXISTING
WHEEL
CHAIRS
STOCK
E1 E2 E3
E4
C1
A3 A2
A1 B1
B2
CLINIC
HOSPITAL
D1 D2 D3
D4 D5 D6
P-W P-E
A4
W
KEY PLAN
NTS
W
Revisions: Date:
Date: 2024.10.01 11:26:05-04'00'
FLOOR PLAN NOTES
SHEET KEYNOTES
NOT IN CONTRACT
SCOPE LEGEND:
B
C.2
D.2
B.2
1.2
34.4
A.01
1B202
EXAM ROOM 1
109 SF
1B201C
SOILED HOLD
47 SF
1B203
EXAM ROOM 2
107 SF
1A723
ISOLATION ROOM
131 SF
1A722
ISOLATION ROOM
121 SF
1A126
EXAM ROOM 7
106 SF
1A127
EXAM ROOM 6
106 SF
1B206
EXAM ROOM 5
106 SF
1B205
EXAM ROOM 4
106 SF
1B204
EXAM ROOM 3
106 SF
1A125A
PRIVATE TOILET
56 SF
1A502
TOILET 1
57 SF
1A504
TOILET 2
60 SF
1A128
EXAM ROOM 10
139 SF
1A724
EXAM ROOM 12
127 SF
1B201
NURSE STATION
285 SF
1A121
MED ROOM
104 SF
1A122
CLEAN UTILITY
66 SF
1A119
EXAM ROOM 9
128 SF
1A718
EXAM ROOM 11
126 SF
1A125
EXAM ROOM 8
125 SF 1AC04
CORRIDOR
535 SF
19' - 10"
6'
0"
9'
5" 9'
7"
8' - 0"
12' - 4"
33' - 11"
10' - 4 3/4"10' - 5"10' - 5"10' - 5"10' - 5"
61' - 11 1/2"
7'
/4
8'
0"
12' - 9"
8' - 3"
10' - 6 1/4"
7' - 9"
8' - 0"
8' - 0"
8'
0"
11' - 5 1/2"
4' - 9"
10' - 6 1/4"
AE-401
AE-401
AE-401
AE-401
1B205
1B
1B
1B201c
1A723
1A722
1AC06
1A721
1A722a
1A723a
1B206
1A125
1A126 1A127
1A125a
1B204
1A504
1A122
1A502
1A121
1A719
1A120
AE-403
1A721
ISOLATION
130 SF / 141 SF
1A124
CONSULT
120 SF / 170 SF
1F507
PHYSICIAN
120 SF / 130 SF
1FC07
CORRIDOR
487 SF
1B201a
ELEC
0 SF / 93 SF
1B201b
COMM
0 SF / 149 SF
AE-702
A5D
8' - 0"
A5D
A5 D
A5D
A5D
A5 G
A5D
C 2D
C2D
C2D
A5G
A5G
A5D
A5D
A5D C4D
A5G
A5D
A5 D
A5 D
A5 D
A5D
A5 D
A5D
A5D
A5 D
C4D
A5D
A5D
B6D
A5D
A5D
A5D
C4D
C4D
A5D
A5 D
C 2D
C2D
C 2D
A5D
A6D
C2D
C4D
C4D
C4D
A5G
A5D
A5D
A5D
A5G
13' - 2"
1AC06
CORRIDOR
134 SF
1B201B
NOURISHMENT
13 SF
3' - 4 1/4" 6' - 3"
1"
9' - 1"
2'
5"
1AC04
CORRIDOR
535 SF
1A801
OFFICE
120 SF / 132 SF
1A803
OFFICE
120 SF / 131 SF
1B505
FIRE COMMAND
130 SF
1BC05
CORRIDOR
709 SF
1BC04a
KIOSK CHECK-IN
0 SF / 54 SF
1FC05
CORRIDOR
534 SF
AE-401
AE-401
COUNTERTOP
ICE MACHINE/
UNDERCOUNTER
FRIDGE
1B20A
CLEAN UTILITY
ALCOVE
25 SF
1A721
ANTE ROOM
32 SF
9'
4"
6' - 3"
1AC04A
CORRIDOR
273 SF
C 2D
AE-401
AE-401
1'
3/
4"1' - 8"
WALL GUARD PER
2/AE502, TYP.
CORNER
GUARD PER
3/AE502,
TYP.
12' - 4 3/8"
13' - 4 1/4"
7' - 3"
5' - 5"
7' - 6 7/8"
AE-401
AE-401
8' - 2 3/4"
6'
0"
6'
0"
6'
0"
6'
0"
6'
0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0 1/2"
6' - 0"
6'
0"
1B200
PNEUMATIC TUBE
SYSTEM
19 SF
A5D
A5D
6' - 0"
/4
1AC05
CORRIDOR
350 SF
TRIAGE
121 SF
1B303a
OPERATIONS
180 SF / 273 SF
B6D
1A718
1A119
1AC04b
AE-501
AE-501
TYP.
TYP.
5'
1/
2"
A5G
1AC04
1AC05
1A719
ANTE RM
0 SF / 48 SF
AE-404
FEC
AED
4' - 2"
AE-502
12' - 4"
5' - 0"
4' - 2"
3'
0"
AE-702
AE-403
8'
0"
8' - 0"4' - 2"
7' - 6"
2' - 2"
12' - 2 1/2"
11' - 10"
1' - 0" 8' - 0"
5' - 6"
VA FORM 08 - 6231
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 10
A
B
C
D
E
F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD214-23
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT RENOVATE LAKE NONA BUILDING
2 FOR EMERGENCY DEPARTMENT
(ED) AND OBSERVATION UNIT
ORLANDO, FLORIDA
OF
ARCHITECT - OF - RECORD FL. REG. NO.
675-23-100
FINAL CONSTRUCTION
DRAWINGS
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
JRF SNG
JENNIFER R. FONG AR97191
AE-101
LEVEL1, AREA E2 - FAST TRACK FLOOR
PLAN
6 94SEPTEMBER 25, 2024
PNEUMATIC TUBE SYSTEM.
BD PYXIS MEDSTATION ES.
3" DEPRESSED SLAB FOR FUTURE SHOWER. SEE
STRUCTURAL AND PLUMBING FOR MORE
INFORMATION.
NOURISHMENT WITH COUNTERTOP ICE MACHINE
AND REFRIGERATOR.
CARD READER LOCATION.
NURSE STATION.
WALL PROTECTION. SEE 4/AE502.
PUSH PLATE LOCATION.
1. DIMENSIONS ARE TO: THE FACE OF FINISH OF
PARTITIONS, EXISTING ELEMENTS, EQUIPMENT,
MASONRY, OR CONCRETE; STRUCTURAL
GRIDS; AND CLEAR JAMB OPENING OF DOORS.
2. FIELD VERIFY ACTUAL CONDITIONS AND
DIMENSIONS TO EXISTING ELEMENTS. NOTIFY
ARCHITECT OF DISCREPANCIES AND
UNDOCUMENTED CONDITIONS THAT CONFLICT
WITH NEW WORK.
3. REFER TO VA STANDARD FOR THE CUT
SHEET/LIST AND QUANTITY REQUIRED FOR THE
MEDICAL EQUIPMENT TO BE USED IN FAST
TRACK.
4. FOR WALL ACCESS PANEL INFORMATION
COORDINATE WITH PLUMBING DRAWINGS.
5. REFER TO MEP AND FIRE SPRINKLER
DRAWINGS FOR MORE INFORMATION.
E1 E2 E3
E4
C1
A3 A2
A1 B1
B2
CLINIC
HOSPITAL
D1 D2 D3
D4 D5 D6
P-W P-E
A4
W
KEY PLAN
NTS
WSCALE: 1/4" = 1'-0"2 LEVEL1, AREA E2- FAST TRACK FLOOR PLAN
1A119 EXAM ROOM 9 128 SF
1A121 MED ROOM 104 SF
1A122 CLEAN UTILITY 66 SF
1A125 EXAM ROOM 8 125 SF
1A125A PRIVATE TOILET 56 SF
1A126 EXAM ROOM 7 106 SF
1A127 EXAM ROOM 6 106 SF
1A128 EXAM ROOM 10 139 SF
1A502 TOILET 1 57 SF
1A504 TOILET 2 60 SF
1A718 EXAM ROOM 11 126 SF
1A721 ANTE ROOM 32 SF
1A722 ISOLATION ROOM 13 121 SF
1A723 ISOLATION ROOM 14 131 SF
1A724 EXAM ROOM 12 127 SF
1AC04 CORRIDOR 535 SF
1AC04A CORRIDOR 273 SF
1AC05 CORRIDOR 350 SF
1AC06 CORRIDOR 134 SF
1B20A CLEAN UTILITY ALCOVE 25 SF
1B200 PNEUMATIC TUBE SYSTEM 19 SF
1B201 NURSE STATION 285 SF
1B201B NOURISHMENT 13 SF
1B201C SOILED HOLD 47 SF
1B202 EXAM ROOM 1 109 SF
1B203 EXAM ROOM 2 107 SF
1B204 EXAM ROOM 3 106 SF
1B205 EXAM ROOM 4 106 SF
1B206 EXAM ROOM 5 106 SF
FAST TRACK
Revisions: Date:
Date: 2024.10.01 11:25:40-04'00'
FLOOR PLAN NOTES
SHEET KEYNOTES
NOT IN CONTRACT
SCOPE LEGEND:
C
D
E
36 35
D.9
35.2 34.5
13' - 7"
1"
12' - 8" 7' - 0" 13' - 8" 11' - 1 3/8"
6'
6"
6'
6"
8' - 0"
6'
6"
6'
6"
11' - 11"
13' - 6"
/2
55' - 8 1/2"
/2
9' - 11 1/2"
12' - 11 1/4"
65' - 8"
1"
5'
0"
8' - 0"8' - 0" 22' - 8"
6'
1/
8" 6'
9"
1F307
MED ROOM
77 SF
1F101
SOILED HOLD
43 SF
1F401
CLEAN UTILITY
59 SF
1F303
NURSE STATION 2
218 SF
1F301
NURSE STATION 1
218 SF
1F201
STAFF ROOM
43 SF
1F408
OBSERVATION
ROOM 4
147 SF
1F406
OBSERVATION
ROOM 3
135 SF
1F404
OBSERVATION
ROOM 2
137 SF
1F308
OBSERVATION
ROOM 1
148 SF
1F104
OBSERVATION
ROOM 5
142 SF
1F108
OBSERVATION
ROOM 6
151 SF 1F203
OFFICE
127 SF
1F605
OBSERVATION
ROOM 7
134 SF
1F308A
PRIVATE TOILET 1
69 SF
1F404A
PRIVATE TOILET 2
69 SF
1F106
SHARED TOILET 1
55 SF
1F406A
PRIVATE TOILET 3
69 SF
1F408A
PRIVATE TOILET 4
69 SF
1F601
OBSERVATION
ROOM 10
150 SF
1F602
SHARED TOILET 2
50 SF
1F605A
PRIVATE TOLIET 5
70 SF
1F603
OBSERVATION
ROOM 9
150 SF
1F604A
SHOWER
81 SF
1M715
CHIEF OF
CARDIOLOGY
1F716
ELEVATOR LOBBY
1F808a
WORK
1F716a
PATIENT STORAGE
1FC05
CORRIDOR
AE-402
AE-402
1F
1F307b
1F
1F307a
1F
1FC03a
1FC03b
1F
1F6031F601
1F404a
1F308a
1F408a
1F406a
1F106
1F602
1F
1F108
1F
1F
1F
1F
1F104
1F203
AE-403
AE-403
AE-403
AE-403
1FC03B
CORRIDOR
261 SF
6'
6"
A5D
A5 D
A5 D
C2D
A5D
A5D
A5 D
A4 D
A5D
A5D
A5D
A5D
A5D A5D
A5 D
A5D
A5 D
A5D
A5 D
A5D
A5 D
A5D
A5D
C 4D
A5D
C
2DA5
D
This is the start of the file's text. The full file is on GovTribe.