Attachment 8 - Photos.pdf

PDF 7 MB Posted

Attached to
Repair Fire Pump Controllers, B1176, HEF Disposal
Solicitation number
W50S6K-26-B-A001
Issued by

About this file

This is Attachment 8, a visual documentation file consisting of photographs of a fire suppression system installation and decommissioning project. The images show various components of the system including a Pre-Pump Fire Controller (red cabinet), a Siemens System 3 Universal Alarm Control unit, a Fire Extinguishing Control System panel, releasing panels with multiple indicator lights and manual stations, foam piping infrastructure, horizontal feed mains, risers, water line connections, and a HEF (High Expansion Foam) tank system with associated mechanical equipment, pressure gauges, valves, and piping networks.

Key decommissioning requirements documented in the images include: removal of all foam piping and components connected to the HEF tank, with the foam riser to remain in place and be properly terminated using a cap, blind flange, or other approved method; removal of all water line piping to the HEF tank, with the horizontal feed main remaining in place and properly terminated using a cap, blind flange, or other approved method; and proper scheduling of hanger bay work with a minimum of one week advance notice coordinated with the Contracting Officer's Representative (COR). The photographs provide visual reference for the scope of work related to system deactivation and component removal while preserving specified infrastructure elements.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1376523256M Typewritten Text Attachment 8

Releasing Panel

Rectangle

Callout Remove all foam piping and components coming from HEF Tank

1376523256M Line

1376523256M Line

1376523256M Line

1376523256M Line

1376523256M Callout Foam Riser to remain and NOT removed. Properly terminate using a cap, blind flange, or other approved method.

Rectangle

Rectangle

1376523256M Callout Remove all Water line piping to the HEF Tank

1376523256M Line

1376523256M Line

1376523256M Line

1376523256M Callout Horizontal Feed Main to Remain and NOT removed. Properly terminate using a cap, blind flange, or other approved method.

Work in the Hangar Bay needs to be scheduled minimum 1 week in advance. Scheduled with COR.

Attachment 8 - Photos
M2.2
E8

Site Photos