This is a technical analysis document for NFPA 780 Simplified Risk Assessment related to lightning protection determination for a fuel tank replacement project (B2096, comm. no. 482503).

The document presents a comprehensive lightning protection risk assessment for a structure with specific dimensional and material specifications. The structure is a metal building with a nonmetallic roof measuring 8 feet in length, 16 feet in width, and 8 feet in height (equivalent to 2.4 meters by 4.9 meters by 2.4 meters). The assessment calculates an equivalent collective area of 3,090 square feet (287 square meters) and applies NFPA 780 reference tables to determine construction and occupancy coefficients. Key coefficients include: construction coefficient (Cc) of 0.5 for metal structure with nonmetallic roof, structure contents coefficient (Cc) of 3 for standard value and noncombustible materials, structure occupancy coefficient (Co) of 0.5 for normally occupied spaces, and lighting consequence coefficient (Ce) of 10 for consequences to the environment. The annual threat of occurrence (No) is calculated at 1.5×10⁻³, resulting in an annual threat tolerance (Nc) of 200.0×10⁻⁶. The determination indicates that No ≤ Nc with Lightning Protection System (LPS) optional status. The analysis includes tolerance analysis ranges and references NFPA tables for location factors, construction coefficients, structure contents coefficients, structure occupancy coefficients, and lighting consequence coefficients to support the risk assessment conclusion.

View the file

Other files

File Type Posted
Amendment 1 Repair Fuel Tanks COMBINED SYNOPSIS.pdf PDF
Attachment 7 - BUILDER Inventory and Assessment Complete Guide (18 Jul 25).pdf PDF
Attachment 13 - FTW Environmental Requirements for Construction v9 for 2023 Update App.pdf PDF
Attachment 9 - Contractor Laydown Area for Replace Fuel Tanks B2096.docx DOCX document
Attachment 12 - Fort Wainwright Simplified Field Screening Plan.pdf PDF
Attachment 16 - Specifications Replace Fuel Tanks B2096.pdf PDF
Attachment 10 - Division 01 Specs Replace Fuel Tanks B2096.pdf PDF
Attachment 5 - BUILDER Catalog Spreadsheet(07AUG25).xlsx XLSX spreadsheet
Attachment 15 - SOP Manifest Requirements and Procedures MAR25_.pdf PDF
Repair Fuel Tanks COMBINED SYNOPSIS.docx DOCX document
Attachment 11 - Erosion and Sediment Control Plan (APP E).pdf PDF
Attachment 1 -SOW Replace Fuel Tanks B2096 January 14th 2026.pdf PDF
Attachment 4 - Submittal Register B2096 Fuel Tank Replacement Jan 12th 2026.xlsx XLSX spreadsheet
Attachment 3 - Price Proposal Replace Fuel Tanks.docx DOCX document
Attachment 2 - 482503_Final Construction 22x34 Drawings_1-9-2026 Replace Fuel Tanks B2096.pdf PDF
Attachment 14 - Solid Waste Reporting Requirements 2025.pdf PDF
Attachment 6 - BUILDER Contract Verbiage(New Contracts)(Jan26).docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .