Attachment 6 - BUILDER Contract Verbiage(New Contracts)(Jan26).docx
DOCX document 28 KB Posted
- Attached to
- Replace Fuel Tanks at building 2096
- Solicitation number
- W912D026Q0098
About this file
This document is an attachment containing BUILDER data capture requirements and specifications for contractor obligations related to equipment inventory documentation and tracking on a federal construction project.
The contractor is required to comprehensively document all removed and installed systems, components, and equipment within a BUILDER catalog spreadsheet, capturing salient information including make, model, serial numbers, capacities, voltage, CFM, RPM, and linear/square footage measurements. The contractor must physically tag all newly installed fire panels, mechanical, and HVAC systems with laminated paper or metal-stamped labels displaying item name, make, model, serial number, and installation date, securing tags with wire or zip ties and ensuring readability from a reasonable distance. Additionally, the contractor must organize items by category as specified in the BUILDER spreadsheet (such as doors, windows, and lighting fixtures), clearly identify all item locations within the building structure (floor, room, wing), and photograph all systems, components, and equipment designated in the BUILDER Catalog Spreadsheet as requiring inventory photos, with images capturing both data plates and overall equipment views. The document references the BUILDER Inventory and Assessment Guide for additional detailed information and was issued by Eric Chun on January 26.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDER Data Capture Requirements:
· Contractor to list all Removed Systems, Components and Equipment including all salient information such as make, model, serial number(s), capacities, voltage, CFM, RPM, LF, SF, etc. within the Removed equipment tab of the BUILDER catalog spreadsheet (attached). This includes both what’s identified currently within BUILDER and what was not previously captured.
· Contractor to list all Installed Systems, Components and Equipment including all salient information such as make, model, serial number(s), capacities, voltage, CFM, RPM, etc. Data to be input within the Installed Equipment tab of the BUILDER catalog spreadsheet.
· Contractor will physically tag all newly installed fire panels, mechanical and HVAC Systems, Components, Equipment as applicable. Tagging will state Item name, make, model, serial number and Installation date. Tagging will either be laminated paper, or metal stamped, and will be securely fixed to the equipment with either wire or zip tie as appropriate. Tag and text size will be appropriately sized such that it can be read at a reasonable distance.
· Contractor will group items as identified within the BUILDER catalog spreadsheet. Examples to include certain types of Doors, Windows, Lighting fixtures, etc.
· Contractor to ensure all items locations are clearly identified within the building, for example Floor, Room, Wing, etc, as applicable.
· Contractor will take photos of all Systems, Components and Equipment that are identified within the BUILDER Catalog Spreadsheet as requiring an Inventory Photo. Photos will be taken to capture both the data plate (as applicable) and an overall photo of each item.
· Refer to BUILDER Inventory and Assessment Guide (attached) for further detailed information
POC: Eric Chun Date: JAN 26