Attachment 2 - 482503_Final Construction 22x34 Drawings_1-9-2026 Replace Fuel Tanks B2096.pdf
PDF 4 MB Posted
- Attached to
- Replace Fuel Tanks at building 2096
- Solicitation number
- W912D026Q0098
About this file
Design Plans for Replace Fuel Tanks B2096 at Fort Wainwright
This is a comprehensive set of architectural and engineering design plans for the replacement of fuel storage tanks at Building 2096, Fort Wainwright, Alaska (Project DPW-24035-4J). The project involves demolition of existing 300-gallon diesel and 300-gallon gasoline above-ground fuel tanks and installation of new 500-gallon double-wall UL 2085-listed protected storage tanks with associated dispensing equipment. The work is governed by UFC standards (DOD Building Code, Civil Engineering, Fire Protection, Petroleum Fuel Facilities) and applicable codes including IBC 2024, IMC 2024, NFPA standards, and the National Electrical Code.
The mechanical scope includes installation of skid-mounted diesel and gasoline storage tanks equipped with tank-mounted fuel pumps (20 GPM), remote dispensers capable of 2-40 GPM, automatic fuel nozzles tested to -40°F, expansion relief valves, emergency shutoff valves with fusible links, fuel filters, and complete piping systems with drop tubes and water draw-off connections. The electrical scope involves provision of two 1/3 HP fuel transfer pump circuits (120V single-phase) with circuit breakers and local disconnect switches, emergency fuel shutoff control accessible from the panelboard, and a pole-mounted LED area luminaire with photocell control rated for -40°C operation. Civil work includes excavation and concrete pad foundations for tanks approximately 8' x 12'-6", bollard protection systems, site grading with 4-inch topsoil and seeding, a personnel gate modification, and proper drainage sloped away from tank locations. Fuel tank labeling requirements include product identification, capacity, NFPA 704 emergency response diamonds, DOT hazmat placards, and "no smoking" warnings. The contractor must provide training on operations and maintenance, coordinate testing per NFPA 30 standards, and leave tanks 90% full upon project completion.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 View Name 1/8" = 1'-0"A101
Room name
GENERAL SYMBOLS
NAME
NUMBER
SHEET LOCATION
SCALE
TRUE NORTH
GRID LINE
ROOM NAME
ROOM NUMBER
PLAN NORTH
REVISION
SEE DISCIPLINES FOR SPECIFIC SYMBOLS
PROJECT TEAM
OWNERS REPRESENTATIVE
DPW FORT WAINWRIGHT
POINT OF CONTACT: MATTHEW MCBRIDE
DPW, Fort Wainwright, AK 907 361-7700 matthew.n.mcbride.civ@army.mil
DESIGNERS REPRESENTATIVE
DESIGN ALASKA
POINT OF CONTACT: BLAKE BURLEY
601 COLLEGE ROAD
FAIRBANKS, AK 99701
907 452-1241 blake@designalaska.com
VICINITY MAP
PROJECT
LOCATION
M O
NTG
O
M
ERY RD
B A D
G E R
R
DOLD BADGER RD
ALASKA MAP
PACIFIC OCEAN
ARCTIC OCEAN
BERING
SEA
KODIAK
ARCTIC CIRCLE
SEWARD
SITKA
JUNEAU
HAINES
WHITEHORSE YT
DAWSON YT
HAINES
JCT
HOMER
ANCHORAGE
EAGLE
CORDOVA
VALDEZ
GLENNALLEN
TOK
NORTH
POLE
FAIRBANKS
NENANA
TANANA
CIRCLE
NOME
KOTZEBUE
UTQIAGVIK
(BARROW)
PRUDHOE BAY
U N
IT
E
D S
T A
T E
S
R U
S S
IA
U N
IT
E
D S
T A
T E
S C
A N
A D
A
PROJECT
LOCATION
CODE INFORMATION
GOVERNING CODES
GOVERNING CODES
UFC DOD BUILDING CODE UFC 1-200-01
UFC CIVIL ENGINEERING UFC 3-201-01
UFC LANDSCAPING UFC 3-201-02
UFC FIRE PROTECTION FOR FACILITIES UFC 3-600-01
UFC DESIGN: PETROLEUM FUEL FACILITIES UFC 3-460-01
UFC PETROLEUM FUEL SYSTEMS MAINTENANCE UFC 3-460-03
UFC ELECTRICAL ENGINEERING UFC 3-501-01
UFC INTERIOR AND EXTERIOR LIGHTING SYSTEMS UFC 3-530-01
AND CONTROLS
UFC LIGHTING AND STATIC ELECTRICITY UFC 3-575-01
PROTECTION SYSTEMS
IES ILLUMINATION ENGINEERING SOCIETY
INTERNATIONAL BUILDING CODE IBC - 2024
INTERNATIONAL MECHANICAL CODE IMC - 2024
FIRE CODE NFPA 1 - 2021
NATIONAL ELECTRICAL CODE NFPA 70 - 2020
NATIONAL FIRE ALARM AND SIGNALING CODE NFPA 72 -
LIFE SAFETY CODE NFPW 101
FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE NFPA 30 - 2021
CODE FOR MOTOR FUEL DISPENSING FACILITIES NFPA 30A - 2021
AND REPAIR GARAGES
INSTALLATION OF LIGHTNING PROTECTION SYSTEMS NFPA 780
AUTHORITY HAVING JURISDICTION
FORT WAINWRIGHT
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.comAECC511
12/18/2025 9:25:45 AM
GENERAL
INFORMATION
G010
REPLACE FUEL
TANKS B2096
482503
19 DEC 2025
SHEET INDEX
DPW FORT WAINWRIGHT
DPW-24035-4J
FORT WAINWRIGHT, AK
REPLACE FUEL TANKS B2096
1. GENERAL
G010 GENERAL INFORMATION
2. CIVIL
C001 HAUL ROUTE
C100 EXISTING CONDITIONS AND DEMOLITION PLAN
C200 SITE IMPROVEMENTS
C700 DETAILS
5. MECHANICAL
M001 MECHANICAL ABBREVIATIONS, LEGENDS, SCHEDULES, NOTES, AND
SPECIFICATIONS
M002 MECHANICAL SIGNAGE SCHEDULE
M201 MECHANICAL DETAILS
7. ELECTRICAL
E001 LEGEND, SCHEDULES, AND DETAILS
E002 SITE PLAN, SPECIFICATIONS AND DETAILS
X
TANANA
MIDDLE
SCHOOL
RED
LAST
FRONTIER
FIRE
STATION
CROSS
OUTDOOR
REC
AUTO
SKILLS
SCHOOL AGE
SERVICES
ARCTIC LIGHTS
ELEMENTARY
SCHOOL
STATION
SUB-
X X
X
LADD
ELEMENTARY
SCHOOL
TRAINOR
GATE
BIRCHWOOD
HOUSING
CHENA COVE
RECREATION
AREA
YOUTH
CENTER
FIRE
EDUCATION
CTR
STATION
BASSETT
ARMY
HOSPITAL
FIREGSAB HANGAR
STATION
CHENA BEND
GOLF COURSE
POST
OFFICE
EXCHANGE
COMMISSARY
BADGER
GATE
WELCOME
CENTER
OBSTACLE
COURSE
MEMORIAL
PARK
FIRE
TRAINING
AREA
CHENA RIVER
TRAINOR GATE ROAD
RIVER ROAD
DRIVING
RANGE
STEESE HWY
ORGANIC & BRUSH
DISPOSAL LOCATION
CONTAMINATED SOIL
STOCKPILE LOCATION
WOODCHIP DISPOSAL
LOCATION
PROJECT AREA
CLEAN SOIL
DISPOSAL SITE
HUAL ROUTE1
C001 1"=1000'
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
1/8/2026 1:46 PM 482503 C001 HAUL ROUTE.DWG
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
C001
ALJ
IAL
HAUL ROUTE
SHEET NOTES:
1. CLEAN SOILS SHALL BE DISPOSED OF ON-BASE ON RIVER ROAD AS-SHOWN.
COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR EXACT
LOCATION AND ACCESS. NO GOVERNMENT BORROW MATERIAL IS AVAILABLE.
2. THE CONTRACTOR'S STAGING/ LAYDOWN AREA SHALL BE WITHIN THE LIMIT
SHOWN. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER
FOR ADDITIONAL STAGING / LAYDOWN AREA IF NEEDED.
3. ALL CONCRETE WASTE SHALL BE DISPOSED OF OFF-BASE AT THE CONTRACTORS
EXPENSE.
4. ORGANICS & BRUSH SHALL BE DISPOSED OF ON-BASE ON CHENA COVE ROAD AS
SHOWN. COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR
EXACT LOCATION AND ACCESS.
5. SHORT-TERM CONTAMINATED SOILS SHALL BE STORED WITHING THE
CONTRACTOR STAGING/ LAYDOWN AREA.
GRAVEL PATH
GRASS
BUILDING 2095
ASPHALT PARKING
AREA
BUILDING 2096
DOUBLE SWING
GATE
PESTICIDE
STORAGE
REMOVE FENCE FABRIC
AND MINIMUM AMOUNT OF
LINE POSTS REQUIRED
FOR NEW PERSONNEL
GATE INSTALLATION
DOUBLE SWING
GATE
DEMO AND REMOVE A
300 GALLON DIESEL
AND A 300 GALLON
GASOLINE FUEL
TANK,SEE NOTE 3
APPROXIMATE
LOCATION OF
PRIVATE WELL
ELECTRICAL
PANEL
APPROXIMATE
EXCAVATION LIMITS,
EQUIPMENT THIS AREA TO
BE RELOCATED BY OWNERCLEAR AND GRUB ALL
TREES THIS AREA
SOIL STOCKPILE LOCATION,
SEE CONTAMINATED SOIL
NOTES
EXISTING CONDITIONS AND DEMOLITION PLAN1
C100 1"=20'
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
12/18/2025 5:05 PM C100 EXISTING CONDITIONS AND DEMOLITION PLAN.DWG
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
C100
ALJ
IAL
EXISTING
CONDITIONS AND
DEMOLITION PLAN
LEGEND
DEMOLITION
STRUCTURE
EDGE OF ASPHALT PAVEMENT
GRAVEL
CHAIN-LINK FENCE
BARBED WIRE FENCE
SIGN
BOLLARD
UNDERGROUND WATER LINE
UNDERGROUND SEWER LINE
UTILITY POLE
OVERHEAD POWER LINE
UNDERGROUND POWER LINE
TREE LINE
GENERAL NOTES
1. A SURVEY WAS NOT PERFORMED FOR THIS WORK. DRAWING IS BASED OFF OF
AERIAL IMAGERY, AS BUILTS AND SITE PHOTOS.
2. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF ABOVE GROUND AND BELOW
GROUND IMPROVEMENTS PRIOR TO COMMENCEMENT OF EARTH MOVING
ACTIVITIES.
3. FUEL TANKS ARE ABOVE GROUND SINGLE WALL ON ELEVATED STANDS. THERE
ARE NO CONCRETE PADS. NO EARTHWORK WILL BE REQUIRED IN THIS AREA.
4. EXISTING TANKS WILL REMAIN IN SERVICE FOR THE DURATION OF THE PROJECT.
GOVERNMENT WILL NOTIFY CONTRACTOR WHEN EXISTING TANKS ARE AVAILABLE
FOR DEMOLITION. TANKS WILL BE AVAILABLE FOR DEMOLITION NO GREATER THAN
THREE WEEKS AFTER GOVERNMENT ACCEPTANCE OF NEW TANKS.
EARTH MOVING NOTES
1. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTH-MOVING OPERATIONS. RESTORE
IMPROVEMENTS AND FINISHES DAMAGED BY CONSTRUCTION ACTIVITIES TO PRE CONSTRUCTION CONDITIONS.
2. BACKFILL MATERIAL SHALL BE FREE OF ORGANIC MATERIAL, DEBRIS, OR OTHER DELETERIOUS MATERIAL
3. SUBMIT ASTM C-117/C-136 GRADATION ANALYSES, AND ASTM D-1557 MODIFIED PROCTOR TEST RESULTS FOR STRUCTURAL FILL, CRUSHED AGGREGATE, DRAIN ROCK AND OTHER BACKFILL MATERIAL SPECIFIED TO BE USED PRIOR TO BEGINNING ANY BACKFILL
WORK.
STRUCTURAL FILL:
MATERIAL CLASSIFIED BY ASTM D2487-17 AS SANDY GRAVEL AND MEETING THE FOLLOWING GRADATION:
SIZE % PASSING
4" 100
NO.4 30-60
NO.200 0-5
COMMON FILL: ANY SANDY GRAVEL, SAND, SANDY-SILT, SILT OR OTHER COMMON SOIL MATERIALS, CONTAINING NO DEBRIS OR
ORGANIC MATERIAL.
4. OFFSITE FILL BROUGHT TO THE SITE SHALL COME FROM AN APPROVED PIT. APPROVED PIT SHALL HAVE PHASE I ENVIRONMENTAL
SITE ASSESSMENT ON FILE.
5. BACKFILL EXCAVATION IN MAXIMUM 6" LEVEL LIFTS, ADJUST MOISTURE CONTENT AS REQUIRED TO COMPACT EACH LIFT OF
STRUCTURAL FILL TO 95% DENSITY AND COMMON FILL TO 90% DENSITY.
6. EMPLOY A QUALIFIED INDEPENDENT TESTING AGENCY TO PERFORM REQUIRED FIELD AND LABORATORY TESTING.
7. OBTAINING UTILITY LOCATIONS AND PROTECTING UTILITIES IS THE RESPONSIBILITY OF CONTRACTOR. CONTACT UTILITY LOCATOR
SERVICE FOR PROJECT AREA BEFORE BEGINNING EARTH-MOVING OPERATIONS.
CONCRETE NOTES
1. ALL CAST-IN-PLACE CONCRETE SHALL HAVE THE FOLLOWING PROPERTIES:
A. A MINIMUM 28-DAY COMPRESSIVE STRENGTH (f'c) OF 4000 PSI
B. MAXIMUM AGGREGATE SIZE: 3/4"
C. AIR ENTRAINMENT BY VOLUME: 4%-6%
D. MAXIMUM SLUMP OF 6" AT TRUCK CHUTE DISCHARGE POINT
E. EXTERIOR CONCRETE TO BE BROOM FINISHED
2. CONCRETE SHALL BE TESTED FOR TEMPERATURE. SLUMP, AIR CONTENT AND STRENGTH VERIFICATION IN
ACCORDANCE WITH ASTM C1064, ASTM C143, ASTM C321, ASTM C31 & C39 RESPECTIVELY.
3. CONCRETE SHALL MEET ALL REQUIREMENTS OF ACI 301 SPECIFICATION FOR STRUCTURAL CONCRETE BUILDINGS.
4. REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 60.
5. PLAIN-STEEL WELDED-WIRE REINFORCEMENT SHALL BE FABRICATED FROM STEEL WIRE INTO FLAT SHEETS WITH
WELDED CONNECTIONS AND SHALL CONFORM WITH ASTM A 1064
6. OUTSIDE AIR TEMPERATURE SHALL BE BETWEEN 40°F AND 85°F
7. PROTECT CONCRETE FROM FREEZING FOR 14 DAYS AFTER PLACEMENT.
SEEDING NOTES
1. ALL SEEDING SHALL BE PERFORMED BETWEEN JUNE 1 AND AUGUST 15. SEEDING SHALL NOT BE DONE DURING WINDY
CONDITIONS OR WHEN CLIMATIC OR GROUND CONDITIONS WOULD HINDER PLACEMENT OR PROPER GROWTH. DO NOT
SEED WHEN AIR OR GROUND TEMPERATURES ARE BELOW 40 DEGREES F.
SUBMIT SOIL REPORT ON TOPSOIL PROPOSED FOR USE. INCLUDE TEST RESULTS OR CERTIFICATES FOR pH, NITROGEN, PHOSPHORUS, AND POTASSIUM, PARTICLE SIZE AND ORGANIC CONTENT BY VOLUME. SUBMIT LOCATION OF THE TOPSOIL
SOURCES FOR REVIEW
TOPSOIL:
SIZE % OF MIXTURE
SAND 25-45
SILT 35-55
FINE ORGANICS 10-20
TOPSOIL TO BE FRIABLE LOAM FREE OF SUBSOIL, LARGE ROOTS, GRASS, STONES, NOXIOUS WEEDS, DEBRIS, AND
OTHER FOREIGN MATERIAL, AND HAVE A MAXIMUM MOISTURE CONTENT OF 50 PERCENT WITH AN ACIDITY (pH)
RANGE BETWEEN 5.5-7.0.
2. APPLY FERTILIZER AT 12 LB PER 1000 SF. FERTILIZER SHALL BE 20-20-10 TO SUPPORT INITIAL GROWTH. NO CYANAMID
COMPOUNDS OR HYDRATED LIME WILL BE PERMITTED IN MIXED FERTILIZERS.
3. SEED SHALL BE PLACED AT THE RATE OF 4 LB PER 1000 SF. ALL SEED SHALL HAVE A MINIMUM PURITY RATE OF 90% AND A
GERMINATION RATE OF MINIMUM 85%. SEED MIX SHALL BE "KENAI" KENTUCKY BLUEGRASS 50%, CREEPING RED FESCUE
25% AND PERENNIAL RYEGRASS 25%.
4. DORMANT SEEDING MAY BE DONE. SOIL TEMPERATURE SHALL BE BELOW 40°F TO PREVENT GERMINATION AND SHOULD
ONLY BE UNDERTAKEN AFTER THE FIRST HARD KILLING FROST BUT NOT AFTER FOUR INCHES OF SNOW.
GATE NOTES
1. SUBMIT CONSTRUCTION DETAILS, MATERIAL DESCRIPTIONS, DIMENSIONS OF INDIVIDUAL COMPONENTS AND FINISHES FOR
GATE POSTS, RAILS AND FITTINGS AND GATES AND HARDWARE.
2. COMPLY WITH ASTM F900 FOR GATE POSTS AS WELL AS SINGLE SWING GATE TYPES.
3. GATE LEAF WIDTH AND FABRIC HEIGHT: AS INDICATED ON THE DRAWINGS
4. MATCH GATE FABRIC TO THAT OF THE EXISTING FENCE SYSTEM.
5. INSTALL GATES ACCORDING TO MANUFACTURERS WRITTEN INSTRUCTIONS, LEVEL, PLUMB AND SECURE FOR FULL OPENING
WITHOUT INTERFERENCE. ATTACH FABRIC AS FOR FENCING. ATTACH HARDWARE USING TAMPER-RESISTANT OR
CONCEALED MEANS. INSTALL GROUND-SET ITEMS IN CONCRETE FOR ANCHORAGE.
6. ADJUST GATES TO OPERATE SMOOTHLY, EASILY AND QUIETLY, FREE OF BINDING, WARP, EXCESSIVE DEFLECTION, DISTORTION, NONALIGNMENT, AND MISPLACEMENT THROUGHOUT ENTIRE OPERATIONAL RANGE. CONFIRM THAT LATCHES
AND LOCKS ENGAGE ACCURATELY AND SECURELY WITHOUT FORCING OR BINDING.
7. LUBRICATE HARDWARE AND OTHER MOVING PARTS.
8. GATE LOCKS ARE OWNER FURNISHED OWNER INSTALLED.
CONTAMINATED SOIL NOTES
1. POL (PETROLEUM, OIL AND LUBRICANTS) CONTAMINANTS WERE ENCOUNTERED
DURING PAST UNDERGROUND FUEL STORAGE REMOVAL PROJECTS SOUTH WEST
OF THE SITE.
2. SOIL EXCAVATED FOR THIS WORK SHALL BE STOCKPILED FOR TESTING AS
SPECIFIED. COORDINATE PLACEMENT OF STOCKPILE LOCATION WITH DPW AND
BASE ENVIRONMENTAL.
PERSONNEL GATE ACCESS
CENTER BOLLARDS
BETWEEN FENCE
AND FUEL TANK 3'
MIN CLEAR SPACE
EACH SIDE, TYP
4" TOPSOIL AND SEED
DISTURBED AREAS
BOLLARDS, TYP 14
C700
CONCRETE PAD APPROX 8' X 12'-6"
C700
C700
POWER TO TANKS PER ELECTRICAL
FUEL NOZZLES THIS SIDE OF TANK, TYP BOTH TANKS
DIESEL
FUEL TANK
MOGAS
FUEL TANK
(E) SWING GATE
LIGHT POLE PER ELECTRICAL
STUB UP POWER THROUGH CONCRETE PAD TYP BOTH TANKS, PER ELECTRICAL
1'-4"
LINE OF BOLLARDS SHALL NOT EXTEND BEYOND THE GATE
POST OR INTO THE VEHICLE CIRCULATION PATH, TYP 4
5' M
IN, 10' M
AX FRO
M
BO
LLARD
SITE IMPROVEMENTS1
C200 1"=5'
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
1/8/2026 3:22 PM C200 SITE PLAN.DWG
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
08-Jan-2026
C200
ALJ
IAL
SITE
IMPROVEMENTS
BOLLARD DETAIL3
C700 NO SCALE
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
18-Dec-2025
12/18/2025 4:06 PM C700 DETAILS.DWG
482503
19 DEC 2025
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
REPLACE FUEL
TANKS B2096
REGISTERED PROFESSIONA L ENGINEER
Isaac Austin Ladines
CE 197973
18-Dec-2025
C700
ALJ
IAL
DETAILS
COMMON FILL COMMON FILL
18" MIN. COMPACTED
STRUCTURAL FILLIN-SITU SOIL
GRADE ADJACENT
GRAVEL AREAS
SMOOTH & COMPACT
DISTURBED AREAS
4"
DIESEL TANK
SEE NOTE 7
6"
8" ALL AROUND
#5 REBAR AT 14"
O/C EACH WAY
3" REBAR EDGE
CLEARANCE ALL
AROUND
ANCHOR BOLTS
SEE MECHANICAL
ABOVEGROUND TANKS ON SOIL
EXCAVATION NOTES
1. CONCRETE SLAB DIMENSIONS ARE APPROXIMATE. VERIFY DIMENSIONS AND
LAYOUT WITH TANK MANUFACTURER PRIOR TO CONSTRUCTION.
2. OWNER'S REPRESENTATIVE SHALL INSPECT EXCAVATED MATERIAL AND BASE
OF EXCAVATION FOR CONFORMANCE PRIOR TO BACKFILLING.
3. COMPACT BASE OF EXCAVATION WITH LARGE VIBRATORY PLATE COMPACTOR
(MIN 10,000LB CENTRIFUGAL FORCE), MINIMUM THREE PASSES. A PASS IS
COUNTED EACH TIME THE RUNNING COMPACTOR MOVES OVER AN AREA.
4. FILL MATERIAL SHALL BE PLACED AND COMPACTED WITH A LARGE VIBRATORY
PLATE COMPACTOR, MINIMUM THREE PASSES PER LIFT. EACH LIFT SHALL BE
COMPLETE PRIOR TO PLACING AND COMPACTING SUBSEQUENT LIFTS.
5. PERMANENT EROSION STABILIZATION MUST BE ACHIEVED ON ALL DISTURBED
SOILS. IN GRAVELY AREAS, GRADE SMOOTH AND COMPACT DISTURBED
GROUND.
6. TOP OF SLAB TO BE 4" MIN. ABOVE ADJACENT GRADE.
7. PROVIDE POSITIVE DRAINAGE AWAY FROM TANK AND SLAB. SLOPE MINIMUM 5%
FOR 5' AWAY FROM TANK.
3' -0
" M
IN
, T Y
P
6", TYP
16"Ø MIN, TYP
4'-0"
TOP RAIL OR
TENSION
WIRE AS
SPECIFIED,
TYP
BRACE RAIL
LATCH
ASSEMBLY
COMPATIBLE
WITH
PADLOCK
BRACE
RAIL, TYP
TRUSS
ROD, TYP
GRADE LINE
2" MIN,
5" MAX
HINGE
HINGE
3/8"Ø
TRUSS
RODS,
TYP
2.875" O.D.
GATE POST,
TYP
M A
TC
H
E X
IS
TI
N G
FE
N
C E
F A
B R
IC
NOTE:
THIS DETAIL SHOWS THE GATE
AND FENCE ASSEMBLY FROM
THE SECURE SIDE.
TENSION WIRE,
TYP
PLAN AT EQUIPMENT
FUEL TANK
4' TYP
4' O.C. TYP
AS REQ'D. TO
PROTECT
EQUIPMENT
BOLLARD, TYP
CAP TOP SECTION
6"
1'-6"
4' -0
3"
4' -0
CONCRETE BASE
FINISH
GRADE
TROWEL FINISH
CONCRETE DOME
6" OD SCHEDULE 40 OR
80 STEEL PIPE. FILL
WITH CONCRETE
APPLY PRIMER AND TWO COATS OF "SAFETY
YELLOW" PAINT OR PROVIDE YELLOW
PLASTIC SLEEVE.
1'-0"
MIN
1'-0"
MIN
COMPACTED STRUCTURAL FILL
SLOPE TO
DRAIN
STORAGE TANK FOUNDATION EXCAVATION SECTION1
C200 NO SCALE
PERSONNEL GATE2
C700 NO SCALE
CONCRETE BASE
MECHANICAL SYMBOLS
PIPE FLOW ARROW
PIPE CONNECTION
PIPE ELBOW TURNED DOWN
PIPE ELBOW TURNED UP
PIPE TEE DOWN
UNION
PIPE CAP
PIPE BREAK
ISOLATION VALVE
CHECK VALVE
PUMP
FUELING EQUIPMENT SCHEDULE
SYMBOL ITEM CAPACITY / SIZE MOTOR
DATA
OPERATING
WEIGHT (LB)
BASIS OF DESIGN REMARKS
SEISMIC - CONCRETE ANCHOR BOLT SCHEDULE
MINIMUM ANCHOR
EMBEDMENT (IN)
SYMBOL MINIMUM HOUSEKEEPING
PAD THICKNESS (IN)
MINIMUM SPACE
BETWEEN ANCHORS (IN)
MINIMUM EDGE
DISTANCE (IN)
ANCHOR BOLT
DIAMETER (IN)
NUMBER OF
BOLTS PER SIDE
INSTALLATION
TORQUE (FT-LBS)
2-1/2D-2096 4 683/8 2 -----
{1} BASIS OF DESIGN: HILTI KH-EZ 316 STAINLESS STEEL SCREW ANCHOR
{2} ALTERNATIVE BRANDS WILL NOT BE REVIEWED WITHOUT FORCE CALCULATIONS SIGNED BY A LICENSED ENGINEER.
{3} SEISMIC ANCHOR INSTALLATION REQUIRES SPECIAL INSPECTION.
{4} FOR NORMAL WEIGHT VALUES. ANCHORS INTO NEW CONCRETE (4000 PSI).
{5} SINGLE ANCHOR WITH SEISMIC TENSION OR SHEAR LOAD ONLY.
P-1 FUEL PUMP 20 GPM 1/3 HP
115V/1Ø/60
----- GPI GPRO V20-115RD-N08
RD-1 REMOTE DISPENSER 2 TO 40 GPM ----- 60 GPI QM40-G8N-RD 1. SOLENOID VALVE, AND LOCKABLE NOZZLE HOLDER
2. PROVIDE WITH MOUNTING SHELF KIT
3. MANUFACTURER TESTED TO -40°F
4. LOCATE EMERGENCY FUEL SHUTOFF SWITCH PER ELEC
N-1 AUTOMATIC DIESEL
FUEL NOZZLE
3/4" NPT ----- ----- OPW 11B-0100-XC
FUEL TANK SCHEDULE
SYMBOL ITEM CAPACITY / SIZE OPERATING
WEIGHT {1} (LB)
BASIS OF DESIGN REMARKS
{1} OPERATING WEIGHT INCLUDES TANK APPURTENANCES. INDICATED PLUS 10% IS MAXIMUM ALLOWED WEIGHT IF USING A SEISMIC DETAIL PROVIDED AS PART OF CONTRACT DOCUMENTS.
D-2096 ABOVE GROUND DIESEL
STORAGE TANK
M-2096 ABOVE GROUND GASOLINE
STORAGE TANK
500 GALLONS
60" Ø X 79" L
500 GALLONS
60" Ø X 79" L
GREER TANK
STI FIREGUARD
CYLINDRICAL DOUBLE WALL TANK
N-2 AUTOMATIC GASOLINE
FUEL NOZZLE
3/4" NPT ----- ----- OPW 11BP-0400-XC
1. PROVIDE WITH SPLASH GUARD
2. GREEN COLOR
3. MANUFACTURER TESTED TO -40°F
1. PROVIDE WITH SPLASH GUARD
2. BLACK COLOR
3. MANUFACTURER TESTED TO -40°F
2-1/2M-2096 4 683/8 2 -----
1. ELECTRICAL FED THROUGH ASSOCIATED REMOTE DISPENSER
2. PROVIDE WITH VACUUM BREAKER
3. PROVIDE WITH 10 GPM FLOW RESTRICTOR
4. MANUFACTURER TESTED TO -40°F
1. UL 2085 APPROVED
2. SKID MOUNTED, SKID LENGTH 91"
3. SLOPE TANK MIN 1/8" PER FOOT TOWARD WATER DRAW OFF
GREER TANK
STI FIREGUARD
CYLINDRICAL DOUBLE WALL TANK
1. UL 2085 APPROVED
2. SKID MOUNTED, SKID LENGTH 91"
3. SLOPE TANK MIN 1/8" PER FOOT TOWARD WATER DRAW OFF
MECHANICAL SPECIFICATIONS
1. CONTRACTOR TO PROVIDE ALL LABOR AND MATERIALS REQUIRED TO ACCOMPLISH THE INSTALLATION OF MECHANICAL SYSTEMS SHOWN ON PROJECT
DRAWINGS.
2. PLANS - THE CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. THE DRAWINGS ARE PARTIALLY DIAGRAMMATIC, NOT NECESSARILY SHOWING ALL OFFSETS OR EXACT LOCATIONS OF PIPING, UNLESS SPECIFICALLY DIMENSIONED.
3. PERMITS - THE CONTRACTOR SHALL SECURE AND PAY FOR ALL NECESSARY PERMITS AND FEES.
4. PROVIDE WORK IN ACCORDANCE WITH UFC 3-401-01 REFERENCING THE 2018 INTERNATIONAL MECHANICAL CODE; UFC 3-460-01 REFERENCING NFPA 30
AND NFPA 30A; AND UFC 3-600-01.
5. MATERIALS - ALL MATERIALS SHALL BE NEW AND UNUSED. ALL NEW MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS AND IN THE BEST PRACTICE OF THE CRAFT. OBTAIN OWNERS APPROVAL OF ALL PRODUCTS AND MATERIALS PRIOR TO ORDERING OR
INSTALLING ANY PART OF ANY SYSTEM.
6. EQUIPMENT SUBSTITUTIONS - ALL EQUIPMENT LISTED IS REPRESENTATIVE OF THE STANDARD OF QUALITY AND PERFORMANCE REQUIRED. OR EQUAL SUBSTITUTIONS SHALL BE CONSIDERED IF THE SUBSTITUTE CATALOG CUTS ARE SUBMITTED AND ARE SHOWN TO BE EQUAL OR BETTER QUALITY, INCLUDING EFFICIENCY OF PERFORMANCE, MATERIALS OF CONSTRUCTION, SIZE, AND WEIGHT.
7. SUBMITTALS - SUBMITTALS SHALL BE ELECTRONIC, PDF FORMAT. THE DATA SHALL BE ARRANGED AND INDEXED UNDER BASIC CATEGORIES. SUBMIT ON TANKS, TANKS APPURTENANCES, TANK LABELING, PUMPS, FUEL DISPENSING EQUIPMENT, PIPING, SIGNAGE, EMERGENCY SHUTDOWN DEVICES, AND EMERGENCY PHONE. TANK LABELING AND SIGNAGE SUBMITTALS SHALL INCLUDE SHOP DRAWINGS TO INCLUDE LOCATION, SIZE, AND MATERIAL. TANK SUBMITTALS SHALL INCLUDE SHOP DRAWINGS TO INCLUDE BUT NOT BE LIMITED TO THE TANKS, TANK LIFTING POINTS, TANK OPENINGS, LADDERS, SKIDS, PLATFORMS, AND CHANNEL STRUT MOUNTING POINTS.
8. FUEL TANKS - ABOVE GROUND STORAGE TANKS SHALL BE DOUBLE WALL SKID MOUNTED UL 2085 LISTED PROTECTED TANKS. TANK SKID SHALL BE CONSTRUCTED TO SUPPORT THE FULL GRAVITY WEIGHT OF THE FILLED TANK AND SEISMIC FORCES IN ACCORDANCE WITH ASCE 7-16 AND REFERENCED API REQUIREMENTS. STRIKER PLATES UNDER EACH TANK OPENING SHALL BE 1/4" THICK, LARGER IN DIAMETER THAN TANK OPENING, WELDED CONTINUOUSLY AROUND PLATE PERIMETER, AND COATED WITH THE TANK INTERIOR. TANKS SHALL BE SHOP-BUILT AND TESTED IN ACCORDANCE WITH NFPA 30, WHICH INCLUDES TESTING IN ACCORDANCE WITH THE LISTING OR APPLICABLE STANDARDS. CONCRETE EXTERIOR ABOVE GROUND STORAGE TANKS SHALL NOT BE ALLOWED. COORDINATE WITH TANK MANUFACTURER TO PROVIDE INTEGRAL CONNECTION POINTS FOR CHANNEL STRUT SUPPORTS ON TANKS AS REQUIRED FOR TANK MOUNTED PIPING, CONDUIT, AND EQUIPMENT. TANKS SHALL BE COATED WITH MANUFACTURER'S
STANDARD COATING FOR COLD WEATHER CLIMATES.
9. FUEL TANK LABELING - PROVIDE LABELING FOR EACH FUEL TANK TO INCLUDE PRODUCT STORED, TANK CAPACITY, TANK NAME AND NUMBER AS SCHEDULED, MANUFACTURER'S LISTING LABEL, NFPA 704 EMERGENCY RESPONSE DIAMOND, DOT HAZMAT PLACARD, AND THE WORDS "NO SMOKING", AND "COMBUSTIBLE" OR "FLAMMABLE" AS APPLICABLE. PAINTED LABELING SHALL BE APPLIED WITH DURABILITY EQUAL TO TANK EXTERIOR COATING.
LABELING SHALL NOT BE PLACED BENEATH ANY TANK MOUNTED OBSTRUCTIONS. PROVIDE SHOP DRAWINGS OF PROPOSED LABELS AND SIGNAGE TO INCLUDE THE SIZE, LOCATION, AND MATERIAL OF SIGNAGE. NFPA 704 EMERGENCY RESPONSE DIAMONDS SHALL BE PROVIDED ON MINIMUM TWO SIDES OF EACH TANK MOST LIKELY TO BE SEEN BY FIRST RESPONDERS. NFPA 704 EMERGENCY RESPONSE DIAMOND SHALL BE OF A SIZE AS DESCRIBED IN NFPA 704 CHAPTER 9 WITH THREE INCH HIGH NUMERALS. DOT HAZMAT PLACARDS SHALL BE PROVIDED FOR EACH TANK IN ACCORDANCE WITH 49 CFR
172. PRODUCT STORED, TANK CAPACITY, TANK NAME AND NUMBER AS SCHEDULED, AND THE WORDS "NO SMOKING" AND "COMBUSTIBLE" OR "FLAMMABLE" AS APPLICABLE SHALL BE PROVIDED ON BOTH LONG SIDES OF EACH TANK IN MINIMUM THREE INCH HIGH LETTERING.
10. FUEL OIL PIPING AND ACCESSORIES - MATERIALS AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 31. PIPE SHALL BE IPS SCHEDULE 40 BLACK STEEL WITH MALLEABLE IRON OR STEEL FITTINGS WITH THREADED JOINTS. PIPE DOPE FOR THREADED FITTINGS SHALL BE LISTED BY THE MANUFACTURER AS SUITABLE FOR THE PROPOSED USES, TEMPERATURE RANGING FROM -90°F TO 410°F, HERCULES GRRIP/GRRIP LITE OR EQUAL.
FILTERS: WOOL FELT, GENERAL OR EQUAL.
11. FUEL DISPENSING EQUIPMENT - TANK MOUNTED FUEL PUMP UL LISTED FOR APPLICATION, COMPLETE WITH PUMP AND MOTOR, LISTED FOR -40°F OPERATING CONDITIONS, GREAT PLAINS INDUSTRIES OR EQUAL. DUCTILE IRON AND STAINLESS STEEL SPRING ACTUATED EXPANSION RELIEF VALVE, MORRISON BROS 78DI OR EQUAL. SINGLE PRODUCT SINGLE HOSE REMOTE DISPENSER WITH MANUALLY OPERATED PUMP SWITCH, SOLENOID VALVE TO PREVENT DISPENSING WHILE SWITCH IS OPEN, NOZZLE HOLDER, AND MOUNTING HARDWARE, GREAT PLAINS INDUSTRIES OR EQUAL. ONE OR THREE QUARTER INCH FUEL HOSE, OIL RESISTANT SYNTHETIC RUBBER TUBE AND COVER, BRAIDED SYNTHETIC YARN REINFORCED TUBE, RATED FOR MINUS 65° F AND 300 PSIG, GOODYEAR ARCTIC ORTAC OR EQUAL. FIELD ADJUSTABLE HEAVY DUTY SPRING BALANCE SINGLE HOSE RETRACTOR, 12 TO 20 LB RETRACTION STRENGTH, OPW POMECO 102 OR EQUAL. UL LISTED COMBINATION HOSE SWIVEL AND BREAKAWAY FITTING, RECONNECTABLE, POPPET PROTECTED FROM IMPACT AFTER SEPARATION, OPW 66B OR EQUAL. UL LISTED NOZZLE, 3/4", AUTOMATIC SHUTOFF NOZZLE WITH HOLD OPEN DEVICE, BUILT IN CHECK VALVE, COMPATIBLE WITH ASSOCIATED FUEL TYPE, OPW 11B OR EQUAL.
12. EQUIPMENT INSTALLATION - INSTALL ALL EQUIPMENT WHERE NOTED ON THE DRAWINGS PROPERLY LEVELED, ALIGNED, AND SECURED IN PLACE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. PROVIDE MISCELLANEOUS APPURTENANCES, ACCESSORIES, SUPPORTS, AND CONTROL CONNECTIONS REQUIRED FOR COMPLETE AND OPERATING SYSTEMS. INSTALL ANCHORS, BOLTS, NUTS, WASHERS, AND SCREWS TO SECURE THE WORK IN PLACE AS REQUIRED FOR PROPER INSTALLATION. SIZES AND TYPES OF ANCHORS AND BOLTS NOT INDICATED OR SPECIFIED SHALL BE AS REQUIRED FOR PROPER INSTALLATION. MAINTAIN MANUFACTURER'S RECOMMENDED SERVICE CLEARANCES. INSTALL STORAGE TANKS IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND NFPA 30. LIFT AND PLACE STORAGE TANKS TO MINIMIZE DAMAGE TO TANK COATINGS, STORAGE TANKS SHALL NOT BE DRAGGED. INSPECT STORAGE TANK EXTERIOR SURFACES FOR DAMAGE PRIOR TO, DURING, AND FOLLOWING PLACEMENT OF STORAGE TANKS.
REPAIR SURFACE DAMAGE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND THE APPROPRIATE UL OR STI STANDARD.
13. TESTING - TANKS SHALL BE TESTED IN ACCORDANCE WITH NFPA 30, STI R912, AND MANUFACTURER'S INSTRUCTIONS. TIGHTNESS TESTING SHALL BE CONDUCTED BY THE CONTRACTOR AFTER INSTALLATION AND BEFORE ENTERING SERVICE, DEFICIENCIES FOUND DURING TIGHTNESS TESTING TO BE CORRECTED BY THE CONTRACTOR. CONTRACTOR SHALL PROVIDE NECESSARY FUEL FOR TESTING AND COMMISSIONING. CONTRACTOR SHALL LEAVE TANKS 90% FULL. CONTRACTOR SHALL COORDINATE TESTING WITH THE OWNER'S REPRESENTATIVE TO ALLOW FOR ATTENDANCE AT TESTING AND
COMMISSIONING ACTIVITIES.
14. TRAINING - CONTRACTOR SHALL PROVIDE OPERATIONS AND MAINTENANCE TRAINING FOR GOVERNMENT PERSONNEL. OPERATIONS AND MAINTENANCE TRAINING SHALL INCLUDE USE OF DISPENSERS, EMERGENCY SHUTOFF DEVICES, AND EMERGENCY PHONE; CLEANING AND REPLACEMENT OF STRAINERS, FILTERS, AND TANK FILL SPILL CONTAINERS; ANNUAL, MONTHLY, AND DAILY TESTING REQUIREMENTS AND PROCEDURES; AND WATER DRAW OFF PROCEDURES. THE CONTRACTOR SHALL PLACE ALL SYSTEMS AND MAJOR EQUIPMENT IN OPERATION AND INSTRUCT GOVERNMENT PERSONNEL ON PROPER OPERATION AND MAINTENANCE OF THE CONSTRUCTED SYSTEMS. CONTRACTOR COORDINATE TRAINING SCHEDULE WITH THE GOVERNMENT
AND PROVIDE ITEMIZED TRAINING SUMMARY FOR REVIEW MINIMUM TWO WEEKS AHEAD.
15. PROJECT RECORD DRAWINGS - MARK UP A CLEAN SET OF DRAWINGS AS THE WORK PROGRESSES TO SHOW THE DIMENSIONED LOCATION AND ROUTING OF ALL MECHANICAL WORK WHICH WILL BECOME PERMANENTLY CONCEALED. SHOW ROUTING OF WORK IN CONCEALED BLIND SPACES. DELIVER THESE
DRAWINGS TO THE OWNER AT COMPLETION OF THE PROJECT.
16. WARRANTY - ALL WORK PERFORMED UNDER THIS CONTRACT TO BE FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE. ANY FAULTY MATERIALS OR WORKMANSHIP SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER
DURING THE GUARANTEE PERIOD.
COMMISSIONING REQUIREMENTS
1. INDEPENDENT THIRD-PARTY COMMISSIONING IS NOT REQUIRED.
2. DEMONSTRATE FUNCTIONALITY OF EACH DISPENSER, OVERFILL PROTECTION VALVE, EMERGENCY SHUT-OFF SWITCH, AND BREAKER
INTERLOCK.
3. CONTRACTOR TO PROVIDE DOCUMENTATION INDICATING SYSTEM IS OPERATING AS INTENDED AND DEMONSTRATE FUNCTIONALITY, IN PERSON, AT THE REQUEST OF THE CONTRACTING OFFICER. PROVIDE CONTRACTING OFFICER WITH A WRITTEN RECORD INDICATING THAT ALL SYSTEMS
ARE FUNCTIONING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. WHERE DEFICIENCIES ARE NOTED PROVIDE RECORD OF CORRECTION. AN IN-PERSON DEMONSTRATION OF CORRECTED COMPONENTS MAY BE
REQUESTED AT CONTRACTING OFFICER'S DISCRETION.
TANK REMOVAL NOTES
1. THE SITE HAS TWO UNREGULATED FUEL TANKS. THE TWO TANKS ARE DISPENSING TYPE. NO DOCUMENTED
RECORDS OF A RELEASE RELATED TO THE CURRENT INSTALLATIONS ARE KNOWN.
2. THE TANK REMOVAL WORK CONSIST OF REMOVAL AND DISPOSAL OF ALL COMPONENTS OF THE TANK SYSTEMS INCLUDING RESIDUAL FUEL, SLUDGE, TANKS, PIPING, AND OTHER APPURTENANCES. THE CONTRACTOR SHALL
SUBMIT A WORKPLAN OUTLINING TANK CONTENTS REMOVAL AND TANK REMOVAL FROM SITE.
3. THE CONTRACTOR SHALL COMPLY WITH LAWS, ORDINANCES, RULES, AND REGULATIONS OF FEDERAL, STATE AND LOCAL AUTHORITIES REGARDING HANDLING, STORAGE, TRANSPORT AND DISPOSAL OF HAZARDOUS MATERIALS, HAZARDOUS WASTES, AND ALL OTHER CONSTRUCTION MATERIALS.
4. FUEL TANKS NEED NOT BE DESTROYED AFTER REMOVAL FROM SITE.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
REPLACE FUEL
TANKS B2096
482503
AECC511
19 DEC 2025
12/17/2025 3:56:31 PM
MECHANICAL
ABBREVIATIONS,
LEGENDS,
SCHEDULES,
NOTES, AND
SPECIFICATIONS
M001
BAB
VAU
ABBREVIATION FULL NAME
(E) EXISTING
APPR APPROVED
APPROX APPROXIMATE
C COMMON
DI DUCTILE IRON
DIA DIAMETER
DN DOWN
ELEC ELECTRICAL
EXIST EXISTING
FLA FULL LOAD AMPERAGE
FLEX FLEXIBLE
GA GAUGE
GALV GALVANIZED
GI GALVANIZED IRON
IPS IRON PIPE SIZE
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
MTR MOTOR
ABBREVIATION FULL NAME
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPSH NET PUMP SUCTION HEAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
PRV PRESSURE RELIEF VALVE
RPM REVOLUTIONS PER MINUTE
S/S START/STOP
SIM SIMILAR
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
VOL VOLUME
W/ WITH
W/O WITHOUT
MECHANICAL ABBREVIATIONS
A
K
AF AL
T S
TA
E O
49 TH
S
Blake Allen Burley
ME-160408
R E
G
ISTERED
PROFESS IONAL
ENG
IN
E
E R
18-DEC-2025
EMERGENCY INSTRUCTIONS
IN CASE OF FIRE OR SPILL:
(1) USE EMERGENCY STOP BUTTON
(2) REPORT FIRE OR ACCIDENT BY CALLING FTW
DISPATCH AT (907) 353-9170. REPORT SPILLS BY
CALLING 24-HOUR SPILL HOTLINE AT (907) 482-7267
OR DIAL 911. REPORT LOCATION.
WARNING
IT IS UNLAWFUL AND DANGEROUS TO DISPENSE GASOLINE INTO
UNAPPROVED CONTAINERS.
NO SMOKING.
STOP MOTOR.
NO FILLING OF PORTABLE CONTAINERS IN OR ON A MOTOR VEHICLE.
PLACE CONTAINER ON GROUND BEFORE FILLING.
DISCHARGE YOUR STATIC ELECTRICITY BEFORE FUELING BY TOUCHING
A METAL SURFACE AWAY FROM THE NOZZLE.
DO NOT RE-ENTER YOUR VEHICLE WHILE GASOLINE IS PUMPING.
IF A FIRE STARTS, DO NOT REMOVE NOZZLE - BACK AWAY IMMEDIATELY.
DO NOT ALLOW INDIVIDUALS UNDER LICENSED AGE TO USE THE PUMP.
OPERATING INSTRUCTIONS
TO BEGIN FUELING REMOVE NOZZLE FROM HOLDER
PLACE NOZZLE SECURELY IN VEHICLE OR CONTAINER FILL PORT.
LIFT NOZZLE SUPPORT TO ACTIVATE PUMP SWITCH.
LIFT LATCH ON NOZZLE TO BEGIN FUELING.
REMAIN OUTSIDE OF VEHICLE AND WITHIN VIEW OF THE FUELING NOZZLE
DURING FUELING.
QUANTITYSYMBOL GRAPHIC (NO SCALE)
MIN 1/4" HIGH BLACK LETTERING ON WHITE
BACKGROUND
1/8" THICK BLACK BORDER 1/8" FROM EDGE
{1}
WARNING
IT IS UNLAWFUL AND DANGEROUS TO DISPENSE GASOLINE INTO
UNAPPROVED CONTAINERS.
NO SMOKING.
STOP MOTOR.
NO FILLING OF PORTABLE CONTAINERS IN OR ON A MOTOR VEHICLE.
PLACE CONTAINER ON GROUND BEFORE FILLING.
DISCHARGE YOUR STATIC ELECTRICITY BEFORE FUELING BY TOUCHING
A METAL SURFACE AWAY FROM THE NOZZLE.
DO NOT RE-ENTER YOUR VEHICLE WHILE GASOLINE IS PUMPING.
IF A FIRE STARTS, DO NOT REMOVE NOZZLE -- BACK AWAY IMMEDIATELY.
DO NOT ALLOW INDIVIDUALS UNDER LICENSED AGE TO USE THE PUMP.
SIGNAGE SCHEDULE
SGN-1 1
SGN-2 1
SGN-3 1
SIGN CONTENT
EMERGENCY INSTRUCTIONS:
IN CASE OF FIRE OR SPILL:
(1) USE EMERGENCY STOP BUTTON
(2) REPORT FIRE OR ACCIDENT BY CALLING FTW DISPATCH AT (907)
353-9170 OR DIAL 911. REPORT SPILLS BY CALLING 24-HOUR SPILL
HOTLINE AT (907) 482-7267. REPORT LOCATION.
COLORS / SPECIAL NOTES
OPERATING INSTRUCTIONS
TO BEGIN FUELING REMOVE NOZZLE FROM HOLDER
PLACE NOZZLE SECURELY IN VEHICLE OR CONTAINER FILL PORT.
LIFT NOZZLE SUPPORT TO ACTIVATE PUMP SWITCH.
LIFT LATCH ON NOZZLE TO BEGIN FUELING.
REMAIN OUTSIDE OF VEHICLE AND WITHIN VIEW OF THE FUELING
NOZZLE DURING FUELING.
LOCATE IN DISPENSING AREA ABOVE
DISPENSERS
MIN 1/4" HIGH BLACK LETTERING ON WHITE
BACKGROUND
{1}
MIN 1/4" HIGH BLACK LETTERING ON WHITE
BACKGROUND
{1}
EMERGENCY
FUEL SHUTOFF
SGN-4 1 EMERGENCY FUEL SHUTOFF MIN 1" HIGH WHITE LETTERING ON RED
BACKGROUND
1/8" THICK WHITE BORDER 1/8" FROM EDGE
{2}
NOTES
LOCATE IN DISPENSING AREA ABOVE
DISPENSERS
LOCATE IN DISPENSING AREA ABOVE
DISPENSERS
LOCATE ABOVE EMERGENCY
SHUTOFF DEVICE
{1} SIGN SHALL BE CONSTRUCTED OF AN ALUMINUM PANEL WITH AN OPAQUE BACKGROUND.
{2} SIGN SHALL BE CONSTRUCTED OF AN ALUMINUM PANEL WITH A RETROREFLECTIVE BACKGROUND SHEETING. LETTERS, NUMERALS, SYMBOLS, AND BORDERS SHALL BE APPLIED TO RETROREFLECTIVE SHEETING IN ACCORDANCE WITH SHEETING MANUFACTURER INSTRUCTIONS.
{3} SIGN SHALL BE CONSTRUCTED OF PETROLEUM RESISTANT ADHESIVE LABEL
SGN-5 1 DO NOT FILL ABOVE 4'-2" MIN 1/2" HIGH BLACK LETTERING ON WHITE
BACKGROUND {3}
LOCATE INSIDE 5 GALLON SPILL
CONTAINMENT BUCKET
DO NOT FILL ABOVE 4'-2"
SGN-6 1 M-2096 MIN 1" HIGH BLACK LETTERING ON WHITE
BACKGROUND {1}
LOCATE ON TANK M-2096
M-2096
SGN-7 1 D-2096 MIN 1" HIGH BLACK LETTERING ON WHITE
BACKGROUND {1}
LOCATE ON TANK D-2096
D-2096
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
REPLACE FUEL
TANKS B2096
482503
AECC511
19 DEC 2025
12/17/2025 3:56:31 PM
MECHANICAL
SIGNAGE
SCHEDULE
M002
BAB
VAU
A K
AF AL
T S
TA
E O
49 TH
S
Blake Allen Burley
ME-160408
R E
G
ISTERED
PROFESS IONAL
ENG
IN
E
E
P-1
RD-1
EMERGENCY SHUTOFF VALVE, DOUBLE-POPPET TYPE
WITH FUSIBLE LINK, OPW 10BFP-5726 OR EQUAL
SECURE PIPE TO TANK, TYP
1" DIESEL SUPPLY
3/4" FUEL
HOSE
HOSE RETRACTOR, OPW
POMECO 102 OR EQUAL
COMBINATION HOSE SWIVEL AND
BREAKAWAY BETWEEN HOSE AND
NOZZLE, OPW 661B OR EQUAL
TANK MOUNTED DIESEL FUEL PUMP
WITH INTEGRAL CHECK VALVE,
STRAINER, AND VACUUM BREAKER
EXPANSION RELIEF VALVE,
MORRISON 078DI 25 PSI
GATE VALVE
3/4" FUEL HOSE
AUTOMATIC DIESEL
FUEL NOZZLE, N-1
FUEL FILTER WITH SPIN
ON CARTRIDGE
1-1/4" DROP
TUBE
GATE VALVE
DIESEL TANK
TANK SKID
EXPANSION RELIEF VALVE
1/2" DROP TUBE
CONCRETE SLAB
P-1
RD-1
3/4" FUEL
HOSE
HOSE RETRACTOR, OPW
POMECO 102 OR EQUAL
COMBINATION HOSE SWIVEL AND
BREAKAWAY BETWEEN HOSE AND
NOZZLE, OPW 661B OR EQUAL
TANK MOUNTED GASOLINE FUEL
PUMP WITH INTEGRAL CHECK
VALVE, STRAINER, AND VACUUM
BREAKER
GATE VALVE
3/4" FUEL HOSE
AUTOMATIC GASOLINE
FUEL NOZZLE, N-2
GATE VALVE
GASOLINE TANK
TANK SKID
1" GASOLINE SUPPLY
EXPANSION RELIEF VALVE,
MORRISON 078DI 25 PSI OR
EQUAL
1-1/4" DROP
TUBE
EXPANSION RELIEF VALVE
1/2" DROP TUBE
EMERGENCY SHUTOFF VALVE, DOUBLE-POPPET TYPE
WITH FUSIBLE LINK, OPW 10BFP-5726 OR EQUAL
SECURE PIPE TO TANK, TYP
FUEL FILTER WITH SPIN
ON CARTRIDGE
CONCRETE SLAB
MANUAL INTERSTITIAL LEAK DETECTION,
KRUEGER TYPE K OR EQUAL
INTERSTITIAL TANK
EMERGENCY VENT
1/4" MIN STRIKER PLATE, DIA 4"
LARGER THAN TANK OPENING, TYP
BOLLARDS PER CIVIL
5 GALLON SPILL CONTAINMENT BUCKET
WITH LOCKABLE LID. LABEL "ULTRA LOW
SULFUR DIESEL" OR "GASOLINE" AS
APPROPRIATE.
15' MINIMUM HOSE, FILL-RITE
FRHA OR EQUAL
PRIMARY TANK
EMERGENCY VENT
GROUNDING, PER ELECTRICAL
PRIMARY TANK VENT WITH WHISTLE ALARM, OUTLET
MIN 10'-0" ABOVE GRADE, MORRISON 922 WITH 6 OZ.
POPPET OR EQUAL
2" STRAIGHT FILL PORT FOR MANUAL
GAUGING WITH LOCKABLE CAP
2" WATER DRAW OFF DROP TUBE
1" FROM BOTTOM OF TANK
OSHA COMPLIANT LADDER
2" WATER DRAW OFF WITH FEMALE
CAM AND GROOVE FITTING AND PLUG
3", TYP 4
6", TYP 3
CONCRETE SLAB PER CIVIL
6'-8" MINIMUMDROP TUBE, TYP
TANK SKID
EXPANSION RELIEF VALVE
1/2" DROP TUBE
SECURE TANK SKID TO CONCRETE SLAB
PER CONCRETE ANCHOR BOLT SCHEDULE
2" OPW DRYLOK ADAPTER FILL CONNECTION
WITH 2" FEMALE NPT THREADS AND CAP
M201
CLASS B 20 POUND FIRE
EXTINGUISHER, PROVIDE
MOUNTING BRACKET
SEE DISPENSING PIPING
DIAGRAMS
M201
CLOCK GAUGE VISIBLE FROM FILL
CONTAINER, MORRISON 818 OR EQUAL
SGN-5 ON INSIDE OF SPILL
CONTAINMENT BUCKET
GENERAL NOTES
1. PROVIDE SIGNAGE AS INDICATED ON M002.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
REPLACE FUEL
TANKS B2096
482503
AECC511
19 DEC 2025
12/17/2025 3:56:31 PM
MECHANICAL
DETAILS
M201
BAB
VAU
NO SCALEM201
2 DIESEL DISPENSING PIPING DIAGRAM
NO SCALEM201
3 GASOLINE DISPENSING PIPING DIAGRAM
NO SCALEM201
1 ABOVE GROUND DISPENSING TANK DETAIL
A K
AF AL
T S
TA
E O
49 TH
S
Blake Allen Burley
ME-160408
R E
G
ISTERED
PROFESS IONAL
ENG
IN
E
E
ELECTRICAL SYMBOL LEGEND
MOTOR (HP, VOLTAGE & PHASE NOTED ON DRAWING)
PANELBOARD SURFACE MOUNTED
POWER SYMBOLS
T
MANUAL MOTOR RATED SWITCH
WITH THERMAL OVERLOADS (TT-SWITCH)
M
ANNOTATION SYMBOLS
L1-12
L1-12
AHU-1
PANEL & CIRCUIT IDENTIFICATION
PANEL & CIRCUIT IDENTIFICATION
B LIGHTING FIXTURE TAG
'L1' DENOTES PANEL NAME, '24' DENOTES CIRCUIT NUMBER.L1-24
LIGHTING FIXTURE TAG
(SEE LIGHTING FIXTURE SCHEDULE)
B2
# SPECIFIC NOTE KEY
(REFERENCE # UNDER 'SPECIFIC NOTES' ON EACH SHEET)
a
SWITCH IDENTIFICATION TAG
a SWITCH IDENTIFIER
EQUIPMENT IDENTIFIER
(SEE MECHANICAL ELECTRICAL SCHEDULE)
EXISTING TO REMAIN(E) DEMOLISH / DEMOLISHED(X)
LIGHTING SYMBOLS
POLE MOUNT LIGHT FIXTURE
ELECTRICAL ABBREVIATIONS
ABOVE FINISHED FLOORAFF
AMERICAN WIRE GAUGEAWG
HORSEPOWERHP
MAIN CIRCUIT BREAKERMCB
CORRELATED COLOR
TEMPERATURE
CCT
LIGHT EMITTING DIODELED
COPPERCU
EQUIPMENT GROUNDING
CONDUCTOR
EGC
FULL LOAD AMPSFLA
GROUNDGND
GROUND-FAULT CIRCUIT
INTERRUPTER
GFCI
GROUND-FAULT
PROTECTION OF EQUIPMENT
GFPE
MAIN GROUNDING
BUSBAR
MGB
MAIN DISTRIBUTION
PANELBOARD
MDP
MAXIMUM OVER
CURRENT PROTECTION
MOCP
MANUAL TRANSFER
SWITCH
MTS
OVER CURRENT
PROTECTION
OCP
PANELBOARDPNL
VARIABLE FREQUENCY
DRIVE
VFD
UNLESS OTHERWISE
NOTED
UON
CONDUITC
CIRCUIT BREAKER TYPECBT
GROUNDING ELECTRODE
CONDUCTOR
GEC
SUPPLY SIDE BONDING
JUMPER
SSBJ
AMP INTERRUPTING
CAPACITY
AIC
UNINTERRUPTIBLE
POWER SUPPLY
UPS
AS REQUIRED
NOTE:
CONDUIT TYPE, SIZE, AND
NUMBER OF CONDUITS AS
SHOWN ON DRAWINGS
(TYPICAL)
BACKFILL ABOVE CONDUIT &
BEDDING BELOW CONDUIT
(MAY BE SAME TYPE MATERIAL)
POWER CONDUIT(S)2
(O
R P
E R
N E
C T
A B
L E
.5
) 0
FINISH GRADE
STRUCTURAL FILL
SURFACE FINISH TO MATCH ADJACENT FINISH
MARKER/WARNING
TAPE 3" WIDE MIN
COMPACTION ALLOWED ONLY
AFTER MIN 4" STRUCTURAL
FILL OVER BACKFILL MATERIAL
SPACING BETWEEN SIMILAR
TYPES OF CONDUITS TO BE MIN
2" OR 1 X DIAMETER OF CONDUIT
WHICHEVER IS GREATER
A K
AF AL
T S
TA
E O
49 TH
S
R E
G
ISTERED
PROFESS IONAL
ENG
IN
E
E R
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.comAECC511
19-DEC-2025
Donald L Hopkins
No. EE 10582
12/18/2025 4:05:50 PM
DLH
NBD
LEGEND,
SCHEDULES, AND
DETAILS
E001
REPLACE FUEL
TANKS B2096
482503
19 DEC 2025
ELECTRIC MOTOR AND EQUIPMENT SCHEDULE
TAG DESCRIPTION RATING PHASE FLA MOPD
MOTOR
DISCONNECT
MINIMUM CONDUCTOR
& RACEWAY
PANEL-CIRCUIT COMMENTS
120 V
P-1 FUEL TRANSFER PUMP AND CONTROLS 1/3 HP 1 7.2 A 20.0 A CIRCUIT BREAKER 2 #12, #12 GND, 3/4" C. MAIN - 9 CONTROLLER INCLUDES LOCAL DISCONNECT
P-2 FUEL TRANSFER PUMP AND CONTROLS 1/3 HP 1 7.2 A 20.0 A CIRCUIT BREAKER 2 #12, #12 GND, 3/4" C. MAIN - 13 CONTROLLER INCLUDES LOCAL DISCONNECT
NOTES: CIRCUIT BREAKERS IDENTIFIED AS (N) ARE NEW CIRCUIT BREAKERS INSTALLED IN PREPARED SPACES.
MD METER DATA [ARTICLE 220.87] 0 VA 0.0% 0 VA
CH CHILLER [ARTICLE 440.33] (SUMMER ONLY) 0 VA 0.0% 0 VA
EH ELEC. HEAT [ARTICLE 215.2(A)(1)] (WINTER ONLY) 0 VA 0.0% 0 VA
H HBO [ARTICLE 220.14(A)] (WINTER ONLY) 0 VA 0.0% 0 VA SUMMER DEMAND [NO CHANGE]: 2,098 VA 10.1 A 20.2%
A APPLIANCE [ARTICLE 220.56] 0 VA 0.0% 0 VA WINTER DEMAND [NO CHANGE]: 2,098 VA 10.1 A 20.2%
M MOTOR [ARTICLE 430.24] 1,728 VA 112.5% 1,944 VA SEASONAL LOAD [NEC 220.60]
R RECEPTACLES [ARTICLE 220.47] 0 VA 0.0% 0 VA
L LIGHTING [ARTICLE 215.2(A)(1)] 123 VA 125.0% 154 VA DEMAND LOAD: 2,098 VA 10.1 A 20.2%
E NON-CONTINUOUS [ARTICLE 215.2(A)(1)] 0 VA 0.0% 0 VA CONNECTED LOAD: 1,851 VA 8.9 A 17.8%
C CONTINUOUS [ARTICLE 215.2(A)(1)] 0 VA 0.0% 0 VA LOAD AMPS % MCB
LOAD CLASSIFICATION [NEC 2023] CONNECTED LOAD DEMAND FACTOR DEMAND LOAD PANEL TOTALS
% MCB (PHASE): 30.9% 0.0%
CONNECTED AMPS (PHASE): 15.4 A 0.0 A
CONNECTED LOAD (PHASE): 1,851 VA 0 VA
15 (N) EMERGENCY FUEL SHUTDOWN POWER -- -- 20 1 0 -- 1 -- -- -- PREPARED SPACE 16
13 (N) P-2 (1/3 HP) FUEL TRANSFER PUMP M 20 1 864 123 1 20 L (N) FUEL TANK AREA LIGHT 14
11 (E) UNKNOWN LOAD E 20 1 0 0 1 20 E (E) UNKNOWN LOAD 12
9 (N) P-1 (1/3 HP) FUEL TRANSFER PUMP M 20 1 864 0 10
7 (E) UNKNOWN LOAD E 20 1 0 0
2 20 E (E) UNKNOWN LOAD
5 0 0 6
(E) UNKNOWN LOAD E 20 2
0 0
2 20 E (E) UNKNOWN LOAD
1 (E) UNKNOWN LOAD E 20 1 0 0 1 20 E (E) UNKNOWN LOAD 2
CKT CIRCUIT DESCRIPTION CBT
LOAD
CLASS
TRIP P A B P TRIP
LOAD
CLASS
CBT CIRCUIT DESCRIPTION CKT
SUPPLY FROM: POLE MOUNT XFMR ENCLOSURE: TYPE 3R PHASE, WIRE: 1 PH, 3 W MAINS TYPE: MCB A.I.C. RATING: 10,000 A
LOCATION: UTILITY POLE MOUNTING: SURFACE VOLTS: 120/208V MAINS RATING: 100.0 A MCB RATING: 50.0 A
PANEL: MAIN
EXISTING PANELBOARD MAIN
NOT TO SCALEE001
1 TYPICAL TRENCH DETAIL
LIGHTING FIXTURE SCHEDULE (BASIS OF DESIGN)
FIXTURE
TAG
TYPE
NOMINAL
LUMENS
CCT
(K)
DESCRIPTION MOUNTING MANUFACTURER MODEL
INPUT
LOAD (W)
A LED 14,700 3,000 POLETOP MOUNTED LED AREA LUMINAIRE , -40C AND IP65 RATED, PHOTOCELL CONTROLLED POLE TOP LITHONIA P5 30K SYM MVOLT RADPT20 PE SF DBLXD 123
P STEEL ROUND TAPERED BLACK FINISHED STEEL POLE 20 FEET TALL CONCRETE FOUNDATION LITHONIA RTS 20 5-9B PT BAA DBLXD
NO SCALEE001
2 ONE LINE DIAGRAM
DIESEL
MOGAS
(E) UTILITY POLE AND TRANSFORMERS
P-1
P-2
(E) UTILITY POLE AND PANELBOARD
R
CLASS I DIVISION 2 AREA WITHIN HATCH
AREA 18" ABOVE GROUND LEVEL
SEE BELOW FOR ELEVATIONS OF CLASSIFIED AREAS
A
A
1" = 10'-0"E002
1 ELECTRICAL SITE PLAN
A K
AF AL
T S
T A E O
49 TH
S
R E
G
ISTERED
PROFESS IONAL
ENG
IN
E
E R
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors
601 College Road Fairbanks AK 99701
907.452.1241 designalaska.comAECC511
08-JAN-2026
Donald L Hopkins
No. EE 10582
1/8/2026 4:13:18 PM
DLH
NBD
SITE PLAN,
SPECIFICATIONS
AND DETAILS
E002
REPLACE FUEL
TANKS B2096
482503
19 DEC 2025
LIGHTING CALCULATIONS
AREA TARGET AVG MAX MIN AVG/MIN
FUELING STATION 2.0 fc 1.9 fc 2.1 fc 1.3 fc 1.5
NO SCALEE002
2 LIGHTING CALCS
SPECIFIC SHEET NOTES
1 TRACE AND VERIFY CIRCUITS ON THE PANEL BEFORE CONNECTING A NEW LOAD.
2 PROVIDE TWO SETS OF CONDUITS ONE FOR P-1 AND ONE FOR P-2. NOTE
UNDERGROUND ELECTRICAL LINES ARE IN REPRESENTATIVE LOCATIONS WHERE
CONTRACTOR TO COORDINATE WITH OTHER SYSTEMS TO RESOLVE CONFLICTS,
i.e. BOLLARD LOCATIONS AND MECHANICAL MOTORS.
3 PROVIDE REMOTE FUEL TANK EMERGENCY SHUT-OFF SWITCH AT LOCATION OF
PANELBOARD WITH CODE REQUIRED PLACARD DENOTING (EMERGENCY FUEL
SHUTOFF). SWITCH SHALL DISCONNECT POWER TO ALL FUEL PUMPS /
CONTROLLERS WITH ONE ACTION. SHUTOFF SWITCH TO BE ENCLOSED UNDER
CLEAR COVER WITH PUSHBUTTON SWITCH UNDER THE COVER.
NO SCALEE002
3 POLE FOUNDATION
NO SCALEE002
4 AREA CLASSIFICATION ELEVATION
| General |
| G010 - GENERAL INFORMATION |
| Civil |
| C001 HAUL ROUTE |
| C100 EXISTING CONDITIONS AND DEMOLITION PLAN |
| C200 SITE PLAN |
| C700 DETAILS |
| Mechanical |
| M001 - MECHANICAL ABBREVIATIONS, LEGENDS, SCHEDULES, NOTES, AND SPECIFICATIONS |
| M002 - MECHANICAL SIGNAGE SCHEDULE |
| M201 - MECHANICAL DETAILS |
| Electrical |
| E001 - LEGEND, SCHEDULES, AND DETAILS |
| E002 - SITE PLAN, SPECIFICATIONS AND DETAILS |
File details come from the government source that posted it. Updated .