This attachment is a set of drawings for a federal construction solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation involves expanding Building 1 at the Fargo VA Medical Center to create additional primary care and Whole Health clinic space in a two-story addition, as well as converting existing basement space to mechanical and EMS offices, work rooms, and lockers. The project will reroute part of the road between the medical center and flood wall, relocate the flood wall basin and road further from the building addition to comply with security standards, and use helical piers to support new foundation work to a suitable depth as specified in contract documents. The flood wall must remain operational year-round.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING
ADDITION
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
VICINITY MAP
PROJECT
SITE
RE
D
RI
VE
R
FARGO VA
HOSPITAL
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
11/16/2021
GRADING CROSS SECTIONS
CG101
17 128
PL
O
TD
AT
E
PL
O
TB
Y
PA
TH XR
EF
NORTH
NOTES
EXISTING PUMP HOUSE
SECTION 1 SECTION 2 SECTION 3
LEGEND
EXISTING PRIMARY
CARE BUILDING
BUILDING
ADDITION
EXISTING PUMP HOUSE
FF=892.10
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
VICINITY MAP
PROJECT
SITE
RE
D
RI
VE
R
FARGO VA
HOSPITAL
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
NOTES:
11RD.dwg
11/16/2021
ROADWAY PLAN AND PROFILE
CG102
18 128
PL
O
TD
AT
E
PL
O
TB
Y
PA
TH XR
EF
N O
RTH
EXISTING PRIMARY
CARE BUILDING
BUILDING ADDITION
RED
R
IV
ER
EXISTING BUILDING
EXISTING PRIMARY
CARE BUILDING
BUILDING ADDITION
RED
R
IV
ER
EXISTING BUILDING
F.F. = 892.1'
F.F. = 892.1'
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
VICINITY MAP
PROJECT
SITE
RE
D
RI
VE
R
FARGO VA
HOSPITAL
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
NORTH
NOTES:
11/16/2021
DRAINAGE AND EROSION CONTROL
PLAN
CE100
19 128
PL
O
TD
AT
E
PL
O
TB
Y
PA
TH XR
EF
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
11/16/2021
DETAILS
DT100
20 128XR
EF
PA
TH
PL
O
TB
Y
PL
O
TD
AT
E
NEW STAIR FOOTING
STAIR ADJUSTMENT DETAIL
HANDRAIL
HANDRAIL BASEPLATE PTO PIPE SUPPORT BRACKET
NEW PTO PIPE
NEW PTO PIPE SUPPORT
CONCRETE BOLLARDS
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
11/16/2021
DETAILS
DT101
21 128XR
EF
PA
TH
PL
O
TB
Y
PL
O
TD
AT
E
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions: of
CONSTRUCTION DOCUMENTS
EXPAND BLDG. 1 FOR
PRIMARY CARE
WFPJAG
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
Department of Veterans Affairs
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESSIONA L ENGIN
EE
R
11/16/2021
GATE DETAILS
DT102
22 128XR
EF
PA
TH
PL
O
TB
Y
PL
O
TD
AT
E
UP
UP
WAITING
E1D -64
OI&T
E1D -64A
NURSE STATION
& PACT AREA
E1D -80
EXAM
E1D -81
EXAM
E1D -82
EXAM
E1D -83
EXAM
E1D -84
EXAM
E1D -85
SOILED
E1D -86
CLEAN
E1D -87
NURSE STATION
& PACT AREA
E1D -95
EXAM
E1D -96
EXAM
E1D -97
EXAM
E1D -98
EXAM
E1D -99
CLEAN
E1D -100
BARIATRIC EXAM
E1D -101
EXAM
E1D -102
SOILED
E1D -103
EXAM
E1D -104
TLT
E1D -109
OFFICE (M.H.)
E1D -108
CONSULT (M.H.)
E1D -110
OFFICE (M.H.)
E1D -112
LINEN
E1D -113
TLT
E1D -115
COPY AREA
E1D -121
OFFICE (PHARM)
E1D -122
TLT
E1D -123
WORK ROOM
(P.C. DOC'S)
E1D -124 CONSULT (S.W.)
E1D -126
TOILET
E1D -127
TOILET
E1D-127A
HAC
E1D -131
SOCIAL
WORKER'S
CONSULT
E1D -132
SOCIAL
WORKERS
E1D -133
MEDS
E1D -134
OPER 8
E1D -135
OFFICE
E1D -136
OPER 9
E1D -137
OPER 7
E1D -138
OPER 10
E1D -139
ELEV
E37
LOCKER
E1D - 128
CONF
E1D - 129
STAFF BREAK
ROOM
E1D - 130
02-2202-22 02-2202-22 02-2202-22
02-2202-22 02-2202-22 02-2202-22
02-11
02-03
02-03 02-03
02-02
02-02
TLT
E1D - 117
WORK ROOM
(P.C. DOC'S)
E1D - 116
OFFICE (PHARM)
E1D - 118
CONSULT
(PHARM)
E1D - 120
AD1.511
17' - 7 1/2"
02-1902-19 02-1902-19 02-1902-19
02-2102-21 02-2102-24 02-24
02-16
AD1.51
4 02-25
02-34 02-34
02-34 02-34 02-34
02-3402-3402-34
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN.
ITEMS TO BE DEMOLISHED. SEE
KEYNOTES.
PERIMETER OF NEW BUILDING
FOOTPRINT
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED
CONDITIONS. COORDINATE DEMOLITION BETWEEN
ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
3. EXISTING DOORS SHOW AT 45 DEGREE ANGLE FOR
CLARITY WITH THE EXCEPTION OF TOILET
PARTITIONS.
4. EXISTING WALL SHADED FOR CLARITY.
MECHANICAL
ROOM
EBD - 70
STORAGE
EBD - 80
TLT
EBD - 81
ELEC.
EBD - 83
IRM
EBD - 84
ELEV. MECH.
EBD - 86
PROGRAM CLERK
EBD - 91
FOREMAN
EBD - 92
BREAK ROOM
EBD - 95
ELEV.
EB38
02-23 02-23 02-23 02-22 02-22 02-22
02-02
AD1.51
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:4
A
M
CONSTRUCTION DOCUMENTS
11/16/21
DEMOLITION PLAN - FIRST LEVEL
AD1.01
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
22 128
1/8" = 1'-0"
DEMOLITION PLAN - FIRST LEVEL
DEMOLITION LEGEND:
NORTH
N
02-02 REMOVE EXISTING DOOR, DOOR HARDWARE, AND
FRAME COMPLETELY.
02-03 REMOVE EXISTING WALL FROM FLOOR TO
STRUCUTRE ABOVE.
02-11 REMOVE PORTION OF EXISTING MASONRY WALL AND
WINDOWS AS REQUIRED FOR NEW OPENING. SEE
DETAIL 3/A1.44.
02-16 REMOVE EXISTING MASONRY VENEER TO THE
EXTENTS SHOWN. ACCOMODATE NEW MASONRY AS
REQUIRED AT NEW PLANE. FIELD VERIFY.
02-19 REMOVE EXISTING FLOOR COVERING AND BASE AS
REQUIRED TO ACCOMODATE NEW FLOOR PLAN.
02-21 REMOVE EXISTING HANDRAIL AND RUB RAILS AS
REQUIRED TO ACCOMODATE NEW FLOOR PLAN,
REINSTALL AS REQUIRED.
02-22 DEMO EXISTING ALUMINUM WINDOW. PREP ROUGH
OPENING FOR INFILL. SEE SHEET A1.40 WALL TYPE
M3D FOR INFILL.
02-23 DEMO EXISTING LOUVER. ACCOMODATE TO INSTALL
NEW DUCTING AT THE OPENING. REFER TO
MECHANICAL.
02-24 REMOVE SIGNS AND REINSTALL ON NEW LOCATIONS
AS REQUIRED.
02-25 SAWCUT (PLANE) THE FACE OF THE PRE-CAST
ACCENT AT THE BASE OF THE BRICK. THE PRE-CAST
SHALL BE PLANED TO ALIGN WITH FACE BRICK ABOVE.
SEE STRUCTURAL DRAWINGS FOR FURTHER DETAIL.
02-34 REMOVE AND SALVAGE EXISTING SHADE.
GENERAL NOTES:
KEYNOTES:
SHEET SPECIFIC NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED CONDITIONS.
2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE CONTRACTOR SHALL COORDINATE
DEMOLITION WITH NEW CONSTRUCTION TO ENSURE QUALITY OF FINAL PRODUCT.
3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING: INTERIOR PARTITIONS (REMOVE TO STRUCTURE); CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.; FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, RESILIENT TILE, SHEET VINYL, CERAMIC TILE ETC; DOORS AND FRAMES UNLESS NOTED OTHERWISE; CMU BLOCK/BRICK AND BACKUP WALL SYSTEM; CABINET WORK, SHELVING, BASES; TOILET
PARTITIONS AND ACCESSORIES; EQUIPMENT ITEMS; PLUMBING FIXTURES.
4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION BETWEEN ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
5. REFER TO PHASING SHEET FOR PROJECT PHASING AND SEQUENCE OF WORK. ALL DEMOLITION AND REMODEL WORK
MUST BE CLOSELY COORDINATED WITH THE COR.
6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING OR PATCHING.
7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR WITH THE EXCEPTION OF SPECIFIED ITEMS DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED BY THE
(COR) TO BE RETAINED BY THE VA.
8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF LAWFULLY.
9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A DAILY BASIS. COORDINATE WITH THE COR THE
IDENTIFICATION AND TRANSFER OF ANY ITEMS THAT NEED TO BE SALVAGED.
10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO STARTING DEMOLITION. MAY NOT BE LIMITED TO UTILITIES SHOWN ON ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS
FOR ADDITIONAL INFORMATION.
11. UPON ENCOUNTERING UNFORESEEN CONDITIONS DURING REMODEL WORK, THE CONTRACTOR SHALL NOTIFY THE
(COR) BEFORE PROCEEDING.
12. COORDINATE DEMOLITION SHOWN ON THIS SHEET WITH DEMOLITION SHOWN ON MECHANICAL, PLUMBING, AND ELECTRICAL DEMOLITION DRAWINGS. CREATE PENETRATIONS AS REQUIRED FOR NEW CONSTRUCTION ON
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
13. THE CONTRACTOR SHALL PROTECT EXISTING CONSTRUCTION TO REMAIN. DAMAGE TO EXISTING CONSTRUCTION
SHALL BE REPAIRED TO EXISTING OR BETTER CONDITION.
14. ERECT AND MAINTAIN TEMPORARY PARTITIONS AND ENCLOSURES FOR EXTERIOR OPENINGS TO PREVENT THE
TRANSMISSION OF DUST, ODOR, AND NOISE AND MAINTAIN WEATHER TIGHT CONDITIONS.
15. PROVIDE TEMPORARY MECHANICAL EXHAUST SYSTEMS TO MAINTAIN A NEGATIVE PRESSURE WITHIN DEMOLITION
ZONES.
16. AT INTERSECTIONS OF REMOVED WALLS WITH WALL TO REMAIN, REPAIR REMAINING WALLS TO MATCH ADJACENT
FINISHED WALLS OR BETTER.
17. CONTRACTOR SHALL PROVIDE TEMPORARY SEAL AT ALL DOOR AND WALL OPENINGS AT PERIMETER WALLS DURING
DEMOLITION WORK TO PROTECT ADJACENT AREAS FROM DUST INTRUSION.
18. SOLID SHADED (GRAY) REGIONS DEPICT EXISTING CONSTRUCTION TO REMAIN.
19. SEE MECHANICAL, ELECTRICAL AND FIRE PROTECTION DRAWINGS FOR OTHER DEMOLITION WORK.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR MOVING ALL FURNISHINGS AND NON PERMANENTLY ATTACHED
EQUIPMENT PRIOR TO COMMENCEMENT OF DEMOLITION. CONTRACTOR SHALL COORDINATE WITH COR ON LOCATION
OF STORED FURNISHINGS.
21. CAP/ABANDON ALL UTILITIES NOT REMOVED TO MAKE ROOM FOR NEW CONSTRUCTION AS REQUIRED. COORDINATE
WITH PROPOSED NEW CONSTRUCTION CONDITIONS.
22. SEE DEMOLITION CEILING PLAN FOR CEILING DEMOLITION.
23. CONTRACTOR SHALL PROTECT ADJACENT ROOMS FROM DAMAGE DURING CONSTRUCTION. RESTORE ALL DAMAGE
TO ORIGINAL CONDITION.
24. ALL INFILL AND PATCHWORK SHALL MATCH ADJACENT SURFACES, IE. WALL, CEILINGS, FLOORS, ETC. COORDINATE
WITH NEW FINISHES WHERE REQUIRED; SEE FINISH SCHEDULE FOR DISTURBED/DAMAGED BY DEMOLITION AND NEW
CONSTRUCTION.
25. DEMOLITION PLANS SHOW EXISTING ROOM NAMES AND NUMBERS. ALL OTHER DRAWINGS SHOW NEW AND EXISTING
ROOM NAMES AND NUMBERS.
1/8" = 1'-0"
DEMOLITION PLAN - BASEMENT LEVEL
NORTH
N
WAITING
E1D -64
OI&T
E1D -64A
NURSE STATION
& PACT AREA
E1D -80
EXAM
E1D -81
EXAM
E1D -82
EXAM
E1D -83
EXAM
E1D -84
EXAM
E1D -85
SOILED
E1D -86
CLEAN
E1D -87
NURSE STATION
& PACT AREA
E1D -95
EXAM
E1D -96
EXAM
E1D -97
EXAM
E1D -98
EXAM
E1D -99
CLEAN
E1D -100
BARIATRIC EXAM
E1D -101
EXAM
E1D -102
SOILED
E1D -103
EXAM
E1D -104
TLT
E1D -109
OFFICE (M.H.)
E1D -108
CONSULT (M.H.)
E1D -110
OFFICE (M.H.)
E1D -112
LINEN
E1D -113
TLT
E1D -115
COPY AREA
E1D -121
OFFICE (PHARM)
E1D -122
TLT
E1D -123
WORK ROOM
(P.C. DOC'S)
E1D -124 CONSULT (S.W.)
E1D -126
TOILET
E1D -127
TOILET
E1D-127A
HAC
E1D -131
SOCIAL
WORKER'S
CONSULT
E1D -132
SOCIAL
WORKERS
E1D -133
MEDS
E1D -134
OPER 8
E1D -135
OFFICE
E1D -136
OPER 9
E1D -137
OPER 7
E1D -138
OPER 10
E1D -139
ELEV
E37
LOCKER
E1D - 128
CONF
E1D - 129
STAFF BREAK
ROOM
E1D - 130
02-4902-49
02-4902-49
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN.
ITEMS TO BE DEMOLISHED. SEE
KEYNOTES.
PERIMETER OF NEW BUILDING
FOOTPRINT
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED
CONDITIONS. COORDINATE DEMOLITION BETWEEN
ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
3. EXISTING DOORS SHOW AT 45 DEGREE ANGLE FOR
CLARITY WITH THE EXCEPTION OF TOILET
PARTITIONS.
4. EXISTING WALL SHADED FOR CLARITY.
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:4
A
M
CONSTRUCTION DOCUMENTS
11/16/21
DEMOLITION REFLECTED CEILING
PLAN - FIRST LEVEL
AD1.50
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
23 128
1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - FIRST LEVEL
DEMOLITION LEGEND:
02-49 REMOVE EXISTING ACOUSTICAL CEILING TILE AND
GRID TO ITS ENTIRETY. AND ANY ASSOCIATED
MECHANICAL/ ELECTRICAL/ PLUMBING/ FIRE
PROTECTION FIXTURES. SEE MECHANICAL/
PLUMBING/ ELECTRICAL/ FIRE PROTECTION FOR
ADDITIONAL INFORMATION.
GENERAL NOTES:
SHEET SPECIFIC NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND VERIFY EXISTING
CONDITIONS/DIMENSIONS AND PROPOSED CONDITIONS.
2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE CONTRACTOR SHALL COORDINATE
DEMOLITION WITH NEW CONSTRUCTION TO ENSURE QUALITY OF FINAL PRODUCT.
3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING: INTERIOR PARTITIONS (REMOVE TO STRUCTURE); CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.; FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, RESILIENT TILE, SHEET VINYL, CERAMIC TILE ETC; DOORS AND FRAMES UNLESS NOTED OTHERWISE; CMU BLOCK/BRICK AND BACKUP WALL SYSTEM; CABINET WORK, SHELVING, BASES; TOILET
PARTITIONS AND ACCESSORIES; EQUIPMENT ITEMS; PLUMBING FIXTURES.
4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION BETWEEN ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
5. REFER TO PHASING SHEET FOR PROJECT PHASING AND SEQUENCE OF WORK. ALL DEMOLITION AND REMODEL WORK
MUST BE CLOSELY COORDINATED WITH THE COR.
6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING OR PATCHING.
7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR WITH THE EXCEPTION OF SPECIFIED ITEMS DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED BY THE
(COR) TO BE RETAINED BY THE VA.
8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF LAWFULLY.
9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A DAILY BASIS. COORDINATE WITH THE COR THE
IDENTIFICATION AND TRANSFER OF ANY ITEMS THAT NEED TO BE SALVAGED.
10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO STARTING DEMOLITION. MAY NOT BE LIMITED TO UTILITIES SHOWN ON ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS
FOR ADDITIONAL INFORMATION.
11. UPON ENCOUNTERING UNFORESEEN CONDITIONS DURING REMODEL WORK, THE CONTRACTOR SHALL NOTIFY THE
(COR) BEFORE PROCEEDING.
12. COORDINATE DEMOLITION SHOWN ON THIS SHEET WITH DEMOLITION SHOWN ON MECHANICAL, PLUMBING, AND ELECTRICAL DEMOLITION DRAWINGS. CREATE PENETRATIONS AS REQUIRED FOR NEW CONSTRUCTION ON
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
13. THE CONTRACTOR SHALL PROTECT EXISTING CONSTRUCTION TO REMAIN. DAMAGE TO EXISTING CONSTRUCTION
SHALL BE REPAIRED TO EXISTING OR BETTER CONDITION.
14. ERECT AND MAINTAIN TEMPORARY PARTITIONS AND ENCLOSURES FOR EXTERIOR OPENINGS TO PREVENT THE
TRANSMISSION OF DUST, ODOR, AND NOISE AND MAINTAIN WEATHER TIGHT CONDITIONS.
15. PROVIDE TEMPORARY MECHANICAL EXHAUST SYSTEMS TO MAINTAIN A NEGATIVE PRESSURE WITHIN DEMOLITION
ZONES.
16. AT INTERSECTIONS OF REMOVED WALLS WITH WALL TO REMAIN, REPAIR REMAINING WALLS TO MATCH ADJACENT
FINISHED WALLS OR BETTER.
17. CONTRACTOR SHALL PROVIDE TEMPORARY SEAL AT ALL DOOR AND WALL OPENINGS AT PERIMETER WALLS DURING
DEMOLITION WORK TO PROTECT ADJACENT AREAS FROM DUST INTRUSION.
18. SOLID SHADED (GRAY) REGIONS DEPICT EXISTING CONSTRUCTION TO REMAIN.
19. SEE MECHANICAL, ELECTRICAL AND FIRE PROTECTION DRAWINGS FOR OTHER DEMOLITION WORK.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR MOVING ALL FURNISHINGS AND NON PERMANENTLY ATTACHED
EQUIPMENT PRIOR TO COMMENCEMENT OF DEMOLITION. CONTRACTOR SHALL COORDINATE WITH COR ON LOCATION
OF STORED FURNISHINGS.
21. CAP/ABANDON ALL UTILITIES NOT REMOVED TO MAKE ROOM FOR NEW CONSTRUCTION AS REQUIRED. COORDINATE
WITH PROPOSED NEW CONSTRUCTION CONDITIONS.
22. SEE DEMOLITION CEILING PLAN FOR CEILING DEMOLITION.
23. CONTRACTOR SHALL PROTECT ADJACENT ROOMS FROM DAMAGE DURING CONSTRUCTION. RESTORE ALL DAMAGE
TO ORIGINAL CONDITION.
24. ALL INFILL AND PATCHWORK SHALL MATCH ADJACENT SURFACES, IE. WALL, CEILINGS, FLOORS, ETC. COORDINATE
WITH NEW FINISHES WHERE REQUIRED; SEE FINISH SCHEDULE FOR DISTURBED/DAMAGED BY DEMOLITION AND NEW
CONSTRUCTION.
25. DEMOLITION PLANS SHOW EXISTING ROOM NAMES AND NUMBERS. ALL OTHER DRAWINGS SHOW NEW AND EXISTING
ROOM NAMES AND NUMBERS.
KEYNOTES:
NORTH
N