ATTACHMENT 4 - Drawings - Volume 1 - 1 of 8.pdf

PDF 15 MB Posted

Attached to
Y1DA--Expand Building 1 for Primary Care (Minor) Construction - Fargo
Solicitation number
36C77622B0063
Issued by

About this file

This solicitation is for the expansion of Building 1 for primary care at the Fargo VA Medical Center in North Dakota. The project involves rerouting part of the road between the medical center and the flood wall, relocating the flood wall basin and road further away from the building addition to comply with physical security requirements. Foundation work will include installing helical piers to support the addition. The two-story addition will create a whole health clinic on the first floor and mechanical space and offices for emergency medical services in the basement. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Responses are due based on the specified solicitation number and work is to provide an expansion to improve primary care services at the Fargo VA facility.

View the file

Other files

File Type Posted
Addendum 1 Civil Drawings.pdf PDF
Addendum 1 Mechanical Drawings.pdf PDF
Technical Questions - FINAL - Fargo 1-11-23.pdf PDF
10 51 13 Metal Lockers.pdf PDF
22 14 00 Facility Storm Drainage.pdf PDF
36C77622B0063 0003.pdf PDF
Addendum 1 Electrical Drawings.pdf PDF
Final Geotechnical Report - VA Bldg 1 Expansion - Fargo.pdf PDF
Addendum 1 Fire Alarm and Sprinkler Drawings_01.pdf PDF
Addendum 1 Structural Drawings.pdf PDF
22 40 00 Plumbing Fixtures.pdf PDF
Addendum 1 Existing Flood Wall Drawings - For Reference Only.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 1-6-23.pdf PDF
Addendum 1 Arch Drawings.pdf PDF
36C77622B0063 0002.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction 11-22-22.docx DOCX document
ATTACHMENT 19 - Construction Wage Rates - Cass 11-25-22.pdf PDF
36C77622B0063 0001.pdf PDF
Site Visit Sign-in Sheet - Fargo 12-5-22.pdf PDF
ATTACHMENT 5 - Drawings - Volume 1 - 2 of 8.pdf PDF
ATTACHMENT 17 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 16 - Contractor Work Hours.pdf PDF
ATTACHMENT 15 - Drawings - Volume 2 - 4 of 4.pdf PDF
ATTACHMENT 3 - Specifications - Volume 3.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 10-7-22.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 21 - Site Visit Instructions.pdf PDF
ATTACHMENT 12 - Drawings - Volume 2 - 1 of 4.pdf PDF
ATTACHMENT 1 - Specifications - Volume 1.pdf PDF
ATTACHMENT 7 - Drawings - Volume 1 - 4 of 8.pdf PDF
ATTACHMENT 13 - Drawings - Volume 2 - 2 of 4.pdf PDF
ATTACHMENT 2 - Specifications - Volume 2.pdf PDF
ATTACHMENT 14- Drawings - Volume 2 - 3 of 4.pdf PDF
ATTACHMENT 8 - Drawings - Volume 1 - 5 of 8.pdf PDF
ATTACHMENT 11 - Drawings - Volume 1 - 8 of 8.pdf PDF
ATTACHMENT 20 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 9 - Drawings - Volume 1 - 6 of 8.pdf PDF
ATTACHMENT 6 - Drawings - Volume 1 - 3 of 8.pdf PDF
ATTACHMENT 10 - Drawings - Volume 1 - 7 of 8.pdf PDF
36C77622B0063 - 11-22-22.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1 /2

:4

:5

A

M

CONSTRUCTION DOCUMENTS

11/16/21

COVER SHEET - VOLUME 1

G0.00

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

1 128

EXPAND BUILDING 1 FOR PRIMARY CARE

PROJECT NO. 437-315

FARGO VA HEALTH CARE SYSTEM

DEPARTMENT OF VETERAN'S AFFAIRS

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

# POUND OR NUMBER

& AND

@ AT

AB ANCHOR BOLT

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL INSTITUTE

ALUM ALUMINUM

ANOD ANODIZED

ASD ALTERNATE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWS AMERICAN WELDING SOCIETY

BD BOARD

BLK BLOCK

BM BEAM

B.O. BOTTOM OF

BOT BOTTOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BLDG BUILDING

BYND BEYOND

CAB CABINET

CER CERAMIC

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

COMPR COMPRESSIBLE

CONC CONCRETE

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CPT CARPET

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CT CERAMIC TILE

DBL DOUBLE

DEMO DEMOLISH OR DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIR DIRECTION

DN DOWN

DR DOOR

DWG DRAWING

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR OR ELEVATION

EPDM ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING)

EQ EQUAL

ES EACH SIDE

EXIST EXISTING

EXP Bolt EXPANSION BOLT

EXP JT EXPANSION JOINT

EXT EXTERIOR

FD FLOOR DRAIN OR FIRE DEPARTMENT

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FM FILLED METAL

FND FOUNDATION

F.O. FACE OF

FT FOOT OR FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRADE BEAM

GP GUSSET PLATE

GR GRADE

GYP GYPSUM

HC HOLLOW CORE

HDR HEADER

HEF HORIZONTAL EACH FACE

HI HIGH

HIF HORIZONTAL INSIDE FACE

HM HOLLOW METAL

HOF HORIZONTAL OUTSIDE FACE

HOR HORIZONTAL

HP HIGH POINT

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

ICBO INTERNATIONAL CONFERENCE OF BUILDING

OFFICIALS

ID INSIDE DIAMETER

ILO IN LIEU OF

IN INCH

INCL INCLUDE

INSUL INSULATED OR INSULATION

INT INTERIOR

INV INVERT

IRGWB IMPACT RESISTANT GYPSUM WALL BOARD

JST JOIST

JT JOINT

K KIP (1000 POUNDS)

LLV LONG LEG VERTICAL

LP LOW POINT

LVL LEVEL

LW LIGHT WEIGHT

LWC LIGHT WEIGHT CONCRETE

MAS MASONRY

MAX MAXIMUM

MCB METAL CORNER BEAD

MECH MECHANICAL

MEMBR MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURED

MIN MINIMUM

MO MASONRY OPENING

MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD

MTL METAL

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

NWC NORMAL WEIGHT CONCRETE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OZ OUNCE

PC PILE CAP

PCC PRE-CAST CONCRETE

PL PLATE

P.LAM PLASTIC LAMINATE

PLUMB PLUMBING

PLY PLYWOOD

PORC PORCELAIN

PNL PANEL

PNT PAINT OR PAINTED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PT POINT

PR PAIR

PROP PROPERTY

PVC POLYVINYL CHLORIDE

ABBREVIATIONS

R RADIUS

RBR RUBBER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE RIGHT END

REINF REINFORCED

REF REFERENCE

REQD REQUIRED

RET RETURN

RETG RETAINING

RM ROOM

R.O. ROUGH OPENING

ROW RIGHT OF WAY

SC SOLID CORE

SDI STEEL DECK INSTITUTE

SECT SECTION

SF STEP FOOTING OR SQUARE FOOT

SHT SHEET

SIM SIMILAR

SL SPLICE LENGTH

SLV SHORT LEG VERTICAL

SOG SLAB ON GRADE

SPEC SPECIFIED OR SPECIFICATION

SPK SPRINKLER OR SPEAKER

SQ SQUARE

SSTL STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIFF STIFFENER

STL STEEL

STR STAIR

STRUCT STRUCTURE OR STRUCTURAL

SUP SUPPORT

SYM SYMMETRICAL

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

T/D TELEPHONE/DATA

TEL TELEPHONE

TEMP TEMPERATURE

THK THICK OR THICKNESS

THRD THREADED

TLT TOILET

T.O. TOP OF

T.O.C TOP OF CONCRETE

T.O.F TOP OF FRAMING

T.O.S TOP OF STEEL/STUD

T.O.W TOP OF WALL

TPD TOILET PAPER DISPENSER

TYP TYPICAL

U/S UNDERSIDE

UNO UNLESS NOTED OTHERWISE

US UNDERSIDE

VB VAPOR BARRIER

VCT VINYL COMPOSITE TILE

VEF VERTICAL EACH FACE

VERT VERTICAL

VIF VERIFY IN FIELD

VOF VERTICAL OUTSIDE FACE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W/ WITH

WD WOOD

WDW WINDOW

WP WORKING POINT

WRB WEATHER RESISTANT BARRIER

WWF WELDED WIRE FABRIC

CC CONTRACTOR PROVIDED/CONTRACTOR

INSTALLED

VC VA PROVIDED/CONTRACTOR INSTALLED

VV VA PROVIDED/VA INSTALLED

STEEL/METAL

WOOD (ROUGH) BLOCKING OR SHIM

BRICK

GRAVEL

EARTH/ENGINEERED FILL

CONCRETE MASONRY

PLAN AND SECTION

WOOD (ROUGH)

ACOUSTIC CEILING TILE

GYPSUM BOARD

CEILING

CONCRETE

ELEVATION

CENTER LINE

LINE SYMBOLS

GRID LINE

PROPERTY LINE

CUT LINE

BATT INSULATION

WOOD SUBSTRATE

RIGID INSULATION

MATERIAL LEGEND

WM - WALK OFF MAT

EF - EPOXY FLOORING (TROWELED)

FLOORING

BID ALTERNATE

CPT - CARPET

CONC - CONCRETE

PT - PORCELAIN TILE

FIBER CEMENT PANEL SIDING

CORRUGATED METAL PANEL

STANDING SEAM METAL ROOF/

SIDING PANEL

V.A. SYMBOLS

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE RESISTIVE RATED LINE, 4 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

V V ITEM - VA SUPPLIED AND INSTALLED

VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED

A

COLUMN GRID

DIMENSION LINE

NORTH ARROW

CL CENTER LINE

N

Room name

1t

VIEW NAME

1/8" = 1'-0"1 DRAWING TITLE

SCALE

BUILDING SECTION

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

WALL SECTION

DETAIL CUT

A101

DETAIL CALLOUT

A101

A101

A101

A101

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

INTERIOR ELEVATION

DRAWING NUMBER

DIRECTION OF SIGHT

SHEET NUMBER

ROOM TAG

ROOM NAME

ROOM NUMBER

KEYNOTE TAG

5-04 KEYNOTE DESIGNATION

DOOR TAG

DOOR NUMBER

PARTITION TAG

WALL DESIGNATION

WINDOW TAG

WINDOW DESIGNATION

ELEVATION MARKER

HEIGHT

NORTH ARROW

TRUE NORTH

PLAN NORTH

ARCHITECTURAL SYMBOLS

M3A

1. THESE LEGENDS ARE COMPOSED OF STANDRD SYMBOLS

AND ARE PERTINENT TO THE CONDITIONS ON THIS SET OF

DRAWINGS TO THE EXTENT APPLICABLE.

2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY

APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC

CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.

LEGEND NOTES:

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1 /2

:4

:5

A

M

CONSTRUCTION DOCUMENTS

11/16/21

LEGENDS, SYMBOLS AND

ABBREVIATIONS

G0.02

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

2 128

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

/1 /2

:3

:1

A

M

CONSTRUCTION DOCUMENTS

11/16/21

PROJECT DIRECTORY, DRAWING

INDEX AND GENERAL NOTES

G0.03

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

3 128

ARCHITECT

JOEL SIMONYAK, AIA, NCARB

MECHANICAL ENGINEER

MATT KOSCAK, PE

ELECTRICAL ENGINEER

RAY DAWES, PE

STRUCTURAL ENGINEER

AARON HARTWELL, PE, SE

FOURFRONT DESIGN INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PHONE (605) 342-9470

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FIRE PROTECTION ENGINEER

CHRIS LEAVER, CONSULTING MANAGER

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

PROJECT DIRECTORY:

CIVIL ENGINEER

JIM GUSKY, PE

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

GENERAL NOTES:

1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, AND

ORDINANCES.

2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS AS

SPECIFIED, OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND

SATISFACTORY INSTALLATION.

3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE

MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE FOR

DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS CONTRACT.

THE CONTRACTOR SHALL RESTORE DAMAGED EXISTING BUILDING

AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.

4. CONTRACTOR SHALL EXERCISE CAUTION TO AVOID ANY DAMAGE WHEN

PERFORMING EARTHWORK, PAVING, OR ANY CONSTRUCTION IN THE

VICINITY OF EXISTING UTILITIES, BUILDINGS, AND LANDSCAPING.

5. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL DIMENSIONS AND

CONDITIONS PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR

SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE

IMMEDIATELY OF ANY DISCREPANCIES.

6. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS WITH

OTHER TRADES.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL WORK.

CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE INSTALLATION OF

MECHANICAL AND ELECTRICAL WORK WILL BE RESTRICTED, CONGESTED, OR

DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION BETWEEN ALL

TRADES.

8. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL MECHANICAL

AND ELECTRICAL ITEMS WITH THE GENERAL CONTRACTOR. CONTRACTOR

SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE OF ANY

DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.

9. ALL DIMENSIONS LOCATING BUILDING AND SITE IMPROVEMENTS ARE TO FACE

OF BUILDING, BACK OF CURB, OR EDGE OF WALK, AND RUN PARALLEL OR

PERPENDICULAR TO EXISTING ROADS.

10. ALL BUILDING DIMENSIONS ARE TO FACE OF STUD, FACE OF MASONRY, AND

EXTERIOR WINDOW OR DOOR ROUGH OPENING.

11. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED OTHERWISE.

CURVED ELEMENTS ARE LOCATED AS DIMENSIONED.

12. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A FIRST

FLOOR DATUM OF +100'-0”. WHERE ITEMS ARE LABELED A.F.F. (ABOVE

FINISHED FLOOR), CONTRACTOR SHALL SET THE ITEM AS MEASURED FROM

THE LOCAL FLOOR ELEVATION. COORDINATE ANY DISCREPANCIES

REGARDING THIS SITUATION TO ASSURE THAT ALL BUILDING COMPONENTS

ARE PROPERLY SET TO FUNCTION AS INTENDED.

13. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.

14. LOCATIONS OF FIRE- AND SMOKE-RATED PARTITIONS WILL BE SHOWN ON ALL

FLOOR PLANS.

15. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR INSTALLATION OF

WALL-MOUNTED CABINETS, TOILET ACCESSORIES, WALL STOPS, AND

MISCELLANEOUS ITEMS.

16. LOCATE INTERIOR CONTROL JOINTS WHERE INDICATED, BUT AT A MINIMUM

TO DIVIDE ALL GYPSUM BOARD INTO SECTIONS NOT EXCEEDING 30-FEET IN

LENGTH.

17. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR CORRIDOR IN

WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.

18. ALL CEILING HEIGHTS LISTED IN THE ROOM FINISH SCHEDULE ARE FROM THE

FINISH FLOOR OF THE LISTED ROOM, UNLESS NOTED OTHERWISE.

19. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING LOCATIONS,

UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE OF DOORS IN THE

CLOSED POSITION, OR; 2) AT THE CENTER LINE OF OPENINGS SEPARATING

ROOMS.

20. ALL METAL STUDS EXTEND TO THE STRUCTURE ABOVE, PROVIDE DOUBLE-

HEAD TRACK TO ALLOW FOR 3/4” MINIMUM DEFLECTION OF THE STRUCTURE.

FIRE AND SMOKE BARRIERS AS WELL AS CORRIDOR WALLS SHALL HAVE ALL

PENETRATION FIRE CAULKED/FIRE PROOFED. WALLS BETWEEN ROOMS

SHALL BE SEALED WITH FIRE TAPING OF THE WALL OR STANDARD CAULKING.

21. ALL MASONRY REINFORCEMENT IS INDICATED ON THE STRUCTURAL

DRAWINGS.

22. ALL EXTERIOR CONTROL JOINTS SHALL RECEIVE BACKER ROD AND SEALANT.

23. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN OMITTED

FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS, PARTITION TYPES, AND

WALL SECTIONS FOR LOCATIONS REQUIRING INSULATION.

24. THE PLANS AND SPECIFICATIONS ARE NOT INTENDED TO DEPICT EACH AND

EVERY CONDITION OR DETAIL OF CONSTRUCTION IN REGARD TO THE AIR AND

MOISTURE RETARDER. THE CONTRACTOR HAS RESPONSIBILITY FOR

ENSURING THE AIR- AND WATER-TIGHT INTEGRITY OF THE STRUCTURE.

25. WORK AT THE DISCRETION OF THE VA MAY BE SHUTDOWN AND

RESCHEDULED DUE TO CRITICAL AREAS OR SPECIAL NEEDS OF PATIENTS

AND STAFF AT NO ADDITIONAL COST TO THE GOVERNMENT.

26. CONTRACTOR SHALL BE REQUIRED TO LOCATE ALL UTILITIES AT THE VA

WORK SITE FOR THIS PROJECT. THE VA DOES NOT LOCATE UTILITIES,

CALLING 811 GETS UTILITIES MARKED UP TO THE VA CAMPUS BUT NOT ON

THE CAMPUS.

27. CONTRACTOR TO INSTALL PROTECTION OR MITIGATION MEASURES TO

ENSURE NO ODORS OR FUMES GET INTO THE BUILDING THOUGH THE

LOUVERED AREAS IN THE EXISTING BUILDING ADJACENT TO THE

CONSTRUCTION SITE. AT A MINIMUM, THE DUCT SHOULD LIKELY BE

TEMPORARILY EXTENDED TO A LOCATION ABOVE THE CLC ROOF, EQUIPMENT

EXHAUST SYSTEM PIPED TO A REMOTE LOCATION AWAY FROM HVAC

LOUVERS, CONTRACTOR TO PROVIDE CHARCOAL FILTERS IN EXISTING AIR

HANDLING UNITS TO ADDRESS CONSTRUCTION ODORS, ETC. FARGO VA HAS

HAD THESE PROBLEMS IN THE PAST AND THESE ARE SOME OF THE

MEASURES TAKEN TO MITIGATE THE FUMES AND ISSUES.

SHEET INDEX

SB101 FOUNDATION PLAN LEVEL B1

SB501 FOUNDATION DETAILS

SB502 FOUNDATION DETAILS

SF101 FLOOR FRAMING PLAN LEVEL 01

SF102 ROOF/FUTURE FLOOR FRAMING PLAN LEVEL 02

SF103 FUTURE FLOOR FRAMING PLAN LEVEL 03

SF104 FUTURE FLOOR FRAMING PLAN LEVEL 04

SF105 FUTURE FLOOR FRAMING PLAN LEVEL 05

SF106 FUTURE FLOOR FRAMING PLAN LEVEL 06

SF401 LATERAL FRAMING ELEVATIONS

SF402 LATERAL FRAMING ELEVATIONS & DETAILS

SF403 LATERAL FRAMING DETAILS

SF404 ENLARGED STAIR FRAMING PLANS AND DETAILS

SF501 FRAMING DETAILS

SF502 FRAMING DETAILS

SF503 FRAMING DETAILS

PLUMBING

P-000 SYMBOLS, LEGENDS AND ABBREVIATIONS

P-101 B/G PLUMBING PLAN - BASEMENT LEVEL

P-102 A/G DRAIN, WASTE AND VENT PLAN - BASEMENT LEVEL

P-103 A/G WATER PLAN - BASEMENT LEVEL

P-104 PLUMBING PLAN - FIRST LEVEL

P-105 ROOF PLUMBING PLAN

P-201 DRAIN, WASTE AND VENT ISOMETRIC

P-202 DOMESTIC WATER ISOMETRIC

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

ELECTRICAL

E-000 ELECTRICAL LEGENDS AND ABBREVIATIONS

E-001 ELECTRICAL PANEL SCHEDULES - BASEMENT LEVEL

E-002 ELECTRICAL PANEL SCHEDULES - LEVEL 1

E-003 ELECTRICAL SCHEMATICS & SCHEDULES

E-004 ELECTRICAL DETAILS

E-005 SPECIAL SYSTEMS DETAILS

E-100 ELECTRICAL SITE DEMOLITION PLAN

E-101 ELECTRICAL SITE PLAN - NEW CONSTRUCTION

E-200 POWER PLANS

E-300 LIGHTING PLANS

E-400 SPECIAL SYSTEMS PLANS

MECHANICAL

M 0.00 SYMBOLS, LEGENDS AND ABBREVIATIONS

M 0.50 EXISTING MECHANICAL ROOM PLANS

M 1.00 BASEMENT HYDRONIC PIPING PLAN

M 1.01 FIRST FLOOR HYDRONIC PIPING PLAN

M 2.00 BASEMENT HVAC PLAN

M 2.01 FIRST FLOOR HAVC PLAN

M 2.10 MECHANICAL ROOF PLAN

M 3.00 MECHANICAL SECTIONS

M 3.10 HVAC ISOMETRIC VIEWS

M 3.11 HYDRONIC PIPING ISOMETRIC VIEWS

M 3.20 ENLARGED MECHANICAL ROOM PLAN AND SECTIONS

M 4.00 MECHANICAL SCHEDULES

M 4.01 MECHANICAL SCHEDULES

M 5.00 MECHANICAL DETAILS - BUILDING 1 - DRY SIDE 1

M 5.01 MECHANICAL DETAILS - BUILDING 1 - DRY SIDE 2

M 5.10 MECHANICAL DETAILS - BUILDING 1 - WET SIDE 1

M 5.11 MECHANICAL DETAILS - BUILDING 1 - WET SIDE 2

M 5.12 MECHANICAL DETAILS - BUILDING 1 - WET SIDE 3

M 6.01 PIPING AND INSTRUMENTATION DIAGRAM (PID)

M 6.02 CONTROL DIAGRAMS

M 6.03 CONTROL DIAGRAMS

FIRE PROTECTION

FA1.00 FIRE ALARM COVER SHEET

FA1.01 FIRE ALARM - BASEMENT LEVEL

FA1.02 FIRE ALARM - FIRST LEVEL

FP1.00 FIRE PROTECTION COVER SHEET

FP1.01 FIRE PROTECTION - BASEMENT LEVEL

FP1.02 FIRE PROTECTION - FIRST LEVEL

SHEET INDEX

GENERAL

G0.00 COVER SHEET - VOLUME 1

G0.02 LEGENDS, SYMBOLS AND ABBREVIATIONS

G0.03 PROJECT DIRECTORY, DRAWING INDEX AND GENERAL NOTES

G0.04 LOCATION MAP / CONTRACTOR STAGING AREA AND ACCESS

G0.05 INFECTION CONTROL RISK ASSESSMENT

G0.10 PLANS PHASING

G1.01 LIFE SAFETY PLANS

G1.02 OCCUPANCY TABLE

CIVIL

CV100 SURVEY SHEET

CD100 DEMOLITION PLAN

CS100 SITE PLAN

CU100 OVERALL UTILITY PLAN

CU101 STORM SEWER PLAN AND PROFILE

CU102 STORM SEWER PLAN AND PROFILE

CU103 SANITARY SEWER PLAN AND PROFILE

CG100 GRADING PLAN

CG101 GRADING CROSS SECTIONS

CG102 ROADWAY PLAN AND PROFILE

CE100 DRAINAGE AND EROSION CONTROL PLAN

DT100 DETAILS

DT101 DETAILS

DT102 GATE DETAILS

ARCHITECTURAL

AD1.01 DEMOLITION PLAN - FIRST LEVEL

AD1.50 DEMOLITION REFLECTED CEILING PLAN - FIRST LEVEL

AD1.51 DEMOLITION - EAST ELEVATION & DETAILS

A1.01 FLOOR PLAN - BASEMENT LEVEL

A1.02 FLOOR PLAN - FIRST LEVEL

A1.20 DIMENSION PLAN - BASEMENT LEVEL

A1.21 DIMENSION PLAN - FIRST LEVEL

A1.40 WALL TYPES

A1.41 PARTITION FRAMING DETAILS

A1.42 HEAD OF WALL DETAILS

A1.43 PLAN DETAILS

A1.44 PLAN DETAILS

A1.45 CEILING DETAILS

A1.50 REFLECTED CEILING PLAN - BASEMENT LEVEL

A1.51 REFLECTED CEILING PLAN - FIRST LEVEL

A1.60 ROOF PLAN

A1.61 ROOF DETAIL

A2.00 EXTERIOR ELEVATIONS

A3.00 BUILDING SECTIONS

A3.10 WALL SECTIONS

A3.11 WALL SECTIONS

A3.20 CURTAINWALL SECTIONS

A4.00 ENLARGED STAIR PLAN(S) AND SECTONS

A4.01 SECTION DETAILS

A5.00 ROOM FINISH SCHEDULE

A5.01 ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS -

BASEMENT

A5.02 INTERIOR ELEVATIONS - FIRST FLOOR

A5.10 FLOOR FINISH PLANS

A5.11 WALL PROTECTION AND SIGNAGE PLANS

A5.12 WALL PROTECTION DETAILS

A5.13 SIGNAGE DETAILS

A5.14 CASEWORK SECTIONS

A6.00 DOOR SCHEDULE, ELEVATION AND DETAILS

A6.01 WINDOW SCHEDULE, DETAILS AND ELEVATIONS

A6.02 CURTAINWALL ELEVATIONS AND DETAILS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL ABBREVIATIONS & IBC INSPECTION TABLES

S-003 IBC INSPECTION TABLES

S-004 SNOW DRIFT AND WIND UPLIFT PLANS

S-005 CONCRETE SURFACE REQUIREMENTS

S-601 STANDARD DETAILS / SCHEDULES

S-602 METAL STUD DETAILS / SCHEDULES

MC

MC

AFGE

AFGE

AFGE

AFGE

RO EOM

HCHV

C P

C P

C P

C P

C P

C P

C P

C P

V A

N V

A N

R

MC

R

R R

19th AVE. N.

21st AVE. N.

E L M

S T

R E

E T

E L M

S T

R E

E T

R E D

R

IV

E R

O F T

H E N

O R

T H

CITY

LIFT

STATION

(STORM

SEWER)

BLDG. NO.

1 MEDICAL CENTER

3 ADMINISTRATION OFFICE

8 FLAGPOLE

9 MEDICAL CENTER

10 BOILER PLANT

11 MAINTENANCE GARAGE

12 WAREHOUSE

13 LAUNDRY

30 ADMINISTRATION OFFICE

39 HIGH VOLTAGE SWITCHGEAR BLDG

42 UND SCHOOL OF MEDICINE

46 MEDICAL CENTER

MC- MOTORCYCLE PARKING

CP- CAR/VAN POOL PARKING

- HANDICAPPED PARKING

40 VBA REGIONAL OFFICE

41 OXYGEN STORAGE TANK

43 PICNIC SHELTER AND PATIO

44 XCEL ENERGY BLDG (NATURAL GAS)

20 GATE WELL

50 COLD STORAGE BUILDING

51 HRMS

52 ADMINISTRATION OFFICE

53 HAZMAT STORAGE BUILDING

54 PANDEMIC FLU STORAGE BUILDING

56 CHILLER PLANT

R- RESERVED PARKING

UND- UNIVERSITY OF NORTH DAKOTA

AFGE- AMERICAN FEDERATION GOVERNMENT EMPLOYEE

RO EOM- REGIONAL OFFICE EMPLOYEE OF THE MONTH

HCHV- HEALTH CARE HOMELESS VETERANS

NFFE- NATIONAL FEDERATION FEDERAL EMPLOYEE

39 54 12 13

30E30W

PROJECT

LOCATION

CONTRACTOR SHARED

PARKING & STAGING AREA

TEMPORARY

CONSTRUCTION

SAFETY FENCE.

DRIVE ACCESS

A

A

B

C

A D

E

F

G

H

I

MAP LEGEND

TEMPORARY

CONSTRUCTION SAFETY

FENCE.

HAUL ROUTE

NOTE: THE CONTRACTOR IS REQUIRED TO KEEP THE ROAD CLEAN AND

CLEARED OF ALL DEBRIS, DIRT, GRAVEL, SAND, MUDM ETC. THE CONTRACTOR

SHALL KEEP THE PATH CLEAN AND CLEARED AT ALL TIMES, THIS SHALL NOT

JUST BE ONCE A DAY AND DONE FOR FOR THE DAY.

MATERIAL DELIVERY ROUTE

PROJECTS EXTENTS

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1 /2

:4

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/21

LOCATION MAP / CONTRACTOR

STAGING AREA AND ACCESS

G0.04

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

4 128

1/64" = 1'-0"

SITE PLAN

N

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.03 FOR GENERAL NOTES

3. NOTE THE CONTRACTOR IS REQUIRED TO KEEP THE ROAD CLEAN AND CLEARED OF ALL

DEBRIS, DIRT, GRAVEL, SAND, MUD, ETC. THE CONTRACTOR SHALL KEEP THE PATH CLEAN

AND CLEARED AT ALL TIMES, THIS SHALL NOT JUST BE ONCE A DAY AND DONE FOR THE DAY.

4. CONTRACTOR SHALL COOPERATE WITH OTHER VA PROJECTS, SERVICE CREWS, ETC. WHO

HAVE WORK GOING ON AT THE SITE .

5. CONTRACTOR, THE NEW ROAD AND FLOOD WALL WORK SHALL BE COMPLETED FIRST AND

THE ROAD AND FLOOD WALL AREAS OPENED BACK UP FOR USE BY THE PUBLIC. OTHER

WORK AREAS MAY START AT THE SAME TIME , BUT THE ROAD AND FLOOD WALL SHALL HAVE

PEOPLE WORKING DAILY TO COMPLETE THE MODIFICATIONS AND OPEN ROADS, SIDEWALKS,

ETC. BACK UP FOR USE.

GENERAL NOTES:

A. CONTRACTOR: PLACE A SIGN AT THE STAIRWELL (INTERNAL ENTRANCES

AND AT THE DOOR EXITING) SAYING "STOP DO NOT ENTER,

CONSTRUCTION AREA, EMERGENCY EXIT ONLY".

B. THE DRIVE BETWEEN THE VA AND UND BUILDINGS SHALL REMAIN OPEN

AND ACCESSIBLE AT ALL TIMES FOR VA AND OTHER CONTRACTORS AND

SERVICE COMPANIES.

C. CONTRACTOR PLACE A SIGN AT THE CORRIDOR EXIT DOOR SAYING "STOP

DO NOT ENTER, CONSTRUCTION AREA, EMERGENCY EXIT ONLY".

D. CURRENT SOUTH ENTRANCE (#6) THE CONTRACTOR SHALL PROVIDE A

LARGE SIGN BY ROOM BD-70 TO REPLACE THE CURRENT SIGN DIRECTING

PEOPLE TO THE SOUTH PARKING LOT. THE NEW SIGN SHALL SAY "NO EXIT,

CONSTRUCTION ZONE".

E. CONSTRUCTION FENCE SHALL BE CONTINUOUS AROUND THE JOB SITE

(AND WILL HAVE TO BE READJUSTED WHEN THE DRIVE AND LOADING

DOCK ARE COMPLETE AND READY FOR THE PUBLIC TO USE WITH NO GAPS

WHERE UNAUTHORIZED VEHICLES OR PEOPLE MAY ENTER THE

CONSTRUCTION SITE. FENCING SHALL BE PROVIDED AND MAINTAINED BY

THE CONTRACTOR. CONTRACTOR SHALL PROVIDE COR WITH PROPOSED

LAYOUT PRIOR TO PERIMETER ADJUSTMENTS.

F. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL MEASURES DURING THE

MORNING AND EVENING TIMES OF PEAK TRAFFIC. CONTRACTOR SHALL

PROVIDE A COMBINATION OF SIGNAGE AND PERSONELL AS REQURIED TO

MAINTAIN SMOOTH TRAFFIC AND MINIMIZE CONCERNS.

G. SIGNS WILL BE REQUIRED AT BOTH THE 19TH AVE. N. ENTRANCE AND THE

21ST AVE N. ENTRANCE GUIDING TRAFFIC. CONTRACTOR SHALL PROVIDE

TRAFFIC CONTROL SIGNAGE THAT ADJUSTS WITH THE CONDITIONS OF

TRAFFIC AROUND THE PROJECT. SIGNAGE SHALL FOLLOW THE

REQUIREMENTS OF THE FARGO VA HOSPITAL SIGNAGE STANDARDS.

H. KEEP THE CONSTRUCTION FENCE DOWN TO THE SOUTH AS MUCH AS

POSSIBLE SO THE SEMI'S WHO NEED TO GET TO THE EAST LOADING DOCK

OR OXYGEN TANKS ARE ABLE TO PULL PAST THE EAST LOADING DOCK

ACCESS ROAD AND BACK UP TO THE LOADING DOCK. COORDINATE

LOCATION OF FENCE WITH VA COR, SCM, POLICE SERVICE AND THE

ROADS / GROUND CREW TO ENSURE ACCESS ISSUES ARE NONEXISTENT

OR MINIMIZED TO THE EXTENT POSSIBLE.

I. CONTRACTOR TO PROVIDE MAPS, SIGNS, ETC. AT ALL DRIVEWAY

ENTRANCES AND EXITS, BUILDING ENTRANCES AND EXITS, ANYWHERE

SIGNS WILL BE NEEDED TO DIRECT PATIENTS, VISITORS AND STAFF

AROUND THE CAMPUS. DIRECT SEMI TRUCKS TO 21ST AVE N ENTRANCE.

ETC. CONTRACTOR SHALL WORK WITH COR, POLICE SERVICE AND VA

GROUNDS CREW TO DETERMINE THE TYPE OF SIGNAGE AND WHAT THE

SIGNAGE WILL SAY. IT MAY BE AS SIMPLE AS PROVIDING A STANDARD

STOP SIGN OR IT MAY HAVE TO BE A CUSTOM SIGN TELLING SEMI'S TO USE

THE 21ST AVE N ENTRANCE.

SHEET SPECIFIC NOTES:

UP

F F

S P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S P

S P

S P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

DN

UP

1 HOUR SMOKE RATED

TEMPORARY CONSTRUCTION

PARTITION. PROVIDE AT

AREAS ONLY REQUIRED BY

IMMEDIATE WORK AND

REMOVE WHEN NOT IN USE.

EXTENT OF TEMPORARY

PARTITION WALLS SHOULD BE

MINIMIZED TO ONLY PROVIDE

THE NECESSARY

CONTAINMENT AND LIMITED

CONTRACTOR ACCESS.

CONTRACTOR SHALL VERIFY

PRIOR TO BIDDING AS TO THE

CONDITION OF ANY EXISTING

WALLS TO BE USED AS THE

BARRIER. VERIFY THAT

WALLS ARE CONSTRUCTED

TO DECK AND SEALED TIGHT

AGAINST THE PASSAGE OF

SMOKE.

TEMPORARY

CONSTRUCTION BARRIER

EBD - 70

EBD - 80

EBD - 95

BD - 133

BD - 132 BD - 131 BD - 130

BD - 110

BD - 117

BD - 130A

BD - 120

BD - 121

BD - 118

BD - 119

BD - 122

BD - 116 BD - 115

BD - 112

BD - 123

BD - 114

BD - 124

BD - 126 BD - 127

BD - 128

BD - 129

BD - 125

BD - 113

CO01

CO02

CO03

STAIRWELL #24

EBD - 70A

BD - 118A

BD - 118B

BD - 119A

BD - 119B

1D -176 1D -175 1D -174 1D -172 1D -171 1D -193

1D -1991D -198 1D -178

1D -189 1D -1901D -1871D -1861D -1851D -184

1D -181

1D -179

1D -177

1D -188A

1D -191A

1D -191

1D -196

1D -188

1D -192 1D -1951D -194

E1D -86 E1D -102

E1D -103

E1D -104

E1D -109

E1D -108

E1D -110

E1D -112

E1D -113

E1D -115 E1D -121

E1D -122

E1D -123

E1D -124 E1D -126

E1D -127

E1D-127A

E1D -131

E1D -132

E1D -133

E1D -134 E1D -135 E37

E1D - 128E1D - 129 E1D - 130

STAIRWELL #24

E1D - 117

1D -197

1D -173

1D -180

1D -182

1D -183

CO04

CO05

CO06

E1D -116 E1D -120

1D -121

EBD - 70A

1D -193

CO04

CO04

M

IN

INFECTION CONTROL RISK ASSESSMENT

STEP ONE: TYPE D

USING THE FOLLOWING TABLE, IDENTIFY THE TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES.

INCLUDES, BUT IS NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50

SQUARE FEET.

• PAINTING (BUT NOT SANDING).

• WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO

NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER

THAN FOR VISUAL INSPECTION.

TYPE B

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

• ACCESS TO CHASE SPACE.

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION

OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.

INCLUDES, BUT IS NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING.

• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.

• NEW WALL CONSTRUCTION.

• MINOR DUCT WORK ABOVE CEILINGS.

• MAJOR CABLING ACTIVITIES.

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS

• REQUIRES HEAVY DEMOLITION ON REMOVAL OF A COMPLETE CABLING SYSTEM

• NEW CONSTRUCTION

STEP TWO: HIGHEST RISK

USING THE FOLLOWING TABLE, IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE AFFECTED. IF

MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

• OFFICE AREA • CARDIOLOGY

• ECHOCARDIOGRAPHY

• ENDOSCOPE

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY / MRI

• RESPIRATORY

THERAPY

• CCU

• EMERGENCY ROOM

• LABOR AND DELIVERY

• LABORATORIES (SPECIMEN)

• MEDICAL UNITS

• NEWBORN NURSERY

• OUTPATIENT SURGERY

• PEDIATRICS

• PHARMACY

• POST ANESTHESIA CARE

UNIT

• SURGICAL UNITS

• ANY AREA CARING FOR

IMMUNE COMPROMISED

PATIENTS

• BURN UNITS

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNIT

• NEGATIVE PRESSURE

ISOLATION ROOMS

• ONCOLOGY

• OPERATING ROOMS

INCLUDING C SECTION

ROOMS

STEP THREE:

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED ...

CONSTRUCTION PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX, TO FIND THE ...

CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

CLASS I - IV OR COLOR-CODED PRECAUTIONS ARE DELINEATED ON THE FOLLOWING PAGE.

IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP I II II III / IV

MEDIUM RISK GROUP I II III IV

HIGH RISK GROUP I II III / IV IV

HIGHEST RISK GROUP II III / IV III / IV IV

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND

RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

UPON COMPLETION OF PROJECTDURING CONSTRUCTION PROJECT

CLASS I

1. EXECUTE WORK BY METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION

OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE

DISPLACED FOR VISUAL INSPECTION

1. CLEAN WORK AREA UPON COMPLETION

OF TASK.

CLASS II

1. PROVIDE ACTIVE MEANS TO PREVENT

AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE

2. WATER MIST WORK SURFACE TO

CONTROL

DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT

OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

1. WIPE WORK SURFACES WITH CLEANER /

DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE

BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND / OR VACUUM WITH HEPA

VACUUM BEFORE LEAVING WORK AREA.

4. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

CLASS III

1. REMOVE OR ISOLATE HVAC SYSTEM IN

AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT

SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLASTIC, TO SEAL

AREA FROM NON WORK AREA OR

IMPLEMENT

CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED

CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE

WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING UNLESS SOLID LID.

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND INFECTION PREVENTION

AND CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA

FILTERED

VACUUMS.

4. WET MOP AREA WITH CLEANER /

DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

CLASS IV

1. ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLASTIC, TO SEAL AREA FROM

NON WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE

WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND

PUNCTURES.

5. CONSTRUCT ANTEROOM AND REQUIRE

ALL PERSONNEL TO PASS THROUGH THIS

ROOM SO THEY CAN BE VACUUMED USING A

HEPA VACUUM CLEANER BEFORE LEAVING

WORK SITE OR THEY CAN WEAR CLOTH OR

PAPER COVERALLS THAT ARE REMOVED

EACH TIME THEY LEAVE THE WORK SITE.

(VA DOES NOT PROVIDE ANY ITEMS

MENTIONED ABOVE).

6. ALL PERSONNEL ENTERING THE WORK

SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED

EACH TIME THE WORKER EXITS THE WORK

AREA. (VA DOES NOT PROVIDE ANY ITEMS

MENTIONED ABOVE).

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND INFECTION PREVENTION

AND CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPT.

2. REMOVE BARRIER MATERIAL CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN COVERED

CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH I-IEPA

FILTERED VACUUMS.

6. WET MOP AREA WITH CLEANER /

DISINFECTANT.

7. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

STEP THREE: CLASS IV

DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS

SUPPLY DUCTS.

COVER TO KEEP DUST

OUT

COVER ALL RETURNS AT

THE GRATE/DIFFUSERS

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

TEMPORARY SWING

DOOR, OR SUSPENDED

PLASTIC ZIPPER WALL

CURTAIN BARRIER WITH

PRIOR VA APPROVAL

FIRE PULL

STATION WITH

AUDIO / VISUAL

PROVIDE STICKY MATS

(CHANGED AS NECESSARY

TO MAINTAIN CLEANLINESS).

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

F L E

X D

U C

T

2' - 11"

TEMPORARY MECHANICAL UNIT

TO PROVIDE NEGATIVE AIR SPACE

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1 /2

:4

:3

A

M

CONSTRUCTION DOCUMENTS

11/16/21

INFECTION CONTROL RISK

ASSESSMENT

G0.05

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

5 128

INFECTION CONTROL NOTES - CLASS IV CONSTRUCITON:

A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.

C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.

D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS

ARE OFFLINE MORE THAN 4 HOURS IN A 24 HOUR PERIOD.

E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION UNITS.

F. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO HVAC RETURN OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.

H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT READ: "CONSTRUCTION AREA -DO

NOT ENTER".

I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.

J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE

THEY REMAIN EFFECTIVE.

K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.

L. OBTAIN INFECTION CONTROL PERMIT FROM VA PRIOR TO BEGINNING WORK.

M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.

N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM

FOR VACUUMING PRIOR TO EXIT BEFORE CONSTRUCTION BEGINS.

O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED.

P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO

MAINTAIN FIRE RATING DUST PROTECTION AND NEGATIVE AIR PRESSURE.

Q. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BE VACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE (VA DOES NOT PROVIDE).

Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.

Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM (EXIT/ENTRANCE)

R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING. (VA DOES

NOT PROVIDE.)

S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT

RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

U. FACE MASKS REQUIRED DUE TO COVID POLICY AT FARGO VA.

GENERAL NOTES:

1/16" = 1'-0"

INFECTION CONTROL - BASEMENT LEVEL

1/16" = 1'-0"

NEW FLOOR PLAN - FIRST LEVEL

1/4" = 1'-0"

INFECTION CONTROL RISK ASSESSMENT

1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

ROOM SCHEDULE - BASEMENT LEVEL

Number Name

BD - 110 STANDALONE PRIMARY

BD - 112 EMS WORKROOM

BD - 113 OFFICE PROGRAM SUPPORT ASST

BD - 114 OFFICE

BD - 115 CART STORAGE

BD - 116 EQUIPMENT STORAGE

BD - 117 MECHANICAL

BD - 118 MEN'S LOCKER ROOM

BD - 118A MEN'S SHOWER

BD - 118B MEN'S TOILET

BD - 119 WOMEN'S LOCKER ROOM

BD - 119A WOMEN'S SHOWER

BD - 119B WOMEN'S TOILET

BD - 120 GEMS STORAGE

BD - 121 HOUSEKEEPING EXPENDABLES

BD - 122 LEADS WORKROOM

BD - 123 STAFF LOUNGE

BD - 124 OFFICE SUPERVISORS

BD - 125 OFFICE GEMS COORDINATOR

BD - 126 SECRETARY OFFICE

BD - 127 OFFICE EMS CHIEF

BD - 128 OFFICE EMS ASST CHIEF

BD - 129 OFFICE ADMIN OFFICER

BD - 130 CONFERENCE ROOM

BD - 130A ELECTRICAL

BD - 131 OFFICE

BD - 132 TOILET

BD - 133 WET ROOM

CO01 CORRIDOR

CO02 CORRIDOR

CO03 CORRIDOR

EBD - 70 MECHANICAL ROOM

EBD - 80 STORAGE

STAIRWELL #24 STAIRWELL #24

ROOM SCHEDULE - FIRST LEVEL

Number Name

1D -121 CORRIDOR

1D -171 EXAM

1D -172 EXAM

1D -173 WORK ROOM

1D -174 EXAM

1D -175 EXAM

1D -176 BARIATRIC EXAM

1D -177 EXAM

1D -178 HAC

1D -179 EXAM

1D -180 CLEAN LINEN

1D -181 EXAM

1D -182 TOILET

1D -183 SOILED LINEN

1D -184 EXAM

1D -185 EXAM

1D -186 EXAM

1D -187 EXAM

1D -188 BREAK ROOM

1D -188A STAFF TLT

1D -189 EXAM

1D -190 EXAM

1D -191 WELLNESS

1D -191A EQUIP STG

1D -192 PHARMACY OFFICE

1D -193 RECEPTION/WAITING

1D -194 LOGISTICS STG

1D -195 ELECT

1D -196 OFFICE

1D -197 OFFICE

1D -198 OFFICE

1D -199 OFFICE

CO04 CORRIDOR

CO05 CORRIDOR

CO06 CORRIDOR

E1D -108 OFFICE (M.H.)

E1D -110 CONSULT (M.H.)

E1D -112 OFFICE (M.H.)

E1D -116 CONSULT PHARM

E1D -120 WORK ROOM (P.C. DOC'S)

E1D -122 OFFICE (PHARM)

E1D -124 WORK ROOM (P.C. DOC'S)

E1D -126 CONSULT (S.W.)

E1D - 128 LOCKER

E1D - 129 CONF

E1D - 130 STAFF BREAK ROOM

E1D-127A TOILET

EBD - 70A STAIRWELL

STAIRWELL #24 STAIRWELL #24

12" = 1'-0"

ILSM TEMPORARY BARRIER TAG

NOTE: GENERAL CONTRACTOR SHALL COORDINATE WITH FARGO VA COR

TO OBTAIN AN ICRA/PCRA FROM FILLED OUT BY LOCAL FARGO VA STAFF

WITH REQUIREMENT BASED UPON AREA OF WORK AND ADJACENCIES.

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.03 FOR GENERAL NOTES

BASEMENT AREA LEGEND:

PHASE 1

PHASE 2

LEVEL 1 AREA LEGEND:

PHASE 1

PHASE 2

1D -176 1D -175 1D -174 1D -172 1D -171 1D -193

1D -1991D -198 1D -178

1D -189 1D -1901D -1871D -1861D -1851D -184

1D -181

1D -179

1D -177 1D -188A

1D -191A

1D -191

1D -196

1D -188

1D -192 1D -194 1D -197

1D -180

1D -182

1D -183

1D -173

SOILED

E1D -86

SOILED

E1D -103

EXAM

E1D -104

TLT

E1D -109

OFFICE (M.H.)

E1D -108

OFFICE (M.H.)

E1D -112

LINEN

E1D -113

TLT

E1D -115

COPY AREA

E1D -121

TLT

E1D -123

WORK ROOM

(P.C. DOC'S)

E1D -124

TOILET

E1D -127

TOILET

E1D-127A

HAC

E1D -131

SOCIAL

WORKERS

E1D -133

MEDS

E1D -134

OPER 8

E1D -135

LOCKER

E1D - 128

CONF

E1D - 129

STAFF BREAK

ROOM

E1D - 130

STAIRWELL

#24

TLT

E1D - 117

CONSULT (S.W.)

E1D -126

1D -195 CO06

E1D -120E1D -116

1D -121

CO04

CO05

OFFICE (PHARM)

E1D -122

CONSULT (M.H.)

E1D -110

CO04

C O

M

IN

BD - 133

BD - 132 BD - 131

BD - 130

BD - 110

BD - 117

BD - 130A

BD - 120 BD - 121

BD - 118

BD - 119

BD - 122

BD - 116

BD - 115

BD - 112

BD - 123

BD - 114

BD - 124

BD - 126

BD - 127 BD - 128 BD - 129

BD - 125

BD - 113

MECHANICAL

ROOM

EBD - 70

STORAGE

EBD - 80

BREAK ROOM

EBD - 95

9427 SF

BASEMENT LEVEL

STAIRWELL

#24

BD - 118ABD - 119A

BD - 118BBD - 119B

CO01

CO02

CO03

STAIRWELL

EBD - 70A

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN.

NEW PLAN AREA LEGEND:

1 HOUR SMOKE RATED

TEMPORARY CONSTRUCTION

PARTITION. PROVIDE AT

AREAS ONLY REQUIRED BY

IMMEDIATE WORK AND

REMOVE WHEN NOT IN USE.

EXTENT OF TEMPORARY

PARTITION WALLS SHOULD BE

MINIMIZED TO ONLY PROVIDE

THE NECESSARY

CONTAINMENT AND LIMITED

CONTRACTOR ACCESS.

CONTRACTOR SHALL VERIFY

PRIOR TO BIDDING AS TO THE

CONDITION OF ANY EXISTING

WALLS TO BE USED AS THE

BARRIER. VERIFY THAT

WALLS ARE CONSTRUCTED

TO DECK AND SEALED TIGHT

AGAINST THE PASSAGE OF

SMOKE.

TEMPORARY

CONSTRUCTION BARRIER

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING INC.

3202 W MAIN ST C,

RAPID CITY, SOUTH DAKOTA 57702

PHONE (605) 343-9606

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1 /2

:4

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/21

PLANS PHASING

G0.10

EXPAND BLDG. 1 FOR

PRIMARY CARE

JGCJS

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

6 128

NET ROOM AREA SCHEDULE

No. Name Area

BD - 110 STANDALONE PRIMARY 527 SF

BD - 112 EMS WORKROOM 357 SF

BD - 113 OFFICE PROGRAM SUPPORT ASST 94 SF

BD - 114 OFFICE 95 SF

BD - 115 CART STORAGE 764 SF

BD - 116 EQUIPMENT STORAGE 719 SF

BD - 117 MECHANICAL 804 SF

BD - 118 MEN'S LOCKER ROOM 258 SF

BD - 118A MEN'S SHOWER 47 SF

BD - 118B MEN'S TOILET 45 SF

BD - 119 WOMEN'S LOCKER ROOM 224 SF

BD - 119A WOMEN'S SHOWER 47 SF

BD - 119B WOMEN'S TOILET 45 SF

BD - 120 GEMS STORAGE 284 SF

BD - 121 HOUSEKEEPING EXPENDABLES 288 SF

BD - 122 LEADS WORKROOM 222 SF

BD - 123 STAFF LOUNGE 288 SF

BD - 124 OFFICE SUPERVISORS 205 SF

BD - 125 OFFICE GEMS COORDINATOR 119 SF

BD - 126 SECRETARY OFFICE 220 SF

BD - 127 OFFICE EMS CHIEF 150 SF

BD - 128 OFFICE EMS ASST CHIEF 117 SF

BD - 129 OFFICE ADMIN OFFICER 126 SF

BD - 130 CONFERENCE ROOM 303 SF

BD - 130A ELECTRICAL 78 SF

BD - 131 OFFICE 114 SF

BD - 132 TOILET 75 SF

BD - 133 WET ROOM 313 SF

CO01 CORRIDOR 625 SF

CO02 CORRIDOR 434 SF

CO03 CORRIDOR 285 SF

EBD - 70 MECHANICAL ROOM 3209 SF

EBD - 80 STORAGE 1892 SF

STAIRWELL #24 STAIRWELL #24 149 SF

1D -121 CORRIDOR 203 SF

1D -171 EXAM 162 SF

1D -172 EXAM 162 SF

1D -173 WORK ROOM 541 SF

1D -174 EXAM 162 SF

1D -175 EXAM 162 SF

1D -176 BARIATRIC EXAM 161 SF

1D -177 EXAM 135 SF

1D -178 HAC 60 SF

1D -179 EXAM 140 SF

1D -180 CLEAN LINEN 77 SF

1D -181 EXAM 138 SF

1D -182 TOILET 66 SF

1D -183 SOILED LINEN 67 SF

1D -184 EXAM 147 SF

1D -185 EXAM 150 SF

1D -186 EXAM 151 SF

1D -187 EXAM 150 SF

1D -188 BREAK ROOM 188 SF

1D -188A STAFF TLT 60 SF

1D -189 EXAM 151 SF

1D -190 EXAM 151 SF

1D -191 WELLNESS 633 SF

1D -191A EQUIP STG 234 SF

1D -192 PHARMACY OFFICE 114 SF

1D -193 RECEPTION/WAITING 338 SF

1D -194 LOGISTICS STG 150 SF

1D -195 ELECT 74 SF

1D -196 OFFICE 106 SF

1D -197 OFFICE 107 SF

1D -198 OFFICE 104 SF

1D -199 OFFICE 108 SF

CO04 CORRIDOR 927 SF

CO05 CORRIDOR 576 SF

CO06 CORRIDOR 377 SF

E1D -108 OFFICE (M.H.) 113 SF

E1D -110 CONSULT (M.H.) 118 SF

E1D -112 OFFICE (M.H.) 119 SF

E1D -116 CONSULT PHARM 167 SF

E1D -120 WORK ROOM (P.C. DOC'S) 207 SF

E1D -122 OFFICE (PHARM) 118 SF

E1D -124 WORK ROOM (P.C. DOC'S) 242 SF

E1D -126 CONSULT (S.W.) 119 SF

E1D - 128 LOCKER 226 SF

E1D - 129 CONF 180 SF

E1D - 130 STAFF BREAK ROOM 336 SF

E1D-127A TOILET 54 SF

EBD - 70A STAIRWELL 140 SF

STAIRWELL #24 STAIRWELL #24 149 SF

NET ROOM TOTAL: 83 23040 SF

NORTH

N

NORTH

N

TOTAL BUILDING GROSS AREA

Name Area

BASEMENT LEVEL 9427 SF

FIRST LEVEL 9119 SF

Total 18546 SF

3/32" = 1'-0"

NEW AREA FLOOR PLAN - FIRST LEVEL

3/32" = 1'-0"

NEW AREA FLOOR PLAN - BASEMENT LEVEL

SEQUENCE OF WORK:

PRECONSTRUCTION ACTIVITIES

• ESTABLISH CONTRACTOR STAGING AREA IN

COORDINATION WITH THE COR ON STATION.

• PROVIDE AND INSTALL TEMPORARY CONSTRUCTION

FENCING TO SECURE AND PROTECT THE PROJECT SITE.

• SUBMIT PROJECT SCHEDULE TO COR. IDENTIFY ALL

TRADES THAT WILL BE NECESSARY TO COMPLETE

DEMOLITION EFFICIENTLY AND CONCURENTLY.

• OBTAIN A PRE-CONSTRUCTION RISK ASSESSMENT AS

PER VA REQUIREMENTS.

• PROTECT ALL ITEMS AND EQUIPMENT NOTED TO REMAIN

AS NECESSARY. THE GENERAL CONTRACTOR SHALL BE

RESPONISBLE TO MAINTAIN THE EXISTING CONDITION

AND REPAIR ANY DAMAGE TO PRE-CONSTRUCTION

CONDITION PRIOR TO PROJECT COMPLETION.

• ESTABLISH ALTERNATE EXITING ROUTES FOR EXISITNG

DOOR THAT WILL BE BLOCKED BY CONSTRUCTION

BEGINNING IN PHASE 1.

PHASE 1

• PERFORM SITE DEMOLITION WORK IDENTIFIED IN CIVIL

DRAWINGS

• ROAD AND FLOOD WALL WORK SHALL BE COMPLETED

FIRST. RETURN THE ROAD FOR PUBLIC USE AS SOON

AS POSSIBLE. UNDERGROUND UTILITY WORK NEEDS TO

BE PLANNED FOR AND EXECUTED FIRST. FLOOD WALL

WORK NEEDS TO BE COMPLETE FOR SPRING FLOODING

EVENT(S) AND IF WORK NOT DONE, CONTRACTOR WILL

BE REQUIRED TO PROVIDE TEMPORARY FLOOD

PROTECTION MEASURES.

• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE

OWNER TO A LOCATION DESIGNATED BY THE COR (ON-

SITE). IT WILL BE THE RESPONSIBILTY OF THE GENERAL

CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO

PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION

CONDITION.

• REMOVE ALL SERVICE/UTILITY SYSTEMS NOTED FOR

DEMOLITION.

• PROVIDE FILL MATERIALS NECESSARY TO BEGIN

FOUNDATION SYSTEM.

• CONSTRUCT NEW BUILDING STRUCTURE..

• CONSTRUCT NEW PARTITION WALLS INCLUDING ROUGH-

IN FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE

PROTECTION.

• INSTALL ALL MECHANICAL, ELECTRICAL, PLUMBING AND

FIRE PROTECTION SYSTSEMS.

• INSTALL ALL CASEWORK, EQUIPMENT DOORS AND

HARDWARE IDENTIFIED IN THE CONSTRUCTION

DOCUMENTS.

• COORDINATE THE INSTALLATION OF OWNER PROVIDED

CONTRACTOR INSTALLED AND OWNER PROVIDED,

OWNER INSTALLED EQUIPMENT WITH THE OWNER AND

THEIR VENDORS.

PHASE 2

• INSTALL TEMPORARY ONE-HOUR FIRE RATED

CONSTRUCTION BARRIERS WHERE SHOWN TO

SEPARATE AREAS OF CONSTRUCTION ACTIVITY

FROM ADJACENT AREAS OF THE HOSPITAL THAT WILL

REMAIN OCCUPIED AND OPERATIONAL

• INSTALL HEPA FILTERS AND SEAL PROJECT BOUNDARY

TO ENSURE NEGATIVE AIR PRESSURE AS PER INFECTION

CONTROL REQUIREMENTS.

• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 2

BOUNDARIES ON BOTH FIRST FLOOR AND BASEMENT

FLOOR.

• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE

OWNER TO A LOCATION DESIGNATED BY THE COR (ON-

SITE). IT WILL BE THE RESPONSIBILTY OF THE GENERAL

CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO

PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION

CONDITION.

• REMOVE ALL MECAHNICAL AND ELECTRICAL SYSTEMS

NOTED FOR DEMOLITION.

• CLEAN AND REPAIR EXISITNG CONCRETE SLAB FOR

INTSTALLATION OF FINISH FLOORING MATERIAL.

• CONSTRUCT NEW PARTITION WALLS INCLUDING ROUGH-

IN FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE

PROTECTION.

• INSTALL ALL MECHANICAL, ELECTRICAL, PLUMBING AND

FIRE PROTECTION SYSTSEMS.

• COMPLETE FINISHES AND REMOVE TEMPORARY

PARTITIONS. REPAIR EXISTING AS NECESSARY.

NOTE:

EGRESS STAIR TO REMAIN OPEN AND SAFE

FOR USE THROUGHOUT DURATION OF

PROJECT, CONTRACTOR TO PROVIDE

TEMPORARY BARRIERS AS NECESSARY TO

ENSURE SAFE EGRESS OUT OF STAIR IN

CASE OF AN EVENT WITHIN EXISTING

HOSPITAL.

F F

S P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S P

S P

S P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

DN

UP

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

S P

S P

S P

S P

SP SP

SP SP

SP SP

MECHANICAL

ROOM

EBD - 70

STORAGE

EBD - 80

BREAK ROOM

EBD - 95

WET ROOM

BD - 133

TOILET

BD - 132

OFFICE

BD - 131

CONFERENCE

ROOM

BD - 130

STANDALONE

PRIMARY

BD - 110

MECHANICAL

BD - 117

ELECTRICAL

BD - 130A

GEMS STORAGE

BD - 120

HOUSEKEEPING

EXPENDABLES

BD - 121

MEN'S LOCKER

ROOM

BD - 118

WOMEN'S

LOCKER ROOM

BD - 119

LEADS

WORKROOM

BD - 122

EQUIPMENT

STORAGE

BD - 116

CART STORAGE

BD - 115

EMS WORKROOM

BD - 112

STAFF LOUNGE

BD - 123

OFFICE

BD - 114

OFFICE

SUPERVISORS

BD - 124

SECRETARY

OFFICE

BD - 126

OFFICE EMS

CHIEF

BD - 127 OFFICE EMS

ASST CHIEF

BD - 128

OFFICE ADMIN

OFFICER

BD - 129

OFFICE GEMS

COORDINATOR

BD - 125

OFFICE

PROGRAM

SUPPORT ASST

BD - 113

STAIRWELL

#24

TD 2

TD 3

CP 2

FEC

FEC

F E

C

FE

EXIT 26

EXIT 25

EXIT 24

STAIRWELL

EBD - 70A

MEN'S TOILET

BD - 118B

WOMEN'S TOILET

BD - 119B

WOMEN'S

SHOWER

BD - 119A

MEN'S SHOWER

BD - 118A

CORRIDOR

CO01

BARIATRIC EXAM

1D -176

EXAM

1D -175

EXAM

1D -174

EXAM

1D -172

EXAM

1D -171

RECEPTION/WAITING

1D -193

OFFICE

1D -199

OFFICE

1D -198

HAC

1D -178

EXAM

1D -189

EXAM

1D -190

EXAM

1D -187

EXAM

1D -186

EXAM

1D -185

EXAM

1D -184

EXAM

1D -181

EXAM

1D -179

EXAM

1D -177 STAFF TLT

1D -188A

WELLNESS

1D -191

OFFICE

1D -196

BREAK ROOM

1D -188

PHARMACY

OFFICE

1D -192

ELECT

1D -195

LOGISTICS STG

1D -194

EXAM

E1D -104

OFFICE (M.H.)

E1D -108

CONSULT (M.H.)

E1D -110

OFFICE (M.H.)

E1D -112

OFFICE (PHARM)

E1D -122

WORK ROOM

(P.C. DOC'S)

E1D -124

CONSULT (S.W.)

E1D -126

TOILET

E1D -127

TOILET

E1D-127A

SOCIAL

WORKER'S

CONSULT

E1D -132

SOCIAL

WORKERS

E1D -133

LOCKER

E1D - 128

CONF

E1D - 129

STAFF BREAK

ROOM

E1D - 130

STAIRWELL

#24

OFFICE

1D -197

EQUIP STG

1D -191A

CLEAN LINEN

1D -180

TOILET

1D -182

SOILED LINEN

1D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .