This attachment is a drawing for a federal construction solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation involves expanding Building 1 at the Fargo VA Medical Center for primary care. The project will reroute part of the road between the medical center and the flood wall, relocate the flood wall basin and road further from the building addition to comply with security standards. Foundation work will include helical piers to the specified depth, and the addition will provide a two-story structure with the first floor converted to a Whole Health clinic and supporting rooms, and the basement converted to mechanical and EMS office/work space. The flood wall must remain operational year-round. The response deadline and award date are not specified.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
A
A3.00
A3.00
B C
CO02
MECHANICAL
BD - 117
STANDALONE
PRIMARY
BD - 110
BARIATRIC EXAM
1D -176
EXAM
1D -175
EXAM
1D -174
EXAM
1D -172
EXAM
1D -171
RECEPTION/WAITING
1D -193
CORRIDOR
CO02
TOILET
BD - 132
OFFICE
BD - 131
CONFERENCE
ROOM
BD - 130
A3.00
A3.00
A3.10
1 A1.61
A3.10
A3.00
A3.00
CORRIDOR
CO05
WET ROOM
BD - 133
1D-121
A1.60
D
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
A
A3.00
A3.00
B C
A3.20
BD-116 BD-115 BD-114 BD-113
EXAM
1D -181
CORRIDOR
CO04
SOILED LINEN
1D -183
WORK ROOM
1D -173
BREAK ROOM
1D -188
CORRIDOR
CO05
WELLNESS
1D -191
OFFICE
SUPERVISORS
BD - 124
CORRIDOR
CO02
CORRIDOR
CO01
A3.10
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
161413 18
A3.00
A3.00
A3.00
A3.00
MECHANICAL
BD - 117
CORRIDOR
CO04
HAC
1D -178
EQUIPMENT
STORAGE
BD - 116
CLEAN LINEN
1D -180
TOILET
1D -182
SOILED LINEN
1D -183
CORRIDOR
CO04
EXAM
1D -186
CORRIDOR
CO01
WOMEN'S
LOCKER ROOM
BD - 119
A3.11
A3.11
EXAM
1D -174
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0" e12 1413
A3.00
A3.00
BD-130A
OFFICE
1D -197
OFFICE EMS
ASST CHIEF
BD - 128
OFFICE
BD - 131
CONF
E1D - 129
CORRIDOR
CO06
CORRIDOR
CO03
A3.11
ELECTRICAL
BD - 130A
CORRIDOR
E1D - CO
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
16 14 1318
A3.00
A3.00
A3.00
A3.00 A4.00
A4.00
A4.00
17 15
A3.20
CO06A
CO03A
STAIRWELL #24 LOCKER
E1D - 128
STAIRWELL #24 CONFERENCE
ROOM
BD - 130
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:4
A
M
CONSTRUCTION DOCUMENTS
11/16/21
BUILDING SECTIONS
A3.00
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
40 128
1/8" = 1'-0"
BUILDING SECTION
1/8" = 1'-0"
BUILDING SECTION
1/8" = 1'-0"
BUILDING SECTION
1/8" = 1'-0"
BUILDING SECTION
1/8" = 1'-0"
BUILDING SECTION
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
A
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
A4.01
A4.01
A4.01
Sim
FOUNDATION DRAINAGE SYSTEM, SEE
CIVIL AND STRUCTURAL DRAWINGS
NOTE: ALL ELEVATIONS FOR DECK
MUST MATCH EXISTING & FUTURE
PLANNED VERTICAL EXPANSION
1' - 6"
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1 1/2" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
WALL SYSTEM:
FACE BRICK
3/8" DRAINAGE MAT
1 1/2" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
A4.01
A4.01
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
6 1/4" TAPERED INSULATION
1' - 1 1/4" RIGID INSULATION
EXISTING METAL DECK
EXISTING STRUCTURE
T.O MASONRY
113' - 11 3/4"
A4.01
Sim
D
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0" eA A
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
A4.01
Sim
A4.01
Sim
A4.01
Sim
FOUNDATION DRAINAGE SYSTEM, SEE
CIVIL AND STRUCTURAL DRAWINGS
96' - 0"
95' - 0"
A4.01
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:5
A
M
CONSTRUCTION DOCUMENTS
11/16/21
WALL SECTIONS
A3.10
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
41 128
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION 1 1/2" = 1'-0"
EXISTING WINDOW DETAIL
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
A4.01
A4.01
Sim
A4.01
Sim
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
FOUNDATION DRAINAGE SYSTEM, SEE
CIVIL AND STRUCTURAL DRAWINGS
NOTE: ALL ELEVATIONS FOR DECK
MUST MATCH EXISTING & FUTURE
PLANNED VERTICAL EXPANSION
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0" e12
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
A4.01
A4.01
SW1
SW1
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURA
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
A4.01
Sim
A4.01
Sim
A4.01
Sim
FOUNDATION DRAINAGE SYSTEM, SEE
CIVIL AND STRUCTURAL DRAWINGS
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
Level 0.1 89' - 0"
A
26' - 2 1/2"
T.O. PARAPET
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
WALL SYSTEM:
MECHANICAL LOUVER
MEMBRANE AIR AND WATER BARRIER
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
PRE-FINISHED MECHANICAL
LOUVER, SEE SPECIFICATIONS
A4.01
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURA
A4.01
WALL SYSTEM:
PREFINISHED METAL LOUVER
PREFINISHED METAL FLASHING AT EXPOSED
WALL SURFACES
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUD WITH BLOWN IN BLANKET
SYSTEM INSULATION
5/8" GYPSUM BOARD
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:0
A
M
CONSTRUCTION DOCUMENTS
11/16/21
WALL SECTIONS
A3.11
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
42 128
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
LOUVER SECTION
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
A6.02 x Sim
D
A6.02
A6.02
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
C
A6.02 xx
A6.02 x1
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
60 MIL INTUMESCENT
FIRE-PROOFING PAINT,
UL BXUV. Y634 AT ALL
EXPOSED STRUCTURE
(IE BEAMS, DECK,
LATERAL BRACING
8" FRAMED ALUMINUM
CURTAIN WALL, BLAST
RESISTENT, SEE
SPECIFICATIONS
1" INSULATED GLAZING,
SEE SPECIFICATIONS
60 MIL INTUMESCENT
FIRE-PROOFING PAINT,
UL BXUV. Y634 AT ALL
EXPOSED STRUCTURE
(IE BEAMS, DECK,
LATERAL BRACING)
FLOOR SYSTEM:
FLOOR FINISH, SEE
STRUCTURAL
6" CONCRETE SLAB, SEE
STRUCTURAL
2" METAL DECKING, SEE
STRUCTURAL
A6.02
FIRST LEVEL
100' - 0"
Second Level / T.O. Concrete Deck 112' - 7 1/4"
BASEMENT LEVEL
88' - 0"
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
FLOOR SYSTEM:
CONCRETE FILLED SLAB
STEEL STAIR FRAMING,
SEE STRUCTURAL
8" FRAMED ALUMINUM
CURTAIN WALL, BLAST
RESISTENT, SEE
SPECIFICATIONS
1" INSULATED GLAZING,
SEE SPECIFICATIONS
A6.02 x Sim
A6.02
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.03 FOR GENERAL NOTES
3. APPLY 1 1/2" THICK FIREPROOFING AT ALL
EXPOSED STRUCTURAL STEEL,
DECKING,SECONDARY STRUCTURE WITHIN
CEILING SPACE ABOVE BASEMENT & FIRST
FLOOR LEVEL CEILING, TYP. EXCEPT STAIRS.
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:0
A
M
CONSTRUCTION DOCUMENTS
11/16/21
CURTAINWALL SECTIONS
A3.20
EXPAND BLDG. 1 FOR
PRIMARY CARE
TBJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
43 128
3/4" = 1'-0"
BLAST RESISTANT CURTAINWALL_B SECTION
3/4" = 1'-0"
BLAST RESISTANT CURTAINWALL_A SECTION
3/4" = 1'-0"
BLAST RESISTANT CURTAINWALL_C SECTION
GENERAL NOTES:
NOTE: MATCH EXISTING (ADJACENT, OTHERS
AT HIGHER FLOORS) BLDG. FLOOR ELEVATIONS
FOR THIS JOB AND FUTURE VERTICAL EXPANSION
UP
T
SEE STRUCTURAL
1 1/2" O.D. STEEL PIPE GUARD TOP RAIL
3/4" DIAMETER VERTICAL
BALUSTER AT 4" MAX
MAIN SUPPORT POST BEYOND
HOLLOW
STRUCTURAL
SECTION
SUPPORT, SEE
STRUCTURAL
STAIR TREAD
12X2 HSS SEE
STRUCTURAL
STEEL STAIR FRAME,
SEE STRUCTURAL
RUBBER TREAD COVER AND
NOSING
METAL DECK
CONCRETE FILLED SLAB
1 1/2" GUARD RAIL
1 1/2" HANDRAIL
STEEL STAIR FRAMING,
SEE STRUCTURAL
STAIR BEYOND
B12D
M3B
1 1/2" DIA. GUARD RAIL
1 1/2" DIA. HANDRAIL
STEEL STRINGER
CONCRETE PAN FILLED
STAIRS
4"
1' - 11"
4" 4" 4" 4"
MAX
SEE STRUCTURAL FOR
ANGLE AND SCREW ANCHOR
HANDRAIL BRACKET, 4'-0"
O.C. MAX
1/2" MIN. ANCHOR BOLT
AND EXPANSION SHIELD
PARTITION AS SCHEDULED,
SEE PLAN FOR TYPE
MIN. CLR
1"
PROVIDE BLOCKING AT
GYPSUM BOARD
T O
P O
F S
T A
IR
N
O S
IN
G
RETURN HANDRAIL TO
WALL AT ENDS
2 1/4"
FIRST LEVEL
100' - 0"
BASEMENT LEVEL
88' - 0"
E. TO. MASONRY
111' - 10"
T.O. EXISTING ROOF DECK
111' - 2 3/4"
A4.00
CONCRETE FILLED,
STEEL PAN TREAD
" 2
E
Q R
IS
E
R S
STAIRWELL
#24
1' - 0"
1' - 0"
T.O MASONRY
113' - 11 3/4"
CO03B
SEE 5/A6.02
FOR CURTAINWALL
ELEVATION
A4.00
A4.00
STAIRWELL
#24
A4.00
A4.00
8' - 0"
3' - 10"
4"
3' - 10"
A3.20
B
CO06A
D
A4.00
A4.00
A4.00
A4.00
8' - 0"
3' - 10"
4"
3' - 10"
STAIRWELL
#24
D
FIRST LEVEL
100' - 0"
BASEMENT LEVEL
88' - 0"
E. TO. MASONRY
111' - 10"
T.O. EXISTING ROOF DECK
111' - 2 3/4"
A4.00
A4.00
2"
STAIRWELL
#24
T.O MASONRY
113' - 11 3/4"
D
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.03 FOR GENERAL NOTES
3. APPLY 1 1/2" THICK FIREPROOFING AT ALL
EXPOSED STRUCTURAL STEEL,
DECKING,SECONDARY STRUCTURE WITHIN
CEILING SPACE ABOVE BASEMENT & FIRST
FLOOR LEVEL CEILING, TYP. EXCEPT STAIRS.
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:1
A
M
CONSTRUCTION DOCUMENTS
11/16/21
ENLARGED STAIR PLAN(S) AND
SECTONS
A4.00
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
44 128
1 1/2" = 1'-0"
STAIR - GUARD AT CENTER OF FLIGHT
1" = 1'-0"
TYPICAL STAIR LANDING SECTION
1" = 1'-0"
TYPICAL STAIR RAIL SECTION
3" = 1'-0"
TYPICAL HANDRAIL DETAIL
1/4" = 1'-0"
STAIR SECTION
1/4" = 1'-0"
NEW FLOOR PLAN - FIRST LEVEL
1/4" = 1'-0"
NEW FLOOR PLAN - BASEMENT LEVEL
1/4" = 1'-0"
STAIR SECTION
GENERAL NOTES:
SHEET SPECIFIC NOTES:
1. REFERENCE STRUCTURAL FOR STAIR DETAILS
2. ALL STRUCTURAL STEEL AND TUBING IS TO BE
PAINTED. SEE STRUCTURAL REFRENCE 099100
3. ENSURE ELEVATIONS OF DECKS, ETC. MATCH
EXISTING & PLANNED FUTURE EXPANSION
FLOOR/DECK LEVELS AND ROOF TOO.
A
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
MEMBRANE FLASHING
CONTINUOUS STRIP
TREATED WOOD CANT
5/8"GYPSUM BOARD
SHEATHING, TYP.
ROOF MEMBRANE
PRE-FINISHED METAL COPING
60 MIL MEMBRANE ROOFING,
EXTEND OVER PARAPET
5/8" TREATED
PLYWOOD SHEATHING
2X TREATED WOOD
NAILER
CONTINUOUS
GALVANIZED KEEPER
TYPICAL. EACH SIDE
SEALENT, TYP.
ADJUSTABLE MASONRY
ANCHOR
1 1/2" THICK FIREPROOFING AT
ALL STEEL ABOVE CEILING
26' - 2 1/2"
T.O. PARAPET
1' - 8"
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
A
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL
STRUCTURE
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
STEEL BEAM, SEE STRUCTURAL
ADJUSTABLE MASONRY
ANCHOR
1' - 8"
1' - 10"
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
A4.01
Sim
ISOLATION JOINT MORTAR NET
SELF-ADHERED MEMBRANE
FLASHING OVER TERMINATION
BAR WITH SEALANT
THROUGH WALL FLASHING
WEEP VENT
SILL GASKET MEMBRANE
AND SEALANT
12" CONCRETE GRADE BEAM,
SEE STRUCTURAL
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 8" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
MEMBRANE FLASHING
CONTINUOUS STRIP
TREATED WOOD CANT
5/8" TREATED
PLYWOOD SHEATHING
PRE-FINISHED METAL COPING
60 MIL MEMBRANE ROOFING,
EXTEND OVER PARAPET
5/8" TREATED
PLYWOOD
2X TREATED WOOD
NAILER
CONTINUOUS
GALVANIZED CLEAT
TYPICAL. EACH SIDE
SEALANT
ADJUSTABLE MASONRY
ANCHOR
26' - 2 1/2"
T.O. PARAPET
REFER TO STRUCTURAL
FOR STRAP SPLICE
D
WALL SYSTEM:
FACE BRICK
7/8" DRAINAGE MAT
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUDS AT 16" O.C. WITH
BLOWN IN BLANKET SYSTEM INSULATION
5/8" GYPSUM BOARD
WALL SYSTEM:
FACE BRICK
3/8" DRAINAGE MAT
1 1/2" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
EXISTING WALL AND
FLOOR
A4.01
D
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
ROOF SYSTEM:
ROOF MEMBRANE
GLASS MAT GYPSUM SHEATHING
TAPERED INSULATION
5" RIGID INSULATION
METAL DECK WITH CONCRETE
TOPPING, SEE STRUCTURAL
STEEL BEAMS, SEE STRUCTURAL
CUT IN METAL
REGLET
PREFINISHED METAL REGLET AND COUNTER
FLASHING; CUT IN REGLET TO EXISTING
MASONRY JOINT
CONTINUOUS ANCHOR CLEAT
BACKER ROD
2X TREATED
WOOD
BLOCKING
MEMBRANE FLASHING, HOT
WELD TO ROOF MEMBRANE
SEALANT
EXPANSION JOINT COVER
BATT
INSULATION
M
IN
1 1/2" THICK FIREPROOFING AT
ALL EXPOSED STEEL STRUCTURE
FLOOR SYSTEM:
FLOOR FINISH, SEE STRUCTURAL
6" CONCRETE SLAB, SEE STRUCTURAL
2" METAL DECKING, SEE STRUCTURAL
SW1
CONCRETE DECK EDGE ANGLE,
SEE STRUCTURAL
5 5/8"
/8
3 5/8"
/8
.8
WALL SYSTEM:
EPDM ROOF FLASHING
1/2" EXTERIOR RATED SHEATHING
6" STUDS AT 16" O.C. WITH FULL
DEPTH BATT INSULATION
1/2" SHEATHING
PRE-FINISHED
COUNTER FLASHING
EPDM FLASHING
UNDER STOREFRONT
A6.01
ATTACHED STUD TO SLAB W/ SIMPSON
RCKW 5.5" KNEEWALL CONNECTOR WITH
RCKWS 5.5" STIFFENER W/ 1/2" DIA TITEN
HD SCREW ANCHOR 3-1/4" EMBED OR
APPROVED EQUAL
A
MEMBRANE FLASHING
CONTINUOUS STRIP
TREATED WOOD CANT
5/8" TREATED
PLYWOOD SHEATHING
PRE-FINISHED METAL COPING
60 MIL MEMBRANE ROOFING,
EXTEND OVER PARAPET
5/8" TREATED
PLYWOOD
2X TREATED WOOD
NAILER
CONTINUOUS
GALVANIZED CLEAT
TYPICAL. EACH SIDE
SEALANT
PRE-FINISHED MECHANICAL
LOUVER, SEE SPECIFICATIONS
REFER TO INSTALLATION
INSTRUCTION FOR
INSTALLATION
WALL SYSTEM:
PREFINISHED METAL LOUVER
PREFINISHED METAL FLASHING AT EXPOSED
WALL SURFACES
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUD WITH BLOWN IN BLANKET
SYSTEM INSULATION
5/8" GYPSUM BOARD
A
ISOLATION JOINT
12" CONCRETE GRADE BEAM,
SEE STRUCTURAL
PRE-FINISHED MECHANICAL
LOUVER, SEE SPECIFICATIONS
PERIMETER CAULK
REFER TO INSTALLATION
INSTRUCTION FOR
INSTALLATION
WALL SYSTEM:
PREFINISHED METAL LOUVER
PREFINISHED METAL FLASHING AT EXPOSED
WALL SURFACES
1" RIGID INSULATION
FLUID APPLIED MEMBRANE
AIR/MOISTURE BARRIER
1/2" EXTERIOR RATED SHEATHING
6" METAL STUD WITH BLOWN IN BLANKET
SYSTEM INSULATION
5/8" GYPSUM BOARD
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:2
A
M
CONSTRUCTION DOCUMENTS
11/16/21
SECTION DETAILS
A4.01
EXPAND BLDG. 1 FOR
PRIMARY CARE
JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
45 128
1 1/2" = 1'-0"
PARAPET DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
1 1/2" = 1'-0"
SECTION DETAIL
6" = 1'-0"
Detail 9
1 1/2" = 1'-0"
EXISTING WINDOW DETAIL
1 1/2" = 1'-0"
PARAPET DETAIL @ LOUVER
1 1/2" = 1'-0"
SILL DETAIL @ LOUVER
3' - 0" MAX.
1' - 0" 3' - 6"
6" MAX. 3' - 0"
1' - 6" re fl e c ti v e s u rf a c e to
2" Varies 2"
MIN.
1' - 3"
ADA Water Closet Soap Dispenser Baby Changing Station
Drinking Fountain
Fire Extinguisher w/
Cabinet, Fire
Extinguisher on Bracket
B
DA
C
Paper Towel Dispenser
Countertop
"Countertop
Countertop
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.03 FOR GENERAL NOTES
3. APPLY 1 1/2" THICK FIREPROOFING AT ALL
EXPOSED STRUCTURAL STEEL,
DECKING,SECONDARY STRUCTURE WITHIN
CEILING SPACE ABOVE BASEMENT & FIRST
FLOOR LEVEL CEILING, TYP. EXCEPT STAIRS.
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:2
A
M
CONSTRUCTION DOCUMENTS
11/16/21
ROOM FINISH SCHEDULE
A5.00
EXPAND BLDG. 1 FOR
PRIMARY CARE
MD/JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
46 128
Room Finish Schedule
Number Name Floor Finish Base Finish
Walls Ceiling
CommentsWest East North South Finish
1D -121 CORRIDOR LVT-1 PRB P-1 P-1 P-1 P-1 ACT-1
1D -171 EXAM LVT-2 RB-1 P-1 P-1 P-3 P-1 ACT-1
1D -172 EXAM LVT-2 RB-1 P-1 P-1 P-3 P-1 ACT-1
1D -173 WORK ROOM CPT-1/LVT-2 RB-1 P-4 P-1 P-1 P-1 ACT-1
1D -174 EXAM LVT-2 RB-1 P-1 P-1 P-3 P-1 ACT-1
1D -175 EXAM LVT-2 RB-1 P-1 P-1 P-3 P-1 ACT-1
1D -176 BARIATRIC EXAM LVT-2 RB-1 P-1 P-1 P-3 P-1 ACT-1
1D -177 EXAM LVT-2 RB-1 P-3 P-1 P-1 P-1 ACT-1
1D -178 HAC QT-1 QT-COVE P-1/FRP P-1/FRP P-1/FRP P-1/FRP ACT-1
1D -179 EXAM LVT-2 RB-1 P-3 P-1 P-1 P-1 ACT-1
1D -180 CLEAN LINEN LIN-1 LIN-1 P-1 P-1 P-1 P-1 ACT-1
1D -181 EXAM LVT-2 RB-1 P-3 P-1 P-1 P-1 ACT-1
1D -182 TOILET PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 ACT-1
1D -183 SOILED LINEN LIN-1 LIN-1 P-1 P-1 P-1 P-1 ACT-1
1D -184 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -185 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -186 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -187 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -188 BREAK ROOM LVT-2 RB-1 P-4 P-1 P-1 P-1 ACT-1
1D -188A STAFF TLT PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 GYP
1D -189 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -190 EXAM LVT-2 RB-1 P-1 P-1 P-1 P-3 ACT-1
1D -191 WELLNESS CPT-1 RB-1 P-1 P-1 P-1 P-4 ACT-1/GYP
1D -191A EQUIP STG LIN-1 LIN-1 P-1 P-1 P-1 P-1 ACT-1
1D -192 PHARMACY OFFICE CPT-1 RB-1 P-1 P-3 P-1 P-1 ACT-1
1D -193 RECEPTION/WAITING CPT-1 RB-1 P-1 P-1 P-4 P-4 ACT-1
1D -194 LOGISTICS STG LIN-1 LIN-1 P-1 P-1 P-1 P-1 ACT-1
1D -195 ELECT CONC RB-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
1D -196 OFFICE CPT-1 RB-1 P-4 P-1 P-1 P-1 ACT-1
1D -197 OFFICE CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
1D -198 OFFICE CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
1D -199 OFFICE CPT-1 RB-1 P-4 P-1 P-1 P-1 ACT-1
BD - 110 STANDALONE PRIMARY LIN-1 LIN-1 P-1 P-1 P-1 P-1 ACT-1
BD - 112 EMS WORKROOM CPT-1 RB-1 P-4 P-1 P-1 P-1 ACT-1
BD - 113 OFFICE PROGRAM SUPPORT ASST CPT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
BD - 114 OFFICE CPT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
BD - 115 CART STORAGE LIN-1 LIN-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 116 EQUIPMENT STORAGE LIN-1 LIN-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 117 MECHANICAL CONC RB-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 118 MEN'S LOCKER ROOM PT-1 PT-COVE P-1 P-1 P-1 P-1 ACT-1/GYP
BD - 118A MEN'S SHOWER PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2 P-1/PT-2/PT-3 ACT-1/GYP SEE ELEVATIONS FOR TILE
LAYOUT
BD - 118B MEN'S TOILET PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 ACT-1/GYP SEE ELEVATIONS FOR TILE
LAYOUT
BD - 119 WOMEN'S LOCKER ROOM PT-1 PT-COVE P-1 P-1 P-1 P-1 ACT-1/GYP
BD - 119A WOMEN'S SHOWER PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 ACT-1/GYP SEE ELEVATIONS FOR TILE
LAYOUT
BD - 119B WOMEN'S TOILET PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 ACT-1/GYP SEE ELEVATIONS FOR TILE
LAYOUT
BD - 120 GEMS STORAGE LIN-1 LIN-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 121 HOUSEKEEPING EXPENDABLES LIN-1 LIN-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 122 LEADS WORKROOM CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
BD - 123 STAFF LOUNGE LVT-2 RB-1 P-4 P-1 P-1 P-1 ACT-1
BD - 124 OFFICE SUPERVISORS CPT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
BD - 125 OFFICE GEMS COORDINATOR CPT-1 RB-1 P-1 P-1 P-1 P-4 ACT-1
BD - 126 SECRETARY OFFICE CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
BD - 127 OFFICE EMS CHIEF CPT-1 RB-1 P-4 P-1 P-1 P-1 ACT-1
BD - 128 OFFICE EMS ASST CHIEF CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
BD - 129 OFFICE ADMIN OFFICER CPT-1 RB-1 P-4 P-1 P-1 P-1 ACT-1
BD - 130 CONFERENCE ROOM CPT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
BD - 130A ELECTRICAL CONC RB-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
BD - 131 OFFICE CPT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
BD - 132 TOILET PT-1 PT-COVE P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 P-1/PT-2/PT-3 GYP
BD - 133 WET ROOM PT-1 PT-COVE PT-2 PT-2 PT-2 PT-2 ACT-1
CO01 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
CO02 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
CO03 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
CO04 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
CO05 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
CO06 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
E1D -108 OFFICE (M.H.) EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
E1D -110 CONSULT (M.H.) EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
E1D -112 OFFICE (M.H.) EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
E1D -116 CONSULT PHARM CPT-1 RB-1 P-1 P-1 P-1 P-4 ACT-1
E1D -120 WORK ROOM (P.C. DOC'S) CPT-1 RB-1 P-1 P-1 P-1 P-4 ACT-1
E1D - 128 LOCKER EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
E1D - 129 CONF EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
E1D - 130 STAFF BREAK ROOM EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EBD - 70 MECHANICAL ROOM EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EBD - 80 STORAGE EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
STAIRWELL #24 STAIRWELL #24 RF-1 RB-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
STAIRWELL #24 STAIRWELL #24 RF-1 RB-1 P-1 P-1 P-1 P-1 OPEN TO STRUCTURE
1/4" = 1'-0"
Mounting Heights
Toilet Room Accessory...
A 42" Grab bar
B 18" Grab bar
C Toilet paper dispenser
D 36" Grab bar
GENERAL NOTES:
A5.015
A5.019
A5.01
A5.01
M3A M3B M3B M3B
M3B
M3A
M3B
M3B
M3A
M3A
M3AM3A
M3A
M2A
M3A
M14A
M3B
M3A
M2A
M6B
M2A
M3AM6B
6' - 6 13/16"6' - 6 13/16"
/4
/4
3' - 1" 6' - 8" 12' - 5" 2' - 2" 11' - 5"
1' - 7"
1' - 10" 7' - 11" 1' - 1" 5' - 2" 2' - 6" 5' - 2" 1' - 1" 5' - 5" 1' - 6"
6' - 0" 5' - 2" 1' - 7"
2' - 7"
3' - 9" 4' - 2"
22-03 22-03
A5.01
22Sim
S im
S im
24Sim
A5.01
26Sim
S im
28Sim
S im
10-50
7' - 10"
09-67
BD-118A BD-118B8
22' - 0"
10-5010-50
09-67
26-50
10-04 10-04
10-50
10-50
7' - 10"
A5.14
Sim
10-50
10-50
22' - 0"
A5.14
Sim
09-67
10-50
10-50
BD-1198
12' - 7"
A5.14
Sim
10-50
10-50 10-50
A5.14
22' - 0"
10-50
10-50
12' - 7"
A5.14
Sim
BD-119ABD-119B8
22' - 0"
26-50
10-04
10-04
BD-123
F
09-65
10-09 10-09
13' - 3"
09-65
12-35
12-35
12-42
12-30
22' - 0"
A5.14
A5.14
A5.14
A5.14
26-50
D D D
09-65
10-09 10-09 10-09
13' - 3"
23-0123-01 09-65
22' - 0"
09-65
18' - 10"
11-01
10-21.1
09-65
17' - 1"
11-01
11-01
23-01
10-21.1
10-21.1
09-65
BD-130
17' - 3"
26-50
BD-130A
09-65
17' - 1"
11-01
10-21.110-21.1
10-04
18' - 5"
09-36
09-36
22-0122-01
BD-1338
18' - 7"
09-36
26-50
17' - 10"
09-36
10-21.210-21.2
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.03 FOR GENERAL NOTES
3. APPLY 1 1/2" THICK FIREPROOFING AT ALL
EXPOSED STRUCTURAL STEEL,
DECKING,SECONDARY STRUCTURE WITHIN
CEILING SPACE ABOVE BASEMENT & FIRST
FLOOR LEVEL CEILING, TYP. EXCEPT STAIRS.
6' - 6"
09-32
09-31
22-03
22-01
7' - 9"
09-32
09-31
22-03
22-01
6' - 6"
09-31
BD-118A
7' - 9"
09-32
09-31
22-03
6' - 6"
09-33
09-32
22-01
09-31
7' - 0"
09-33
09-32
09-31
10-22
22-01 22-01
10-37
10-30
6' - 6"
09-33
09-32
09-31
BD-118B
7' - 0"
09-33
09-32
09-31
10-35
19' - 8 1/4"
10-21.110-21.1 09-65
18' - 2 3/4"
10-21.110-21.109-65
19' - 8 1/4"
09-65
18' - 2 3/4"
09-65
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING INC.
3202 W MAIN ST C,
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
/1 /2
:4
:4
A
M
CONSTRUCTION DOCUMENTS
11/16/21
ENLARGED FLOOR PLAN AND
INTERIOR ELEVATIONS - BASEMENT
A5.01
EXPAND BLDG. 1 FOR
PRIMARY CARE
MD/JGCJS
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
47 128
1/4" = 1'-0"
ENLARGED LOCKER ROOMS
1/4" = 1'-0"
BD-118 MEN'S LOCKER RM NORTH
1/4" = 1'-0"
BD-118 MEN'S LOCKER RM EAST
1/4" = 1'-0"
BD-118 MEN'S LOCKER RM SOUTH
1/4" = 1'-0"
BD-118 MEN'S LOCKER RM WEST
1/4" = 1'-0"
BD-119 WOMEN'S LOCKER RM NORTH
1/4" = 1'-0"
BD-119 WOMEN'S LOCKER RM EAST
1/4" = 1'-0"
BD-119 WOMEN'S LOCKER RM SOUTH
1/4" = 1'-0"
BD-119 WOMEN'S LOCKER RM WEST
1/4" = 1'-0"
BD-123 STAFF LOUNGE NORTH
1/4" = 1'-0"
BD-123 STAFF LOUNGE EAST
1/4" = 1'-0"
BD-123 STAFF LOUNGE SOUTH
1/4" = 1'-0"
BD-123 STAFF LOUNGE WEST
1/4" = 1'-0"
BD-130 CONFERENCE RM NORTH
1/4" = 1'-0"
BD-130 CONFERENCE RM EAST
1/4" = 1'-0"
BD-130 CONFERENCE RM SOUTH
1/4" = 1'-0"
BD-130 CONFERENCE RM WEST
1/4" = 1'-0"
BD-133 WET ROOM NORTH
1/4" = 1'-0"
BD-133 WET ROOM EAST
1/4" = 1'-0"
BD-133 WET ROOM SOUTH
1/4" = 1'-0"
BD-133 WET ROOM WEST
GENERAL NOTES:
KEYNOTES:
09-31 PT-2, PORCELAIN TILE, SEE SPECIFICATION.
09-32 PT-3, GLASS TILE, SEE SPECIFICATION.
09-33 METAL BULLNOSE TRIM, SEE SPECIFICATION.
09-36 PT-4, PORCELAIN TILE, SEE SPECIFICATION.
09-65 RUBBER BASE, SEE SPECIFICATION.
09-67 PORCELAIN TILE BASE, SEE SPECIFICATION.
10-04 ROOM SIGN, SEE SIGNAGE SCHEDULE
10-09 ROLL TYPE WINDOW SHADES
10-21.1 CG-1, VINYL CORNER GUARD, SEE SPECIFICATION.
10-21.2 CG-2, STAINLESS STEEL CORNER GUARD, SEE
SPECIFICATION.
10-22 24"x30" MIRROR, SEE SPECIFICATION.
10-30 SURFACE MOUNTED PAPER TOWEL DISPENSER, SEE
SPECIFICATION.
10-35 ROBE HOOK, SEE SPECIFICATION.
10-37 SOAP DISPENSER (A5075), SEE SPECIFICATION.
10-50 FULL HEIGHT METAL LOCKERS, SEE SPECS.
11-01 WALL MOUNTED DISPLAY BY OWNER. TYPICAL. SEE
ELECTRICAL FOR CONNECTION TYP.
12-30 PLASTIC LAMINATE COUNTERTOP AND BACKSPLASH,
TYPICAL
12-35 PLASTIC LAMINATE WALL CABINETS, TYP., SEE
SPECIFICATION.
12-42 PLASTIC LAMINATE WALL CABINETS, TYP., SEE
SPECIFICATION.
22-01 PLUMBING FIXTURE (REF. MECHANICAL)
22-03 SOLID SURFACE SHOWER PAN, TYP.
23-01 MECHANICAL EQUIPMENT (REF. MECHANICAL).
26-50 INTERIOR LIGHT FIXTURE (REF. ELECTRICAL)
1/4" = 1'-0"
BD-118A MEN'S SHOWER NORTH
1/4" = 1'-0"
BD-118A MEN'S SHOWER EAST
1/4" = 1'-0"
BD-118A MEN'S SHOWER SOUTH
1/4" = 1'-0"
BD-118A MEN'S SHOWER WEST
1/4" = 1'-0"
BD-118B MEN'S TOILET NORTH
1/4" = 1'-0"
BD-118B MEN'S TOILET EAST
1/4" = 1'-0"
BD-118B MEN'S TOILET SOUTH
1/4" = 1'-0"
BD-118B MEN'S TOILET WEST
1/4" = 1'-0"
BD-112 EMS WORKROOM NORTH
1/4" = 1'-0"
BD-112 EMS WORKROOM EAST
1/4" = 1'-0"
BD-112 EMS WORKROOM SOUTH
1/4" = 1'-0"
BD-112 EMS WORKROOM WEST
File details come from the government source that posted it. Updated .