ATTACHMENT 15 - Drawings - Volume 2 - 4 of 4.pdf

PDF 4 MB Posted

Attached to
Y1DA--Expand Building 1 for Primary Care (Minor) Construction - Fargo
Solicitation number
36C77622B0063
Issued by

About this file

This solicitation is for the expansion of Building 1 for primary care at the Fargo VA Medical Center. The project involves rerouting part of the road between the medical center and the flood wall, relocating the flood wall basin and road further away from a new building addition to comply with standoff requirements. Foundation work will include installing helical piers to the specified depth. The two-story addition will create a whole health clinic on the first floor and mechanical space and offices for EMS in the basement. The solicitation requests bids for the construction work described to expand primary care facilities at the identified location by the specified date.

View the file

Other files

File Type Posted
Addendum 1 Civil Drawings.pdf PDF
Addendum 1 Mechanical Drawings.pdf PDF
Technical Questions - FINAL - Fargo 1-11-23.pdf PDF
10 51 13 Metal Lockers.pdf PDF
22 14 00 Facility Storm Drainage.pdf PDF
36C77622B0063 0003.pdf PDF
Addendum 1 Electrical Drawings.pdf PDF
Final Geotechnical Report - VA Bldg 1 Expansion - Fargo.pdf PDF
Addendum 1 Fire Alarm and Sprinkler Drawings_01.pdf PDF
Addendum 1 Structural Drawings.pdf PDF
22 40 00 Plumbing Fixtures.pdf PDF
Addendum 1 Existing Flood Wall Drawings - For Reference Only.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 1-6-23.pdf PDF
Addendum 1 Arch Drawings.pdf PDF
36C77622B0063 0002.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction 11-22-22.docx DOCX document
ATTACHMENT 19 - Construction Wage Rates - Cass 11-25-22.pdf PDF
36C77622B0063 0001.pdf PDF
Site Visit Sign-in Sheet - Fargo 12-5-22.pdf PDF
ATTACHMENT 5 - Drawings - Volume 1 - 2 of 8.pdf PDF
ATTACHMENT 17 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 16 - Contractor Work Hours.pdf PDF
ATTACHMENT 4 - Drawings - Volume 1 - 1 of 8.pdf PDF
ATTACHMENT 3 - Specifications - Volume 3.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 10-7-22.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 21 - Site Visit Instructions.pdf PDF
ATTACHMENT 12 - Drawings - Volume 2 - 1 of 4.pdf PDF
ATTACHMENT 1 - Specifications - Volume 1.pdf PDF
ATTACHMENT 7 - Drawings - Volume 1 - 4 of 8.pdf PDF
ATTACHMENT 13 - Drawings - Volume 2 - 2 of 4.pdf PDF
ATTACHMENT 2 - Specifications - Volume 2.pdf PDF
ATTACHMENT 14- Drawings - Volume 2 - 3 of 4.pdf PDF
ATTACHMENT 8 - Drawings - Volume 1 - 5 of 8.pdf PDF
ATTACHMENT 11 - Drawings - Volume 1 - 8 of 8.pdf PDF
ATTACHMENT 20 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 9 - Drawings - Volume 1 - 6 of 8.pdf PDF
ATTACHMENT 6 - Drawings - Volume 1 - 3 of 8.pdf PDF
ATTACHMENT 10 - Drawings - Volume 1 - 7 of 8.pdf PDF
36C77622B0063 - 11-22-22.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

FIRE ALARM DEVICE SYMBOLS

SPOT-TYPE SMOKE DETECTOR

SPEAKER STROBE - CEILING MOUNT

SPEAKER STROBE - WALL MOUNT

MANUAL PULL STATION

SPRINKLER TAMPER SWITCH MONITOR MODULE

SPRINKLER WATER FLOW MONITOR MODULEWF

T

SPEAKER - CEILING MOUNT

MAGNETIC DOOR HOLD RELAYDH

S DUCT-TYPE SMOKE DETECTOR

ISO ISOLATION MODULE

SPEAKER STROBE - WALL MOUNT WATER PROOFWP

STROBE - WALL MOUNT

1. THIS PROJECT INCLUDES THE DESIGN OF AN EXTENSION TO THE EXISTING ADDRESSABLE FIRE ALARM SYSTEM FOR THE NEW BUILDING ADDITION SHOWN ON THESE PLANS PER NFPA 72 (2019 ed.), LOCAL BUILDING CODES, AND THE VA FIRE PROTECTION DESIGN MANUAL (SEVENTH ed.).

NEW WIRING AND DEVICES WILL BE INSTALLED IN PROJECT AREAS ON ALL LEVELS.

2. FINAL DEVICE LOCATION AND CIRCUIT ROUTING IS TO BE DETERMINED BY THE

FIRE ALARM CONTRACTOR AND IS SUBJECT TO APPROVAL BY THE ENGINEER OF

RECORD.

3. REFER TO SPECIFICATION SECTION 28 31 00 FOR ADDITIONAL FIRE ALARM SYSTEM

INFORMATION.

4. ALL DEVICES SHALL BE UL LISTED AND FM APPROVED PER THE VA FIRE PROTECTION

DESIGN MANUAL. ALL NEW DEVICES SHALL BE PURCHASED FROM THE BUILDING FIRE ALARM

MAINTENANCE CONTRACTOR TO ENSURE COMPATIBILITY WITH BUILDING'S FIRE ALARM SYSTEM.

5. DEVICES ARE REQUIRED TO BE PROTECTED DURING PAINTING.

6. CEILING MOUNTED DEVICES SHALL BE LOCATED IN THE CENTER POINT OF SQUARE

CEILING TILES AND ALLOWED TO BE IN THE QUARTER AND/OR CENTER POINTS OF

RECTANGULAR CEILING TILES.

7. NOT ALL REQUIRED DEVICES AND WIRING ARE SHOWN. CONSIDERATION OF

ADDITIONAL DEVICES AND WIRING DUE TO INTERFERENCE WITH OTHER TRADES,

OBSTRUCTIONS, IMPROVED AESTHETICS, OR OWNER/AHJ REQUESTS SHALL BE MADE

PRIOR TO BID BY THE FIRE ALARM CONTRACTOR.

8. FIRE ALARM CONTRACTOR TO PROVIDE ALL NECESSARY MATERIAL TO PROVIDE

COMPLETE SYSTEM(S) TO COMPLY WITH NFPA 72, LOCAL BUILDING CODES, AND THE

VA FIRE PROTECTION DESIGN MANUAL. ANY AND ALL CLARIFICATIONS TO BID

DOCUMENTS SHALL BE MADE PRIOR TO BID.

9. THE FIRE ALARM CONTRACTOR SHALL INSPECT THE SITE PRIOR TO BID. NO

ALLOWANCES FOR EXTRA DEVICES ETC. WILL BE ALLOWED AFTER AWARD OF

CONTRACT DUE TO MISUNDERSTANDING OF WORK INVOLVED OR LACK OF KNOWLEDGE

OF ANY PROJECT SITE CONDITIONS.

10. CONTROL PANEL AND DEVICE LOCATIONS SHOWN ON THESE PLANS IS CONCEPTUAL

BUT IS TO BE CLOSELY FOLLOWED BY THE FIRE ALARM CONTRACTOR. ANY MAJOR

CHANGES TO WHAT IS BEING INDICATED ON THESE PLANS SHALL FIRST BE APPROVED

BY THE ARCHITECT AND ENGINEER OF RECORD.

11. ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, & ELECTRICAL FEATURES INDICATED

ON THE FA SHEETS SHALL BE VERIFIED BY CONSULTING THE A/S/M&E SHEETS.

12. ALL CALCULATIONS ARE THE RESPONSIBILITY OF THE FIRE ALARM CONTRACTOR. ANY

AND ALL CLARIFICATION TO BID DOCUMENTS SHALL BE MADE PRIOR TO BID.

13. SHOULD ANY EXISTING SYSTEM DEFICIENCIES NOT INDICATED ON THESE PLANS BE

DISCOVERED AS PART OF CONDUCTING THE WORK INCLUDED IN THIS SCOPE, THEY

SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY.

14. THESE PLANS SHALL BE USED AS A GENERAL GUIDE IN THE GENERATION OF THE FIRE

ALARM CONTRACTOR'S BID AND ARE NOT INTENDED TO INDICATE THE ENTIRE EXTENT

OF ALARM PROTECTION REQUIRED. ANY AREAS REQUIRED TO BE PROTECTED PER

NFPA 72 THAT MAY OR MAY NOT BE SHOWN WITH PROTECTION ON THESE PLANS SHALL

BE INCLUDED IN THE CONTRACTOR'S BID.

15. FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND RE-INSTALLING

OF EXISTING CEILING TILE AND WALLS NOT REMOVED BY THE GENERAL

CONTRACTOR FOR THE DEMOLITION OF EXISTING FIRE ALARM DEVICES, WIRING, ETC.

ANY CEILING OR WALL COMPONENTS DAMAGED SHALL BE REPLACED OR PATCHED

WITH NEW BY THIS CONTRACTOR.

16. FIRE ALARM RISER DIAGRAM AND SHOP DRAWINGS, INCLUDING BATTERY CALCULATIONS AND NOTIFICATION APPLIANCE CIRCUIT VOLTAGE DROP ANALYSIS PLUS SEQUENCE OF OPERATIONS, SHALL BE PREPARED AND SUBMITTED BY THE FIRE ALARM CONTRACTOR.

FIRE ALARM CONTROL PANEL MATRIX

EVENT

MANUAL PULL STATION ACTIVATION

SMOKE DETECTOR ACTIVATION

DUCT SMOKE DETECTOR ACTIVATION

A N

N U

N C

IA

T

E O

N F

IR

E

A L A

R M

C O

N T

R O

L P

A N

E L

A C

T

IV

A T

E A

U D

IB

L E

N O

T

IF

IC

A

T

IO

N

S

IG

N A

L S

U P

E R

V

IS

IN

G

S T

A T

IO

N

IN

IT

IA

T

E R

E C

A L L E

L E

V A

T O

R

S H

U T

D O

W N

A S

S O

C

IA

T E

D A

IR

H

A N

D L E

R A

N D

C L O

S E

A S

S O

C

IA

T E

D F

/S D

A M

P E

R S

A C

T

IV

A T

E V

IS

IB

L E

N O

T

IF

IC

A

T

IO

N

C L O

S E

A S

S O

C

IA

T E

D S

M O

K E

D A

M P

E R

R E

L E

A S

E A

S S

O C

IA

T

E D

D O

O R

H O

L D

S

1. MATRIX SHALL FOLLOW PROVISIONS OF VA FIRE PROTECTION

DESIGN MANUAL FOR ZONED NOTIFICAITON REQUIREMENTS.

2. THE SAME SYSTEM RESPONSE SHALL BE USED IN THE ADDITION

AS WHAT IS CURRENTLY USED IN THE EXISITNG FACILITY.

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

/1

/2

:1

:5

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE ALARM COVER SHEET

FA1.00

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

123 128

GENERAL NOTES:

11-18-21

30 30

15 15

30 30

30 30

15 15

M

15 15

M

S P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S

P S

P S

P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

M

SP SP

EXISTING TO REMAIN.

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT.

1. ALL EXISITNG DEVICES IN WORK AREA TO BE

REMOVED AND REPLACED PER THIS LAYOUT.

2. ALL NEW FIRE ALARM DEVICES TO TIE INTO

EXISTING FIRE ALARM PANEL.

3. CONFIRM NEW SMOKE ZONE BOUNDARIES WITH

ARCHITECT OF RECORD.

4. CONTRACTOR TO PROVIDE ALL PROGRAMMING,

MESSAGE CHIPS, ETC. REQUIRED FOR CHANGE TO

THE EXISTING FIRE ALARM SYSTEM.

A C EB D F G H

I

S S

DH DH

NEW SMOKE DETECTOR TO BE

ON EXISTING ZONE

MECHANICAL

BD - 117

804 SF

EQUIPMENT STORAGE

BD - 116

719 SF

CART STORAGE

BD - 115

764 SF

CORRIDOR

CO01

625 SF

EMS WORKROOM

BD - 112

357 SF

OFFICE

BD - 114

95 SF

OFFICE PROGRAM SUPPORT ASST

BD - 113

94 SF

MEN'S LOCKER ROOM

BD - 118

258 SF

WOMEN'S LOCKER ROOM

BD - 119

224 SF

MEN'S TOILET

BD - 118B

45 SF

WOMEN'S TOILET

BD - 119B

45 SF

GEMS STORAGE

BD - 120

284 SF

HOUSEKEEPING EXPENDABLES

BD - 121

288 SF

LEADS WORKROOM

BD - 122

222 SF

STAFF LOUNGE

BD - 123

288 SF

OFFICE SUPERVISORS

BD - 124

205 SF

OFFICE GEMS COORDINATOR

BD - 125

119 SF

SECRETARY OFFICE

BD - 126

220 SF

OFFICE EMS CHIEF

BD - 127

150 SF

OFFICE EMS ASST CHIEF

BD - 128

117 SF

OFFICE ADMIN OFFICER

BD - 129

126 SF

CONFERENCE ROOM

BD - 130

303 SF

OFFICE

BD - 131

114 SF

TOILET

BD - 132

75 SF

ELECTRICAL

BD - 130A

78 SF

WET ROOM

BD - 133

313 SF

STANDALONE PRIMARY

BD - 110

527 SF

STAIRWELL #24

CORRIDOR

CO02

434 SF

WF T

FIRE ALARM DEVICE SYMBOLS

SPOT-TYPE SMOKE DETECTOR

SPEAKER STROBE - CEILING MOUNT

SPEAKER STROBE - WALL MOUNT

MANUAL PULL STATION

SPRINKLER TAMPER SWITCH MONITOR MODULE

SPRINKLER WATER FLOW MONITOR MODULEWF

T

SPEAKER - CEILING MOUNT

MAGNETIC DOOR HOLD RELAYDH

S DUCT-TYPE SMOKE DETECTOR

ISO ISOLATION MODULE

SPEAKER STROBE - WALL MOUNT WATER PROOFWP

STROBE - WALL MOUNT

FIRE BARRIER SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

/1

/2

:1

:5

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE ALARM - BASEMENT LEVEL

FA1.01

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

124 128

NEW PLAN AREA LEGEND:

SHEET NOTES:

1/8" = 1'-0"

FIRE ALARM PLAN - BASEMENT LEVEL

15 15

30 30

M

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

S P

S P

S P

S P

SP SP

SP SP

M

SP SP

EXISTING TO REMAIN.

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT.

1.. ALL EXISITNG DEVICES IN WORK AREA TO BE

REMOVED AND REPLACED PER THIS LAYOUT.

2. ALL NEW FIRE ALARM DEVICES TO TIE INTO

EXISTING FIRE ALARM PANEL.

3. CONFIRM NEW SMOKE ZONE BOUNDARIES WITH

ARCHITECT OF RECORD. DEVICES TO BE TIED INTO

RESPECTIVE ZONES PER THEIR LOCATION.

4. CONTRACTOR TO PROVIDE ALL PROGRAMMING,

MESSAGE CHIPS, ETC. REQUIRED FOR CHANGE TO

THE EXISTING FIRE ALARM SYSTEM.

A C EB D F G H

I

DH DH

NEW DEVICES TO BE

ON EXISTING ZONE

BARIATRIC EXAM

1D -176

161 SF

EXAM

1D -175

162 SF

EXAM

1D -174

162 SF

EXAM

1D -172

162 SF

EXAM

1D -171

162 SF

EXAM

1D -177

135 SF

EXAM

1D -179

140 SF

EXAM

1D -181

138 SF

EXAM

1D -184

147 SF

EXAM

1D -185

150 SF

EXAM

1D -186

151 SF

EXAM

1D -187

150 SF

EXAM

1D -189

151 SF

EXAM

1D -190

151 SF EQUIP STG

1D -191A

234 SF

WELLNESS

1D -191

633 SF

BREAK ROOM

1D -188

188 SF

STAFF TLT

1D -188A

60 SF

WORK ROOM

1D -173

541 SF

SOILED LINEN

1D -183

67 SF

TOILET

1D -182

66 SF

CLEAN LINEN

1D -180

77 SF

HAC

1D -178

60 SF

CORRIDOR

CO04

927 SF

CORRIDOR

CO04

927 SF

CORRIDOR

CO06

377 SF

CONSULT PHARM

E1D -116

167 SF

WORK ROOM (P.C. DOC'S)

E1D -120

207 SF

RECEPTION/WAITING

1D -193

338 SF

PHARMACY OFFICE

1D -192

114 SF

LOGISTICS STG

1D -194

150 SF

ELECT

1D -195

74 SF

OFFICE

1D -196

106 SF

OFFICE

1D -197

107 SF

OFFICE

1D -198

104 SF

OFFICE

1D -199

108 SF

STAIRWELL #24

WF T

FIRE ALARM DEVICE SYMBOLS

SPOT-TYPE SMOKE DETECTOR

SPEAKER STROBE - CEILING MOUNT

SPEAKER STROBE - WALL MOUNT

MANUAL PULL STATION

SPRINKLER TAMPER SWITCH MONITOR MODULE

SPRINKLER WATER FLOW MONITOR MODULEWF

T

SPEAKER - CEILING MOUNT

MAGNETIC DOOR HOLD RELAYDH

S DUCT-TYPE SMOKE DETECTOR

ISO ISOLATION MODULE

SPEAKER STROBE - WALL MOUNT WATER PROOFWP

STROBE - WALL MOUNT

FIRE BARRIER SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

/2

:1

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE ALARM - FIRST LEVEL

FA1.02

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

125 128

NEW PLAN AREA LEGEND:

SHEET NOTES:

1/8" = 1'-0"

FIRE ALARM PLAN - FIRST LEVEL

2-STORY

BUILDING

ADDITION

(8,400 sf per floor)

# BUILDING NUMBERS

LEGEND

FLOW HYDRANT

GAUGE HYDRANT

EXISTING UNDERGROUND

LEAD-IN

EXISTING 4" FIRE

PROTECTION

VALVE ASSEMBLY

NEW HYDRANT

LOCATION (SEE CIVIL

PLANS)

EXISTING UNDERGROUND

FIRE MAIN

NEW 6" UNDERGROUND

FIRE MAIN

NEW VALVES

EXISTING UNDERGROUND

FIRE MAIN TO BE REMOVED

(SEE CIVIL PLANS)

POINT WHERE OUTSIDE HOSE

ALLOWANCES SHALL BE TAKEN

EXISITNG FIRE DEPARTMENT

CONNECTION AND OUTSIDE ALARM

WATER SUPPLY EFFECTIVE

POINT FOR CALCULATIONS

1. FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK INCLUDES INSTALLATION OF A

STANDPIPE SYSTEM TIED INTO THE EXISTING 4" VALVE ASSEMBLY AND WET SPRINKLER

PROTECTION AT BASEMENT LEVEL AND FIRST LEVEL OF THE NEW ADDITION. LIMITED

REWORK WITHIN THE EXISTING BUILDING IS REQUIRED.

2. NEW ADDITION SHALL HAVE ENTIRELY NEW SPRINKLER ZONE SUPPLIED WITHIN NEW

STAIRWELL AS SHOWN ON DRAWINGS. THIS IS TO MAINTAIN CORRELATION OF NEW

SPRINKLER ZONES TO THE NEW SMOKE ZONE OF THE ADDITION.

3. ALL COMPONENTS OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH VA

DESIGN GUIDELINES, NFPA 13 (2019), NFPA 14 (2019) AND NFPA 25 (2020) EDITION. REFER

TO SPECIFICATION SECTIONS 21 08 00 & 21 13 13 FOR ADDITIONAL FIRE SPRINKLER

SYSTEM INFORMATION.

4. ALL PATIENT CARE AREAS ASSUME LIGHT HAZARD PROTECTION IN ACCORDANCE WITH

NFPA 13 (2019). PARKING, MECHANICAL/ELECTRICAL ROOMS ORDINARY HAZARD GROUP

1 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019). STORAGE AREAS, LAUNDRY,

ORDINARY HAZARD GROUP 2 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019).

5. EXIT STAIRWELL TO BE PROVIDED WITH PLUGGED/CAPPED 2 1/2" OUTLETS FOR

POTENTIAL FUTURE STANDPIPE SYSTEM. ZONE CONTROL VALVES WILL BE PROVIDED

AT EACH LEVEL.

6. CONFIRM 3" ZONE CONTROL/MAINS AND 1 1/2" BRANCHLINES FOR SPRINKLER SYSTEM

PIPE SIZING VIA HYDRAULIC CALCULATIONS.

7. PROVIDE ALL SYSTEM COMPONENTS NECESSARY FOR A COMPLETE INSTALLATION.

SYSTEM COMPONENTS SHALL INCLUDE BUT ARE NOT LIMITED TO DISTRIBUTION PIPING,

SPRINKLER PIPING, SPRINKLERS, PIPE SUPPORTS, ALARMS, DRAINS, TEST

CONNECTIONS, CONTROL VALVES AND CHECK VALVES.

8. SEMI RECESSED SPRINKLERS REQUIRED IN AREAS WITH FINISHED CEILINGS.

CONCEALED SPRINKLERS ARE NOT ALLOWED IN LIGHT HAZARD OCCUPANCIES PER VA

GUIDELINES. UPRIGHTS IN EXPOSED AREAS TO BE BRASS FINISH.

9. TAMPER SWITCHES AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED BY THE

FIRE PROTECTION CONTRACTOR AND WIRED PER SPECIFICATION - DIVISION 28.

10. TESTING OF SPRINKLER PIPING SHALL BE IN ACCORDANCE WITH NFPA 13 - 200 PSI FOR

2 HRS

11. SHOP DRAWINGS SHALL BE APPROVED BY THE OWNER'S DESIGNATED

REPRESENTATIVE AND THE AHJ PRIOR TO FABRICATION

12. HANG ALL PIPING PER NFPA 13 - CHAPTER 9. CONTRACTOR SHALL INDICATE ALL PIPE

SUPPORTS.

13. STEEL PIPING IS REQUIRED IN ALL AREAS .

14. UNLESS NOTED OTHERWISE ALL AREAS INCLUDE WET SPRINKLER SYSTEMS.

TEMPERATURES MAINTAINED GREATER THAN OR EQUAL TO 40 DEGREES FAHRENHEIT

AT ALL TIMES.

15. ALL PENETRATIONS AT FIRE BARRIERS OR OTHER RATED ASSEMBLIES ARE REQUIRED

TO BE SEALED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE OR

OTHER APPROVED MEANS.

16. COORDINATION IS REQUIRED WITH ALL TRADES. PROVIDE SPRINKLER PROTECTION

ABOVE AND BELOW ALL OBSTRUCTIONS.

16. COORDINATE SHUT DOWNS AND TIE IN WORK WITH AHJ AND GENERAL CONTRACTOR

AND VA FP ENGINEERING.

17. FLOW TEST PROVIDED FROM SUMMIT FIRE CONSULTING (SFC)

A. STATIC: 48 PSI

B. RESIDUAL: 39 PSI

C. FLOW: 809 GPM

D. DATE: 9/1/2021

E. EFFECTIVE POINT: WHERE THE NEW 6" FIRE MAIN TIES INTO THE EXISTING LOOP

MAIN SOUTH OF THE BUILDING.

F. HOSE ALLOWANCES SHALL BE TAKEN AT THE POINT OF CONNECTION TO THE

EXISTING LEAD-IN MAIN TO THE EXISTING OUTSIDE MAIN JUST WEST OF THE

EXISTING RISER.

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

/1

/2

:1

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE PROTECTION COVER SHEET

FP1.00

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

126 128

1/32" = 1'-0"

SITE PLAN

GENERAL NOTES:

P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S P

S P

S P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

SP SP

EXISTING TO REMAIN.

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT.

1. PIPE ROUTING TO BE VERIFIED DURING FIELD

SURVEY. ROUTE SHOWN IS SCHEMATIC.

2. COORDINATE ANY EXISTING CEILING TILE

REMOVAL IN EXISTING BUILDING FOR NEW PIPE

INSTALL.

3. COORDINATE WITH ALL TRADES TO AVOID

CONFLICTS. SPRINKLER MAINS AND SUPPLY TO

ROUTE AS TIGHT AS POSSIBLE TO BOTTOM OF

STRUCTURAL BEAMS TO AVOID MECHANICAL

EQUIPMENT.

4. DEMO WORK AT THIS LEVEL SHOULD INCLUDE THE

REMOVAL OF THE EXISTING ANTIFREEZE SYSTEM

AND BACKFLOW.

FIRST LEVEL

100' - 0"

BASEMENT LEVEL

88' - 0"

ZONE CONTROL

- FLOW SWITCH

- TEST & DRAIN

- PRESSURE RELIEF

- AIR/WATER GAUGE

CHECK VALVE

BUTTERFLY

VALVE -

SUPERVISED

2 1/2" OUTLET

CAPPED/PLUGGED FOR

POTENTIAL FUTURE

STANDPIPE

3'-6" AFF

4" VERTICAL SUPPLY

DRAIN PIPE

TO EXTERIOR

ZONE CONTROL

- FLOW SWITCH

- TEST & DRAIN

- PRESSURE RELIEF

- AIR/WATER GAUGE

CHECK VALVE

BUTTERFLY VALVE -

SUPERVISED

2 1/2" OUTLET CAPPED/PLUGGED FOR

POTENTIAL FUTURE STANDPIPE

3'-6" AFF

2" DRAIN LINE

CAP

DRAIN CAP

A C EB D F G H

I e9 e10

FP1.01

ROUTE UP TO FIRST

LEVEL

4" BUTTERFLY VALVE

SUPERVISED

4" SUPPLY ABOVE

CEILING @ APPROX

ELEVATION OF 9'-6"

TIE INTO EXISITNG 4"

VALVE ASSEMBLY.

PROVIDE NEW TEE,

SUPERVISED BLUTTERFLY

VALVE, AND FLOW SWITCH

(TIE INTO EXISITNG FIRE

ALARM CONTROL PANEL).

OH1

OH2 OH2

OH2

OH2

OH1

PROVIDE SPRINKLERS AT

BOTTOM OF STAIRS

MECHANICAL

BD - 117

804 SF

EQUIPMENT STORAGE

BD - 116

719 SF

CART STORAGE

BD - 115

764 SF

MEN'S LOCKER ROOM

BD - 118

258 SF

WOMEN'S LOCKER ROOM

BD - 119

224 SF

MEN'S TOILET

BD - 118B

45 SF

WOMEN'S TOILET

BD - 119B

45 SF

GEMS STORAGE

BD - 120

284 SF

HOUSEKEEPING EXPENDABLES

BD - 121

288 SF

LEADS WORKROOM

BD - 122

222 SF

STAFF LOUNGE

BD - 123

288 SF

OFFICE SUPERVISORS

BD - 124

205 SF

OFFICE

BD - 114

95 SF

OFFICE PROGRAM SUPPORT ASST

BD - 113

94 SF

EMS WORKROOM

BD - 112

357 SF

STANDALONE PRIMARY

BD - 110

527 SF

WET ROOM

BD - 133

313 SF

TOILET

BD - 132

75 SF

OFFICE

BD - 131

114 SF

ELECTRICAL

BD - 130A

78 SF

CONFERENCE ROOM

BD - 130

303 SF

STAIRWELL #24

OFFICE ADMIN OFFICER

BD - 129

126 SF

OFFICE EMS ASST CHIEF

BD - 128

117 SF

OFFICE EMS CHIEF

BD - 127

150 SF

SECRETARY OFFICE

BD - 126

220 SF

OFFICE GEMS COORDINATOR

BD - 125

119 SF

CORRIDOR

CO01

625 SF

CORRIDOR

CO02

434 SF

OH2

BASEMENT ZONE

CONTROL LOCATION

2" DRAIN PIPE

FP1.01

EXISITNG ANTIFREEZE

SYSTEM AND BACKFLOW

TO BE COMPLETELY

REMOVED BACK TO MAIN

IN MECHANICAL ROOM.

CAP SYSTEM & PATCH ALL

HOLES. ALL PATCHES TO

MATCH FINISHES.

OH1 ORDINARY HAZARD GROUP 1: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

ORDINARY HAZARD GROUP 2: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

LIGHT HAZARD: 0.10 GPM/SF OVER 1,500SF, 100GPM HOSE STREAM

HAZARD CLASSIFICATIONS (PER NFPA 13)

OH2

AT NEW TEE: INSTALL 4" BUTTERFLY

VALVE, FLOW SWITCH AND DRAIN.

SEE FLOOR PLAN FOR ROUTE TO ADDTION.

EXISTING VALVE ASSEMBLY

SCALE: NO SCALE

FIRE BARRIER SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

DEMO GLYCOL FILLED

SPRINKLER SYSTEM UNDER

OVERHANG. REMOVE PIPING

BACK TO THE SYSTEM VALVE

ASSEMBLY AND CAP.

FILL STATION, ETC. TO BE

REMOVED.

PATCH ALL HOLES AND PROVIDE

FINISHES TO MATCH EXISTING.

DEMO - GLYCOL SPRINKLER SYSTEM

SCALE: NO SCALE

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

/2

:1

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE PROTECTION - BASEMENT LEVEL

FP1.01

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

127 128

NEW PLAN AREA LEGEND:

SHEET NOTES:

1/2" = 1'-0"

ZONE DETAIL

1/8" = 1'-0"

FIRE PROTECTION PLAN - BASEMENT

P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

S P

S P

S P

S P

SP SP

SP SP

SP SP

EXISTING TO REMAIN.

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT.

1. COORDINATE WITH ALL TRADES TO AVOID

CONFLICTS. SPRINKLER MAINS AND SUPPLY TO

ROUTE AS TIGHT AS POSSIBLE TO BOTTOM OF

STRUCTURAL BEAMS TO AVOID MECHANICAL

EQUIPMENT.

A C EB D F G H

I

FP1.01

FED FROM BELOW

1ST FLOOR ZONE

CONTROL LOCATION

OH2

OH1OH2

OH2

OH2

PROVIDE SPRINKLER

AT TOP OF STAIRS

BARIATRIC EXAM

1D -176

161 SF

EXAM

1D -175

162 SF

EXAM

1D -174

162 SF

EXAM

1D -172

162 SF

EXAM

1D -171

162 SF

EXAM

1D -177

135 SF

EXAM

1D -179

140 SF

EXAM

1D -181

138 SF

EXAM

1D -184

147 SF

EXAM

1D -185

150 SF

EXAM

1D -186

151 SF

EXAM

1D -187

150 SF

EXAM

1D -189

151 SF

EXAM

1D -190

151 SF

EQUIP STG

1D -191A

234 SF

HAC

1D -178

60 SF

CLEAN LINEN

1D -180

77 SF

TOILET

1D -182

66 SF

SOILED LINEN

1D -183

67 SF

WORK ROOM

1D -173

541 SF

BREAK ROOM

1D -188

188 SF

STAFF TLT

1D -188A

60 SF

WELLNESS

1D -191

633 SF

PHARMACY OFFICE

1D -192

114 SF

LOGISTICS STG

1D -194

150 SF

ELECT

1D -195

74 SF

OFFICE

1D -196

106 SF

OFFICE

1D -197

107 SF

OFFICE

1D -198

104 SF

OFFICE

1D -199

108 SF

STAIRWELL #24

CORRIDOR

CO06

377 SF

RECEPTION/WAITING

1D -193

338 SF

CORRIDOR

CO04

927 SF

CORRIDOR

CO04

927 SF

OH2

REVIEW CEILING DETAIL FOR

POSSIBLE SPRINKLER

OBSTRUCTION

2" DRAIN PIPE

EXISTING SPRINKLERS IN

EXISITNG BUILDING TO REMAIN IN

EXISISTNG ZONE.

OH1 ORDINARY HAZARD GROUP 1: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

ORDINARY HAZARD GROUP 2: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

LIGHT HAZARD: 0.10 GPM/SF OVER 1,500SF, 100GPM HOSE STREAM

HAZARD CLASSIFICATIONS (PER NFPA 13)

OH2

FIRE BARRIER SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

EXISITNG SPRINKLER SYSTEM

PIPE & SPRINKLER HEADS TO

REMAIN IN DEMOED AREA.

DURING DEMO, SPRINKLER

HEADS AND BRANCHLINES

SHALL BE TURNED UP TO

PROVIDE COVERAGE WITH NO

CEILING. CHANGE OUT EXISTING

SPRINKLER HEADS DURING

DEMO IF CODE REQUIRES.

ONCE NEW CEILING IS

INSTALLED, TURN SPRINKLER

HEADS AND BRANCHLINES BACK

DOWN TO PROTECT BELOW

CEILING.

DEMO - EXISTING SPRINKLER SYSTEM

SCALE: NO SCALE

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

/1

/2

:1

:0

A

M

CONSTRUCTION DOCUMENTS

11/16/2021

FIRE PROTECTION - FIRST LEVEL

FP1.02

EXPAND BLDG. 1 FOR

PRIMARY CARE

CJNB

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

128 128

NEW PLAN AREA LEGEND:

SHEET NOTES:

1/8" = 1'-0"

FIRE PROTECTION PLAN - FIRST LEVEL

File details come from the government source that posted it. Updated .