This solicitation is for a minor construction project to expand Building 1 for primary care at the Fargo VA Medical Center. The project involves rerouting a road between the medical center and flood wall to relocate the flood wall basin and road further away from the building addition to comply with physical security standards. Foundation work will include installing helical piers to suitable depths. The addition will provide a two-story structure with a whole health clinic on the first floor and mechanical space and offices for EMS in the basement. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin. Responses are due based on the specified timeline and procedures in the solicitation documentation.

View the file

Other files

File Type Posted
Addendum 1 Civil Drawings.pdf PDF
Addendum 1 Mechanical Drawings.pdf PDF
Technical Questions - FINAL - Fargo 1-11-23.pdf PDF
10 51 13 Metal Lockers.pdf PDF
22 14 00 Facility Storm Drainage.pdf PDF
36C77622B0063 0003.pdf PDF
Final Geotechnical Report - VA Bldg 1 Expansion - Fargo.pdf PDF
Addendum 1 Fire Alarm and Sprinkler Drawings_01.pdf PDF
Addendum 1 Structural Drawings.pdf PDF
22 40 00 Plumbing Fixtures.pdf PDF
Addendum 1 Existing Flood Wall Drawings - For Reference Only.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 1-6-23.pdf PDF
Addendum 1 Arch Drawings.pdf PDF
36C77622B0063 0002.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction 11-22-22.docx DOCX document
ATTACHMENT 19 - Construction Wage Rates - Cass 11-25-22.pdf PDF
36C77622B0063 0001.pdf PDF
Site Visit Sign-in Sheet - Fargo 12-5-22.pdf PDF
ATTACHMENT 5 - Drawings - Volume 1 - 2 of 8.pdf PDF
ATTACHMENT 17 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 16 - Contractor Work Hours.pdf PDF
ATTACHMENT 4 - Drawings - Volume 1 - 1 of 8.pdf PDF
ATTACHMENT 15 - Drawings - Volume 2 - 4 of 4.pdf PDF
ATTACHMENT 3 - Specifications - Volume 3.pdf PDF
ATTACHMENT 19 - Construction Wage Rates - Cass 10-7-22.pdf PDF
ATTACHMENT 18 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 21 - Site Visit Instructions.pdf PDF
ATTACHMENT 12 - Drawings - Volume 2 - 1 of 4.pdf PDF
ATTACHMENT 1 - Specifications - Volume 1.pdf PDF
ATTACHMENT 7 - Drawings - Volume 1 - 4 of 8.pdf PDF
ATTACHMENT 13 - Drawings - Volume 2 - 2 of 4.pdf PDF
ATTACHMENT 2 - Specifications - Volume 2.pdf PDF
ATTACHMENT 14- Drawings - Volume 2 - 3 of 4.pdf PDF
ATTACHMENT 8 - Drawings - Volume 1 - 5 of 8.pdf PDF
ATTACHMENT 11 - Drawings - Volume 1 - 8 of 8.pdf PDF
ATTACHMENT 20 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 9 - Drawings - Volume 1 - 6 of 8.pdf PDF
ATTACHMENT 6 - Drawings - Volume 1 - 3 of 8.pdf PDF
ATTACHMENT 10 - Drawings - Volume 1 - 7 of 8.pdf PDF
36C77622B0063 - 11-22-22.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL PANEL SCHEDULES

BASEMENT LEVEL

E-001

CONSTRUCTION DOCUMENTS

/2

/2

:1 1:

A

M

EXPAND BLDG. 1 FOR

PRIMARY CARE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

Department of Veterans Affairsof

437-315

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050 12811/16/2021 RD JS

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

PE-9846

DATE

01/04/23ADDENDUM #11

Revision Number Associated with Clouded Area#

ELECTRICAL DETAILS

E-004

CONSTRUCTION DOCUMENTS

/2

/2

:1 1:

A

M

EXPAND BLDG. 1 FOR

PRIMARY CARE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

Department of Veterans Affairsof

437-315

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050 12811/16/2021 RD JS

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

PE-9846

DATE

01/04/23ADDENDUM #11

Revision Number Associated with Clouded Area#

CONDUIT TRAPEZE MOUNTING DETAIL

SCALE: NTS

FLOOR SLAB PENETRATION DETAIL

SCALE: NTS

LUMINAIRE MOUNTING - GYPBOARD CEILING

SCALE: NTS

LUMINAIRE MOUNTING - LAY-IN CELING

SCALE: NTS

DOWNLIGHT MOUNTING

SCALE: NTS

EXIT SIGN MOUNTING

SCALE: NTS

POWER SERVICE SCHEMATIC

SCALE: NTS

BASEMENT LEVEL ELECTRICAL BUS BAR GROUNDING DETAIL

SCALE: NTS

LEVEL 1 ELECTRICAL BUS BAR GROUNDING DETAIL

SCALE: NTS

POWER SERVICE GROUNDING DETAIL

SCALE: NTS

INSTALL IN ACCORDANCE WITH MANUFACTURER'S

MOUNTING INSTRUCTIONS AND USING THE

RECOMMENDED MOUNTING HARDWARE.

LOCKING SQUARE

WASHER & NUT

JUNCTION BOX

1/4" SCREW

INTEGRAL GALVANIZED LIPPED STEEL

MOUNTING CHANNEL. CEILING GRID

PIECES NOT TO BE USED.

HANGER WIRE AND

MOUNTING CHANNEL

ATTACHED TO STRUCTURE

FIXTURE WHIP FROM

JUNCTION BOX 6' LONG MAX

CEILING HANGER WIRE

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

ARCHITECTURAL

CEILING GRID

ARCHITECTURAL

CEILING GRID

ACOUSTICAL

CEILING TILE

(TYP)

ARCHITECTURAL

CEILING GRID

INSTALL IN ACCORDANCE WITH MANUFACTURER'S

MOUNTING INSTRUCTIONS AND USING THE

RECOMMENDED MOUNTING HARDWARE.

CEILING HANGER

WIRE, TYP.

WIRE TIE OR SCREW

BAR HANGER TO

CROSS BEAM TYP.

CEILING

CROSS BEAM

CEILING MAIN BEAM

FIXTURE WHIP FROM

JUNCTION BOX 6'

LONG MAX

RECESSED CAN

LUMINAIRE

CEILING BEAM

GYPSUM

BOARD (TYP)

LUMINAIRE

BAR HANGERS

LUMINAIRE SUSPENSION WIRES

RECESSED CAN

LUMINAIRE

REFER TO

SCHEDULE.

INSTALL IN ACCORDANCE WITH MANUFACTURER'S

MOUNTING INSTRUCTIONS AND USING THE

RECOMMENDED MOUNTING HARDWARE.

LUMINAIRE.

REFER TO

SCHEDULE

LUMINAIRE.

REFER TO

SCHEDULE

FIXTURE WHIP

FROM JUNCTION

BOX 6' LONG MAX.

LUMINAIRE MANUFACTURER'S

MOUNTING HARDWARE

LUMINAIRE

SUSPENSION

WIRES

3 TWIST MINIMUM (TYP)

ACOUSTICAL

CEILING TILE (TYP)

ARCHITECTURAL

CEILING GRID

INSTALL IN ACCORDANCE WITH MANUFACTURER'S

MOUNTING INSTRUCTIONS AND USING THE

RECOMMENDED MOUNTING HARDWARE.GYPSUM BOARD

CEILING CROSS BEAM

LUMINAIRE.

REFER TO

SCHEDULE

DRYWALL BORDER

LUMINAIRE.

REFER TO

SCHEDULE

FIXTURE WHIP

FROM JUNCTION

BOX 6' LONG MAX.

LUMINAIRE MANUFACTURER'S

MOUNTING HARDWARE

LUMINAIRE

SUSPENSION

WIRES

3 TWIST MINIMUM (TYP)

GYPSUM BOARD (TYP)

CEILING CROSS BEAM

CEILING MAIN BEAM

3/8" MAX

JUNCTION BOX

(SIZE AS REQUIRED)

CONDUIT FITTING

SPRING

NUT, TYP

FLOOR

SLAB, TYP.

FIRESTOP SEALANT

CONDUIT, TYP MINERAL WOOL

(FIRMLY PACKED)

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL, TYP.

STEEL EXPANSION

ANCHOR, TYP

LENGTH AS REQUIRED1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING

CHANNEL LONGER THAN 36" SHALL BE INSTALLED

WITH A CENTER SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY

APPROVED METHOD PER SPECIFICATION 26 05 33,

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS.

FIELD VERIFY EXACT CONDITIONS.

GENERAL NOTES

WASHER &

LOCKNUT

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

LOCKING SQUARE

WASHER & LOCKNUT

3/8" MIN GALVANIZED

THREADED ROD, TYP.

CONDUIT CLAMP.

SIZE AS REQUIRED

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

BASMENT FLOOR

FIRST FLOOR

PANEL 10S5

SWBD-1SWBD EQUIPMENT BRANCHSWBD LIFE SAFETY

K

200A 200A800A

ATS-EBATS-LS

100A 225A

PANEL EB10S5 PANEL ES10S5

FEEDER #1 AND

FEEDER # 2 FROM

BUILDING 39

CONNECT NEW

FEEDERS TO EXISTING

SPARE BREAKER (TYP)

2-1/2" EMT WITH (4)

300 KCMIL THHN +

#2 CU GRND

4" EMT EACH WITH

(8) 350 KCMIL THHN

+ 2/0 CU GRND

4" EMT EACH WITH

(8) 300 KCMIL THHN

+ 2/0 CU GRND

PANEL 11S5 PANEL EB11S5 PANEL ES11S5

125 100 50

NOTE: EXISTING BUILDING 1

SWITCHGEAR LOCATION IS

SHOWN ON THE OVERALL SITE

PLAN. REFER TO 1/E101

2" EMT WITH (4)

2/0 THHN + #4

CU GRND

2" EMT WITH (4)

#1 THHN + #6

CU GRND

2" EMT WITH (4)

#1 THHN + #6

CU GRND

NOTE: MINIMUM 2" STAND-OFF FROM WALL TO BACK SIDE OF PLATE

WALL MOUNTED

GROUNDING

BUSBAR

INSULATOR

LUG

SUPPORT BRACKET

COPPER

PLATE

2/0 CU TO SWBD-1.

1/0 CU TO FIRST FLOOR ELECTRICAL

ROOM GROUNDING BUS BAR.

#2 CU TO SWBD-LIFE SAFETY.

2/0 CU TO SWBD-EQUIPMENT BRANCH.

#2 CU TO 10S5.

#6 CU TO PANEL 10S5ES LOCATED IN BD-130A.

#2 CU TO PANEL 10S5EB LOCATED IN BD-130A.

4/0 BOND TO EMT CONDUIT SYSTEM.

4/0 BOND TO GAS PIPING.

4/0 BOND TO BUILDING FOUNDATION

STRUCTURAL STEEL.

NOTE: MINIMUM 2" STAND-OFF FROM WALL TO BACK SIDE OF PLATE

WALL MOUNTED

GROUNDING

BUSBAR

INSULATOR

LUG

SUPPORT BRACKET

COPPER

PLATE

1/0 CU FROM BASEMENT LEVEL

GROUNDING BUS BAR.

#6 CU TO PANEL EB11S5.

#6 CU TO PANEL 11S5.

#8 CU TO PANEL ES11S5.

1/0 BOND TO EMT CONDUIT SYSTEM.

1/0 BOND TO GAS PIPING.

1/0 BOND TO BUILDING FOUNDATION

STRUCTURAL STEEL.

BASMENT FLOOR

FIRST FLOOR

PANEL 10S5

SWBD-1SWBD EQUIPMENT BRANCHSWBD LIFE SAFETY

PANEL EB10S5 PANEL ES10S5

2-1/2" EMT WITH

#2 CU GRND

4" EMT EACH WITH

2/0 CU GRND

4" EMT EACH WITH

2/0 CU GRND

PANEL 11S5 PANEL EB11S5 PANEL ES11S5

NOTE: EXISTING BUILDING 1

SWITCHGEAR LOCATION IS

SHOWN ON THE OVERALL SITE

PLAN. REFER TO 1/E101

4/0 BOND TO STRUCTURAL STEEL

1/0 BOND TO STRUCTURAL STEEL

4/0 BOND TO METALLIC CONDUIT

4/0 BOND TO METALLIC WATER PIPING

1/0 BOND TO METALLIC CONDUIT

1/0 BOND TO METALLIC WATER PIPING

#4 CU IN

3/4" EMT

#6 CU IN

3/4" EMT

#8 CU IN

3/4" EMT

#2 CU IN

3/4" EMT

#2 CU IN

3/4" EMT

#6 CU IN

3/4" EMT

#6 CU BONDING

JUMPER

#6 CU BONDING

JUMPER

#8 CU BONDING

JUMPER

#2 CU BONDING

JUMPER

#2 CU BONDING

JUMPER

#2 CU BONDING

JUMPER

NEUTRAL

BUS (TYP)

EQUIPMENT

GROUND BUS

(TYP)

1/0 GROUND TO UPPER

FLOOR GROUND BAR

GROUND BUS BAR (TYP)

OVERALL SITE PLAN

SCALE: 1/128" = 1'

EXPANDED SITE POWER PLAN - NEW CONSTRUCTION

SCALE: 1/16" = 1'

ELECTRICAL SITE PLAN

NEW CONSTRUCTION

E-101

CONSTRUCTION DOCUMENTS

/2

/2

:1 1:

A

M

EXPAND BLDG. 1 FOR

PRIMARY CARE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

Department of Veterans Affairsof

437-315

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050 12811/16/2021 RD JS

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

PE-9846

DATE

01/04/23ADDENDUM #11

Revision Number Associated with Clouded Area#

N

RE

D

RI

VE

R

OF

TH

E

NO

RT

H

30W 30E

12 13

BOTTOM O

F D

IKE SLO

PE

BO

TT

O M

O F

D

IK

E

SL

O

PE

TOP O

F EARTHEN DIKE

TO

P

O F

EA

R

TH

EN

D

IK

E

BO

TT

O M

O F

D

IK

E

SL

O

PE

8 3

W6X15

BB-18A

MANUAL

WASH

BB-20A

STERILE

EQUIPMENT

ACCESS

BD-60E

BIOMED

OFFICE

BB-67

RESEARCH

BB-67B

RESEARCH

FACILITY

CHIEF

LOGISTICS

OFFICER

SUPERVISOR

INVENTORY

MANAGEMENT

BC-20B

OFFICE

BC-20A

OFFICE

BC-20

OPEN

OFFICE

BC-05C

OFFICE

BC-05B

OFFICE

BC-05

OPEN

OFFICE

BC-02

IRM

BC-05A

OFFICE

BC-01

WORK-

ROOM

B B

-9

ST

O

R A

G E

BB-94

ELECTRICAL

BB-93

STORAGE

BB-92

IRM

BB-91

STORAGE

BB-95A

WOMEN'S

LOCKER

BB-95B

MEN'S

LOCKERBB-95

FITNESS

CENTER

BB-96

BACK-UP

DIASASTER

ROOM/FITNESS

INSTRUCTION

BB-100

MECHANICAL

BD-62

FILE

ROOM

& BAS

BD-92

FOREMAN

BD-91

PROGRAM

CLERK

BD-95

STAFF

BREAK ROOM

BD-86

ELEV. MECH.

BD-84

IRM

BD-83

ELEC.B

D -8

TL

T

ELEV.

BD-80

STORAGE

BD-90

EQUIPMENT

AREA

BD-85B

MECHANIC

SHOP

BD-85A

PLUMBING

SHOP

BD-63A1

SHWR.

B D

-6 3A

TO

IL

ET

BD-63

MEN'S

LOCKER

ROOM

B D

-6

LO

C

K

SM

IT

H

SH

O

P

BD-75B

CARPENTRY

SHOP

BD-75A

ELECTRIC

SHOP

BD-65

PAINT

SHOP

BD-65A

SPRAY &

DRYING

BD-60

BIOMED

DROP-OFF

AREA

B D

-6 0A

SO

IL

ED

BD-60B

WORK

AREABD-60C

CHARGING

AREA

BD-60D

BIOMED

SHOP

B B

-8

BB-69

BB-85

B E-

BC-10

ROI

SOCIAL WORK

OFFICE

BD-70

MECHANICAL

ROOM

BC-15A

OEF/OIF

OFFICE

BA-44

PASSAGE

BB-12

PASSAGE

BB-79

INVESTIGATIVE

DRUG ROOM

BE-45

NORTH

LOADING

DOCK

BE-29

MECHANICAL

ROOM

BE-02

FED EX

ROOM

BE-10A

MAIL

ROOM

B C

-7

EL

EV

A

TO

R

EQ

U

IP

M

EN

T

BC-68

CANTEEN

STORAGE

BB-90C

PHARM

OFFICE

BB-90

ANTICOAG

CLINIC

BB-90B

PHARM

OFFICE

BB-90A

PHARM

OFFICE

BB-66

WOMEN

BA-71

STORAGE

BA-82

TREATMENT

ROOM

BD-31

SAFETY

EQUIP.

BD-33

ENG.

LIBRARY

BD-35

SAFETY

EQUIP.

BE-24

LINEN

BD-11

WARD

PROPERTY

BE-20

LINEN

BLDG 3

SUPPLY

CHAIN

MANAGEMENT

BF-11

TOILET

BA-44A

WOMENS

LOCKER

BA-44B

MENS

LOCKER

BB-21

CART LIFT

S-3

MACHINE

BB-17

PREP/

ASSEMBLY/

STORAGE

B B

-1 7A

ET

O

/L O

W T

EM

P

ST

ER

IL

E

BB-20

RECEIVING/

DECONTAMINATION

BB-18B

CART

WASH

BB-15

CLEAN

STORAGE

BB-15B1

TOILET

BB-15B

MENS

LOCKER

BB-16A

CLER.

BB-16B

CLER.

BB-34

MECHANICAL

BB-34B

CART LIFT

S-4

MACHINE

BB-34A

UPS

BB-15A

WOMENS

LOCKER

BD-08

CANTEEN

STORAGE

BB-64

MEN

BB-62

ARMORY

BB-61

HOLDING

BB-56

EV

BB-60A

TOILET

BB-59A

TOILET

BB-59

LOCKER

BB-58

MECHANICAL

BB-60

LOCKER

BD-37

ENG.

OFFICE

BD-39

ENG.

OFFICE

BD-41

GEMS

OFFICE

BD-47

NFFE

BD-43

EMERG.

MNGR

OFFICE

BD-45

COMMON

BD-50A

ASST. CHIEF

ENG.

OFFICE

BD-50B

CHIEF

ENG.

OFFICE

BD-50

ENGINEERING

OFFICES

BD-42

ENG.

CONF.

BD-40

SAFETY

OFFICE

BD-38

EEO

OFFICE

BD-36

SAFETY

OFFICE

BD-34

FORMS & PROD.

ROOM

BB-80A

CONTROLLED

SUBSTANCE

VAULT

BE-28

SOUTHEAST

LOADING

DOCK

BE-27

MECHANICAL

ROOM

BB-90D

PHARM

OFFICE

BE-25

MECHANICAL

ROOM

BD-22

TELECONFERENCE

ROOM

BD-23

ASST.

EMS

OFFICE

BD-21

EMS

OFFICE

BD-20

CHIEF EMS

OFFICE

BD-12

FEMALE

TOILET

BD-10

MALE

TOILET

BD-04

STAFF

BREAK

ROOM

BD-06

OI&T

STORAGE

BD-05

MAIL

ROOM

BE-10

MAIL

ROOM

STORAGE

BE-09

MECHANICAL

ROOM

BE-07

PROS.

STORAGE

BE-30

N&FS

SUBSISTENCE

STORAGE

BE-34

PHARMACY

STORAGE

BE-42

WOMENS

LOCKER

BE-40

MENS

LOCKER

BE-40A

SHOWER

& TOILET BE-44A

COMPACTOR

ROOM

BE-42A

SHOWER

& TOILET

BE-44

CARTS

BE-50

DEEP

FREEZE

BE-47

BIO-

HAZARD

REFER

BE-46

MECHANICAL

ROOM

BE-38C

HAC

BE-36

OFFICE

BE-35

MORGUE

BE-98

BUILDING 1

GENERATOR

ROOM

BE-38

SUPPLY

CHAIN

MANAGEMENTBE-37

MORGUE

COOLER

BE-38A

LOCKER

BE-38B

TOILET

BE-97

STORAGE

BE-31A

SUPPLY

CHAIN

MANAGEMENT

STORAGE

BE-99

BUILDING 1

SWITCHGEAR

ROOM

BC-79

MECHANICAL

ROOM

BC-80

RETAIL

STORE

BC-81

RETAIL

STORAGE

BC-82

OFFICE

CANTEEN

CHIEF

BE-31

DIETETICS/

AMMS STORAGE

BE-05

MECHANICAL ROOM

BC-85B

FOOD

STORAGE

ROOM

BC-95

WOMENS

LOCKER BC-85A

HAC

BC-96

MENS

TOILET

BD-02

OI&T/TELEPHONE

ROOM

BB-03

M&R

SHOP

BC-83

ADMIN

OFFICE

BC-94

MENS

LOCKER

BC-90A

CREDIT

UNION

BC-93

EMS

SIGN-IN

ROOM

BC-91

EMS

BREAK

ROOM

BC-90

CREDIT

UNION

BC-69

VENDING

MACHINE

AREA

BC-70

CANTEEN

STORAGE

BC-89

PROVIDER

LOUNGEBC-67

WOMEN

BC-34

BC-66

MEN

BC-75

CANTEEN

DINING

AREA

BC-74

FOOD

SERVING

AREA

BC-74A

CANTEEN

KITCHEN

BC-64

OI&T

OFFICE

BC-63

OI&T

OFFICE

BC-15

OEF/OIF

SW WORK SPACE

BC-47

OI&T

OFFICE & STORAGE

BC-59

MECHANICAL

ROOM

BC-74B

CANTEEN

STORAGE

BC-60

TELEPHONE

EQUIPMENT

ROOM

BC-58

OI&T

OFFICE

BC-56

OI&T

OFFICE

BC-54

OI&T

STORAGE

BC-52

CIO

OFFICE

BC-50

COMPUTER

ROOM

BC-50A

UPS

BB-27

CH. PHARM

OFFICE

BB-72A

IV

HOODS

BB-72

ANTE

ROOM BB-72B

CHEMO

HOODS

BC-46

OI&T

OFFICE

BC-44

OI&T

OFFICE

BC-41

MECHANICAL

ROOM

BC-43

OI&T

OFFICE

BC-45

OI&T

OFFICE

BC-13

SUPER

OFFICE

BC-12

INTRVW

ROOM

BC-11A

INTERVIEW

ROOM

BA-01

MECHANICAL

ROOM

BC-11

HOMELESS

OUTREACH

BC-32

SOCIAL

WORK

OFFICE

BC-30

COMPLIANCE

OFFICER

BC-24

OI&T HUB

BA-03

EMS

STORAGE

BA-07

SPS

STORAGE

BA-05

ENVIRONMENT

MANAGEMENT

STORAGE

BA-01A

BUILDING 46

SWITCHGEAR

ROOM

BA-75

PHYSICAL

THERAPY

BA-81

SPECIAL

TREAT

BA-85

STORAGE

BA-84

EMPLOYEE

LOUNGE

BA-78

TREATMENT

ROOM

BA-76

REHAB

SPVR

OFFICE

BA-74

SPEECH

THERAPY

BA-72A

CLOSET

BA-72

RECP

OT /

SPEECH

BA-65A

MECHANICAL

ROOM

BA-70

CHIEF

PROS

OFFICE

BA-68

O.T.

OFFICE

BA-65

OCCUPATIONAL

THERAPY

BA-65B

O.T.

KITCHEN

BA-73

REC

THER

OFFICE

BA-50

WAITING

AREA

BA-45

PROS.

PROSTHETICS

OFFICE

B A

-4

C O

R R

EC

TI

VE

TH

ER

A

PY

BA-43

PROSTHETICS

SENS. AIDS

OFFICE

BA-39

TOILET

B A

-3

H A

C

BA-30

OI&T

BA-35

PROS.

STORAGE

BA-01B

BUILDING 46

EMERGENCY

GENERATOR

ROOM

BA-07A

BUILDING 9

EMERGENCY

GENERATOR

ROOM

BA-10

BUILDING 9

SWITCHGEEAR

ROOM

BA-09

SOILED

LINEN

ROOM

BB-09

BLDG #9

TANK ROOM

BB-78

STRIP

PACKING

BB-80B

HAC

BB-10

ENG/VAEA

STORAGE

BB-80

IN-PATIENT

PHARMACY

BB-76

STAFF

LOUNGE

B B

-1 5A

TO

IL

ET

BB-26

PHARMACY

OFFICE

BB-22

PHARMACY

WAITING

BB-28

PHARM TECH

OFFICE

BB-31

PHARMACY

OFFICE

BB-33

PHARMACY

OFFICE

BB-24

RECEIVING

BB-30

ASSIST.

CHIEF

OFFICE

BB-75

PHARMACY

STORAGE

BB-70

PHARM

CONF &

CLASS

ROOM

BB-85B

OCCUP.

HEALTH

OFFICE

BB-85

OCC

HEALTH

BB-85A

EXAM

BB-84

OCC

HEALTH

BB-67C

RESEARCH

BB-67D

RESEARCH

BB-68

EMS

BB-67A

RESEARCH

BB-32

CHIEF

SPS

OFFICE

BB-35

IMAGING

UPS

BB-55

PIV &

CLERICAL

BB-50

STORAGE

BB-53

POLICE

TRAINING

BB-57

EQ

BB-54

ASST.

CHIEF

POLICE

BB-52

CHIEF

POLICE

BUILDING 1

EXPANSION -

PRIMARY

CARE

EXISTING BUILDING 1 SWITCHGEAR

LOCATION FOR NORMAL, EQUIPMENT,

AND LIFE SAFETY POWER

NEW BASEMENT LEVEL

ELECTRICAL CLOSET

LOCATION

CONDUIT PATHWAY FOR POWER TO NEW PRIMARY CARE EXPANSION.

CONTRACTOR TO FIELD COORDINATE SPECIFIC LOCATION OF NEW CONDUIT

WITH EXISTING CONDITIONS IN ACCESSIBLE CEILING SPACE ABOVE HALLWAY

ALONG PATH SHOWN. NEW CONDUIT MUST BE AT OR ABOVE LEVEL OF

EXISTING PIPE/CONDUIT. REFER TO POWER SINGLE LINE DETAIL FOR SIZING.

E-101

NEW LEVEL 1

ELECTRICAL CLOSET

LOCATION

E-003

APPROXIMATE EXISTING

ACCESS CONTROL

PANEL LOCATION

CONDUIT PATHWAY BACK TO ACCESS

CONTROL PANEL LOCATION FOR ACCESS

CONTROL GATE CARD READERS.

CONDUIT PATHWAY BACK TO ACCESS

CONTROL PANEL LOCATION FOR

RELOCATED DOOR ACCESS CARD READER.

BD-92

FOREMAN

BD-91

PROGRAM

CLERK

BD-95

STAFF

BREAK ROOM

BD-86

ELEV. MECH.

BD-84

IRM

BD-83

ELEC.B

D -8

TL

T

ELEV.

BD-80

STORAGE

BD-90

EQUIPMENT

AREA

BD-85B

MECHANIC

SHOP

BD-85A

PLUMBING

SHOP

B D

-6 3A

TO

IL

ET

LOCKER

ROOM

LO

C

K

SM

IT

H

BD-75B

CARPENTRY

SHOP

BD-75A

ELECTRIC

SHOP

BD-65

PAINT

SHOP

BD-65A

SPRAY &

DRYING

BD-70

MECHANICAL

ROOM

BD-50A

ASST. CHIEF

ENG.

OFFICE

BD-50B

CHIEF

ENG.

OFFICE

UP

WET ROOM

BD - 133

OPEN SPACE

BD - 111

FUTURE OFFICE

BD - 131

CONFERENCE

ROOM

BD - 130

STANDALONE

PRIMARY

BD - 110MECHANICAL

BD - 117

ELECTRICAL

BD - 130A

GEMS STORAGE

BD - 120A

HOUSEKEEPING

EXPENDABLES

BD - 121

MEN'S LOCKER

ROOM

BD - 118

WOMEN'S

LOCKER ROOM

BD - 119

LEADS

WORKROOM

BD - 122

EQUIPMENT

STORAGE

BD - 116

CART STORAGE

BD - 115

EMS WORKROOM

BD - 112

STAFF LOUNGE

BD - 123

OFFICE FUTURE

BD - 114

OFFICE

SUPERVISORS

BD - 124

SECRETARY

WAITING

BD - 126

SECRETARY

BD - 126A

OFFICE EMS

CHIEF

BD - 127

OFFICE EMS

ASST CHIEF

BD - 128

OFFICE ADMIN

OFFICER

BD - 129

OFFICE GEMS

COORDINATOR

BD - 125

OFFICE

PROGRAM

SUPPORT ASST

BD - 113

CORRIDOR

CO01

CORRIDOR

CO02

CORRIDOR

CO03

BUILDING 1

EXPANSION -

PRIMARY

CARE

EXISTING 3 LEG FEEDER

(120-208 3 PH) PARALLEL

300KCMIL TO EXISTING 800A

SWBD-1 SHOPS GEAR

LOCATED IN BD-83.

NEW UNDERGROUND DUCT

BANK. EXISTING CIRCUIT #1

AND CIRCUT #2. 4160V, 3

PHASE. EACH CIRCUIT IS 3

#4/0 CU + #1/0 GROUND. (TYP)

MH

MH

NEW LOCATION OF MANHOLE #11.

PROVIDE 120V #5-20 WP RECEPTACLE IN

MANHOLE FOR SUMP PUMP. REFER TO

DETAIL 9/E-004.

MHMH

NEW UNDERGROUND

DUCT BANK 4160V, 3

PHASE WITH 3 #4/0 CU

+ #1/0 GROUND. (TYP)

MH

NEW LOCATION OF MANHOLE #10.

PROVIDE 120V #5-20 WP RECEPTACLE

INSIDE MANHOLE FOR SUMP PUMP.

REFER TO DETAIL 9/E-004.

LOCATION OF NEW POLE BASE. REUSE

EXISTING POLE AND POLE MOUNTED

LUMINAIRE IN NEW LOCATION.

CONTRACTOR TO INSTALL NEW POLE

BASE PER DETAIL 4/E-004. (TYP)

ES10S5-8

H

HH

H

T

REINSTALL EXISTING T38 75KVA

TRANSFORMER IN SAME LOCATION

ONCE INSTALLATION OF NEW

GRADE BEAM IS COMPLETE.

LOCATION OF NEW POLE BASE.

REUSE EXISTING POLE AND

POLE MOUNTED LUMINAIRE IN

NEW LOCATION. CONTRACTOR

TO INSTALL NEW POLE BASE PER

DETAIL 4/E-004. (TYP)

NEW LOCATION OF EXISTING POLE AND

POLE MOUNTED LUMINAIRE.

CONTRACTOR TO INSTALL NEW POLE

BASE PER DETAIL 10/E-101. (TYP)

H

H

H

TRENCHED ELECTRICAL LINE. 1-1/2"

SCHEDULE 80 PVC CONDUIT WITH

(4) #8 AWG THWN + (2) #8 CU

GROUND TO PROVIDE 120V POWER

TO RECEPTACLE IN MANHOLE FOR

SUMP PUMP.

TRENCHED ELECTRICAL LINE. 1-1/2"

SCHEDULE 80 PVC CONDUIT WITH

(2) #8 AWG THWN + (1) #8 CU

GROUND TO PROVIDE 120V POWER

TO RECEPTACLE IN MANHOLE FOR

SUMP PUMP.

EB10S5-9

NEW UNDERGROUND DUCT

BANK. EXISTING CIRCUIT #1

AND CIRCUT #2. 4160V, 3

PHASE. EACH CIRCUIT IS 3

#4/0 CU + #1/0 GROUND. (TYP)

PANEL 10S5

PANEL EB10S5

PANEL ES10S5

TRENCHED

ELECTRICAL

LINE. 1-1/2"

SCHEDULE 80

PVC CONDUIT

WITH (2) #8

AWG THWN +

(1) #8 CU

GROUND.

EB10S5-11

PB

PROVIDE NEW TRAFFIC RATED PULL

BOX AT FORMER LOCATION OF POLE

MONTED LUMINAIRE #69.

CONTRACTOR TO EVALUATE UNDERGROUND POWER

LINE SERVING BUILDING 43. CONTRACTOR TO

MAINTAIN EXISTING POWER OR PROVIDE NEW

CONDUIT AND WIRING TO BUILDING 43.

TRENCHED ELECTRICAL LINE. 1-1/2"

SCHEDULE 80 PVC CONDUIT WITH

(2) #8 AWG THWN + (1) #8 CU

GROUND TO PROVIDE 120V POWER

TO POLE MOUNT LUMINAIRE.

CR

CR

CR

LOCATION OF NEW POLE BASE.

REUSE EXISTING POLE AND

POLE MOUNTED LUMINAIRE IN

NEW LOCATION. CONNECT TO

EXISTING POWER. CONTRACTOR

TO INSTALL NEW POLE BASE PER

DETAIL 4/E-004. (TYP)

J

MH

NEW MANHOLE TO BE INSTALLED. NEW

ELECTRICAL DUCT BANK WILL BE

CONNECTED. PROVIDE 120V #5-20 WP

RECEPTACLE INSIDE MANHOLE FOR

SUMP PUMP. REFER TO DETAIL 9/E-004.

EB10S5-20

MODEL 773-E SERIES

CRASH BARRIER

WITH ACCESS CONTROL.

PROVIDE WITH MAG LOCK

HOLD DOWN BAR, FIRE

DEPARTMENT KNOX BOX,

BATTERY BACK-UP AND

FOUNDATION REBAR.

2 NEW JUNCTION BOXES TO BE INSTALLED IN THIS

LOCATION. EXISTING BURIED UTILITY LINE TO BE

STUBBED UP INTO NEW JUNCTION BOX IN FLOOR.

EXTENDED EXISTING POWER FROM FLOOR BOX,

ROUTING INSIDE INTERIOR WALL, TO SECOND

JUNCTION BOX INSTALLED ABOVE ACCESSIBLE CEILING.

POWER WILL BE UTILIZED FOR EXTERIOR POLE

MOUNTED LUMINAIRE.

INSTALL NEW CARD READER TO CONTROL ACCESS

GATE.

3/4" PVC CONDUIT BFG WITH (3) #12 AWG THWN TO

PROVIDE 120V POWER TO CONTROLLED ACCESS GATE

AND ASSOCIATED CARD READERS.

1" PVC CONDUIT BFG WITH CAT 6A CABLING FROM

SECURITY PANEL TO CARD READER FOR ACCESS GATE.

NEW PULL BOX TO BE INSTALLED IN FORMER LOCATION

OF LIGHTPOLE #69. EXISTING POWER IS TO BE

REUSED. NEW WIRE AND CONDUIT TO BE INSTALLED

FROM JUNCTION BOX EXTENDING EXISTING POWER TO

NEW LIGHT POLE LOCATIONS.

KEYED ELECTRICAL NOTES

BASE BID TO INCLUDE CONTROLLED ACCESS GATE AND ALL

ASSOCIATED WIRING, CONDUIT AND BACK BOXES.

BID ALTERNATE #2 DOES NOT INCLUDE CONTROLLED ACCESS

GATE AND ALL ASSOCIATED WIRING CONDUIT AND BACK BOXES.

AutoCAD SHX Text 19th AVE. N.

AutoCAD SHX Text 21st AVE. N.

AutoCAD SHX Text

ELM STREET

AutoCAD SHX Text

MC

AutoCAD SHX Text

ELM STREET

AutoCAD SHX Text

MC

AutoCAD SHX Text

UND

AutoCAD SHX Text

UND

AutoCAD SHX Text

NFFE

AutoCAD SHX Text

NFFE

AutoCAD SHX Text

AFGE

AutoCAD SHX Text

AFGE

AutoCAD SHX Text

AFGE

AutoCAD SHX Text

AFGE

AutoCAD SHX Text

RO EOM

AutoCAD SHX Text

HCHV

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text R

AutoCAD SHX Text

MC

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

UND

AutoCAD SHX Text

UND

AutoCAD SHX Text

NFFE

AutoCAD SHX Text

NFFE

AutoCAD SHX Text

UP

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

F

F F

F

F

F

F

FF

F

F

F

F

F

F

F F

F

FFF

F

F

F

F

F

J

S P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S P

S P

S P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

GFI

GFI GFI GFI

GFIGFIGFIGFI

F

F F F F

F

F

F

F F F F F F

F

F F

F

F

F

F

F F F

F FGFI GFI

F

F

F

J

J

J

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

S P

S P

S P

S P

SP SP

SP SP

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

SP SP

SP SP

J

S

W

KEYED ELECTRICAL NOTES

INSTALL RECEPTACLE AND TIE INTO EXISTING POWER

CIRCUIT.

INSTALL NEW RECEPTACLE AND TIE INTO EXISTING

EMERGENCY POWER CIRCUIT.

INSTALL RECEPTACLE FOR POWER BEHIND WALL MOUNT

TV PER DETAIL 1/E-004.

CONTRACTOR TO INSTALL FUSTAT ABOVE ACCESSIBLE

CEILING AND RMX MEDIUM DUTY COMMERCIAL DOOR

OPENER FOR ROLLING COUTERTOP GATE. PROVIDE

WALL MOUNT KIT #AAA011.0001S, AND BOTTOM SENSING

EDGE.

LEVEL 1 ELECTRICAL GROUNDING BUS BAR LOCATION.

SEE DETAIL 10/E-003. BUS BAR NOT RATED FOR OIT

SERVICE.

BASEMENT LEVEL ELECTRICAL GROUNDING BUS BAR

LOCATION. SEE DETAIL 9/E-003. BUS BAR NOT RATED

FOR OIT SERVICE.

PROVIDE DUPLEX RECEPTACLE AT LIFT DOCKING

STATION TO POWER BARIATRIC PATIENT LIFT.

RECEPTACLE HEIGHT TO BE COORDINATED WITH LIFT

MANUFACTURER.

RECEPTACLE IS FACTORY PROVIDED. POWER FOR

INTERNAL AHU LIGHTING TO BE PROVIDED BY THIS

CIRCUIT.

RECEPTACLE TO BE MOUNTED 18" AFF. COORDINATE

RECEPTACLE BOX INSTALLATION DEPTH SO THAT COVER

PLATE WILL BE FLUSH AGAINST MIRROR SURFACE.

MIRROR INSTALLER TO FIELD COORDINATE AND PROVIDE

OPENING IN MIRROR TO ACCOMMODATE RECEPTACLE

INSTALLATION.

MAGNETIC DOOR HOLD OPEN BY DOOR HARDWARE

VENDOR MOUNTED ON WALL AT LOCATION TO MEET

DOOR SWING.

SPSP

EB10S5- 1,3,5

EB10S5- 2,4,6

10S5- 31

10S5- 29

10S5- 23

10S5- 24

10S5- 25

10S5- 28

10S5- 27

10S5- 21

10S5- 20

10S5- 19

10S5- 18

10S5- 17

10S5- 16

10S5- 12

10S5- 13

10S5- 14

10S5- 15

10S5- 11

10S5- 10

10S5- 9 10S5- 8

10S5- 4

10S5- 6

10S5- 2

10S5- 7

10S5- 1

TU-15

TU-4

TU-5

TU-11

TU-12

TU-13

TU-14

TU-17

TU-18 TU-19

TU-20

TU-22

TU-21TU-1

TU-3

TU-6

TU-10

TU-24

TU-8

TU-9

TU-7

TU-16

EB10S5- 7

PANEL ES10S5

PANEL EB10S5

PANEL 10S5

10S5- 26

M-AHU-085

eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO

A B C e12

10S5- 22

10S5- 32

WP

WP

WP

WP

WPWP

WP

WP

WET ROOM

BD - 133

TOILET

BD - 132

OFFICE

BD - 131

CONFERENCE

ROOM

BD - 130STANDALONE

PRIMARY

BD - 110

MECHANICAL

BD - 117

ELECTRICAL

BD - 130A

GEMS

STORAGE

BD - 120

HOUSEKEEPING

EXPENDABLES

BD - 121

MEN'S

LOCKER

ROOM

BD - 118

WOMEN'S

LOCKER

ROOM

BD - 119

LEADS

WORKROOM

BD - 122

EQUIPMENT

STORAGE

BD - 116

CART

STORAGE

BD - 115

EMS

WORKROOM

BD - 112

STAFF

LOUNGE

BD - 123

OFFICE

BD - 114

OFFICE

SUPERVISORS

BD - 124

SECRETARY

OFFICE

BD - 126

OFFICE

EMS CHIEF

BD - 127 OFFICE

EMS ASST

CHIEF

BD - 128

OFFICE

ADMIN

OFFICER

BD - 129

OFFICE

GEMS

COORDINATOR

BD - 125

OFFICE

PROGRAM

SUPPORT

ASST

BD - 113

CORRIDOR

CO01

CORRIDOR

CO02

CORRIDOR

CO03

MEN'S

SHOWER

BD - 118A

MEN'S

TOILET

BD - 118B

WOMEN'S

SHOWER

BD - 119A

WOMEN'S

TOILET

BD - 119B

BD117-HWP-1

BD117-HWP-2

UH-1

EF-B08

EB10S5- 15

EB10S5- 9

10S5- 34

10S5- 5

10S5- 30

ES10S5- 2 ES10S5- 1

ES10S5- 3

CP-1

EB10S5- 8,10,12

EB10S5- 14,16,18

VFD VFD

10S5- 3

EB10S5- 11

EB10S5- 13

WMS-1

10 10

ES10S5- 5

ES11S5- 2

ES11S5- 1

ES11S5- 3

11S5- 35

11S5- 37 11S5- 39

11S5- 21

11S5- 23

11S5- 24

11S5- 13

11S5- 28

11S5- 29

11S5- 32

11S5- 31

11S5- 34

11S5- 33

11S5- 30

11S5- 12

11S5- 10 11S5- 7 11S5- 6

TU-30 TU-29 TU-28 TU-26 TU-25

TU-31

TU-32

TU-34

TU-36 TU-37 TU-38 TU-39 TU-41 TU-42

TU-43

TU-44TU-35

TU-33

TU-45

TU-49

TU-50 TU-51 TU-52

TU-46

TU-47

EB11S5- 1 11S5- 9

eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO

A B C e12

11S5- 1

11S5- 3

PANEL ES11S5

PANEL EB11S5

PANEL 11S5

TU-48

11S5- 27

WORK

ROOM

1D -173

BARIATRIC

EXAM

1D -176

EXAM

1D -175

EXAM

1D -174

EXAM

1D -172

EXAM

1D -171

RECEPTION/WAITING

1D -193

OFFICE

1D -199

OFFICE

1D -198

HAC

1D -178

EXAM

1D -189

EXAM

1D -190

EXAM

1D -187

EXAM

1D -186

EXAM

1D -185

EXAM

1D -184

EXAM

1D -181

EXAM

1D -179

EXAM

1D -177

STAFF TLT

1D -188A

EQUIP STG

1D -191A

WELLNESS

1D -191

OFFICE

1D -196

BREAK

ROOM

1D -188

PHARMACY

OFFICE

1D -192

ELECT

1D -195

LOGISTICS

STG

1D -194

TOILET

E1D-127A

LOCKER

E1D - 128

CONF

E1D - 129

STAFF

BREAK

ROOM

E1D - 130

OFFICE

1D -197CLEAN

LINEN

1D -180

TOILET

1D -182

SOILED

LINEN

1D -183

CORRIDOR

CO04 CORRIDOR

CO05

CORRIDOR

CO06

STAIRWELL

EBD - 70A TOILET

E1D-127A

STAIRWELL

EBD - 70A

11S5- 2

11S5- 38 11S5- 36

11S5- 20

11S5- 19

11S5- 1711S5- 18 11S5- 16 11S5- 15 11S5- 14

11S5- 25

11S5- 26

11S5- 22 11S5- 5

EF-120

11S5- 40

ES11S5- 411S5- 4

CORRIDOR

CO05

11S5- 8

EB11S5- 2

ES11S5- 5

DO

DO

EB11S5- 4

EB11S5- 6

E-200

11S5- 11

9 9 9

ES11S5- 6

ES11S5- 8

ES11S5- 10

DATA RACK FOR PAGING

SPEAKER SYSTEM

ES11S5- 7

ES11S5- 9

11S5- 41

ES11S5- 12

ROOM

E1D-116

ROOM

E1D-120

CORRIDOR

E1D-121

1 1

REMOVE EXISTING CARD READER, ASSOCIATED

DEVICES & WIRING. PREPARE CARD READER FOR

RELOCATION. CONDUIT TO REMAIN AND BE EXTENDED

ABOVE ACCESSIBLE CEILING TO NEW LOCATION

SHOWN ON SHEET E-400.

J

ROOM

1D-116

ROOM

1D-1201D-118

REMOVE EXISTING RECEPTACLES, DATA

CONNECTIONS AND ASSOCIATED

WIRING FROM EXISTING WALLS TO BE

DEMOLISHED IN THEIR ENTIRETY.

ROOM

REMODEL

AREA

LOCATION

RATED WALL SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

ESSF IOO NRP ALD EE NR GE

T INSI E

G E

E R

R

RAYMOND

DAWES

PE-9846

DATE

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

01/04/23ADDENDUM #11

Revision Number Associated with Clouded Area#

/6

/2

:3

:2

A

M

CONSTRUCTION DOCUMENTS

11/16/21

POWER PLANS

E-200

EXPAND BLDG. 1 FOR

PRIMARY CARE

JSRD

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

99 128

1/8" = 1'-0"

BASEMENT LEVEL - POWER PLAN

1/8" = 1'-0"

LEVEL 1 - POWER PLAN

VAV TERMINAL UNITS WILL BE

PROVIDED WITH FACTORY INSTALLED

TOGGLE STYLE POWER DISCONNECT

SWITCH AND 50 VA TRANSFORMER IN

TERMINAL UNIT CONTROL BOX FOR

CONTROL POWER TO TERMINAL UNIT

(TYP).

VAV TERMINAL UNITS WILL BE

PROVIDED WITH FACTORY INSTALLED

TOGGLE STYLE POWER DISCONNECT

SWITCH AND 50 VA TRANSFORMER IN

TERMINAL UNIT CONTROL BOX FOR

CONTROL POWER TO TERMINAL UNIT

(TYP).1/8" = 1'-0"

LEVEL 1 - ELECTRICAL REMODEL PLAN

1/8" = 1'-0"

BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN

1/8" = 1'-0"

LEVEL 1 - ELECTRICAL DEMOLITION PLAN

1" = 30'-0"

REMODEL AREA LOCATION

KEYED ELECTRICAL NOTES

1 EXISTING LUMINAIRE TO REMAIN.

REMOVE EXISTING LUMINAIRE AND PREPARE FOR REUSE

IN NEW LOCATION.

INSTALL EXISTING LUMINAIRE FROM ROOM 1D-118 IN NEW

LOCATION SHOWN. CONNECT TO EXISTING LIGHTING

CIRCUIT FROM ROOM 1D-120. CONNECT SWITCH LEG TO

EXISTING SWITCH BANK REINSTALLED IN NEW LOCATION

SHOWN.

INSTALL EXISTING LUMINAIRE FROM ROOM 1D-116 IN NEW

LOCATION SHOWN. CONNECT TO EXISTING LIGHTING

CIRCUIT IN CORRIDOR 1D-121. CONNECT SWITCH LEG TO

NEW SWITCH BANK IN LOCATION SHOWN.

LUMINAIRE TO BE ON UNSWITCHED EMERGENCY POWER

TO PROVIDE ALWAYS-ON LIGHTING IN STAIRWELL.

SPSP

O

S ,D

,D O

S ,D

,D

2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D

O

S ,D

,D

2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D

2OS

O

S

2OS 2OS 2OS 2OS 2OS 2OS

2OS

2OS

O S

O S

O S

O S

O

SOS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS

OS OS

OS

OS OS

O V

OVOV

O V

OV OV

OS

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

S P

S P

S P

S P

SP SP

SP SP

S P

S P

S P

SP SP

S P

S P

S P

SPSP

S P

S P

S P

SP SPSP SP

SP SP

SPSP

SP SP

SP SP

OS

OS

OS OS

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

OSOS

OV OV

O V

O V

OV OV

OV OV

OVOV OVOV OVOV

O V

O V

O V

O V

OVOV

OVOV

2OS

2OS2OS

2OS 2OS 2OS 2OS

2OS

O

S

O

S

OS

O S

O S

O S

O S

O V

O V

OS OS OS

OS

OS

OS

O

S

A

A

A

A

OS

OV

S P

S P

S P

S P

SPSP SPSP

S P

S P

S P

SPSP SPSPSPSPSP

S P

S P

S P

S P

S P

S P

SP

S P

SP SPSP SP

S P

S P

S P

S P

O

S eC.1eD eE eF eG eH eI eI.1 e12

REMOVE EXISTING

SWITCHES AND PREPARE

FOR REINSTALLATION IN

NEW LOCATION.

2 2

ROOM

1D-116

ROOM

1D-118

ROOM

1D-120

(E) PANEL(E) PANEL

REMODEL

AREA

LOCATION

RATED WALL SYMBOLS

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

SMOKE PARTITION

BE

B

BE

B

BE

B

BE

B

B

B BE

B BE

B BE

B

BE

B

BE BE

B

BE

B

BE

B

BE

B

BE B

B

B

BE

BE

B

A

B

B

AE B A

A BE A

B

BE

B

BE

B

BE

B

BE

B

BE

B

BE

BE

B

BE

B

BE

B

BE

B

B

BE

B

B

B

B

BE

BE

B

B

B

B

BE

BE

B

B

B

B BE B B

BE

B

BE

AE

AE

AE

A

A AE

AE A

G

G

ES11S5- 1111S5- 46

11S5- 45 eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO

A B C e12

X

X X

X

BARIATRIC

EXAM

1D -176

EXAM

1D -175

EXAM

1D -174

EXAM

1D -172

EXAM

1D -171

RECEPTION/WAITING

1D -193

OFFICE

1D -199

OFFICE

1D -198

HAC

1D -178

EXAM

1D -189

EXAM

1D -190

EXAM

1D -187

EXAM

1D -186

EXAM

1D -185

EXAM

1D -184

EXAM

1D -181

EXAM

1D -179

EXAM

1D -177 STAFF TLT

1D -188A

EQUIP STG

1D -191A

WELLNESS

1D -191

OFFICE

1D -196

BREAK

ROOM

1D -188

PHARMACY

OFFICE

1D -192

ELECT

1D -195

LOGISTICS

STG

1D -194

LOCKER

E1D - 128

CONF

E1D - 129

STAFF

BREAK

ROOM

E1D - 130

OFFICE

1D -197

WORK

ROOM

1D -173

CLEAN

LINEN

1D -180

TOILET

1D -182

SOILED

LINEN

1D -183

CORRIDOR

CO04

CORRIDOR

CO05

CORRIDOR

CO06

CORRIDOR

E1D - CO

X

X

X

DATA RACK FOR PAGING

SPEAKER SYSTEM

B

B B B

B B B BE

B

BE

BE B

B

BE

B

BE

B B BE B B BE B

B

BE

B

B

BE

BE B

B

BE

CE

C

C

CE

BE

BE

B

B

B

B

B BE

B

B

BE

A

B

B

A

BE

BE

B

B

BE B

ABE

BE

A A

BE

BE

A

B

BE B

B

BE

A

BE

G

BE B

B

BE

B

B

BE

B B

BE B

B B

C CE

C

C CE

BE B B

B B

D

DE

D

D D D

DE D DE

D DE D

D

D D

DE D DE

D D DE

D

D

DE D D

D

DE

F F

FF

G G

FF

ES10S5- 7

10S5- 33

10S5- 35 eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO

A B C e12

C

X

X

X

X

X

B eC.1eD eE eF eG eH eI eI.1 e12

INSTALL NEW SWITCHES

AND CONNECT TO EXISTING

LIGHTING CIRCUIT FOR

ROOM E1D-116. .

INSTALL NEW SWITCHES

AND CONNECT TO EXISTING

LIGHITNG CIRCUIT FOR

ROOM E1D-120.

INSTALL NEW SWITCHES

AND TIE INTO EXISTING

COORIDOR LIGHITNG

CIRCUIT.

(E) PANEL (E) PANEL

(E) PANEL

ESSF IOO NRP ALD EE NR GE

T INSI E

G E

E R

R

RAYMOND

DAWES

PE-9846

DATE

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

CALIBRE

9090 S RIDGELINE BLVD, SUITE 105

HIGHLANDS RANCH COLORADO 80129

PHONE (303) 730-0434

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

01/04/23ADDENDUM #11

Revision Number Associated with Clouded Area#

/6

/2

:3

:2

A

M

CONSTRUCTION DOCUMENTS

11/16/21

LIGHTING PLANS

E-300

EXPAND BLDG. 1 FOR

PRIMARY CARE

JSRD

2101 ELM STREET

FARGO, ND 58102FARGO VAHCS

437-315

100 128

1/8" = 1'-0"

FIRST LEVEL - LIGHTING DEMOLITION PLAN

1" = 30'-0"

REMODEL AREA LOCATION

1/8" = 1'-0"

FIRST LEVEL - LIGHTING PLAN

1/8" = 1'-0"

BASEMENT LEVEL - LIGHTING PLAN

1/8" = 1'-0"

FIRST LEVEL - LIGHTING REMODEL PLAN

FARGO PRIMARY CARE - ELEC-E-001
FARGO PRIMARY CARE - ELEC-E-001
FARGO PRIMARY CARE - ELEC-E-004
FARGO PRIMARY CARE - ELEC-E-004
FARGO PRIMARY CARE - ELEC-E-101
FARGO PRIMARY CARE - ELEC-E-101
11 19.2481.A08 Fargo- Expand Bldg.1 for Primary Care - Sheet - E-200 - POWER PLANS
11 19.2481.A08 Fargo- Expand Bldg.1 for Primary Care - Sheet - E-300 - LIGHTING PLANS

File details come from the government source that posted it. Updated .