This solicitation is for a minor construction project to expand Building 1 for primary care at the Fargo VA Medical Center. The project involves rerouting a road between the medical center and flood wall to relocate the flood wall basin and road further away from the building addition to comply with physical security standards. Foundation work will include installing helical piers to suitable depths. The addition will provide a two-story structure with a whole health clinic on the first floor and mechanical space and offices for EMS in the basement. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin. Responses are due based on the specified timeline and procedures in the solicitation documentation.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL PANEL SCHEDULES
BASEMENT LEVEL
E-001
CONSTRUCTION DOCUMENTS
/2
/2
:1 1:
A
M
EXPAND BLDG. 1 FOR
PRIMARY CARE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
Department of Veterans Affairsof
437-315
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050 12811/16/2021 RD JS
ESSF IOO NRP ALD EE NR GET INSI EG E
E R
R
RAYMOND
DAWES
PE-9846
DATE
01/04/23ADDENDUM #11
Revision Number Associated with Clouded Area#
ELECTRICAL DETAILS
E-004
CONSTRUCTION DOCUMENTS
/2
/2
:1 1:
A
M
EXPAND BLDG. 1 FOR
PRIMARY CARE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
Department of Veterans Affairsof
437-315
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050 12811/16/2021 RD JS
ESSF IOO NRP ALD EE NR GET INSI EG E
E R
R
RAYMOND
DAWES
PE-9846
DATE
01/04/23ADDENDUM #11
Revision Number Associated with Clouded Area#
CONDUIT TRAPEZE MOUNTING DETAIL
SCALE: NTS
FLOOR SLAB PENETRATION DETAIL
SCALE: NTS
LUMINAIRE MOUNTING - GYPBOARD CEILING
SCALE: NTS
LUMINAIRE MOUNTING - LAY-IN CELING
SCALE: NTS
DOWNLIGHT MOUNTING
SCALE: NTS
EXIT SIGN MOUNTING
SCALE: NTS
POWER SERVICE SCHEMATIC
SCALE: NTS
BASEMENT LEVEL ELECTRICAL BUS BAR GROUNDING DETAIL
SCALE: NTS
LEVEL 1 ELECTRICAL BUS BAR GROUNDING DETAIL
SCALE: NTS
POWER SERVICE GROUNDING DETAIL
SCALE: NTS
INSTALL IN ACCORDANCE WITH MANUFACTURER'S
MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.
LOCKING SQUARE
WASHER & NUT
JUNCTION BOX
1/4" SCREW
INTEGRAL GALVANIZED LIPPED STEEL
MOUNTING CHANNEL. CEILING GRID
PIECES NOT TO BE USED.
HANGER WIRE AND
MOUNTING CHANNEL
ATTACHED TO STRUCTURE
FIXTURE WHIP FROM
JUNCTION BOX 6' LONG MAX
CEILING HANGER WIRE
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM, TYP.
ARCHITECTURAL
CEILING GRID
ARCHITECTURAL
CEILING GRID
ACOUSTICAL
CEILING TILE
(TYP)
ARCHITECTURAL
CEILING GRID
INSTALL IN ACCORDANCE WITH MANUFACTURER'S
MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.
CEILING HANGER
WIRE, TYP.
WIRE TIE OR SCREW
BAR HANGER TO
CROSS BEAM TYP.
CEILING
CROSS BEAM
CEILING MAIN BEAM
FIXTURE WHIP FROM
JUNCTION BOX 6'
LONG MAX
RECESSED CAN
LUMINAIRE
CEILING BEAM
GYPSUM
BOARD (TYP)
LUMINAIRE
BAR HANGERS
LUMINAIRE SUSPENSION WIRES
RECESSED CAN
LUMINAIRE
REFER TO
SCHEDULE.
INSTALL IN ACCORDANCE WITH MANUFACTURER'S
MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.
LUMINAIRE.
REFER TO
SCHEDULE
LUMINAIRE.
REFER TO
SCHEDULE
FIXTURE WHIP
FROM JUNCTION
BOX 6' LONG MAX.
LUMINAIRE MANUFACTURER'S
MOUNTING HARDWARE
LUMINAIRE
SUSPENSION
WIRES
3 TWIST MINIMUM (TYP)
ACOUSTICAL
CEILING TILE (TYP)
ARCHITECTURAL
CEILING GRID
INSTALL IN ACCORDANCE WITH MANUFACTURER'S
MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.GYPSUM BOARD
CEILING CROSS BEAM
LUMINAIRE.
REFER TO
SCHEDULE
DRYWALL BORDER
LUMINAIRE.
REFER TO
SCHEDULE
FIXTURE WHIP
FROM JUNCTION
BOX 6' LONG MAX.
LUMINAIRE MANUFACTURER'S
MOUNTING HARDWARE
LUMINAIRE
SUSPENSION
WIRES
3 TWIST MINIMUM (TYP)
GYPSUM BOARD (TYP)
CEILING CROSS BEAM
CEILING MAIN BEAM
3/8" MAX
JUNCTION BOX
(SIZE AS REQUIRED)
CONDUIT FITTING
SPRING
NUT, TYP
FLOOR
SLAB, TYP.
FIRESTOP SEALANT
CONDUIT, TYP MINERAL WOOL
(FIRMLY PACKED)
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL, TYP.
STEEL EXPANSION
ANCHOR, TYP
LENGTH AS REQUIRED1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING
CHANNEL LONGER THAN 36" SHALL BE INSTALLED
WITH A CENTER SUPPORT ROD.
2. FASTEN THREADED ROD TO STRUCTURE BY
APPROVED METHOD PER SPECIFICATION 26 05 33,
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS.
FIELD VERIFY EXACT CONDITIONS.
GENERAL NOTES
WASHER &
LOCKNUT
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
LOCKING SQUARE
WASHER & LOCKNUT
3/8" MIN GALVANIZED
THREADED ROD, TYP.
CONDUIT CLAMP.
SIZE AS REQUIRED
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
BASMENT FLOOR
FIRST FLOOR
PANEL 10S5
SWBD-1SWBD EQUIPMENT BRANCHSWBD LIFE SAFETY
K
200A 200A800A
ATS-EBATS-LS
100A 225A
PANEL EB10S5 PANEL ES10S5
FEEDER #1 AND
FEEDER # 2 FROM
BUILDING 39
CONNECT NEW
FEEDERS TO EXISTING
SPARE BREAKER (TYP)
2-1/2" EMT WITH (4)
300 KCMIL THHN +
#2 CU GRND
4" EMT EACH WITH
(8) 350 KCMIL THHN
+ 2/0 CU GRND
4" EMT EACH WITH
(8) 300 KCMIL THHN
+ 2/0 CU GRND
PANEL 11S5 PANEL EB11S5 PANEL ES11S5
125 100 50
NOTE: EXISTING BUILDING 1
SWITCHGEAR LOCATION IS
SHOWN ON THE OVERALL SITE
PLAN. REFER TO 1/E101
2" EMT WITH (4)
2/0 THHN + #4
CU GRND
2" EMT WITH (4)
#1 THHN + #6
CU GRND
2" EMT WITH (4)
#1 THHN + #6
CU GRND
NOTE: MINIMUM 2" STAND-OFF FROM WALL TO BACK SIDE OF PLATE
WALL MOUNTED
GROUNDING
BUSBAR
INSULATOR
LUG
SUPPORT BRACKET
COPPER
PLATE
2/0 CU TO SWBD-1.
1/0 CU TO FIRST FLOOR ELECTRICAL
ROOM GROUNDING BUS BAR.
#2 CU TO SWBD-LIFE SAFETY.
2/0 CU TO SWBD-EQUIPMENT BRANCH.
#2 CU TO 10S5.
#6 CU TO PANEL 10S5ES LOCATED IN BD-130A.
#2 CU TO PANEL 10S5EB LOCATED IN BD-130A.
4/0 BOND TO EMT CONDUIT SYSTEM.
4/0 BOND TO GAS PIPING.
4/0 BOND TO BUILDING FOUNDATION
STRUCTURAL STEEL.
NOTE: MINIMUM 2" STAND-OFF FROM WALL TO BACK SIDE OF PLATE
WALL MOUNTED
GROUNDING
BUSBAR
INSULATOR
LUG
SUPPORT BRACKET
COPPER
PLATE
1/0 CU FROM BASEMENT LEVEL
GROUNDING BUS BAR.
#6 CU TO PANEL EB11S5.
#6 CU TO PANEL 11S5.
#8 CU TO PANEL ES11S5.
1/0 BOND TO EMT CONDUIT SYSTEM.
1/0 BOND TO GAS PIPING.
1/0 BOND TO BUILDING FOUNDATION
STRUCTURAL STEEL.
BASMENT FLOOR
FIRST FLOOR
PANEL 10S5
SWBD-1SWBD EQUIPMENT BRANCHSWBD LIFE SAFETY
PANEL EB10S5 PANEL ES10S5
2-1/2" EMT WITH
#2 CU GRND
4" EMT EACH WITH
2/0 CU GRND
4" EMT EACH WITH
2/0 CU GRND
PANEL 11S5 PANEL EB11S5 PANEL ES11S5
NOTE: EXISTING BUILDING 1
SWITCHGEAR LOCATION IS
SHOWN ON THE OVERALL SITE
PLAN. REFER TO 1/E101
4/0 BOND TO STRUCTURAL STEEL
1/0 BOND TO STRUCTURAL STEEL
4/0 BOND TO METALLIC CONDUIT
4/0 BOND TO METALLIC WATER PIPING
1/0 BOND TO METALLIC CONDUIT
1/0 BOND TO METALLIC WATER PIPING
#4 CU IN
3/4" EMT
#6 CU IN
3/4" EMT
#8 CU IN
3/4" EMT
#2 CU IN
3/4" EMT
#2 CU IN
3/4" EMT
#6 CU IN
3/4" EMT
#6 CU BONDING
JUMPER
#6 CU BONDING
JUMPER
#8 CU BONDING
JUMPER
#2 CU BONDING
JUMPER
#2 CU BONDING
JUMPER
#2 CU BONDING
JUMPER
NEUTRAL
BUS (TYP)
EQUIPMENT
GROUND BUS
(TYP)
1/0 GROUND TO UPPER
FLOOR GROUND BAR
GROUND BUS BAR (TYP)
OVERALL SITE PLAN
SCALE: 1/128" = 1'
EXPANDED SITE POWER PLAN - NEW CONSTRUCTION
SCALE: 1/16" = 1'
ELECTRICAL SITE PLAN
NEW CONSTRUCTION
E-101
CONSTRUCTION DOCUMENTS
/2
/2
:1 1:
A
M
EXPAND BLDG. 1 FOR
PRIMARY CARE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
Department of Veterans Affairsof
437-315
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050 12811/16/2021 RD JS
ESSF IOO NRP ALD EE NR GET INSI EG E
E R
R
RAYMOND
DAWES
PE-9846
DATE
01/04/23ADDENDUM #11
Revision Number Associated with Clouded Area#
N
RE
D
RI
VE
R
OF
TH
E
NO
RT
H
30W 30E
12 13
BOTTOM O
F D
IKE SLO
PE
BO
TT
O M
O F
D
IK
E
SL
O
PE
TOP O
F EARTHEN DIKE
TO
P
O F
EA
R
TH
EN
D
IK
E
BO
TT
O M
O F
D
IK
E
SL
O
PE
8 3
W6X15
BB-18A
MANUAL
WASH
BB-20A
STERILE
EQUIPMENT
ACCESS
BD-60E
BIOMED
OFFICE
BB-67
RESEARCH
BB-67B
RESEARCH
FACILITY
CHIEF
LOGISTICS
OFFICER
SUPERVISOR
INVENTORY
MANAGEMENT
BC-20B
OFFICE
BC-20A
OFFICE
BC-20
OPEN
OFFICE
BC-05C
OFFICE
BC-05B
OFFICE
BC-05
OPEN
OFFICE
BC-02
IRM
BC-05A
OFFICE
BC-01
WORK-
ROOM
B B
-9
ST
O
R A
G E
BB-94
ELECTRICAL
BB-93
STORAGE
BB-92
IRM
BB-91
STORAGE
BB-95A
WOMEN'S
LOCKER
BB-95B
MEN'S
LOCKERBB-95
FITNESS
CENTER
BB-96
BACK-UP
DIASASTER
ROOM/FITNESS
INSTRUCTION
BB-100
MECHANICAL
BD-62
FILE
ROOM
& BAS
BD-92
FOREMAN
BD-91
PROGRAM
CLERK
BD-95
STAFF
BREAK ROOM
BD-86
ELEV. MECH.
BD-84
IRM
BD-83
ELEC.B
D -8
TL
T
ELEV.
BD-80
STORAGE
BD-90
EQUIPMENT
AREA
BD-85B
MECHANIC
SHOP
BD-85A
PLUMBING
SHOP
BD-63A1
SHWR.
B D
-6 3A
TO
IL
ET
BD-63
MEN'S
LOCKER
ROOM
B D
-6
LO
C
K
SM
IT
H
SH
O
P
BD-75B
CARPENTRY
SHOP
BD-75A
ELECTRIC
SHOP
BD-65
PAINT
SHOP
BD-65A
SPRAY &
DRYING
BD-60
BIOMED
DROP-OFF
AREA
B D
-6 0A
SO
IL
ED
BD-60B
WORK
AREABD-60C
CHARGING
AREA
BD-60D
BIOMED
SHOP
B B
-8
BB-69
BB-85
B E-
BC-10
ROI
SOCIAL WORK
OFFICE
BD-70
MECHANICAL
ROOM
BC-15A
OEF/OIF
OFFICE
BA-44
PASSAGE
BB-12
PASSAGE
BB-79
INVESTIGATIVE
DRUG ROOM
BE-45
NORTH
LOADING
DOCK
BE-29
MECHANICAL
ROOM
BE-02
FED EX
ROOM
BE-10A
ROOM
B C
-7
EL
EV
A
TO
R
EQ
U
IP
M
EN
T
BC-68
CANTEEN
STORAGE
BB-90C
PHARM
OFFICE
BB-90
ANTICOAG
CLINIC
BB-90B
PHARM
OFFICE
BB-90A
PHARM
OFFICE
BB-66
WOMEN
BA-71
STORAGE
BA-82
TREATMENT
ROOM
BD-31
SAFETY
EQUIP.
BD-33
ENG.
LIBRARY
BD-35
SAFETY
EQUIP.
BE-24
LINEN
BD-11
WARD
PROPERTY
BE-20
LINEN
BLDG 3
SUPPLY
CHAIN
MANAGEMENT
BF-11
TOILET
BA-44A
WOMENS
LOCKER
BA-44B
MENS
LOCKER
BB-21
CART LIFT
S-3
MACHINE
BB-17
PREP/
ASSEMBLY/
STORAGE
B B
-1 7A
ET
O
/L O
W T
EM
P
ST
ER
IL
E
BB-20
RECEIVING/
DECONTAMINATION
BB-18B
CART
WASH
BB-15
CLEAN
STORAGE
BB-15B1
TOILET
BB-15B
MENS
LOCKER
BB-16A
CLER.
BB-16B
CLER.
BB-34
MECHANICAL
BB-34B
CART LIFT
S-4
MACHINE
BB-34A
UPS
BB-15A
WOMENS
LOCKER
BD-08
CANTEEN
STORAGE
BB-64
MEN
BB-62
ARMORY
BB-61
HOLDING
BB-56
EV
BB-60A
TOILET
BB-59A
TOILET
BB-59
LOCKER
BB-58
MECHANICAL
BB-60
LOCKER
BD-37
ENG.
OFFICE
BD-39
ENG.
OFFICE
BD-41
GEMS
OFFICE
BD-47
NFFE
BD-43
EMERG.
MNGR
OFFICE
BD-45
COMMON
BD-50A
ASST. CHIEF
ENG.
OFFICE
BD-50B
CHIEF
ENG.
OFFICE
BD-50
ENGINEERING
OFFICES
BD-42
ENG.
CONF.
BD-40
SAFETY
OFFICE
BD-38
EEO
OFFICE
BD-36
SAFETY
OFFICE
BD-34
FORMS & PROD.
ROOM
BB-80A
CONTROLLED
SUBSTANCE
VAULT
BE-28
SOUTHEAST
LOADING
DOCK
BE-27
MECHANICAL
ROOM
BB-90D
PHARM
OFFICE
BE-25
MECHANICAL
ROOM
BD-22
TELECONFERENCE
ROOM
BD-23
ASST.
EMS
OFFICE
BD-21
EMS
OFFICE
BD-20
CHIEF EMS
OFFICE
BD-12
FEMALE
TOILET
BD-10
MALE
TOILET
BD-04
STAFF
BREAK
ROOM
BD-06
OI&T
STORAGE
BD-05
ROOM
BE-10
ROOM
STORAGE
BE-09
MECHANICAL
ROOM
BE-07
PROS.
STORAGE
BE-30
N&FS
SUBSISTENCE
STORAGE
BE-34
PHARMACY
STORAGE
BE-42
WOMENS
LOCKER
BE-40
MENS
LOCKER
BE-40A
SHOWER
& TOILET BE-44A
COMPACTOR
ROOM
BE-42A
SHOWER
& TOILET
BE-44
CARTS
BE-50
DEEP
FREEZE
BE-47
BIO-
HAZARD
REFER
BE-46
MECHANICAL
ROOM
BE-38C
HAC
BE-36
OFFICE
BE-35
MORGUE
BE-98
BUILDING 1
GENERATOR
ROOM
BE-38
SUPPLY
CHAIN
MANAGEMENTBE-37
MORGUE
COOLER
BE-38A
LOCKER
BE-38B
TOILET
BE-97
STORAGE
BE-31A
SUPPLY
CHAIN
MANAGEMENT
STORAGE
BE-99
BUILDING 1
SWITCHGEAR
ROOM
BC-79
MECHANICAL
ROOM
BC-80
RETAIL
STORE
BC-81
RETAIL
STORAGE
BC-82
OFFICE
CANTEEN
CHIEF
BE-31
DIETETICS/
AMMS STORAGE
BE-05
MECHANICAL ROOM
BC-85B
FOOD
STORAGE
ROOM
BC-95
WOMENS
LOCKER BC-85A
HAC
BC-96
MENS
TOILET
BD-02
OI&T/TELEPHONE
ROOM
BB-03
M&R
SHOP
BC-83
ADMIN
OFFICE
BC-94
MENS
LOCKER
BC-90A
CREDIT
UNION
BC-93
EMS
SIGN-IN
ROOM
BC-91
EMS
BREAK
ROOM
BC-90
CREDIT
UNION
BC-69
VENDING
MACHINE
AREA
BC-70
CANTEEN
STORAGE
BC-89
PROVIDER
LOUNGEBC-67
WOMEN
BC-34
BC-66
MEN
BC-75
CANTEEN
DINING
AREA
BC-74
FOOD
SERVING
AREA
BC-74A
CANTEEN
KITCHEN
BC-64
OI&T
OFFICE
BC-63
OI&T
OFFICE
BC-15
OEF/OIF
SW WORK SPACE
BC-47
OI&T
OFFICE & STORAGE
BC-59
MECHANICAL
ROOM
BC-74B
CANTEEN
STORAGE
BC-60
TELEPHONE
EQUIPMENT
ROOM
BC-58
OI&T
OFFICE
BC-56
OI&T
OFFICE
BC-54
OI&T
STORAGE
BC-52
CIO
OFFICE
BC-50
COMPUTER
ROOM
BC-50A
UPS
BB-27
CH. PHARM
OFFICE
BB-72A
IV
HOODS
BB-72
ANTE
ROOM BB-72B
CHEMO
HOODS
BC-46
OI&T
OFFICE
BC-44
OI&T
OFFICE
BC-41
MECHANICAL
ROOM
BC-43
OI&T
OFFICE
BC-45
OI&T
OFFICE
BC-13
SUPER
OFFICE
BC-12
INTRVW
ROOM
BC-11A
INTERVIEW
ROOM
BA-01
MECHANICAL
ROOM
BC-11
HOMELESS
OUTREACH
BC-32
SOCIAL
WORK
OFFICE
BC-30
COMPLIANCE
OFFICER
BC-24
OI&T HUB
BA-03
EMS
STORAGE
BA-07
SPS
STORAGE
BA-05
ENVIRONMENT
MANAGEMENT
STORAGE
BA-01A
BUILDING 46
SWITCHGEAR
ROOM
BA-75
PHYSICAL
THERAPY
BA-81
SPECIAL
TREAT
BA-85
STORAGE
BA-84
EMPLOYEE
LOUNGE
BA-78
TREATMENT
ROOM
BA-76
REHAB
SPVR
OFFICE
BA-74
SPEECH
THERAPY
BA-72A
CLOSET
BA-72
RECP
OT /
SPEECH
BA-65A
MECHANICAL
ROOM
BA-70
CHIEF
PROS
OFFICE
BA-68
O.T.
OFFICE
BA-65
OCCUPATIONAL
THERAPY
BA-65B
O.T.
KITCHEN
BA-73
REC
THER
OFFICE
BA-50
WAITING
AREA
BA-45
PROS.
PROSTHETICS
OFFICE
B A
-4
C O
R R
EC
TI
VE
TH
ER
A
PY
BA-43
PROSTHETICS
SENS. AIDS
OFFICE
BA-39
TOILET
B A
-3
H A
C
BA-30
OI&T
BA-35
PROS.
STORAGE
BA-01B
BUILDING 46
EMERGENCY
GENERATOR
ROOM
BA-07A
BUILDING 9
EMERGENCY
GENERATOR
ROOM
BA-10
BUILDING 9
SWITCHGEEAR
ROOM
BA-09
SOILED
LINEN
ROOM
BB-09
BLDG #9
TANK ROOM
BB-78
STRIP
PACKING
BB-80B
HAC
BB-10
ENG/VAEA
STORAGE
BB-80
IN-PATIENT
PHARMACY
BB-76
STAFF
LOUNGE
B B
-1 5A
TO
IL
ET
BB-26
PHARMACY
OFFICE
BB-22
PHARMACY
WAITING
BB-28
PHARM TECH
OFFICE
BB-31
PHARMACY
OFFICE
BB-33
PHARMACY
OFFICE
BB-24
RECEIVING
BB-30
ASSIST.
CHIEF
OFFICE
BB-75
PHARMACY
STORAGE
BB-70
PHARM
CONF &
CLASS
ROOM
BB-85B
OCCUP.
HEALTH
OFFICE
BB-85
OCC
HEALTH
BB-85A
EXAM
BB-84
OCC
HEALTH
BB-67C
RESEARCH
BB-67D
RESEARCH
BB-68
EMS
BB-67A
RESEARCH
BB-32
CHIEF
SPS
OFFICE
BB-35
IMAGING
UPS
BB-55
PIV &
CLERICAL
BB-50
STORAGE
BB-53
POLICE
TRAINING
BB-57
EQ
BB-54
ASST.
CHIEF
POLICE
BB-52
CHIEF
POLICE
BUILDING 1
EXPANSION -
PRIMARY
CARE
EXISTING BUILDING 1 SWITCHGEAR
LOCATION FOR NORMAL, EQUIPMENT,
AND LIFE SAFETY POWER
NEW BASEMENT LEVEL
ELECTRICAL CLOSET
LOCATION
CONDUIT PATHWAY FOR POWER TO NEW PRIMARY CARE EXPANSION.
CONTRACTOR TO FIELD COORDINATE SPECIFIC LOCATION OF NEW CONDUIT
WITH EXISTING CONDITIONS IN ACCESSIBLE CEILING SPACE ABOVE HALLWAY
ALONG PATH SHOWN. NEW CONDUIT MUST BE AT OR ABOVE LEVEL OF
EXISTING PIPE/CONDUIT. REFER TO POWER SINGLE LINE DETAIL FOR SIZING.
E-101
NEW LEVEL 1
ELECTRICAL CLOSET
LOCATION
E-003
APPROXIMATE EXISTING
ACCESS CONTROL
PANEL LOCATION
CONDUIT PATHWAY BACK TO ACCESS
CONTROL PANEL LOCATION FOR ACCESS
CONTROL GATE CARD READERS.
CONDUIT PATHWAY BACK TO ACCESS
CONTROL PANEL LOCATION FOR
RELOCATED DOOR ACCESS CARD READER.
BD-92
FOREMAN
BD-91
PROGRAM
CLERK
BD-95
STAFF
BREAK ROOM
BD-86
ELEV. MECH.
BD-84
IRM
BD-83
ELEC.B
D -8
TL
T
ELEV.
BD-80
STORAGE
BD-90
EQUIPMENT
AREA
BD-85B
MECHANIC
SHOP
BD-85A
PLUMBING
SHOP
B D
-6 3A
TO
IL
ET
LOCKER
ROOM
LO
C
K
SM
IT
H
BD-75B
CARPENTRY
SHOP
BD-75A
ELECTRIC
SHOP
BD-65
PAINT
SHOP
BD-65A
SPRAY &
DRYING
BD-70
MECHANICAL
ROOM
BD-50A
ASST. CHIEF
ENG.
OFFICE
BD-50B
CHIEF
ENG.
OFFICE
UP
WET ROOM
BD - 133
OPEN SPACE
BD - 111
FUTURE OFFICE
BD - 131
CONFERENCE
ROOM
BD - 130
STANDALONE
PRIMARY
BD - 110MECHANICAL
BD - 117
ELECTRICAL
BD - 130A
GEMS STORAGE
BD - 120A
HOUSEKEEPING
EXPENDABLES
BD - 121
MEN'S LOCKER
ROOM
BD - 118
WOMEN'S
LOCKER ROOM
BD - 119
LEADS
WORKROOM
BD - 122
EQUIPMENT
STORAGE
BD - 116
CART STORAGE
BD - 115
EMS WORKROOM
BD - 112
STAFF LOUNGE
BD - 123
OFFICE FUTURE
BD - 114
OFFICE
SUPERVISORS
BD - 124
SECRETARY
WAITING
BD - 126
SECRETARY
BD - 126A
OFFICE EMS
CHIEF
BD - 127
OFFICE EMS
ASST CHIEF
BD - 128
OFFICE ADMIN
OFFICER
BD - 129
OFFICE GEMS
COORDINATOR
BD - 125
OFFICE
PROGRAM
SUPPORT ASST
BD - 113
CORRIDOR
CO01
CORRIDOR
CO02
CORRIDOR
CO03
BUILDING 1
EXPANSION -
PRIMARY
CARE
EXISTING 3 LEG FEEDER
(120-208 3 PH) PARALLEL
300KCMIL TO EXISTING 800A
SWBD-1 SHOPS GEAR
LOCATED IN BD-83.
NEW UNDERGROUND DUCT
BANK. EXISTING CIRCUIT #1
AND CIRCUT #2. 4160V, 3
PHASE. EACH CIRCUIT IS 3
#4/0 CU + #1/0 GROUND. (TYP)
MH
MH
NEW LOCATION OF MANHOLE #11.
PROVIDE 120V #5-20 WP RECEPTACLE IN
MANHOLE FOR SUMP PUMP. REFER TO
DETAIL 9/E-004.
MHMH
NEW UNDERGROUND
DUCT BANK 4160V, 3
PHASE WITH 3 #4/0 CU
+ #1/0 GROUND. (TYP)
MH
NEW LOCATION OF MANHOLE #10.
PROVIDE 120V #5-20 WP RECEPTACLE
INSIDE MANHOLE FOR SUMP PUMP.
REFER TO DETAIL 9/E-004.
LOCATION OF NEW POLE BASE. REUSE
EXISTING POLE AND POLE MOUNTED
LUMINAIRE IN NEW LOCATION.
CONTRACTOR TO INSTALL NEW POLE
BASE PER DETAIL 4/E-004. (TYP)
ES10S5-8
H
HH
H
T
REINSTALL EXISTING T38 75KVA
TRANSFORMER IN SAME LOCATION
ONCE INSTALLATION OF NEW
GRADE BEAM IS COMPLETE.
LOCATION OF NEW POLE BASE.
REUSE EXISTING POLE AND
POLE MOUNTED LUMINAIRE IN
NEW LOCATION. CONTRACTOR
TO INSTALL NEW POLE BASE PER
DETAIL 4/E-004. (TYP)
NEW LOCATION OF EXISTING POLE AND
POLE MOUNTED LUMINAIRE.
CONTRACTOR TO INSTALL NEW POLE
BASE PER DETAIL 10/E-101. (TYP)
H
H
H
TRENCHED ELECTRICAL LINE. 1-1/2"
SCHEDULE 80 PVC CONDUIT WITH
(4) #8 AWG THWN + (2) #8 CU
GROUND TO PROVIDE 120V POWER
TO RECEPTACLE IN MANHOLE FOR
SUMP PUMP.
TRENCHED ELECTRICAL LINE. 1-1/2"
SCHEDULE 80 PVC CONDUIT WITH
(2) #8 AWG THWN + (1) #8 CU
GROUND TO PROVIDE 120V POWER
TO RECEPTACLE IN MANHOLE FOR
SUMP PUMP.
EB10S5-9
NEW UNDERGROUND DUCT
BANK. EXISTING CIRCUIT #1
AND CIRCUT #2. 4160V, 3
PHASE. EACH CIRCUIT IS 3
#4/0 CU + #1/0 GROUND. (TYP)
PANEL 10S5
PANEL EB10S5
PANEL ES10S5
TRENCHED
ELECTRICAL
LINE. 1-1/2"
SCHEDULE 80
PVC CONDUIT
WITH (2) #8
AWG THWN +
(1) #8 CU
GROUND.
EB10S5-11
PB
PROVIDE NEW TRAFFIC RATED PULL
BOX AT FORMER LOCATION OF POLE
MONTED LUMINAIRE #69.
CONTRACTOR TO EVALUATE UNDERGROUND POWER
LINE SERVING BUILDING 43. CONTRACTOR TO
MAINTAIN EXISTING POWER OR PROVIDE NEW
CONDUIT AND WIRING TO BUILDING 43.
TRENCHED ELECTRICAL LINE. 1-1/2"
SCHEDULE 80 PVC CONDUIT WITH
(2) #8 AWG THWN + (1) #8 CU
GROUND TO PROVIDE 120V POWER
TO POLE MOUNT LUMINAIRE.
CR
CR
CR
LOCATION OF NEW POLE BASE.
REUSE EXISTING POLE AND
POLE MOUNTED LUMINAIRE IN
NEW LOCATION. CONNECT TO
EXISTING POWER. CONTRACTOR
TO INSTALL NEW POLE BASE PER
DETAIL 4/E-004. (TYP)
J
MH
NEW MANHOLE TO BE INSTALLED. NEW
ELECTRICAL DUCT BANK WILL BE
CONNECTED. PROVIDE 120V #5-20 WP
RECEPTACLE INSIDE MANHOLE FOR
SUMP PUMP. REFER TO DETAIL 9/E-004.
EB10S5-20
MODEL 773-E SERIES
CRASH BARRIER
WITH ACCESS CONTROL.
PROVIDE WITH MAG LOCK
HOLD DOWN BAR, FIRE
DEPARTMENT KNOX BOX,
BATTERY BACK-UP AND
FOUNDATION REBAR.
2 NEW JUNCTION BOXES TO BE INSTALLED IN THIS
LOCATION. EXISTING BURIED UTILITY LINE TO BE
STUBBED UP INTO NEW JUNCTION BOX IN FLOOR.
EXTENDED EXISTING POWER FROM FLOOR BOX,
ROUTING INSIDE INTERIOR WALL, TO SECOND
JUNCTION BOX INSTALLED ABOVE ACCESSIBLE CEILING.
POWER WILL BE UTILIZED FOR EXTERIOR POLE
MOUNTED LUMINAIRE.
INSTALL NEW CARD READER TO CONTROL ACCESS
GATE.
3/4" PVC CONDUIT BFG WITH (3) #12 AWG THWN TO
PROVIDE 120V POWER TO CONTROLLED ACCESS GATE
AND ASSOCIATED CARD READERS.
1" PVC CONDUIT BFG WITH CAT 6A CABLING FROM
SECURITY PANEL TO CARD READER FOR ACCESS GATE.
NEW PULL BOX TO BE INSTALLED IN FORMER LOCATION
OF LIGHTPOLE #69. EXISTING POWER IS TO BE
REUSED. NEW WIRE AND CONDUIT TO BE INSTALLED
FROM JUNCTION BOX EXTENDING EXISTING POWER TO
NEW LIGHT POLE LOCATIONS.
KEYED ELECTRICAL NOTES
BASE BID TO INCLUDE CONTROLLED ACCESS GATE AND ALL
ASSOCIATED WIRING, CONDUIT AND BACK BOXES.
BID ALTERNATE #2 DOES NOT INCLUDE CONTROLLED ACCESS
GATE AND ALL ASSOCIATED WIRING CONDUIT AND BACK BOXES.
AutoCAD SHX Text 19th AVE. N.
AutoCAD SHX Text 21st AVE. N.
AutoCAD SHX Text
ELM STREET
AutoCAD SHX Text
MC
AutoCAD SHX Text
ELM STREET
AutoCAD SHX Text
MC
AutoCAD SHX Text
UND
AutoCAD SHX Text
UND
AutoCAD SHX Text
NFFE
AutoCAD SHX Text
NFFE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
RO EOM
AutoCAD SHX Text
HCHV
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text R
AutoCAD SHX Text
MC
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
UND
AutoCAD SHX Text
UND
AutoCAD SHX Text
NFFE
AutoCAD SHX Text
NFFE
AutoCAD SHX Text
UP
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
F
F F
F
F
F
F
FF
F
F
F
F
F
F
F F
F
FFF
F
F
F
F
F
J
S P
S P
S P
S P
SPSP SPSP
S P
S P
S P
SPSP SPSPSPSPSP
S P
S P
S P
S P
S P
S P
SP
S P
SP SPSP SP
S P
S P
S P
S P
GFI
GFI GFI GFI
GFIGFIGFIGFI
F
F F F F
F
F
F
F F F F F F
F
F F
F
F
F
F
F F F
F FGFI GFI
F
F
F
J
J
J
S P
S P
S P
SP SP
S P
S P
S P
SPSP
S P
S P
S P
SP SPSP SP
SP SP
SPSP
S P
S P
S P
S P
SP SP
SP SP
S P
S P
S P
SP SP
S P
S P
S P
SPSP
S P
S P
S P
SP SPSP SP
SP SP
SPSP
SP SP
SP SP
J
S
W
KEYED ELECTRICAL NOTES
INSTALL RECEPTACLE AND TIE INTO EXISTING POWER
CIRCUIT.
INSTALL NEW RECEPTACLE AND TIE INTO EXISTING
EMERGENCY POWER CIRCUIT.
INSTALL RECEPTACLE FOR POWER BEHIND WALL MOUNT
TV PER DETAIL 1/E-004.
CONTRACTOR TO INSTALL FUSTAT ABOVE ACCESSIBLE
CEILING AND RMX MEDIUM DUTY COMMERCIAL DOOR
OPENER FOR ROLLING COUTERTOP GATE. PROVIDE
WALL MOUNT KIT #AAA011.0001S, AND BOTTOM SENSING
EDGE.
LEVEL 1 ELECTRICAL GROUNDING BUS BAR LOCATION.
SEE DETAIL 10/E-003. BUS BAR NOT RATED FOR OIT
SERVICE.
BASEMENT LEVEL ELECTRICAL GROUNDING BUS BAR
LOCATION. SEE DETAIL 9/E-003. BUS BAR NOT RATED
FOR OIT SERVICE.
PROVIDE DUPLEX RECEPTACLE AT LIFT DOCKING
STATION TO POWER BARIATRIC PATIENT LIFT.
RECEPTACLE HEIGHT TO BE COORDINATED WITH LIFT
MANUFACTURER.
RECEPTACLE IS FACTORY PROVIDED. POWER FOR
INTERNAL AHU LIGHTING TO BE PROVIDED BY THIS
CIRCUIT.
RECEPTACLE TO BE MOUNTED 18" AFF. COORDINATE
RECEPTACLE BOX INSTALLATION DEPTH SO THAT COVER
PLATE WILL BE FLUSH AGAINST MIRROR SURFACE.
MIRROR INSTALLER TO FIELD COORDINATE AND PROVIDE
OPENING IN MIRROR TO ACCOMMODATE RECEPTACLE
INSTALLATION.
MAGNETIC DOOR HOLD OPEN BY DOOR HARDWARE
VENDOR MOUNTED ON WALL AT LOCATION TO MEET
DOOR SWING.
SPSP
EB10S5- 1,3,5
EB10S5- 2,4,6
10S5- 31
10S5- 29
10S5- 23
10S5- 24
10S5- 25
10S5- 28
10S5- 27
10S5- 21
10S5- 20
10S5- 19
10S5- 18
10S5- 17
10S5- 16
10S5- 12
10S5- 13
10S5- 14
10S5- 15
10S5- 11
10S5- 10
10S5- 9 10S5- 8
10S5- 4
10S5- 6
10S5- 2
10S5- 7
10S5- 1
TU-15
TU-4
TU-5
TU-11
TU-12
TU-13
TU-14
TU-17
TU-18 TU-19
TU-20
TU-22
TU-21TU-1
TU-3
TU-6
TU-10
TU-24
TU-8
TU-9
TU-7
TU-16
EB10S5- 7
PANEL ES10S5
PANEL EB10S5
PANEL 10S5
10S5- 26
M-AHU-085
eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO
A B C e12
10S5- 22
10S5- 32
WP
WP
WP
WP
WPWP
WP
WP
WET ROOM
BD - 133
TOILET
BD - 132
OFFICE
BD - 131
CONFERENCE
ROOM
BD - 130STANDALONE
PRIMARY
BD - 110
MECHANICAL
BD - 117
ELECTRICAL
BD - 130A
GEMS
STORAGE
BD - 120
HOUSEKEEPING
EXPENDABLES
BD - 121
MEN'S
LOCKER
ROOM
BD - 118
WOMEN'S
LOCKER
ROOM
BD - 119
LEADS
WORKROOM
BD - 122
EQUIPMENT
STORAGE
BD - 116
CART
STORAGE
BD - 115
EMS
WORKROOM
BD - 112
STAFF
LOUNGE
BD - 123
OFFICE
BD - 114
OFFICE
SUPERVISORS
BD - 124
SECRETARY
OFFICE
BD - 126
OFFICE
EMS CHIEF
BD - 127 OFFICE
EMS ASST
CHIEF
BD - 128
OFFICE
ADMIN
OFFICER
BD - 129
OFFICE
GEMS
COORDINATOR
BD - 125
OFFICE
PROGRAM
SUPPORT
ASST
BD - 113
CORRIDOR
CO01
CORRIDOR
CO02
CORRIDOR
CO03
MEN'S
SHOWER
BD - 118A
MEN'S
TOILET
BD - 118B
WOMEN'S
SHOWER
BD - 119A
WOMEN'S
TOILET
BD - 119B
BD117-HWP-1
BD117-HWP-2
UH-1
EF-B08
EB10S5- 15
EB10S5- 9
10S5- 34
10S5- 5
10S5- 30
ES10S5- 2 ES10S5- 1
ES10S5- 3
CP-1
EB10S5- 8,10,12
EB10S5- 14,16,18
VFD VFD
10S5- 3
EB10S5- 11
EB10S5- 13
WMS-1
10 10
ES10S5- 5
ES11S5- 2
ES11S5- 1
ES11S5- 3
11S5- 35
11S5- 37 11S5- 39
11S5- 21
11S5- 23
11S5- 24
11S5- 13
11S5- 28
11S5- 29
11S5- 32
11S5- 31
11S5- 34
11S5- 33
11S5- 30
11S5- 12
11S5- 10 11S5- 7 11S5- 6
TU-30 TU-29 TU-28 TU-26 TU-25
TU-31
TU-32
TU-34
TU-36 TU-37 TU-38 TU-39 TU-41 TU-42
TU-43
TU-44TU-35
TU-33
TU-45
TU-49
TU-50 TU-51 TU-52
TU-46
TU-47
EB11S5- 1 11S5- 9
eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO
A B C e12
11S5- 1
11S5- 3
PANEL ES11S5
PANEL EB11S5
PANEL 11S5
TU-48
11S5- 27
WORK
ROOM
1D -173
BARIATRIC
EXAM
1D -176
EXAM
1D -175
EXAM
1D -174
EXAM
1D -172
EXAM
1D -171
RECEPTION/WAITING
1D -193
OFFICE
1D -199
OFFICE
1D -198
HAC
1D -178
EXAM
1D -189
EXAM
1D -190
EXAM
1D -187
EXAM
1D -186
EXAM
1D -185
EXAM
1D -184
EXAM
1D -181
EXAM
1D -179
EXAM
1D -177
STAFF TLT
1D -188A
EQUIP STG
1D -191A
WELLNESS
1D -191
OFFICE
1D -196
BREAK
ROOM
1D -188
PHARMACY
OFFICE
1D -192
ELECT
1D -195
LOGISTICS
STG
1D -194
TOILET
E1D-127A
LOCKER
E1D - 128
CONF
E1D - 129
STAFF
BREAK
ROOM
E1D - 130
OFFICE
1D -197CLEAN
LINEN
1D -180
TOILET
1D -182
SOILED
LINEN
1D -183
CORRIDOR
CO04 CORRIDOR
CO05
CORRIDOR
CO06
STAIRWELL
EBD - 70A TOILET
E1D-127A
STAIRWELL
EBD - 70A
11S5- 2
11S5- 38 11S5- 36
11S5- 20
11S5- 19
11S5- 1711S5- 18 11S5- 16 11S5- 15 11S5- 14
11S5- 25
11S5- 26
11S5- 22 11S5- 5
EF-120
11S5- 40
ES11S5- 411S5- 4
CORRIDOR
CO05
11S5- 8
EB11S5- 2
ES11S5- 5
DO
DO
EB11S5- 4
EB11S5- 6
E-200
11S5- 11
9 9 9
ES11S5- 6
ES11S5- 8
ES11S5- 10
DATA RACK FOR PAGING
SPEAKER SYSTEM
ES11S5- 7
ES11S5- 9
11S5- 41
ES11S5- 12
ROOM
E1D-116
ROOM
E1D-120
CORRIDOR
E1D-121
1 1
REMOVE EXISTING CARD READER, ASSOCIATED
DEVICES & WIRING. PREPARE CARD READER FOR
RELOCATION. CONDUIT TO REMAIN AND BE EXTENDED
ABOVE ACCESSIBLE CEILING TO NEW LOCATION
SHOWN ON SHEET E-400.
J
ROOM
1D-116
ROOM
1D-1201D-118
REMOVE EXISTING RECEPTACLES, DATA
CONNECTIONS AND ASSOCIATED
WIRING FROM EXISTING WALLS TO BE
DEMOLISHED IN THEIR ENTIRETY.
ROOM
REMODEL
AREA
LOCATION
RATED WALL SYMBOLS
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
SMOKE PARTITION
ESSF IOO NRP ALD EE NR GE
T INSI E
G E
E R
R
RAYMOND
DAWES
PE-9846
DATE
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
01/04/23ADDENDUM #11
Revision Number Associated with Clouded Area#
/6
/2
:3
:2
A
M
CONSTRUCTION DOCUMENTS
11/16/21
POWER PLANS
E-200
EXPAND BLDG. 1 FOR
PRIMARY CARE
JSRD
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
99 128
1/8" = 1'-0"
BASEMENT LEVEL - POWER PLAN
1/8" = 1'-0"
LEVEL 1 - POWER PLAN
VAV TERMINAL UNITS WILL BE
PROVIDED WITH FACTORY INSTALLED
TOGGLE STYLE POWER DISCONNECT
SWITCH AND 50 VA TRANSFORMER IN
TERMINAL UNIT CONTROL BOX FOR
CONTROL POWER TO TERMINAL UNIT
(TYP).
VAV TERMINAL UNITS WILL BE
PROVIDED WITH FACTORY INSTALLED
TOGGLE STYLE POWER DISCONNECT
SWITCH AND 50 VA TRANSFORMER IN
TERMINAL UNIT CONTROL BOX FOR
CONTROL POWER TO TERMINAL UNIT
(TYP).1/8" = 1'-0"
LEVEL 1 - ELECTRICAL REMODEL PLAN
1/8" = 1'-0"
BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN
1/8" = 1'-0"
LEVEL 1 - ELECTRICAL DEMOLITION PLAN
1" = 30'-0"
REMODEL AREA LOCATION
KEYED ELECTRICAL NOTES
1 EXISTING LUMINAIRE TO REMAIN.
REMOVE EXISTING LUMINAIRE AND PREPARE FOR REUSE
IN NEW LOCATION.
INSTALL EXISTING LUMINAIRE FROM ROOM 1D-118 IN NEW
LOCATION SHOWN. CONNECT TO EXISTING LIGHTING
CIRCUIT FROM ROOM 1D-120. CONNECT SWITCH LEG TO
EXISTING SWITCH BANK REINSTALLED IN NEW LOCATION
SHOWN.
INSTALL EXISTING LUMINAIRE FROM ROOM 1D-116 IN NEW
LOCATION SHOWN. CONNECT TO EXISTING LIGHTING
CIRCUIT IN CORRIDOR 1D-121. CONNECT SWITCH LEG TO
NEW SWITCH BANK IN LOCATION SHOWN.
LUMINAIRE TO BE ON UNSWITCHED EMERGENCY POWER
TO PROVIDE ALWAYS-ON LIGHTING IN STAIRWELL.
SPSP
O
S ,D
,D O
S ,D
,D
2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D
O
S ,D
,D
2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D 2OS,D,D
2OS
O
S
2OS 2OS 2OS 2OS 2OS 2OS
2OS
2OS
O S
O S
O S
O S
O
SOS
OS
OS
OS
OS
OS
OS
OS
OS
OS OS
OS
OS OS
OS
OS OS
O V
OVOV
O V
OV OV
OS
S P
S P
S P
SP SP
S P
S P
S P
SPSP
S P
S P
S P
SP SPSP SP
SP SP
SPSP
S P
S P
S P
S P
SP SP
SP SP
S P
S P
S P
SP SP
S P
S P
S P
SPSP
S P
S P
S P
SP SPSP SP
SP SP
SPSP
SP SP
SP SP
OS
OS
OS OS
OS
OS
OS
OS
OS OS
OS
OS
OS
OS
OS
OS
OSOS
OV OV
O V
O V
OV OV
OV OV
OVOV OVOV OVOV
O V
O V
O V
O V
OVOV
OVOV
2OS
2OS2OS
2OS 2OS 2OS 2OS
2OS
O
S
O
S
OS
O S
O S
O S
O S
O V
O V
OS OS OS
OS
OS
OS
O
S
A
A
A
A
OS
OV
S P
S P
S P
S P
SPSP SPSP
S P
S P
S P
SPSP SPSPSPSPSP
S P
S P
S P
S P
S P
S P
SP
S P
SP SPSP SP
S P
S P
S P
S P
O
S eC.1eD eE eF eG eH eI eI.1 e12
REMOVE EXISTING
SWITCHES AND PREPARE
FOR REINSTALLATION IN
NEW LOCATION.
2 2
ROOM
1D-116
ROOM
1D-118
ROOM
1D-120
(E) PANEL(E) PANEL
REMODEL
AREA
LOCATION
RATED WALL SYMBOLS
1-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
SMOKE PARTITION
BE
B
BE
B
BE
B
BE
B
B
B BE
B BE
B BE
B
BE
B
BE BE
B
BE
B
BE
B
BE
B
BE B
B
B
BE
BE
B
A
B
B
AE B A
A BE A
B
BE
B
BE
B
BE
B
BE
B
BE
B
BE
BE
B
BE
B
BE
B
BE
B
B
BE
B
B
B
B
BE
BE
B
B
B
B
BE
BE
B
B
B
B BE B B
BE
B
BE
AE
AE
AE
A
A AE
AE A
G
G
ES11S5- 1111S5- 46
11S5- 45 eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO
A B C e12
X
X X
X
BARIATRIC
EXAM
1D -176
EXAM
1D -175
EXAM
1D -174
EXAM
1D -172
EXAM
1D -171
RECEPTION/WAITING
1D -193
OFFICE
1D -199
OFFICE
1D -198
HAC
1D -178
EXAM
1D -189
EXAM
1D -190
EXAM
1D -187
EXAM
1D -186
EXAM
1D -185
EXAM
1D -184
EXAM
1D -181
EXAM
1D -179
EXAM
1D -177 STAFF TLT
1D -188A
EQUIP STG
1D -191A
WELLNESS
1D -191
OFFICE
1D -196
BREAK
ROOM
1D -188
PHARMACY
OFFICE
1D -192
ELECT
1D -195
LOGISTICS
STG
1D -194
LOCKER
E1D - 128
CONF
E1D - 129
STAFF
BREAK
ROOM
E1D - 130
OFFICE
1D -197
WORK
ROOM
1D -173
CLEAN
LINEN
1D -180
TOILET
1D -182
SOILED
LINEN
1D -183
CORRIDOR
CO04
CORRIDOR
CO05
CORRIDOR
CO06
CORRIDOR
E1D - CO
X
X
X
DATA RACK FOR PAGING
SPEAKER SYSTEM
B
B B B
B B B BE
B
BE
BE B
B
BE
B
BE
B B BE B B BE B
B
BE
B
B
BE
BE B
B
BE
CE
C
C
CE
BE
BE
B
B
B
B
B BE
B
B
BE
A
B
B
A
BE
BE
B
B
BE B
ABE
BE
A A
BE
BE
A
B
BE B
B
BE
A
BE
G
BE B
B
BE
B
B
BE
B B
BE B
B B
C CE
C
C CE
BE B B
B B
D
DE
D
D D D
DE D DE
D DE D
D
D D
DE D DE
D D DE
D
D
DE D D
D
DE
F F
FF
G G
FF
ES10S5- 7
10S5- 33
10S5- 35 eA eA.1 eB eC eC.1eD eE eF eG eH eI eI.1 eJ eK eL eM eN eO
A B C e12
C
X
X
X
X
X
B eC.1eD eE eF eG eH eI eI.1 e12
INSTALL NEW SWITCHES
AND CONNECT TO EXISTING
LIGHTING CIRCUIT FOR
ROOM E1D-116. .
INSTALL NEW SWITCHES
AND CONNECT TO EXISTING
LIGHITNG CIRCUIT FOR
ROOM E1D-120.
INSTALL NEW SWITCHES
AND TIE INTO EXISTING
COORIDOR LIGHITNG
CIRCUIT.
(E) PANEL (E) PANEL
(E) PANEL
ESSF IOO NRP ALD EE NR GE
T INSI E
G E
E R
R
RAYMOND
DAWES
PE-9846
DATE
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
01/04/23ADDENDUM #11
Revision Number Associated with Clouded Area#
/6
/2
:3
:2
A
M
CONSTRUCTION DOCUMENTS
11/16/21
LIGHTING PLANS
E-300
EXPAND BLDG. 1 FOR
PRIMARY CARE
JSRD
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
100 128
1/8" = 1'-0"
FIRST LEVEL - LIGHTING DEMOLITION PLAN
1" = 30'-0"
REMODEL AREA LOCATION
1/8" = 1'-0"
FIRST LEVEL - LIGHTING PLAN
1/8" = 1'-0"
BASEMENT LEVEL - LIGHTING PLAN
1/8" = 1'-0"
FIRST LEVEL - LIGHTING REMODEL PLAN
| FARGO PRIMARY CARE - ELEC-E-001 |
| FARGO PRIMARY CARE - ELEC-E-001 |
| FARGO PRIMARY CARE - ELEC-E-004 |
| FARGO PRIMARY CARE - ELEC-E-004 |
| FARGO PRIMARY CARE - ELEC-E-101 |
| FARGO PRIMARY CARE - ELEC-E-101 |
| 11 19.2481.A08 Fargo- Expand Bldg.1 for Primary Care - Sheet - E-200 - POWER PLANS |
| 11 19.2481.A08 Fargo- Expand Bldg.1 for Primary Care - Sheet - E-300 - LIGHTING PLANS |
File details come from the government source that posted it. Updated .