This solicitation is for a construction project to expand Building 1 for primary care at the Fargo VA Medical Center in North Dakota. The project involves rerouting part of the road between the medical center and flood wall to relocate the flood wall basin and road further away from the building addition to comply with standoff requirements. Foundation work will include installing helical piers to a suitable depth. The two-story addition will include a first floor converted to a whole health clinic space with supporting rooms, and a basement converted to mechanical space and offices/work areas for EMS. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
Volume 2- Specifications
EXPAND BUILDING 1 FOR PRIMARY
CARE
Construction Documents
PROJECT NO.: 437-315
November 16, 2021
U.S. DEPARTMENT OF
V E T E R ANS AF FAI R S
Veterans’ Health Administration Fargo VA Health Care System
12-01-18
Expand Building 1 For Primary Care VA Project No: 437-315
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-1
SECTION 09 51 00
ACOUSTICAL CEILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Acoustical units.
2. Metal ceiling suspension system for acoustical ceilings.
3. Adhesive application.
1.2 RELATED REQUIREMENTS
A. Color, pattern, and location of each type of acoustical unit: Section
09 06 00, SCHEDULE FOR FINISHES.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. A641/A641M-09a(2014) - Zinc-coated (Galvanized) Carbon Steel Wire.
2. A653/A653M-15e1 - Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron
Alloy-coated (Galvannealed) by the Hot-Dip Process.
3. C423-09a - Sound Absorption and Sound Absorption Coefficients by the
Reverberation Room Method.
4. C634-13 - Terminology Relating to Environmental Acoustics.
5. C635/C635M-13a - Manufacture, Performance, and Testing of Metal
Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings.
6. C636/C636M-13 - Installation of Metal Ceiling Suspension Systems for
Acoustical Tile and Lay-in Panels.
7. D1779-98(2011) - Adhesive for Acoustical Materials.
8. E84-15b - Surface Burning Characteristics of Building Materials.
9. E119-16 - Fire Tests of Building Construction and Materials.
10. E413-16 - Classification for Rating Sound Insulation.
11. E580/E580M-14 - Installation of Ceiling Suspension Systems for
Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake
Ground Motions.
12. E1264-14 - Classification for Acoustical Ceiling Products.
C. International Organization for Standardization (ISO):
1. ISO 14644-1 - Classification of Air Cleanliness.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-2
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Ceiling suspension system indicating manufacturer recommendation for each application.
3. Installation instructions.
4. Warranty.
D. Samples:
1. Acoustical units, 150 mm (6 inches) in size, each type.
a. Submit quantity required to show full color and texture range.
2. Suspension system, trim and molding, 300 mm (12 inches) long.
3. Colored markers for access service.
4. Approved samples may be incorporated into work.
E. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Biobased Content:
a. Show type and quantity for each product.
b. Show volatile organic compound types and quantities.
F. Certificates: Certify each product complies with specifications.
1. Acoustical units, each type.
G. Qualifications: Substantiate qualifications comply with specifications.
H. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-3
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum
48 hours before installation.
2. Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until
Government occupancy.
3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Ceiling System: Acoustical ceilings units on exposed grid suspension systems.
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide acoustical units from one manufacturer.
1. Provide each product exposed to view from one production run.
C. Provide suspension system from same manufacturer.
D. ASTM Class A Fire Rating (UL) Fire Resistive
2.3 ACT1 – Acoustical Ceiling Tile
A. Wet Formed Mineral Fiber-Fissured
B. Color: White
C. NRC: 0.55
D. CAC: 35
E. Edge/Joint Detail: Angled Tegular
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-4
F. Thickness: 5/8-inch.
G. Modular Size: 24 X 24IN
2.4 METAL SUSPENSION SYSTEM
A. General: ASTM C635, heavy-duty system, except as otherwise specified.
1. Suspension System: Provide the following:
a. Galvanized cold-rolled steel, bonderized.
2. Main and Cross Runner: Use same construction Do not use lighter-duty sections for cross runners.
B. Exposed Grid Suspension System: Support of lay-in panels.
1. Grid Width: 22 mm (7/8 inch) minimum with8 mm (5/16 inch) minimum panel bearing surface.
2. Molding: Fabricate from the same material with same exposed width and finish.
3. Finish: Baked-on enamel flat texture finish.
a. Color: To match adjacent acoustical units unless specified otherwise in Section 09 06 00, SCHEDULE FOR FINISHES.
C. Suspension System Support of Metal Type V, VI, and VII Tiles: Concealed grid type with runners for snap-in attachment of metal tile (pans).
D. Carrying Channels Secondary Framing: Cold-rolled or hot-rolled steel, black asphaltic paint finish, rust free.
1. Weight per 300 m (per thousand linear feet), minimum:
Size Cold-rolled Hot-rolled mm inches kg pound kg pound
38 1-1/2 215.4 475 508 1120
50 2 267.6 590 571.5 1260
E. Anchors and Inserts: Provide anchors or inserts to support twice the loads imposed by hangers.
1. Hanger Inserts: Steel, zinc-coated (galvanized after fabrication).
a. Flush ceiling insert type:
1) Designed to provide a shell covered opening over a wire loop to permit attachment of hangers and keep concrete out of insert recess.
2) Insert opening inside shell approximately 16 mm (5/8 inch) wide by 9 mm (3/8 inch) high over top of wire.
3) Wire 5 mm (3/16 inch) diameter with length to provide positive hooked anchorage in concrete.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-5
F. Clips: Galvanized steel, designed to secure framing member in place.
G. Tile Splines: ASTM C635.
H. Wire: ASTM A641.
1. Size:
a. Wire Hangers: Minimum diameter 2.68 mm (0.1055 inch).
b. Bracing Wires: Minimum diameter 3.43 mm (0.1350 inch).
2.5 ACCESSORIES
A. Adhesives: Low pollutant-emitting, water based type recommended by adhered product manufacturer for each application.
B. Perimeter Seal: Vinyl, polyethylene or polyurethane open cell sponge material, density of 1.3 plus or minus 10 percent, compression set less than 10 percent with pressure sensitive adhesive coating on one side.
1. Thickness: As required to fill voids between back of wall molding and finish wall.
2. Size: Minimum 9 mm (3/8 inch) wide strip.
C. Access Identification Markers: Colored markers with pressure sensitive adhesive on one side, plastic, 6 to 9 mm (1/4 to 3/8 inch) diameter.
1. Color Code: Provide the following color markers for service identification:
Color Service
Red Engraved with white letters – with fire damper number
Green Engraved with ‘TMV’ white letters
White Engraved with black letters with VAV number
Yellow Chilled Water and Heating Water
Orange Ductwork: Fire Dampers
Blue Ductwork: Dampers and Controls
Black Gas: Laboratory, Medical, Air and Vacuum
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing acoustical panels and suspension system to permit new installation.
1. Dispose of removed materials.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-6
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 ACOUSTICAL UNIT INSTALLATION
A. Applications:
1. Cut acoustic units for perimeter borders and penetrations to fit tight against penetration for joint not concealed by molding.
B. Layout acoustical unit as shown on drawings.
C. Installation:
1. Install acoustic tiles after wet finishes have been installed and solvents have cured.
2. Install lay-in acoustic panels in exposed grid with minimum 6 mm
(1/4 inch) bearing at edges on supports.
a. Install tile to lay level and in full contact with exposed grid.
b. Replace cracked, broken, stained, dirty, or tile.
3. Tile in concealed grid upward access suspension system:
a. Install acoustical tile with joints close, straight and true to line, and with exposed surfaces level and flush at joints.
b. Make corners and arises full, and without worn or broken places.
c. Locate acoustical units providing access to service systems.
4. Markers:
a. Install color coded markers to identify the various concealed piping, mechanical, and plumbing systems.
b. Attach colored markers to exposed grid on opposite sides of the units providing access.
c. Attach marker on exposed ceiling surface of upward access acoustical unit.
D. Touch up damaged factory finishes.
1. Repair painted surfaces with touch up primer.
3.4 CEILING SUSPENSION SYSTEM INSTALLATION
A. General: Install according to ASTM C636.
1. Use direct or indirect hung suspension system or combination of both.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-7
2. Support a maximum area of 1.48 sq. m (16 sq. ft.) of ceiling per hanger.
3. Prevent deflection in excess of 1/360 of span of cross runner and main runner.
4. Provide additional hangers located at each corner of support components.
5. Provide minimum 100 mm (4 inch) clearance from the exposed face of the acoustical units to the underside of ducts, pipe, conduit, secondary suspension channels, concrete beams; and steel beam unless furred system is shown.
6. Provide main runners minimum 1200 mm (48 inches) in length.
7. Install hanger wires vertically. Angled wires are not acceptable except for seismic restraint bracing wires.
B. Direct Hung Suspension System: ASTM C635.
1. Support main runners by hanger wires attached directly to the structure overhead.
2. Maximum spacing of hangers, 1200 mm (4 feet) on centers unless interference occurs by mechanical systems. Use indirect hung suspension system where not possible to maintain hanger spacing.
C. Anchorage to Structure:
1. Concrete:
a. Install hanger inserts and wire loops required for support of hanger and bracing wire. Install hanger wires with looped ends through steel deck when steel deck does not have attachment device.
b. Use eye pins or threaded studs with screw-on eyes in existing or already placed concrete structures to support hanger and bracing wire. Install in sides of concrete beams.
2. Steel:
a. Install carrying channels for attachment of hanger wires.
1) Size and space carrying channels to support load within performance limit.
2) Attach hangers to steel carrying channels, spaced four feet on center, unless area supported or deflection exceeds the amount specified.
Fargo VA Health Care System 09 51 00 Acoustical Ceilings-8
b. Attach carrying channels to the bottom flange of steel beams spaced not 1200 mm (4 feet) on center before fireproofing is installed. Weld or use steel clips for beam attachment.
D. Indirect Hung Suspension System: ASTM C635.
1. Space carrying channels for indirect hung suspension system maximum
1200 mm (4 feet) on center. Space hangers for carrying channels maximum 2400 mm (8 feet) on center or for carrying channels less than 1200 mm (4 feet) or center so as to insure that specified requirements are not exceeded.
2. Support main runners by specially designed clips attached to carrying channels.
3.5 CEILING TREATMENT
A. Moldings:
1. Install metal wall molding at perimeter of room, column, or edge at vertical surfaces.
2. Install special shaped molding at changes in ceiling heights and at other breaks in ceiling construction to support acoustical units and to conceal their edges.
B. Perimeter Seal:
1. Install perimeter seal between vertical leg of wall molding and finish wall, partition, and other vertical surfaces.
2. Install perimeter seal to finish flush with exposed faces of horizontal legs of wall molding.
3.6 CLEANING
A. Remove excess adhesive before adhesive sets.
B. Clean exposed surfaces. Remove contaminants and stains.
- - - E N D - - -
01-01-21
Fargo VA Health Care System 09 65 13 Resilient Base and Accessories-1
SECTION 09 65 13
RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Resilient base (RB) adhered to interior walls and partitions.
2. Resilient stair treads (RST) adhered to interior stair treads.
3. Sheet rubber flooring (SRF) adhered to interior stair landings.
1.2 RELATED REQUIREMENTS
A. Sheet Flooring Integral Base: Section 09 65 16, RESILIENT SHEET
FLOORING.
B. Rubber Tile Flooring at Landings: Section 09 65 19, RESILIENT TILE
FLOORING.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
F1344-15................Rubber Floor Tile.
F1859-14e1..............Rubber Sheet Floor Covering without Backing.
F1860-14e1..............Rubber Sheet Floor Covering with Backing.
F1861-16................Resilient Wall Base.
D4259-18................Preparation of Concrete by Abrasion Prior to
Coating Application.
C. Federal Specifications (Fed. Spec.):
RR-T-650E (1994)........Treads, Metallic and Non-Metallic, Skid-Resistant.
D. International Concrete Repair Institute (ICRI):
310.2R-2013.............Selecting and Specifying Concrete Surface
Preparation for Sealers, Coatings, Polymer
Overlays, and Concrete Repair.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Adhesives and primers indicating manufacturer's recommendation for each application.
3. Installation instructions.
C. Samples:
Fargo VA Health Care System 09 65 13 Resilient Base and Accessories-2
1. Resilient Base: 150 mm (6 inches) long, each type and color.
2. Resilient Stair Treads: 150 mm (6 inches) long, each type and color.
3. Sheet Rubber Flooring: 300 mm (12 inches) square, each type and color.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Low Pollutant-Emitting Materials:
a. Stair Treads and Sheet Rubber Flooring: Submit Floor Score label.
b. Show volatile organic compound types and quantities.
E. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.5 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.6 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage when handling and during construction operations.
1.7 FIELD CONDITIONS
A. Environment:
1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum
48 hours before installation.
2. Work Area Ambient Temperature Range: 21 to 27 degrees C (70 to 80 degrees F) continuously, beginning 48 hours before installation.
3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.8 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 PRODUCTS
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide each product from one manufacturer and from one production run.
Fargo VA Health Care System 09 65 13 Resilient Base and Accessories-3
C. Provide resilient stair treads and sheet rubber flooring from same manufacturer.
2.2 RESILIENT BASE
A. Resilient Base: 3 mm (1/8 inch) thick, 100 mm (4 inches) high.
1. Type: TP thermoplastic rubber, Group 2 – layered with molded top.
Style B-cove.
2.3 RESILIENT STAIR TREADS
A. Resilient Stair Treads: Rubber, skid-resistant abrasive strip nosing, 5 mm (3/16 inch) thick nosing wear surface tapered to 3 mm (1/8 inch) thick at riser.
1. Fed. Spec. RR-T-650, Composition A, Type 2.
2. Abrasive Strips: Design for access by visually impaired.
3. Nosing: Flexible, accommodating angle between tread and riser; shape suiting sub-tread.
4. Size: Single piece full stair tread width and depth.
2.4 PRIMER (FOR CONCRETE FLOORS)
A. Primer: Type recommended by adhesive manufacturer.
2.5 LEVELING COMPOUND (FOR CONCRETE FLOORS)
A. Leveling Compound: Provide products mixed with latex or polyvinyl acetate resins.
2.6 ADHESIVES
A. Adhesives: Low pollutant-emitting, water based type recommended by adhered product manufacturer for each application.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing baseto permit new installation.
1. Dispose of removed materials.
D. Correct substrate deficiencies.
1. Fill cracks, pits, and depressions with leveling compound.
2. Remove protrusions; grind high spots.
3. Apply leveling compound to achieve 3 mm (1/8 inch) in 3 m (10 feet) maximum surface variation.
E. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
1. Mechanically clean concrete floor substrate according to ASTM D4259.
2. Surface Profile: ICRI Guideline No. 310.2R.
Fargo VA Health Care System 09 65 13 Resilient Base and Accessories-4
F. Allow substrate to dry and cure.
G. Perform flooring manufacturer’s recommended bond, substrate moisture content, and pH tests.
3.2 INSTALLATION GENERAL
A. Install products according to manufacturer's instructions.
1. When instructions deviate from specifications, submit proposed resolution for Contracting Officer consideration.
3.3 RESILIENT BASE INSTALLATION
A. Applications:
1. Install resilient base in rooms scheduled on Drawings.
2. Install resilient base on casework and locker toe spaces, and other curb supported fixed equipment.
3. Extend resilient base into closets, alcoves, and cabinet knee spaces, and around columns within scheduled room.
B. Lay out resilient base with minimum number of joints.
1. Length: 600 mm (24 inches) minimum, each piece.
2. Locate joints 150 mm (6 inches) minimum from corners and intersection of adjacent materials.
C. Installation:
1. Apply adhesive uniformly for full contact between resilient base and substrate.
2. Set resilient base with hairline butted joints aligned along top edge.
D. Field form corners and end stops.
1. V-groove back of outside corner.
2. V-groove face of inside corner and notch cove for miter joint.
E. Roll resilient base ensuring complete adhesion.
3.4 RESILIENT STAIR TREAD INSTALLATION
A. Install resilient stair treads without joints on each stair tread substrate.
1. Install full width resilient stair treads on each intermediate and floor landing.
2. Caulk the joint where the stair treads meet the walls and risers.
B. Apply adhesive uniformly for full contact between resilient stair tread and substrate.
1. Roll resilient stair treads ensuring complete adhesion.
3.5 CLEANING
A. Remove excess adhesive before adhesive sets.
Fargo VA Health Care System 09 65 13 Resilient Base and Accessories-5
B. Clean exposed resilient base, resilient stair treads, and sheet rubber flooring surfaces. Remove contaminants and stains.
1. Clean with mild detergent. Leave surfaces free of detergent residue.
C. Polish exposed resilient base to gloss sheen.
3.6 PROTECTION
A. Prohibit traffic on resilient stair treads and sheet rubber flooring 72 hours, minimum, after installation.
B. Protect products from construction traffic and operations.
1. Cover resilient stair treads and sheet rubber flooring with reinforced kraft paper, and plywood or hardboard.
2. Maintain protection until directed by Contracting Officer's
Representative.
C. Replace damaged products and re-clean.
1. Damaged Products include cut, gouged, scraped, torn, and unbonded products.
- - E N D - -
05-01-18
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-1
SECTION 09 65 16
RESILIENT SHEET FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Resilient sheet flooring (RSF) with chemically welded seams and integral cove base.
2. Linoleum welded seam sheet flooring (LIN) with heat welded seams and integral cove base.
1.2 RELATED REQUIREMENTS
A. Color, Pattern and Texture: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Resilient Base over Base of Lockers, Equipment and Casework: Section
09 65 13, RESILIENT BASE AND ACCESSORIES.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. D4259-88(2012) - Abrading Concrete.
2. E648-15e1 - Standard Test Method for Critical Radiant Flux of
Floor-Covering Systems Using a Radiant Heat Energy Source.
3. E662-15a - Standard Test Method for Specific Optical Density of
Smoke Generated by Solid Materials.
4. F1303-04(2014) - Sheet Vinyl Floor Covering with Backing.
5. F1860-14 - Rubber Sheet Floor Covering With Backing.
6. F1913-04(2014) - Vinyl Sheet Floor Covering Without Backing.
C. International Concrete Repair Institute (ICRI):
1. 310.2R-13 - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays, and Concrete Repair.
D. SCS Global Services (SCS):
1. FloorScore.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1. Show size, configuration, and fabrication and installation details.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Application and Installation instructions.
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-2
3. Warranty.
C. Samples:
1. Sheet material, (12 inch by 12 inch), of each color and pattern with welded seam using specified welding rod 300 mm (12 inches) square for each type, pattern and color.
2. Cap strip and fillet strip, 300 mm (12 inches) for integral base.
3. Shop Drawings and Certificates: Layout of joints showing patterns where joints are expressed, and type and location of obscure type joints. Indicate orientation of directional patterns.
4. Certificates: Quality Control Certificate Submittals and lists specified in paragraph, QUALIFICATIONS.
5. Edge strips: 150 mm (6 inches) long each type.
6. Primer: Pint container, each type.
D. Sustainable Construction Submittals:
1. Low Pollutant-Emitting Materials:
a. Sheet Flooring: Submit FloorScore label.
E. Certificates: Certify each product complies with specifications.
1. Heat welded seaming is manufacturer's prescribed method of installation.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer with project experience list.
2. Installer with project experience list.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Regularly installs specified products and is approved by the manufacturer.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-3
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight conditioned facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Work Area Ambient Temperature Range: Minimum 18 to 38 degrees C (65 to 100 degrees F) continuously, beginning 48 hours before installation. Maintain room temperature above 18 degrees C
(65 degrees F) after installation.
2. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant resilient sheet flooring against material and manufacturing defects.
1. Warranty Period: 2 years.
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
A. Sheet Flooring:
1. Critical Radiant Flux: ASTM E648; 0.45 watts per sq.cm or more, Class I.
2. Smoke Density: ASTM E662; less than 450.
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide vinyl sheet color and pattern from one production run.
2.3 RESILIENT SHEET FLOORING
A. Resilient Sheet Flooring (RSF): ASTM F1913; Vinyl, without backing.
1. Wear Surface: Smooth.
2. Thickness: 2 mm (0.080 inches).
B. Resilient Sheet Flooring (RSF): ASTM F1303; Type II, Grade 1, vinyl, with backing.
1. Wear Surface: Smooth.
2. Wear Layer Thickness: Minimum 0.51 mm (0.020 inches).
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-4
3. Total Thickness: 2 mm (0.080 inches).
C. Sheet Size: Provide maximum size sheet produced by manufacturer to minimize joints.
1. Minimum Width: 1200 mm (48 inches).
2.4 WELDED SEAM SHEET FLOORING
1. Wear Surface: Smooth.
2. Wear Layer Thickness: Minimum 1.0 mm (0.040 inches).
3. Total Thickness: 2 mm (0.080 inches).
B. Sheet Size: Provide maximum size sheet produced by manufacturer to minimize joints.
1. Minimum Width: 1200 mm (48 inches).
2.5 ACCESSORIES
A. Bonding Chemical: Flooring manufacturer's standard seam bonding chemical.
B. Welding Rod: Flooring manufacturer's standard, in color matching field color of sheet flooring.
C. Adhesives: Water resistant type recommended by flooring manufacturer to suit application.
D. Base Accessories:
1. Cove Fillet Strip: 19 mm (3/4 inch) radius fillet strip compatible with flooring material.
2. Cap Strip: Zero edge extruded flanged reducer strip compatible with flooring material approximately 25 mm (1 inch) exposed height with
13 mm (1/2 inch) flange.
E. Leveling Compound:
1. As recommended by flooring manufacturer.
F. Primer:
1. Type recommended by adhesive or flooring manufacturer.
G. Edge Strips:
1. Extruded aluminum, mill finish, mechanically cleaned.
2. 28 mm (1-l/8 inch) wide, 6 mm (1/4 inch) thick, bevel one edge to
3 mm (1/8 inch) thick.
3. Drill and counter sink edge strips for flat head screws. Space holes near ends and approximately 225 mm (9 inches) on center.
4. Fasteners: Stainless steel, type to suit application.
H. Sealant:
1. As specified in Section 07 92 00, JOINT SEALANTS.
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-5
2. Compatible with flooring.
I. Polish: Type recommended by flooring manufacturer to suit application and anticipated traffic.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing flooring to permit new installation.
1. Do not use solvents for removing adhesives.
2. Dispose of removed materials.
D. Ensure interior finish work such as drywall finishing, concrete, ceiling work, and painting work is complete and dry before installation.
1. Complete mechanical, electrical, and other work above ceiling line.
2. Ensure heating, ventilating, and air conditioning systems are installed and operating in order to maintain temperature and humidity requirements.
E. Correct substrate deficiencies.
1. Fill cracks, pits, and dents with leveling compound.
2. Grind, sand, or cut away protrusions. Grind high spots.
3. Level flooring substrate to 3 mm (1/8 inch) maximum variation.
F. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
1. Mechanically clean concrete floor substrate according to ASTM D4259.
2. Surface Profile: ICRI 310.2R CSP 3 to CSP 4.
G. Perform flooring manufacturer’s recommended bond, substrate moisture content, and pH tests.
H. Broom or vacuum clean substrates immediately before flooring installation.
I. Primer: Apply primer according to manufacturer’s instructions.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-6
3.3 INSTALLATION OF FLOORING
A. Flooring Layout:
1. Arrange pattern in one direction with pattern matched.
2. Extend flooring wall-to-wall, under cabinets, casework, laboratory and pharmacy furniture, and other equipment for seamless flooring installation.
3. Arrange sheets to minimize seams.
4. Locate seams in inconspicuous and low traffic areas, minimum 150 mm
(6 inches) away from parallel joints in flooring substrates.
B. Match edges of flooring for color shading and pattern at seams.
C. Install flooring flush with adjacent floor finishes.
D. Extend flooring into toe spaces, door reveals, closets, and similar openings.
E. Install flooring fully adhered to substrate.
1. Air pockets or loose edges are not acceptable.
2. Trim sheet materials tight to flooring penetrations; seal joints at pipe with waterproof sealant specified in Section 07 92 00, JOINT
SEALANTS.
F. Butt joints tight, without gaps and bulges.
G. Installation of Edge Strips:
1. Install edge strips at flooring terminations and transitions to other floor finishes.
2. Locate edge strips under center lines of doors unless otherwise indicated.
3. Set edge strips in adhesive and mechanically fasten to substrate.
3.4 INTEGRAL COVE BASE INSTALLATION
A. Set preformed fillet strip at floor intersection with walls and other vertical surfaces.
B. Extend flooring over fillet strip and 150 mm (6 inches) up wall surface.
C. Form straight or radius internal and external corners to suit
Application.
D. Adhere base to wall surface.
E. Terminate base exposed top edge with cap strip. Seal cap strip to wall with sealant.
F. Weld joints as specified for flooring.
Fargo VA Health Care System 09 65 16 Resilient Sheet Flooring-7
3.5 HEAT WELDING
A. Heat weld joints of flooring and base using welding rod.
B. Rout joint, insert welding rod into routed space, and fuse flooring and welding rods for seamless, watertight installation.
1. Fuse joints for seamless weld.
C. Finish joints flush, free from voids, and recessed or raised areas.
3.6 CHEMICAL WELDING
A. Chemically weld joints of flooring and base using bonding chemical.
1. Avoid excess bonding chemical and damage to flooring surfaces.
B. Apply bonding chemical to fuse flooring for seamless, watertight installation.
C. Finish joints flush, free from voids, and recessed or raised areas.
3.7 CLEANING
A. Remove excess adhesive before adhesive sets.
B. Clean and polish materials.
C. Vacuum floor thoroughly.
D. Perform initial maintenance according to flooring manufacturer’s instructions.
1. Delay washing flooring until adhesive is fully set and welded joints can contain wash water.
3.8 PROTECTION
A. Protect flooring from traffic and construction operations.
B. Keep traffic off sheet flooring for minimum 24 hours after installation.
C. Cover flooring with reinforced kraft paper, and plywood or hardboard.
D. Remove protective materials immediately before acceptance.
E. Repair damage.
F. Apply polish to vinyl flooring.
G. Buff flooring to uniform sheen.
- - E N D - -
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-1
SECTION 09 65 19
RESILIENT TILE FLOORING
1.1 DESCRIPTION:
A. This section specifies the installation of luxury vinyl tile, rubber tile, and accessories required for a complete installation.
1.2 RELATED WORK:
A. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.
B. Color, Pattern and Texture for Resilient Tile Flooring and Accessories:
Section 09 06 00, SCHEDULE FOR FINISHES.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.
3. Application, installation, and maintenance instructions.
C. Samples:
1. Tile: Each type, color, thickness and finish.
D. Shop Drawings:
1. Layout of patterns as shown on the construction documents.
2. Edge strip locations showing types and detail cross sections.
1.4 DELIVERY:
A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.
B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.
1.5 STORAGE:
A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-2
1.6 QUALITY ASSURANCE:
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
C. Furnish product type materials from the same production run.
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of
Construction”.
1.8 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine
D2240-05(R2010).........Test Method for Rubber Property—Durometer
Hardness
D4078-02(R2008).........Water Emulsion Floor Finish
E648-14c................Critical Radiant Flux of Floor Covering Systems
Using a Radiant Energy Source
E662-14.................Specific Optical Density of Smoke Generated by
Solid Materials
E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness
Numbers
F510/F510M-14...........Resistance to Abrasion of Resilient Floor
Coverings Using an Abrader with a Grit Feed
Method
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-3
F710-11.................Preparing Concrete Floors to Receive Resilient
Flooring
F925-13.................Test Method for Resistance to Chemicals of
Resilient Flooring
F1344-12(R2013).........Rubber Floor Tile
F1700-13a...............Solid Vinyl Floor Tile
F1869-11................Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride
F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes
F2195-13................Linoleum Floor Tile
C. Code of Federal Regulation (CFR):
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
D. International Standards and Training Alliance (INSTALL):
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS:
A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.
B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per
ASTM E648.
C. Smoke Density: Less than 450 per ASTM E662.
D. Slip Resistance – Not less than 0.5 when tested with ASTM D2047.
2.2 RUBBER TILE:
A. Tile Standard: ASTM F1344, Class I-A, homogeneous rubber tile.
B. Hardness: Manufacturer’s standard hardness, measured using Shore, Type
A durometer per ASTM D2240.
C. Wearing Surface: Molded pattern.
1. Molded-Pattern Figure: Raised discs.
D. Thickness: 3.2 mm (0.125 inch).
E. Size: 610 x 610 mm (24 x 24 inches).
2.5 LUXURY VINYL TILE:
A. ASTM F1700, Class III, Printed Film Vinyl Tile, Type B.
B. Thickness: 12 mil (1/8 inch).
C. Size: 39.3in x 5.91in.
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-4
2.6 ADHESIVES:
A. Provide water resistant type adhesive for flooring as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA
Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
2.7 PRIMER FOR CONCRETE SUBFLOORS:
A. Provide in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
2.8 LEVELING COMPOUND FOR CONCRETE FLOORS:
A. Provide cementitious products with latex or polyvinyl acetate resins in the mix in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
2.9 POLISH AND CLEANERS:
A. Cleaners: As recommended in writing by floor tile manufacturer.
B. Polish: ASTM D4078.
2.10 MOULDING:
A. Provide tapered mouldings of clear anodized aluminum and types as indicated on the construction documents for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 6 mm (1/4 inch). Provide bevel change in level between 6 and
13 mm (1/4 and 1/2 inch) with a slope no greater than 1:2.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS:
A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.
3.2 SUBFLOOR TESTING AND PREPARATION:
A. Prepare and test surfaces to receive resilient tile and adhesive.
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-5
1. Remove existing resilient floor and existing adhesive.
B. Prepare concrete substrates in accordance with ASTM F710.
3.3 INSTALLATION:
A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.
B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.
C. Tile Layout:
1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.
2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.
3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary.
D. Application:
1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
4. Roll tile floor with a minimum 45 kg (100 pound) roller.
E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.
F. Installation of Edge Strips:
1. Locate edge strips under center line of doors unless otherwise shown on construction documents.
2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.
3. Where tile edge is exposed, butt edge strip to touch along tile edge.
Fargo VA Health Care System 09 65 19 Resilient Tile Flooring-6
4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.
5. Caulk joint between flooring and door frames.
3.4 CLEANING AND PROTECTION:
A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.
B. Keep traffic off resilient material for a minimum 72 hours after installation.
C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.
D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.
E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.
3.5 LOCATION:
A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, and other equipment occur.
B. Extend tile flooring for room into adjacent closets and alcoves.
Fargo VA Health Care System 09 68 00 Carpeting-1
SECTION 09 68 00
CARPETING
1.1 DESCRIPTION
A. Section specifies carpet, molding, adhesives, and other items required for complete installation.
1.2 RELATED WORK
A. Section 09 06 00, SCHEDULE FOR FINISHES: Manufacturer, Color and Style of Carpet and Edge Strip.
B. Section 09 65 13, RESILIENT BASE AND ACCESSORIES: Resilient Wall Base.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: A company specializing in carpet installation with a minimum three (3) years’ experience and employing experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program, and a valid OSHA 10 certification.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Product Data:
1. Manufacturer’s catalog data and printed documentation stating physical characteristics, durability, resistance to fading and flame resistance characteristics for each type of carpet material and installation accessory.
2. Manufacturer’s printed installation instructions for the carpet, including preparation of installation substrate, seaming techniques and recommended adhesives and tapes.
C. Samples:
1. Carpet: "Production Quality" samples 305 x 305 mm (12 x 12 inches) of carpets, showing quality, pattern and color specified in
Section 09 06 00, SCHEDULE FOR FINISHES.
Fargo VA Health Care System 09 68 00 Carpeting-2
D. Maintenance Data: Carpet manufacturer’s maintenance instructions describing recommended type of cleaning equipment and material, spotting and cleaning methods and cleaning cycles.
E. Installer’s Qualifications.
F. Manufacturer’s warranty.
1.5 DELIVERY AND STORAGE
A. Deliver carpet in manufacturer’s original wrappings and packages clearly labeled with manufacturer’s brand name, size, dye lot number and related information. Transport carpet to job site in a manner that prevents damage and distortion that might render it unusable. When bending or folding is unavoidable for delivery purposes, unfold carpet and lay flat immediately.
B. Deliver adhesives in containers clearly labeled with manufacturer’s brand name, number, installation instructions, safety instructions and flash points.
C. Store in a clean, dry, well-ventilated area, protected from damage and soiling. Before installation, acclimate carpet to the atmospheric conditions of the areas in which it will be installed for 2 days prior to installation
1.6 ENVIRONMENTAL REQUIREMENTS
A. Maintain areas in which carpeting is to be installed at a temperature between 18 - 35 degrees C (65 - 95 degrees F) with a maximum relative humidity of 65 percent for two (2) days before installation, during installation and for three (3) days after installation.
B. Minimum Substrate Surface Temperature: 18 degrees C (65 degrees F) at time of installation.
C. Three (3) days after installation, maintain minimum temperature of 10 degrees C (50 degrees F) for the duration of the contract.
1.7 WARRANTY
A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of
Construction".
B. Manufacturer Warranty: Manufacturer shall warranty their carpet for a minimum of ten (10) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.
1.8 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
Fargo VA Health Care System 09 68 00 Carpeting-3
B. American National Standards Institute (ANSI):
ANSI/NSF 140-10.........Sustainable Carpet Assessment Standard
C. American Association of Textile Chemists and Colorists (AATCC):
16-04...................Colorfastness to Light
134-11..................Electric Static Propensity of Carpets
165-08..................Colorfastness to Crocking: Textile Floor
Coverings-AATCC Crockmeter Method
174-11..................Antimicrobial Activity Assessment of New
Carpets
D. ASTM International (ASTM):
D1335-17e1..............Tuft Bind of Pile Yarn Floor Coverings
D3278-20................Flash Point of Liquids by Small Scale Closed-
Cup Apparatus
D5116-17................Determinations of Organic Emissions from Indoor
Materials/Products
D5252-20................Operation of the Hexapod Tumble Drum Tester
D5417-16................Operation of the Vettermann Drum Tester
E648-19ae1..............Critical Radiant Flux of Floor-Covering Systems
Using a Radiant Heat Energy Source
E. Code of Federal Regulation (CFR):
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
F. The Carpet and Rug Institute (CRI):
CIS.....................Carpet Installation Standard
G. International Standards and Training Alliance (INSTALL)
H. International Organization for Standardization (ISO):
2551-81.................Machine-Made Textile Floor Coverings
I. U.S. Consumer Product and Safety Commission (CPSC):
16 CFR 1630.............Surface Flammability of Carpets and Rugs
PART 2 - PRODUCTS
2.1 CARPET
A. Physical Characteristics:
Carpet free of visual blemishes, streaks, poorly dyed areas, fuzzing of pile yarn, spots or stains and other physical and manufacturing defects.
1.CPT-1
a. Construction: Level Patterned Loop
b. Face Fiber: Colorstrand SD Nylon
Fargo VA Health Care System 09 68 00 Carpeting-4
c. Dye Method: Solution/Yarn
d. Gauge: 1/12
e. Stitches Per Inch: 9.3 (36.61 per 10cm)
f. Pile Thickness: .100” (2.54mm)
g. Tufted Yarn Weight: 24 ounces per square yard
h. Density: 5,040; Weight Density: 70,565
i. Primary Backing: EcoFlex Matrix
j. Alternate backing: EcoFlex AIR
k. Size: 24”x24”
l. Installation Method: Monolithic
m. Recycled Content: Contains Pre-Consumer Recycled Content
n. Manufacture Location: USA
o. NSF/ANSI-140 Certification: Gold
p. CRI Green Label Plus ID: GLP1171
q. Warranties: Lifetime Limited Carpet Tile, Lifetime Limited
Colorfastness to Light, 10 Year Limited Colorfastness to
Atmospheric Contaminants, 10 Year Limited Stain, Lifetime
Static
r. Radiant Panel (ASTM E-648): Class I Direct Glue
s. Smoke Chamber (ASTM E-662): Less than 450 (flaming Mode)
t. Methenamine Pill Test ASTM D-2859: Passes
u. Dimensional Stability AACHEN Test: Passes
v. Electrostatic Propensity (AATCC 134): Less than 3.5 KV
2.2 ADHESIVE AND CONCRETE PRIMER
A. Provide water resistant, mildew resistant, nonflammable, and nonstaining adhesives and concrete primers for carpet installation.
Provide release adhesive for modular tile carpet as recommended by the carpet manufacturer. Provide adhesives flashpoint of minimum
60 degrees C (140 degrees F) in accordance with ASTM D3278.
2.3 SEAMING TAPE
A. Provide tape for seams as recommended by the carpet manufacturer for the type of seam used in installation.
2.4 EDGE STRIPS (MOLDING)
A. Metal:
1. Utilize metal in corridors and where subject to cart traffic.
2. Hammered surface aluminum, pinless, clamp down type designed for the carpet being installed.
Fargo VA Health Care System 09 68 00 Carpeting-5
3. Floor flange not less than 38 mm (1-1/2 inches) wide, face not less than 16 mm (5/8 inch) wide.
4. Finish: Clear anodic coating unless specified otherwise in
Section 09 06 00, SCHEDULE FOR FINISHES.
B. Vinyl Edge Strip:
1. For use in low traffic areas.