Addendum 1 Fire Alarm and Sprinkler Drawings_01.pdf
PDF 895 KB Posted
- Solicitation number
- 36C77622B0063
About this file
This solicitation is for a construction project to expand Building 1 for primary care services at the Fargo VA Medical Center in North Dakota. Key details include expanding the building with a two-story addition providing first floor whole health clinic space and basement mechanical space and offices for emergency medical services. The project also reroutes part of the road between the medical center and flood wall to relocate the flood wall basin and road further away from the addition to comply with security and resilience standards. Foundation work will include installing helical piers to suitable depths. Fire protection and alarm drawings are provided specifying sprinkler and standpipe systems tied into the existing infrastructure with new zones and components to serve the addition. The solicitation is issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2-STORY
BUILDING
ADDITION
(8,400 sf per floor)
# BUILDING NUMBERS
LEGEND
FLOW HYDRANT
GAUGE HYDRANT
EXISTING UNDERGROUND
LEAD-IN
EXISTING 4" FIRE
PROTECTION
VALVE ASSEMBLY
NEW HYDRANT
LOCATION (SEE CIVIL
PLANS)
EXISTING UNDERGROUND
FIRE MAIN
NEW 6" UNDERGROUND
FIRE MAIN
NEW VALVES
EXISTING UNDERGROUND
FIRE MAIN TO BE REMOVED
(SEE CIVIL PLANS)
POINT WHERE OUTSIDE HOSE
ALLOWANCES SHALL BE TAKEN
EXISITNG FIRE DEPARTMENT
CONNECTION AND OUTSIDE ALARM
WATER SUPPLY EFFECTIVE
POINT FOR CALCULATIONS
1. FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK INCLUDES INSTALLATION OF A
STANDPIPE SYSTEM TIED INTO THE EXISTING 4" VALVE ASSEMBLY AND WET SPRINKLER
PROTECTION AT BASEMENT LEVEL AND FIRST LEVEL OF THE NEW ADDITION. LIMITED
REWORK WITHIN THE EXISTING BUILDING IS REQUIRED.
2. NEW ADDITION SHALL HAVE ENTIRELY NEW SPRINKLER ZONE SUPPLIED WITHIN NEW
STAIRWELL AS SHOWN ON DRAWINGS. THIS IS TO MAINTAIN CORRELATION OF NEW
SPRINKLER ZONES TO THE NEW SMOKE ZONE OF THE ADDITION.
3. ALL COMPONENTS OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH VA
DESIGN GUIDELINES, NFPA 13 (2019), NFPA 14 (2019) AND NFPA 25 (2020) EDITION. REFER
TO SPECIFICATION SECTIONS 21 08 00 & 21 13 13 FOR ADDITIONAL FIRE SPRINKLER
SYSTEM INFORMATION.
4. ALL PATIENT CARE AREAS ASSUME LIGHT HAZARD PROTECTION IN ACCORDANCE WITH
NFPA 13 (2019). PARKING, MECHANICAL/ELECTRICAL ROOMS ORDINARY HAZARD GROUP
1 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019). STORAGE AREAS, LAUNDRY,
ORDINARY HAZARD GROUP 2 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019).
5. EXIT STAIRWELL TO BE PROVIDED WITH PLUGGED/CAPPED 2 1/2" OUTLETS FOR
POTENTIAL FUTURE STANDPIPE SYSTEM. ZONE CONTROL VALVES WILL BE PROVIDED
AT EACH LEVEL.
6. CONFIRM 3" ZONE CONTROL/MAINS AND 1 1/2" BRANCHLINES FOR SPRINKLER SYSTEM
PIPE SIZING VIA HYDRAULIC CALCULATIONS.
7. PROVIDE ALL SYSTEM COMPONENTS NECESSARY FOR A COMPLETE INSTALLATION.
SYSTEM COMPONENTS SHALL INCLUDE BUT ARE NOT LIMITED TO DISTRIBUTION PIPING,
SPRINKLER PIPING, SPRINKLERS, PIPE SUPPORTS, ALARMS, DRAINS, TEST
CONNECTIONS, CONTROL VALVES AND CHECK VALVES.
8. SEMI RECESSED SPRINKLERS REQUIRED IN AREAS WITH FINISHED CEILINGS.
CONCEALED SPRINKLERS ARE NOT ALLOWED IN LIGHT HAZARD OCCUPANCIES PER VA
GUIDELINES. UPRIGHTS IN EXPOSED AREAS TO BE BRASS FINISH.
9. TAMPER SWITCHES AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED BY THE
FIRE PROTECTION CONTRACTOR AND WIRED PER SPECIFICATION - DIVISION 28.
10. TESTING OF SPRINKLER PIPING SHALL BE IN ACCORDANCE WITH NFPA 13 - 200 PSI FOR
2 HRS
11. SHOP DRAWINGS SHALL BE APPROVED BY THE OWNER'S DESIGNATED
REPRESENTATIVE AND THE AHJ PRIOR TO FABRICATION
12. HANG ALL PIPING PER NFPA 13 - CHAPTER 9. CONTRACTOR SHALL INDICATE ALL PIPE
SUPPORTS.
13. STEEL PIPING IS REQUIRED IN ALL AREAS .
14. UNLESS NOTED OTHERWISE ALL AREAS INCLUDE WET SPRINKLER SYSTEMS.
TEMPERATURES MAINTAINED GREATER THAN OR EQUAL TO 40 DEGREES FAHRENHEIT
AT ALL TIMES.
15. ALL PENETRATIONS AT FIRE BARRIERS OR OTHER RATED ASSEMBLIES ARE REQUIRED
TO BE SEALED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE OR
OTHER APPROVED MEANS.
16. COORDINATION IS REQUIRED WITH ALL TRADES. PROVIDE SPRINKLER PROTECTION
ABOVE AND BELOW ALL OBSTRUCTIONS.
16. COORDINATE SHUT DOWNS AND TIE IN WORK WITH AHJ AND GENERAL CONTRACTOR
AND VA FP ENGINEERING.
17. FLOW TEST PROVIDED FROM SUMMIT FIRE CONSULTING (SFC)
A. STATIC: 48 PSI
B. RESIDUAL: 39 PSI
C. FLOW: 809 GPM
D. DATE: 9/1/2021
E. EFFECTIVE POINT: WHERE THE NEW 6" FIRE MAIN TIES INTO THE EXISTING LOOP
MAIN SOUTH OF THE BUILDING.
F. HOSE ALLOWANCES SHALL BE TAKEN AT THE POINT OF CONNECTION TO THE
EXISTING LEAD-IN MAIN TO THE EXISTING OUTSIDE MAIN JUST WEST OF THE
EXISTING RISER.
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
CALIBRE
9090 S RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH COLORADO 80129
PHONE (303) 730-0434
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
Addendum #1 1/4/23
/3
/2
:5
:1
P M
CONSTRUCTION DOCUMENTS
11/16/2021
FIRE PROTECTION COVER SHEET
FP1.00
EXPAND BLDG. 1 FOR
PRIMARY CARE
CJNB
2101 ELM STREET
FARGO, ND 58102FARGO VAHCS
437-315
126 128
1/32" = 1'-0"
SITE PLAN
GENERAL NOTES:
EXISTING UNDERGROUND
FIRE MAIN TO BE REMOVED
(SEE CIVIL PLANS - WORK
TO BE PERFORMED BY
OTHERS)
ADDENDUM #11 01/04/23
Revision Number Associated with Clouded Area#
| FP_Fargo Primary Care_R20 - Sheet - FA1-00 - FIRE ALARM COVER SHEET |
| FP_Fargo Primary Care_R20 - Sheet - FA1-01 - FIRE ALARM - BASEMENT LEVEL |
| FP_Fargo Primary Care_R20 - Sheet - FA1-02 - FIRE ALARM - FIRST LEVEL |
| FP_Fargo Primary Care_R20 - Sheet - FP1-00 - FIRE PROTECTION COVER SHEET |
| FP_Fargo Primary Care_R20 - Sheet - FP1-01 - FIRE PROTECTION - BASEMENT LEVEL |
| FP_Fargo Primary Care_R20 - Sheet - FP1-02 - FIRE PROTECTION - FIRST LEVEL |
File details come from the government source that posted it. Updated .